3. Breach of Contract
•Bowman
•Disposal Would Not Leak if Properly
Installed
• Engineer
• Hydrostatic Testing
• Only person that tested the disposal
4. Breach of Contract
•Bowman
•Disposal Would Not Leak if Properly
Installed
• Tested for one hour
• 20X the amount of normal pressure
• Area where collar located capped
5. Breach of Contract
•All Installations Guaranteed for a
Year
• Does not state that the garbage
disposal must be new
6. Breach of Contract
•All Installations Guaranteed for a
Year
• Does not say the defect must be
reported to Norfolk within one year
• Installation complete in October 2014
• Garbage disposal fitted on Friday,
September 15, 2012
• Disposal failed before October 2013
7. Breach of Contract
•All Installations Guaranteed for a
Year
• Does not state that the garbage
disposal re-install is not covered
9. Breach of Contract
•Workmanlike installation
• Below standards
• Required to properly tighten the Disposal
• Did not properly tighten the Disposal
• Extensive Damages
11. Breach of Contract
•All Installations Guaranteed for a
Year
• Disposal part of the installation
• Installation complete in October 2014
• Garbage disposal fitted on Friday,
September 15, 2012
• Disposal failed before October 2013
17. Hard Facts
•Disposal fine to Stark in 2012
•Stark cannot recall telling Stern
to use New Disposal
•Because:
•No leaks in 2005, 06, 07, 08,
09, 10, or 11 with the Disposal
18. Hard Facts
•No mechanical defects
•No evidence that someone hit
it
•No evidence that
•Leaks into basement occurred
right below kitchen sink area