SlideShare a Scribd company logo
1 of 5
Download to read offline
Curriculum Vitae
Name            :  Hesham ALdeberky                                         Age            : 52 
Nationality  :  EGYPT                                                                Religion     : Muslim     
Profession    : Mechanical   engineer                                     Status        : Married  
Education     : B. Sc Mechanical engineering 92                    
 Mobil            :+966554392879                  Email  : deberky207@gmail.com  
**************************************************************** 
  Qualification  
1‐ Execution supervision for the Elect mechanical installation of industrial and 
commercial and residential facilities .   
2‐ Air condition system installation  
3‐ Project management .  
Fields of experiences  
1‐ Period from (june  2009 – now ) 
    Employer: SAUDI BINLADIN GROUP  
Project 1: King Abdulla Financial District (KAFD‐ZONE 3) 
     A – E/M Parcel manager ( tower A residential 26 floor & tower B office 14                          
floor   with 5 basement total area 60700 m2 
    B – Logistic  manager zone 3 ( 10 parcel & dewatering and Utility )   
    C ‐  Mobilization manager  for All  KFAD & Dewatering for 30 parcels .  
Duties  
1. Doing random site check up for the man‐power, productivity, and work 
progress against the construction schedule. 
2. Follow up the shop drawings and materials submittals approvals’ status 
with the Parcels’ Manager. 
3. Prepare the M.S.R.s’ for the site materials and equipment, beside the 
follow up with the procurement people. 
4. Study the site issues and problems and then submit proposed solutions to 
the consultant for approval. 
5. Follow up the execution of the As‐Built drawings by instructing the site 
people to keep feeding the technical staff with all the changes that shall 
exist on the site work execution against the shop drawings. Also to keep 
following the Technical staff to produce these drawings. 
6. Doing all the arrangements and set up the procedures for the Testing and 
Commissioning activities for getting the Consultant approval and then apply 
on the site. 
7. Monitoring the safety applications on site and staff commitments to them. 
8.  Carry out all the preparations and procedures for the Project’s Handing 
Over process. 
 
2‐ Period from (June2007 – June 2009) 
    Employer: SAUDI BINLADIN GROUP  
2‐project :Dar AL‐EFTA  (Taif)   
This project consists of demolition of existing buildings and construction of
New Main Building (Total Built-Up Area of 11,460 m2), Office Building,
Annexes and Parking Sheds.
Position : Mechanical manager
Duties  
9. Responsible for installation all systems (HVAC  ,drainage ,water supply and 
fire fighting ) 
10.Full coordination with municipality of Taif  for external utilities such as 
(water & drainage city main lines) 
11.Responsible for installation of all types of pumps such as (domestic water 
pump, sump pump , well pump & fire pump ) 
12.Responsible for installation all types of fans such as (supply ,exhaust and 
pressurization fans)  
13. Coordinate with the consultant the arrangement for inspection and test 
the work 
14.Monitor the manpower distribution and control 
15.Check the production rate with foreman against the construction schedule 
16.Coordinate with civil defense about comments to incorporate it in shop 
drawings and site 
17. Responsible for materials take off and deliver material to the site 
18.Daily/Weekly & Monthly Reports including Work Orders backlog, 
accomplished Works 
19.Coordinate with sub‐contractor for FM‐200 system & electrical  department  
,regarding to BMS & FIRE ALARM during installation and testing & 
commissioning  
20. Review the sub contractor invoices based on progress on site  
21.Coordinate with the commissioning team with respect to the logistic 
support during commissioning phases 
22.Carrying out the AS‐BUILT jobs on site 
 
3‐ Period from ( JUNE 2006 – MAY 2007 )   
Company : ALEtqan  consultant  
** Muzdalifa camp at  Makah   
Head section mechanical work ( total area ) 
 
4‐ Period from ( February 1993 – JUNE 2006 ) 
Company : Mechanical Engineer Group co.  MEGCO – Egypt  
A – Project Manager ( March 1999‐ JUNE 2006 )  
** Project ‐ IFCCO & ICC ( Fabrication of tanks # 8  D= 12 m , H = 10 m with 
all piping between tanks to  refinery building  
Fabrication and installation of steel structure 
** project – UGDC – Petroleum ( Air condition – AHU & Duct work and 
insulation for control building and substation building with all wiring control 
and power system and test & control  
** project – Assuit Air port  ( air condition center for travel hall DX Unit 
with duct & test and control. 
** project – General Petroleum co.  ( HVAC System for control building & 
substation , all equipment , duct with control system & election and  test & 
maintains  
** project – Savola – sime (4) 10 of Ramadan ( All electromechanical 
installation for Refinery building with piping work BS , SS , GI and insulation  
Fabrication and installation with insulation of 4 tanks  S.S  
Fabrication and installation  8 Tanks  S.S 63 m3 with pump station 
between tanks  
           ** project ‐  EGY , Gas ( Baltem ) ( ONE B.S doom top tank 1400 m3 fire     
           Tank  , fabrication & installation with painting  
          
  ** project – Savola – sime ( 3) 10 of Ramadan & Halwany Ekhwan  
( Extension of refinery building with all equipment erection , steel structure all 
type of piping , fabrication of 4 tanks SS 11 m3 & 4 Tanks 5 m3 and 4tanks SS  
20m3 each.  
** Project ‐  KORDESA  ( All E/M  Work installation for HVAC System by Humidity , 
3 chiller and 4 A/C Room with all equipment , duct work , all piping type , 
compressed air , plat form and lighting & control system  
B‐ Site Manager (January 1996 – February 1999 ) 
** project – Savola – sime  ( 2 )  
** project ‐  savola – Egypt  ( fabrication of 14 tanks deferent  size from 100 m3 
to 1400 m3 and doable jacket S.S ) 
** Project – ARASEMCO  ( Fabrication of Saylo 40 m3  and plat form support  
C – Site engineer  ( February 1993 – December 1995 )  
** project – Q TEC 10 Of Ramadan  ( fabrication and erection the gamalon steel 
structure with cladding and door  
** project ‐  Savola – Egypt  ( 1 ) 10 of Ramadan ( tin can factory & oil and ghee 
filling lines , water pumping station and pipe rack  
** project ‐  KORDESA  ( DUCT Work HVAC system ,  4 chiller and pipes line and 6 
A/C  room concrete 
** project – ATLAS COPCO  (reaction of   High and low purser compressor air   ) 
** project ‐  Roto Back ( installation & insulation  of pipe line for hot oil from 
boiler oil , fabricated plat farm  )  
 

More Related Content

Viewers also liked

Quimioterapia de infecciones por protozoos
Quimioterapia de infecciones por protozoosQuimioterapia de infecciones por protozoos
Quimioterapia de infecciones por protozoosSaúl Hernandez
 
You slide - Readygrad
You slide - Readygrad You slide - Readygrad
You slide - Readygrad Rohan Holland
 
¿Existe actualmente discriminación hacia los inmigrantes en las aulas?
¿Existe actualmente discriminación hacia los inmigrantes en las aulas?¿Existe actualmente discriminación hacia los inmigrantes en las aulas?
¿Existe actualmente discriminación hacia los inmigrantes en las aulas?Alicia García
 
SAARC ppt on international trade
SAARC ppt on international tradeSAARC ppt on international trade
SAARC ppt on international tradeNeha Kumari
 
Evaluation of magazine - Lucas Sneddon
Evaluation of magazine - Lucas Sneddon Evaluation of magazine - Lucas Sneddon
Evaluation of magazine - Lucas Sneddon whslaura
 
Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"
Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"
Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"FRAPS
 
Cronograma eduardo emilio marla eliana y lucila (2)
Cronograma eduardo emilio marla eliana y lucila (2)Cronograma eduardo emilio marla eliana y lucila (2)
Cronograma eduardo emilio marla eliana y lucila (2)emartineze
 

Viewers also liked (11)

Quimioterapia de infecciones por protozoos
Quimioterapia de infecciones por protozoosQuimioterapia de infecciones por protozoos
Quimioterapia de infecciones por protozoos
 
Presentation1
Presentation1Presentation1
Presentation1
 
You slide - Readygrad
You slide - Readygrad You slide - Readygrad
You slide - Readygrad
 
FRC Learning
FRC LearningFRC Learning
FRC Learning
 
¿Existe actualmente discriminación hacia los inmigrantes en las aulas?
¿Existe actualmente discriminación hacia los inmigrantes en las aulas?¿Existe actualmente discriminación hacia los inmigrantes en las aulas?
¿Existe actualmente discriminación hacia los inmigrantes en las aulas?
 
Agile - be focused
Agile - be focusedAgile - be focused
Agile - be focused
 
Vinodkumar cv
Vinodkumar cvVinodkumar cv
Vinodkumar cv
 
SAARC ppt on international trade
SAARC ppt on international tradeSAARC ppt on international trade
SAARC ppt on international trade
 
Evaluation of magazine - Lucas Sneddon
Evaluation of magazine - Lucas Sneddon Evaluation of magazine - Lucas Sneddon
Evaluation of magazine - Lucas Sneddon
 
Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"
Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"
Совспорт. Футбол 2016 №08 "MYFOOTBALL.WS"
 
Cronograma eduardo emilio marla eliana y lucila (2)
Cronograma eduardo emilio marla eliana y lucila (2)Cronograma eduardo emilio marla eliana y lucila (2)
Cronograma eduardo emilio marla eliana y lucila (2)
 

Similar to CV Hesham aldeberky (20)

Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
CV-ARCHITECT-kariim
CV-ARCHITECT-kariimCV-ARCHITECT-kariim
CV-ARCHITECT-kariim
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
CV
CVCV
CV
 
george cv
george cvgeorge cv
george cv
 
Hussain Abd Alkarem Aweid At Last
Hussain Abd Alkarem Aweid At LastHussain Abd Alkarem Aweid At Last
Hussain Abd Alkarem Aweid At Last
 
(C.V) Electrical Engineer
(C.V) Electrical Engineer(C.V) Electrical Engineer
(C.V) Electrical Engineer
 
mahmoud-2.cv
mahmoud-2.cvmahmoud-2.cv
mahmoud-2.cv
 
ENG ESLAM
ENG ESLAMENG ESLAM
ENG ESLAM
 
CV ahmed12
CV ahmed12CV ahmed12
CV ahmed12
 
Curriculum Vitae najdat-5- 2016
Curriculum Vitae najdat-5- 2016Curriculum Vitae najdat-5- 2016
Curriculum Vitae najdat-5- 2016
 
Maintenance Supervisor.DOC
Maintenance Supervisor.DOCMaintenance Supervisor.DOC
Maintenance Supervisor.DOC
 
Ahmed Metwally GE
Ahmed Metwally GEAhmed Metwally GE
Ahmed Metwally GE
 
hassan aly
hassan aly hassan aly
hassan aly
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
khaled moundicv
khaled moundicvkhaled moundicv
khaled moundicv
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
C.v gaber a. elrazek
C.v   gaber a. elrazekC.v   gaber a. elrazek
C.v gaber a. elrazek
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
 

CV Hesham aldeberky