Accumulated sequence plot of success rate
- Each point in the figure corresponds to a
sequence of wells. The first, leftmost, point
corresponds to the first well, the second to the
first two wells, and so on to the last, rightmost,
point which shows the full sequence of 75
wells.
- For each point, the actual success rate up to
that point is plotted together with the expected,
P90 and P10 success rate predicted by the
pre-drill assessments of the probabilities of
success of the wells in the sequence up to that
point.
- Actual success rate is well under the
predicted for the full sequence, indicating
possible optimism bias
Sliding window plot of success rate
- Each point in the figure corresponds to a
sequence of 25 wells. The first, leftmost, point
corresponds to wells 1 to 25 in the sequence,
the second to wells 2 to 26. The last, rightmost,
point corresponds to wells 51 to 75.
- For each window, the actual success rate for
the wells in that windown is plotted together
with the expected, P90 and P10 success rate
predicted by the pre-drill assessments of the
probabilities of success of the wells in the
window.
- The constant sequence length in the sliding
window plot gives a clearer, less ambiguous
picture of the evolution of the fidelity of
predictions over time (later points
uncontaminated by early statistical
aberrations)
- Actual success rate is consistently under
predicted. Average predicted success rate is
high relative to global averages.
Probability plot for success rate
- The full sequence is divided into five groups
based on assessed pre-drill probability of
success: 0 to 20%, 20% to 40%, 40% to 60%,
60% to 80% and 80% to 100%
- Actual success rates are shown as columns
together with the expected, P90 and P10
success rates predicted by pre-drill
assessments of the prospects in the interval.
- The plot is designed to reveal polarization - the
tendency to overestimate the significance of
evidence and assess probabilities too high or
too low - and the converse baselining - a
tendency not to move probabilities far enough
on the basis of evidence.
- Polarization leads to over-prediction in the
lower intervals and under-prediction in the
upper intervals.
- Baselining leads to under-prediction in the
lower intervals and over-prediction in the upper
intervals.
- Actuals are over-predicted in all probability
ranges. Together with the absence of any
probability assessment between 0% and 20%,
this confirms a consistent optimism
Inferred probability bias parameters
- Stochastic ApS has developed a methodology
that quantifies the amount by which
probabilities are systematically over- or under-
estimated (optimism, pessimism) and the
amount by which probabilities are moved away
from or towards a base-rate (polarization,
baselining).
- These biases are captured in two numbers, the
probability bias parameters, that can be used to
compare performance across regions and trap
types as well as with other companies and
industries.
- The analysis uses a Bayesian model to mimic
the effects of the different biases. The
parameters are then inferred from predictions
and outcomes using Bayesian inversion.
- The Bayesian analysis returns a probability
distribution on the parameters revealing not
only the most likely combination of biases, but
also the uncertainty that necessarily arises
from short sequences.
- Pangloss’ bias footprint reveals a
pronounced, consistent optimism, though
little in the way of polarization.
Visualization of probability biases
- Using the probability bias parameters
presented in the previous slide, it is possible to
reconstruct the relationship of the probabilities
as given to the probabilities as they ought to
have been.
- The optimism can clearly be seen with
probabilities being pushed up across the full
range of ”correct” values (red).
Accumulated sequence plot of discovery resources
- Each point in the figure corresponds to a
sequence of discoveries. The first, leftmost,
point corresponds to the first discovery, the
second to the first two discoveries, and so on
to the last, rightmost, point which shows the
full sequence of 28 discoveries.
- For each point, the actual cumulative
discovered volume up to that point is plotted
together with the expected, P90 and P10
cumulative volume predicted by the pre-drill
assessments of the volume distributions of the
wells in the sequence up to that point.
- Notwithstanding, an early run of relative
success, the rate of resource of addition is
clearly over-predicted
Sliding window plot of discovery resources
- Each point in the figure corresponds to a
sequence of 10 discoveries. The first, leftmost,
point corresponds to wells 1 to 10 in the
sequence, the second to wells 2 to 11. The last,
rightmost, point corresponds to wells 11 to 28.
- For each window, the actual average volume
per discovery in that windown is plotted
together with the expected, P90 and P10
volume per discovery predicted by the pre-drill
assessments of the volume distributions of the
wells in the window.
- The constant sequence length in the sliding
window plot gives a clearer, less ambiguous
picture of the evolution of the fidelity of
predictions over time (later points
uncontaminated by early statistical
aberrations)
- The pattern from the cumulative sequence
plot is confirmed with an early run of resource
additions in line with predictions, followed by
a long sequence of over-prediction.
Percentile plot
- Discoveries are split into ranges according to
the distribution percentile corresponding to the
discovered volume
- The proportion of the total number of
discoveries that fall into each group is plotted
in the percentile plot.
- The distribution of percentiles is uniform so we
should expect to see roughly 20% of
discoveries falling in each percentile interval
- However, there will be a considerable amount
of statistical variance around this 20% value, as
shown the uncertainty range, which is a
function of the number of discoveries.
- The plot is designed to reveal over-confidence -
a tendency to predict ranges that are too small
- and vagueness - a tendency to predict
unecessarily large uncertainty ranges.
- Over-confidence leads to a higher proportion of
discoveries landing in the lowest and highest
percentile intervals.
- Vagueness leads to a higher proportion of
discoveries landing in the middle percentile
intervals.
- Actuals show a systematic tendency to come
in low, skewing the proportions to the lower
percentile ranges. Consistent with optimism
in the assessment of resource parameters.
Resource uncertainty bias parameters
- Stochastic ApS has developed a methodology
that quantifies the amount by which probability
distributions are systematically over- or
under-estimated (optimism, pessimism) and
the amount by which ranges are over- or
under-estimated (over-confidence, vagueness).
- These biases are captured in two numbers, the
volume bias parameters, that can be used to
compare performance across regions and trap
types as well as with other companies and
industries.
- The analysis uses a Bayesian model to mimic
the effects of the different biases. The
parameters are then inferred from predictions
and outcomes using Bayesian inversion.
- The Bayesian analysis returns a probability
distribution on the parameters revealing not
only the most likely combination of biases, but
also the uncertainty that necessarily arises
from short sequences.
- Pangloss’ volume bias footprint also reveals a
pronounced tendency to over-optimism,
although ranges are reasonable predicted.
Empirical distribution plot
- An alternative way to illustrate the deviation
from uniformity of the prediction of percentiles
is by plotting the actual attained percentiles in
an ordered list from least to greatest.
- Theory predicts that - as always, within a
certain range of uncertainty - these percentiles
should fall on a straight line according to their
uniform distribution.
- The empirical distribution of percentiles can
also be predicted based on the resource bias
parameters presented in the previous slide.
- The plot reveals both optimism and pessimism,
as well as over-confidence and vagueness.
- Optimism leads to percentiles that are
consistently under the no-bias curve.
Pessimism, conversely, leads to an upward lift
on the empirical curve
- Over-confidence leads to a steepening of the
curve as prospects come in with unexpectedly
low and high percentiles.
- Conversely vagueness leads to a flattening of
the curve, as everything comes in around the
middle of the wide ranges
- Both the empirical distribution and the
predicted distribution based on the bias
parameters show a tendency to overestimate
the central parameters of the distribution.

More Related Content

More from Graeme Keith

Quick and dirty first principles modelling
Quick and dirty first principles modellingQuick and dirty first principles modelling
Quick and dirty first principles modellingGraeme Keith
 
Oil and Gas exploration services - Stochastic ApS
Oil and Gas exploration services - Stochastic ApSOil and Gas exploration services - Stochastic ApS
Oil and Gas exploration services - Stochastic ApSGraeme Keith
 
Quantitative strategic risk management
Quantitative strategic risk managementQuantitative strategic risk management
Quantitative strategic risk managementGraeme Keith
 
Decision decision decision
Decision decision decisionDecision decision decision
Decision decision decisionGraeme Keith
 
Bayesian updating using saam data
Bayesian updating using saam dataBayesian updating using saam data
Bayesian updating using saam dataGraeme Keith
 
The fundamental unity of strategy and risk
The fundamental unity of strategy and riskThe fundamental unity of strategy and risk
The fundamental unity of strategy and riskGraeme Keith
 

More from Graeme Keith (6)

Quick and dirty first principles modelling
Quick and dirty first principles modellingQuick and dirty first principles modelling
Quick and dirty first principles modelling
 
Oil and Gas exploration services - Stochastic ApS
Oil and Gas exploration services - Stochastic ApSOil and Gas exploration services - Stochastic ApS
Oil and Gas exploration services - Stochastic ApS
 
Quantitative strategic risk management
Quantitative strategic risk managementQuantitative strategic risk management
Quantitative strategic risk management
 
Decision decision decision
Decision decision decisionDecision decision decision
Decision decision decision
 
Bayesian updating using saam data
Bayesian updating using saam dataBayesian updating using saam data
Bayesian updating using saam data
 
The fundamental unity of strategy and risk
The fundamental unity of strategy and riskThe fundamental unity of strategy and risk
The fundamental unity of strategy and risk
 

Recently uploaded

GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 

Recently uploaded (15)

Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 

Look back presentation Pangloss Oil & Gas

  • 1. Lookback analysis of exploration assessments covering the five year period from 1973 to 1977 Prepared for Pangloss Oil & Gas Ltd. by Graeme Keith, Stochastic ApS
  • 2. Accumulated sequence plot of success rate - Each point in the figure corresponds to a sequence of wells. The first, leftmost, point corresponds to the first well, the second to the first two wells, and so on to the last, rightmost, point which shows the full sequence of 75 wells. - For each point, the actual success rate up to that point is plotted together with the expected, P90 and P10 success rate predicted by the pre-drill assessments of the probabilities of success of the wells in the sequence up to that point. - Actual success rate is well under the predicted for the full sequence, indicating possible optimism bias
  • 3. Sliding window plot of success rate - Each point in the figure corresponds to a sequence of 25 wells. The first, leftmost, point corresponds to wells 1 to 25 in the sequence, the second to wells 2 to 26. The last, rightmost, point corresponds to wells 51 to 75. - For each window, the actual success rate for the wells in that windown is plotted together with the expected, P90 and P10 success rate predicted by the pre-drill assessments of the probabilities of success of the wells in the window. - The constant sequence length in the sliding window plot gives a clearer, less ambiguous picture of the evolution of the fidelity of predictions over time (later points uncontaminated by early statistical aberrations) - Actual success rate is consistently under predicted. Average predicted success rate is high relative to global averages.
  • 4. Probability plot for success rate - The full sequence is divided into five groups based on assessed pre-drill probability of success: 0 to 20%, 20% to 40%, 40% to 60%, 60% to 80% and 80% to 100% - Actual success rates are shown as columns together with the expected, P90 and P10 success rates predicted by pre-drill assessments of the prospects in the interval. - The plot is designed to reveal polarization - the tendency to overestimate the significance of evidence and assess probabilities too high or too low - and the converse baselining - a tendency not to move probabilities far enough on the basis of evidence. - Polarization leads to over-prediction in the lower intervals and under-prediction in the upper intervals. - Baselining leads to under-prediction in the lower intervals and over-prediction in the upper intervals. - Actuals are over-predicted in all probability ranges. Together with the absence of any probability assessment between 0% and 20%, this confirms a consistent optimism
  • 5. Inferred probability bias parameters - Stochastic ApS has developed a methodology that quantifies the amount by which probabilities are systematically over- or under- estimated (optimism, pessimism) and the amount by which probabilities are moved away from or towards a base-rate (polarization, baselining). - These biases are captured in two numbers, the probability bias parameters, that can be used to compare performance across regions and trap types as well as with other companies and industries. - The analysis uses a Bayesian model to mimic the effects of the different biases. The parameters are then inferred from predictions and outcomes using Bayesian inversion. - The Bayesian analysis returns a probability distribution on the parameters revealing not only the most likely combination of biases, but also the uncertainty that necessarily arises from short sequences. - Pangloss’ bias footprint reveals a pronounced, consistent optimism, though little in the way of polarization.
  • 6. Visualization of probability biases - Using the probability bias parameters presented in the previous slide, it is possible to reconstruct the relationship of the probabilities as given to the probabilities as they ought to have been. - The optimism can clearly be seen with probabilities being pushed up across the full range of ”correct” values (red).
  • 7. Accumulated sequence plot of discovery resources - Each point in the figure corresponds to a sequence of discoveries. The first, leftmost, point corresponds to the first discovery, the second to the first two discoveries, and so on to the last, rightmost, point which shows the full sequence of 28 discoveries. - For each point, the actual cumulative discovered volume up to that point is plotted together with the expected, P90 and P10 cumulative volume predicted by the pre-drill assessments of the volume distributions of the wells in the sequence up to that point. - Notwithstanding, an early run of relative success, the rate of resource of addition is clearly over-predicted
  • 8. Sliding window plot of discovery resources - Each point in the figure corresponds to a sequence of 10 discoveries. The first, leftmost, point corresponds to wells 1 to 10 in the sequence, the second to wells 2 to 11. The last, rightmost, point corresponds to wells 11 to 28. - For each window, the actual average volume per discovery in that windown is plotted together with the expected, P90 and P10 volume per discovery predicted by the pre-drill assessments of the volume distributions of the wells in the window. - The constant sequence length in the sliding window plot gives a clearer, less ambiguous picture of the evolution of the fidelity of predictions over time (later points uncontaminated by early statistical aberrations) - The pattern from the cumulative sequence plot is confirmed with an early run of resource additions in line with predictions, followed by a long sequence of over-prediction.
  • 9. Percentile plot - Discoveries are split into ranges according to the distribution percentile corresponding to the discovered volume - The proportion of the total number of discoveries that fall into each group is plotted in the percentile plot. - The distribution of percentiles is uniform so we should expect to see roughly 20% of discoveries falling in each percentile interval - However, there will be a considerable amount of statistical variance around this 20% value, as shown the uncertainty range, which is a function of the number of discoveries. - The plot is designed to reveal over-confidence - a tendency to predict ranges that are too small - and vagueness - a tendency to predict unecessarily large uncertainty ranges. - Over-confidence leads to a higher proportion of discoveries landing in the lowest and highest percentile intervals. - Vagueness leads to a higher proportion of discoveries landing in the middle percentile intervals. - Actuals show a systematic tendency to come in low, skewing the proportions to the lower percentile ranges. Consistent with optimism in the assessment of resource parameters.
  • 10. Resource uncertainty bias parameters - Stochastic ApS has developed a methodology that quantifies the amount by which probability distributions are systematically over- or under-estimated (optimism, pessimism) and the amount by which ranges are over- or under-estimated (over-confidence, vagueness). - These biases are captured in two numbers, the volume bias parameters, that can be used to compare performance across regions and trap types as well as with other companies and industries. - The analysis uses a Bayesian model to mimic the effects of the different biases. The parameters are then inferred from predictions and outcomes using Bayesian inversion. - The Bayesian analysis returns a probability distribution on the parameters revealing not only the most likely combination of biases, but also the uncertainty that necessarily arises from short sequences. - Pangloss’ volume bias footprint also reveals a pronounced tendency to over-optimism, although ranges are reasonable predicted.
  • 11. Empirical distribution plot - An alternative way to illustrate the deviation from uniformity of the prediction of percentiles is by plotting the actual attained percentiles in an ordered list from least to greatest. - Theory predicts that - as always, within a certain range of uncertainty - these percentiles should fall on a straight line according to their uniform distribution. - The empirical distribution of percentiles can also be predicted based on the resource bias parameters presented in the previous slide. - The plot reveals both optimism and pessimism, as well as over-confidence and vagueness. - Optimism leads to percentiles that are consistently under the no-bias curve. Pessimism, conversely, leads to an upward lift on the empirical curve - Over-confidence leads to a steepening of the curve as prospects come in with unexpectedly low and high percentiles. - Conversely vagueness leads to a flattening of the curve, as everything comes in around the middle of the wide ranges - Both the empirical distribution and the predicted distribution based on the bias parameters show a tendency to overestimate the central parameters of the distribution.