2. DOSEGANJE FINANČNIH UČINKOV Z
• ANIMACIJO TERMINSKIH PLANOV
• ODKRIVANJEM NESKLADNOSTI NAČRTOV
• OPTIMALNO ORGANIZACIJO GRADBIŠČA
• IZBIRO OPTIMALNIH TEHNOLOGIJ
• UČINKOVITO KOMUNIKCIJO MED UDELEŽENCI IZVEDBE
• UČINKOVITIM OBVLADOVANJEM STROŠKOV
• PRIPRAVA GRADBIŠČNE DOKUMENTACIJE
• VNAŠANJE SPREMEMB PROJEKTA (ZA PID)
UPORABNOST
PROJEKT GRE V IZVAJALSKEM PODJETJU ČEZ TRI FAZE
• PRIPRAVA PONUDBE
• PRIPRAVA NA IZVEDBO IN
• IZVEDBA
3. PRIPRAVA PONUDBE
MODEL
OBJEKTA
IZDELAVA
IZVLEČKOV
UPORABA INFORMACIJ
+ KOMUNIKACIJA
IZDELAVA
PONUDBE
ODDAJA
PONUDBE
UČINKI PRIMERI
PRI PRIPRAVI PONUDB SE POKAŽEJO NASLEDNJI UČINKI
• BOLJŠA KOMUNIKACIJA OB MODELU – KVALITETNEJŠA PONUDBA
• PROSTORSKA PREVERITEV VSEBINE PONUDBE
• KONTROLA KOLIČIN
• ANIMACIJA TERMINSKEGA PLANA
4. PRIPRAVA PONUDBE
UČINKI PRIMERI
KOLIČINE BETONOV: TEMELJNA PLOŠČA
PLOŠČE
NOSILCI
STENE
STEBRI
PRELIMINARNI RAZPIS ZA IZBOR PONUDNIKOV
• KONTROLA KOLIČIN BETONA
• ANIMACIJA UREDITVE GRADBIŠČA
• PREDSTAVITEV OBJEKTA V PROSTORU
Visoka Gradnja Nizka Gradnja
5. PRIPRAVA PONUDBE
UČINKI PRIMERI
Visoka Gradnja Nizka Gradnja
PONUDBA ZA IZVEDBO MESTNE VPADNICE (BREZ
PROJEKTNE DOKUMENTACIJE)
• IDEJNA ZASNOVA TRASE V DOLŽINI 15KM
• IZDELAVA PREČNIH PROFILOV IN NIVELETE
• IZDELAVA MASNE BILANCE
• PREDSTAVITEV OBJEKTA V PROSTORU
6. IZDELAVA IDEJNE TRASE
OMOGOČA NAM PREVERJANJE VPLIVA NIVELETE NA
MASNO BILANCO TER Z UPORABO TIPSKIH PREČNIH
PROFILOV TUDI KONTROLO NAD KOLIČINAMI VKOPOV IN
NASIPOV.
PRIPRAVA PONUDBE
UČINKI PRIMERI
Visoka Gradnja Nizka Gradnja
7. DVONIVOJSKI NA STEBRIH R=60M
Količina Enota Cena/enoto [€] Cena
krožišče PREKLADNA KONSTRUKCIJA 4.742,91m3 460 2.181.739 EUR
STEBRI 226,14m3 550 124.377 EUR
TEMELJI 360,00m3 350 126.000 EUR
KRILA 0,00m3 355 0 EUR
ZAŠČITA 4.072,00m2 85 346.120 EUR
rampe PREKLADNA KONSTRUKCIJA 11.182,84m3 460 5.144.106 EUR
STEBRI 545,69m3 550 300.130 EUR
TEMELJI 625,60m3 350 218.960 EUR
KRILA 512,00m3 355 181.760 EUR
ZAŠČITA 13.328,00m2 85 1.132.880 EUR
SKUPAJ 9.756.072 EUR
DVONIVOJSKI NA TERENU R=60M (vkopano)
Količina Enota Cena/enoto [€] Cena
krožišče PREKLADNA KONSTRUKCIJA 2.430,44m3 460 1.118.002 EUR
STEBRI 105,27m3 550 57.899 EUR
TEMELJI 180,00m3 350 63.000 EUR
KRILA 490,50m3 355 174.128 EUR
ZAŠČITA 2.088,00m2 85 177.480 EUR
rampe PREKLADNA KONSTRUKCIJA 0,00m3 460 0 EUR
STEBRI 0,00m3 550 0 EUR
TEMELJI 0,00m3 350 0 EUR
KRILA 0,00m3 355 0 EUR
0,00
zemeljska dela izkop 5ktg 418.203,12m3 9,54 3.989.658 EUR
posteljica 13.328,00m2 28,43 378.915 EUR
SKUPAJ 5.959.081 EUR
DVIGNJENO KROŽIŠČE
KROŽIŠČE NA NIVOJU TERENA
PONUDBA ZA IZVEDBO MESTNE VPADNICE (BREZ PROJEKTNE DOKUMENTACIJE)
• PRIMERJAVA POTREBNIH DEL IN STROŠKOV Z IZDELAVO VARIANT TIPSKEGA KROŽIŠČA
• GRAFIČNO PREDSTAVITEV POPISA DEL (OBČUTEK ZA VELIKOSTNI RED) + DINAMIČNA POVEZAVA MODELA IN POPISA
PRIPRAVA PONUDBE
UČINKI PRIMERI
Visoka Gradnja Nizka Gradnja
8. UČINKI PRIMERI
PRIPRAVA IZVEDBE
PRI TEHNIČNI PRIPRAVI IZVEDBE SO UČINKI IZDELAVE MODELA SLEDEČI
• KONTROLA PROJEKTNE DOKUMENTACIJE
• BOLJŠA KOMUNIKACIJA OB MODELU
• OPTIMIZACIJA TEHNOLOGIJE
• OPTIMIZACIJA TERMINSKEGA PLANA Z ANIMACIJO IZGRADNJE
• FINANČNI PLAN
• PODLAGA ZA IZDELAVO NAČRTOV OPAŽNE TEHNOLOGIJE
NADGRADNJA
MODELA
IZDELAVA
4D / 5D MODELA
KOMUNIKACIJA
(OPTIMALNE REŠITVE)
IZVEDBA
9. UČINKI PRIMERI
PRIPRAVA IZVEDBE
Visoka Gradnja Nizka Gradnja
KONTROLA PROJEKTNE DOKUMENTACIJE
Z IZDELAVO MODELA IZ KLASIČNIH NAČRTOV UGOTOVIMO
NESKLADNOSTI PROJEKTA V FAZI PRIPRAVE. S TEM SE
IZOGNEMO STROŠKOM ZAUSTAVITVE DEL PRI ODKRITJU
NESKLADNOSTI NA GRADBIŠČU.
PRIMER TABELE
• BELEŽENJE PROJEKTNIH NESKLADNOSTI IN NJIHOV
STATUS
• BELEŽENJE SPREMEMB PROJEKTA
10. UČINKI PRIMERI
PRIPRAVA IZVEDBE
Visoka Gradnja Nizka Gradnja
TEHNOLOGIJA IN PLAN IZVEDBE
Z IZDELAVO 3D MODELA INDUSTRIJSKEGA OBJEKTA SMO
ODKRILI NESKLADNOST NAČRTOV ZA IZVEDBO. Z
ANIMACIJO TERMINSKEGA PLANA PA SMO USKLADILI
IZVEDBO IN TEHNOLOGIJO.
11. UČINKI PRIMERI
PRIPRAVA IZVEDBE
Visoka Gradnja Nizka Gradnja
ANIMACIJA TERMINSKEGA PLANA (PROJEKT IZGRADNJE ŠOLE)
• UČINKOVIT TERMINSKI PLAN OB PODPORI Z VIRI OMOGOČA OPTIMALNO IZGRADNJO
• ANIMACIJA IZVEDBE OMOGOČA PLANERJU BOLJŠO PREDSTAVO OBJEKTA IN S TEM KVALITETNEJŠO IZDELAVO TERMINSKEGA
PLANA
• PLASTIČNO LAHKO PRIKAŽEMO ORGANIZACIJO GRADBIŠČA V VSEH FAZAH IZGRADNJE. (S POSTAVITVIJO ŽERJAVOV V MODEL
SMO NPR. UGOTOVILI POTREBO PO PRESTAVITVI ŽERJAVOV)
12. MODEL JE VIR INFORMACIJ…
UČINKI PRIMERI
5 2059,84
Dilatacija 1 2059,84
Klet 2 2066,33
Temeljna plošča 2066,33
Utor v plošči -6,49
Vdolbina v plošči -6,49
6 61,82
Dilatacija 2 35,49
Klet 2 24,82
Pasovni temelj 24,82
Šprinkler 10,67
Pasovni temelj 10,67
Dilatacija 3 26,33
Klet 2 26,33
Pasovni temelj 26,33
PRIPRAVA IZVEDBE
Visoka Gradnja Nizka Gradnja
KOMUNIKACIJA IN NADZOR NAD KOLIČINAMI:
• NA SESTANKIH JE MODEL POTREBEN ZA
KOMUNIKACIJO MED UDELEŽENCI
• DINAMIČNA POVEZAVA KOLIČIN MODELA Z VIRI IN
POPISOM
• MODEL JE UPORABEN PRI PRIPRAVI IZVEDBE ZAŠČITE
GRADBENE JAME
• ANIMACIJA IZVEDBE
13. NADGRADNJA 3D MODELA…
IZDELAVA NAČRTOV OPAŽENJA
IZDELAMO KNJIŽNICO OPAŽNIH ELEMENTOV, S KATERIMI
OPREMIMO PROSTORSKI MODEL. S TEM OMOGOČIMO
AVTOMATIČNO IZDELAVO NAČRTOV OPAŽENJA IN
IZVLEČKOV OPAŽNIH ELEMENTOV.
UČINKI PRIMERI
PRIPRAVA IZVEDBE
Visoka Gradnja Nizka Gradnja
14. UČINKI PRIMERI
IZVEDBA
3D/4D/5D
MODEL
TEHNIČNA PODPORA IZVEDBA
PODATKE, ZBRANE V MODELU OB PRIPRAVI IZGRADNJE, UPORABIMO NA GRADBIŠČU ZA:
• UČINKOVITO KOMUNIKACIJO OB MODELU
• PREGLED NAD KOLIČINAMI IZVEDENIH DEL
• PRIPRAVO GRADBENE KNJIGE
• LAŽJE IZVEDBE ZAPLETENIH DETAJLOV IN
• DOBRO DOKUMENTIRANJE SPREMEMBE PROJEKTA
• REBALANS TERMINSKEGA IN FINANČNEGA PLANA
15. UČINKI PRIMERI
IZVEDBA
Visoka Gradnja Nizka Gradnja
PRIMER PREGLEDOVANJA KOLIČIN POSAMEZNIH ELEMENTOV
MODELA, KAR JE UPORABNO ZA:
• IZDELAVO GRADBENE KNJIGE IN
MESEČNIH SITUACIJ
• NAROČANJE MATERIALOV
• IZDELAVO DETAJLNIH TERMINSKIH PLANOV
16. 1
2
UPORABA INFORMACIJ MODELA ZA ISKANJE OPTIMALNIH
REŠITEV PRI IZGRADNJI:
• POPIS JE POVEZAN Z MODELOM
• IZDELAVA REBALANSOV PLANA IZVEDBE
• IZDELAVA MESEČNIH SITUACIJ
UČINKI PRIMERI
IZVEDBA
Visoka Gradnja Nizka Gradnja
STENE 0,00 0,00
0,00 0,00
18. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove pri tehnični kineti,
prereza 0,15 m
3
/m
2
m3 37,76 60,45 2.282,59 102,45
0,00 0,00
19. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,20 m
3
/m
2
m3 482,2 60,45 29.148,99 102,45
0,00 0,00
20. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zaokrožene zidove, prereza
0,20 m
3
/m
2
m3 3,93 60,45 237,57 102,45
0,00 0,00
21. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,25 m
3
/m
2
m3 456,68 56,60 25.848,09 95,94
0,00 0,00
22. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,30 m
3
/m
2
m3 2289,29 54,06 123.759,02 91,62
0,00 0,00
23. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zaokrožene zidove, prereza
0,30 m
3
/m
2
m3 9,63 56,60 545,06 95,94
0,00 0,00
24. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,40 m
3
/m
2
m3 42,69 54,68 2.251,18 92,67
0,00 0,00
PLOŠČE 0,00 0,00
0,00 0,00
25. Dobava in vgrajevanje betona MB 30,
0-32 mm, v AB talno ploščo pod tehnično
kineto m3 3,94 61,01 240,38 103,4
0,00 0,00
26. Dobava in vgrajevanje betona MB 30,
0-32 mm, v AB talno ploščo v 2. kleti m3 153,69 59,81 9.192,20 101,38
0,00 0,00
27. Dobava in vgrajevanje betona MB 30,
0-32 mm, v AB prehodno ploščo m3 84,66 59,81 5.063,51 101,38
STENE 0,00 0,00
0,00 0,00
18. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove pri tehnični kineti,
prereza 0,15 m
3
/m
2
m3 4,61 60,45 278,67 102,45
0,00 0,00
19. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,20 m
3
/m
2
m3 164,47 60,45 9.942,21 102,45
0,00 0,00
20. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zaokrožene zidove, prereza
0,20 m
3
/m
2
m3 3,95 60,45 238,78 102,45
0,00 0,00
21. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,25 m
3
/m
2
m3 0 56,60 0,00 95,94
0,00 0,00
22. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,30 m
3
/m
2
m3 823,8 54,06 44.534,63 91,62
0,00 0,00
23. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zaokrožene zidove, prereza
0,30 m
3
/m
2
m3 2,59 56,60 146,59 95,94
0,00 0,00
24. Dobava in vgrajevanje betona MB 30,
0-16 mm v AB zidove, prereza 0,40 m
3
/m
2
m3 42,69 54,68 2.334,29 92,67
0,00 0,00
PLOŠČE 0,00 0,00
0,00 0,00
25. Dobava in vgrajevanje betona MB 30,
0-32 mm, v AB talno ploščo pod tehnično
kineto m3 3,94 61,01 240,38 103,4
0,00 0,00
26. Dobava in vgrajevanje betona MB 30,
0-32 mm, v AB talno ploščo v 2. kleti m3 152,59 59,81 9.126,41 101,38
0,00 0,00
27. Dobava in vgrajevanje betona MB 30,
0-32 mm, v AB prehodno ploščo m3 63,33 59,81 3.787,77 101,38
411.514,08€
1.340.334,58€
PRIMER POPISA ZA
BETONSKA DELA
18. UČINKI PRIMERI
IZVEDBA
Visoka Gradnja Nizka Gradnja
REŠEVANJE ZAPLETENIH DETAJLOV
• PRIKAZ IZVEDBE ARMIRANJA, KI NA GRADBIŠČU IZBOLJŠA
RAZUMEVANJE KORAKOV POLAGANJA POZICIJ ARMATURE TER
OMOGOČA IZDELAVO KOSOVNICE POSAMEZNEGA KORAKA POLAGANJA
19. UČINKI PRIMERI
IZVEDBA
Visoka Gradnja Nizka Gradnja
REŠEVANJE ZAPLETENIH DETAJLOV
• PRIKAZ IZVEDBE ARMIRANJA, KI NA GRADBIŠČU IZBOLJŠA
RAZUMEVANJE KORAKOV POLAGANJA POZICIJ ARMATURE TER
OMOGOČA IZDELAVO KOSOVNICE POSAMEZNEGA KORAKA POLAGANJA
20. UČINKI PRIMERI
IZVEDBA
Visoka Gradnja Nizka Gradnja
REŠEVANJE ZAPLETENIH DETAJLOV
• PRIKAZ IZVEDBE ARMIRANJA, KI NA GRADBIŠČU IZBOLJŠA
RAZUMEVANJE KORAKOV POLAGANJA POZICIJ ARMATURE TER
OMOGOČA IZDELAVO KOSOVNICE POSAMEZNEGA KORAKA POLAGANJA
21. UČINKI PRIMERI
IZVEDBA
Visoka Gradnja Nizka Gradnja
REŠEVANJE ZAPLETENIH DETAJLOV
• PRIKAZ IZVEDBE ARMIRANJA, KI NA GRADBIŠČU IZBOLJŠA
RAZUMEVANJE KORAKOV POLAGANJA POZICIJ ARMATURE TER
OMOGOČA IZDELAVO KOSOVNICE POSAMEZNEGA KORAKA POLAGANJA
22. AVTOCESTNI ODSEK PLUSKA-PONIKVE (8KM)
• AKTIVIRANJE PROJEKTA V PROGRAMU PLATEIA
• IZDELAVA 3D MODELA TRASE (CIVIL 3D)
• KONTROLA KOLIČIN
• MESEČNA IZDELAVA MODELOV IZVEDENIH DEL
• IZVLEČEK KOLIČIN ZA OBRAČUN
• PREDSTAVITEV OBJEKTA V PROSTORU
PRIMERI
IZVEDBA
UČINKI
PRIMER PREČNEGA PROFILA Z OZNAČENIMI
IZVEDENIMI DELI.
Visoka Gradnja Nizka Gradnja
23. AVTOCESTNI PRIKLJUČEK MIRNSKA DOLINA
• VREDNOTENJE KOLIČIN CESTNEGA TELESA IZ 3D MODELA PRI GEOMETRIJI, KJER KLASIČNO VREDNOTENJE PO PREČNIH PROFILIH
NI DOVOLJ NATANČNO
• UMESTITEV OBJEKTOV V PROSTOR SKUPAJ Z MODELOM TRASE DA CELOVIT PREGLED PROJEKTA
PRIMERI
IZVEDBA
UČINKI
Visoka Gradnja Nizka Gradnja
29. KOMUNIKACIJA Z ODDALJENIMI GRADBIŠČI
VZPOSTAVITEV VIRTUALNE PISARNE:
• VIDEO, AVDIO POVEZAVA PREKO INTERNETA
• MOŽNOST SKUPNEGA UREJANJA DOKUMENTOV (MS OFFICE, ADOBE)
• HKRATI LAHKO SESTANKUJE VELIKO ŠTEVILO UDELEŽENCEV
• MOŽNOST UVOZA 3D MODELA IN PREGLEDOVANJE DETAJLOV NA
VIRTUALNEM GRADBIŠČU
30. BIM (BUILDING INFORMATION MODEL) PREDSTAVLJA NAČIN OBLIKOVANJA PODATKOV PROJEKTA ZA FAZE PROJEKTIRANJA, IZVEDBE IN
VZDRŽEVANJA OBJEKTA. Z BIM-OM USTVARIMO OKOLJE OBJEKTA V NJEGOVI ŽIVLJENJSKI DOBI OD PRIPRAVE INVESTICIJE, PROJEKTA PREKO
IZVEDBE IN UPORABE DO NJEGOVE ODSTRANITVE.
POMENI:
• INTEGRACIJA RAZLIČNIH ZNANJ (ARHITEKTURA, GRADBENIŠTVO, STROJNIŠTVO, ELEKTROTEHNIKA)
• INFORMACIJSKI MODEL (BAZA INFORMACIJ O PROJEKTU)
• GENERALKA IZVEDBE PROJEKTA :
3D
4D – TERMINSKO PLANIRANJE
5D – DENARNI TOK
• UPRAVLJANJE PROJEKTA:
VZDRŽEVANJE
ADAPTACIJA
INFORMACIJSKO MODELIRANJE ZGRADB (BIM)
32. PREDNOSTI BIM-A
KLASIČNI PRISTOP BIM
TRAJNOSTNO NAČRTOVANJE PROJEKTA (ENERGIJSKO VARČEN, EKONOMIČEN V CELI ŽIVLJENJSKI DOBI, UPORABNIKU IN OKOLJU
PRIJAZEN, ESTETSKI,… )
IZVEDBA PROJEKTA:
• KVALITETNEJŠA PROJEKTNA DOKUMENTACIJA (PROJEKT, POPIS, TERMINSKI PLAN)
• NAPAKE V PROJEKTU REŠUJEMO PRED PRIČETKOM DEL, KAR ZMANJŠA STROŠKE SPREMEMB
• IZBOLJŠANA KONTROLA NAD DENARNIM TOKOM
• IZBOLJŠANA KONTROLA NAD ČASOVNIM POTEKOM DEL
33. THE BUSINESS VALUE OF BIM IN EUROPE; MCGRAW HILL CONSTRUCTION; 2010 (RAZISKOVALNA ŠTUDIJA)
POSLOVNA VREDNOST BIM-A
VREDNOST UPORABE BIM-A SE KAŽE V POVEČANI PRODUKTIVNOSTI, VEČJI USKLAJENOSTI ZNOTRAJ DELOVNIH TIMOV,
PREDNOSTI PRED KONKURENCO.
IZBOLJŠANA PRODUKTIVNOST
• IZBOLJŠANA ORGANIZACIJA DELA
• PREDHODNO UGOTAVLJANJE NESKLADIJ NAČRTOV IN S TEM MANJ ZAMUDNIH POPRAVKOV NA GRADBIŠČU
• BOLJŠE RAZUMEVANJE PROJEKTA MED VSEMI UDELEŽENCI
• VNAŠANJE SPREMEMB MED GRADNJO
• LAŽJE SODELOVANJE Z NADZOROM
• ZMANJŠANJE NAPAK V DOKUMENTACIJI (NAČRTIH, POPISIH, TERMINSKIH PLANIH,…)
KONKURENČNA PREDNOST
• FINANČNO IN ČASOVNO OBVLADOVANJE PROJEKTA
• NATANČNEJŠA OBDELAVA PROJEKTA
• PROSTORSKA PREDSTAVITEV PROJEKTA OKOLJU (UMESTITEV V PROSTOR)
VELIK UČINEK GLEDE NA ZAČETNI VLOŽEK
• ROI (RETURN OF INVESTEMENT) JE UGODEN PRI MERJENJU UČINKOV
34. THE BUSINESS VALUE OF BIM IN EUROPE; MCGRAW HILL CONSTRUCTION; 2010 (RAZISKOVALNA ŠTUDIJA)
• V ZDA JE VEČ UPORABNIKOV, AMPAK V EU BIM UPORABLJAJO DALJ ČASA.
• VEČ KOT TRETJINA EU UPORABNIKOV (34%) IMA VEČ KOT 5 LET IZKUŠENJ Z BIM; TAKIH JE V ZDA LE 18%.
• BIM MED IZVAJALCI: V ZDA JE 50% UPORABNIKOV, V EU JIH JE LE 24 %. ZVESTEJŠIH UPORABNIKOV MED IZVAJALCI JE LE
11% VENDAR NAPOVEDUJEJO PORAST NA 54% DO LETA 2012.
• 60% PODJETIJ IZ VZORCA UPORABLJA BIM NA VSAJ 30% NJIHOVIH PROJEKTOV, NAPOVED ČEZ DVE LETI JE 75%.
POSLOVNA VREDNOST BIM-A
35. THE BUSINESS VALUE OF BIM IN EUROPE; MCGRAW HILL CONSTRUCTION; 2010 (RAZISKOVALNA ŠTUDIJA)
DONOSNOST INVESTICIJE EU (ROI):
• 74% (63% ZDA) UPORABNIKOV BIM POROČA O POZITIVNIH DONOSIH
• 70% (46% ZDA) INŽENIRJEV (STATIKOV, STROJNIKOV, ELEKTRO) OPAŽA POZITIVNE DONOSE
• 40% (75% ZDA) IZVAJALCEV OPAŽA POZITIVNE DONOSE
MERJENJE DONOSNOSTI INVESTICIJE:
• IZKUŠENI UPORABNIKI MERIJO NA VSAJ 25% PROJEKTOV
• MANJ IZKUŠENI JO LE OCENJUJEJO. (NJIHOVE OCENE SO
NIŽJE, KOT MERITVE IZKUŠENIH)
DONOSNOST INVESTICIJE UPORABNIKOV V EU + ZDA (ROI):
• 46% UPORABNIKOV ZAČETNIKOV OPAŽA POZITIVNE DONOSE
• 80% IZKUŠENIH UPORABNIKOV OPAŽAJO POZITIVNE DONOSE
• 25% IZKUŠENIH UPORABNIKOV OPAŽA DONOSE VEČJE OD 100%
POSLOVNA VREDNOST BIM-A
36. THE BUSINESS VALUE OF BIM IN EUROPE; MCGRAW HILL CONSTRUCTION; 2010 (RAZISKOVALNA ŠTUDIJA)
BIM IZBOLJŠUJE PROJEKTNO OKOLJE GLEDE NA FAZO PROJEKTA.
UPORABNIKI PRIPISUJEJO VISOKO OZ. ZELO VISOKO UPORABNOST BIM:
• IDZ: 26%
• IDP: 32%
• PGD: 69%
• PZI: 67%
NAJVEČJI DOPRINOSI NA PROJEKTIH PREDSTAVLJA:
• BOLJŠE RAZUMEVANJE PROJEKTA MED UDELEŽENCI (69%)
• VEČJA KVALITETA PROJEKTOV (62%)
• ZMANJŠANJE ŠTEVILA NAPAK, NESKLADIJ IN NEJASNOSTI V FAZI
IZVEDBE (59%)
POSLOVNA VREDNOST BIM-A
Editor's Notes
Skupina v okviru katere delujem se ukvarja z uporabo informacijskih tehnologij za podporo izvedbi objektov, v smislu predhodne predstavitve kolega dr. Cerovška.
Sodobni računalniki in programska orodja nam omogočajo izdelavo modelov objektov z informacijami potrebnimi pri izvedbi.
S tem lahko izvedemo generalko izvedbe objekta v virtualnem okolju.
Ravno sedaj, ko je gradbena industrija v težavah je namreč pravi čas za iskanje in vpeljavo novih znanj in tehnologij.
Na ta način želimo doseči:
Večjo konkurenčnost podjetja
Učinkovitejšo izvedbo projektov
Dvig kvalitete storitev
(35 sek)
Motivacija za tak pristop je doseganje finančnih učinkov izvajalca z
Animacijo terminskih planov
Odkrivanjem neskladnosti načrtov
Optimalno organizacijo gradbišča
Izbiro optimalnih tehnologij
Učinkovito komunikcijo med udeleženci izvedbe
Učinkovitim obvladovanjem stroškov
(22 sek)
Za pridobitev posla se najprej soočimo s pripravo ponudbe.
Pri pripravi ponudb so z uporabo modela učinki sledeči:
Ponudbe so izdelane v krajšem času
Pri njihovi izdelavi je komunikacija sodelujočih boljša
Hkrati lahko izvajamo vizualno kontrolo vsebine ponudbe
In kontrolo količin
(20 sek)
Uporaba oz. izdelava modela je primerna tudi za izdelavo preliminarnih ponudb, kjer model uporabimo za določitev količin in vizualno predstavitev objekta.
(10 sek)
Pri tehnični pripravi izvedbe so učinki izdelave modela sledeči:
Preverjena je ustreznost projektne dokumentacije,
komunikacija med različnimi izvajalci objekta je učinkovitejša
Na modelu s pomočjo animacije izvedbe optimiziramo terminski plan
Učinkovita je tudi izdelava načrtov opažev
Ter določitev optimalne tehnologije izvedbe
(21 sek)
Zelo pomembna je kontrola projektne dokumentacije, s katero se izognemo usklajevanju v fazi gradnje, saj neskladja in pomanjkljivosti odpravimo že v fazi tehnične priprave.
Zelo priročna je uporaba tabele, v kateri beležimo projektne neskladnosti in njihov status.
(21 sek)
Z animacijo terminskega plana pa smo uskladili izvedbo in tehnologijo.
Z izdelavo 3D modela industrijskega objekta smo
odkrili neskladnost načrtov za izvedbo.
Z animacijo terminskega plana pa smo uskladili izvedbo in tehnologijo.
Pri tehnični pripravi izvedbe so učinki izdelave modela sledeči:
Preverjena je ustreznost projektne dokumentacije
Omogočena je učinkovita komunikacija različnih izvajalcev objekta
Optimiziran terminski plan s pomočjo animacije modela
Učinkovita izdelava načrtov opažev
Ter optimalna tehnologija izvedbe
(21 sek)
Pri tehnični pripravi izvedbe so učinki izdelave modela sledeči:
Preverjena je ustreznost projektne dokumentacije
Omogočena je učinkovita komunikacija različnih izvajalcev objekta
Optimiziran terminski plan s pomočjo animacije modela
Učinkovita izdelava načrtov opažev
Ter optimalna tehnologija izvedbe
(21 sek)
Pri tehnični pripravi izvedbe so učinki izdelave modela sledeči:
Preverjena je ustreznost projektne dokumentacije
Omogočena je učinkovita komunikacija različnih izvajalcev objekta
Optimiziran terminski plan s pomočjo animacije modela
Učinkovita izdelava načrtov opažev
Ter optimalna tehnologija izvedbe
(21 sek)
Malo za hec malo za res. Z izvedbo generalke na modelu se takim situacijam lažje izognemo. hahahahhahah
(7 sek)