1. WEEKLY REPORT OF GASIFIERS
Sno. Date Client Location Manned by
1 7/31/2010 Vandana Ispat Ltd. Raipur Sunny Dayal The work is progressing fevereshly.. Sunny along
to the existing drg. The same was discussed with
ammened drg. Has been sent.
2 7/31/2010 R S Steels Chennai Devendra Singh Both have been pulled out from the site as the p
Himanshu been delayed and the soft water tank has not ye
deputed to Patna to manage the site at Dina and
3 7/31/2010 Jai Ambe Iron & Steel Ltd. Kolhapur Sumit Nigam Mr. Amit is at the site the work has not beeing h
client.
7/31/2010 Mohit Steel Wada Ramesh Kumar He is manning the site.
4
5 Shiv Kumar Shiv kumar is on leave
the probable date of the restart has been shifted
6 7/31/2010 Radiant casting Nalagarh Sumit Nigam si back at Hd. Qrs. As the party wants to delay th
go to Patna to replace Mr. Devendra, who woul
7
8 Asish Singh
9 7/31/2010 Sanvijai Nagpur Manoj Gasifier is working OK
Ramesh Kumar
REPORTS OF ALL THE GASIFIERS UPDATED UPTO 15TH OF THIS MONTH IS ATTACHE
The work on the automation is progressing well and communication is estabhlished. Vinod has taken a dry run and able to acctuate the elements m
I would be going to petropol in the 2nd. To erect the load cell
2. GASIFIERS
Remarks
rogressing fevereshly.. Sunny along with Mr. Panikar had asked for an ammen
g drg. The same was discussed with Mr. Rahuel and Mr. Praveen and the
g. Has been sent.
en pulled out from the site as the procurement of the water softener has
and the soft water tank has not yet been taken up. They are now beeing
atna to manage the site at Dina and Balmukand
the site the work has not beeing hastened.Due to rains and utter apathy of the
g the site.
on leave
date of the restart has been shifted to 21st of this month. However,
Qrs. As the party wants to delay the commissioning of the gasifier. He slated to
o replace Mr. Devendra, who would eventually go to R S Steels
Has resigned
rking OK
15TH OF THIS MONTH IS ATTACHED.
nd able to acctuate the elements manually by PLC
3. WEEKLY REPORT OF GASIF
Sno. Date Client Location Manned by
1 9/18/2010 Vandana Ispat Ltd. Raipur Devendra Singh Devendra Singh and Brij Bhushan.Th
Brij Bhushan
2 9/18/2010 R S Steels Chennai The latest from the site is the entire
for commissioning of the gasifier
3 9/18/2010 Radiant Casting Baddi Ramesh Kumar the gasifier is working properly. Plea
9/18/2010 Jai Ambe Steel Kolhapur The gasifier is ready for commission
4 9/18/2010 Petropol Bhiwadi Vinod Deswal Automation is complete and has pre
H
5
6
7 9/18/2010 Dina Iron Patna Ramesh Yadav is at the site and mon
8
9
9/18/2010 Balmukand Patna The gas
REPORTS OF ALL THE GASIFIERS UPDATED UPTO
4. WORK DONE BY GOVIND RA
I HAVE BEEN WORKING ON THE ANALYSIS AND MONITORING OF THE GASIFIER AND HAS BEEN FINISHED. THE WORK E
AT VARIOUS SITES WOULD BE ANALYSED AND COMPONENT OF ANALYSIS WOULD CONTAIN THE FOLLOWING: THE AC
GASES AT ACTUALS: VOLUME OF FLUE GASES:CALORIFIC VALUE OF THE GAS AT ACTUALS: CALOMETRIC TEMPERATUR
I AM EAGER TO DISCUSS WITH YOUR GOODSELVES WITH MANUSCRIPT TO FINE TUNE IT AND PUT IT ON THE POWER P
GAS ANALYSER OR OXYGEN ANALYSER. MD HAS PLACED AN ORDER FOR THE SAME. The Presentation of the conferen
5. REPORT OF GASIFIERS
Remarks
Singh and Brij Bhushan.The ducting is on the way to finish.Detail report is attached
from the site is the entire work is over. However they have been asked to wait till the end of this
issioning of the gasifier
er is working properly. Please refer to the monitoring repotrs
er is ready for commissioning, Mr Nirmal Yadav is at the site for commissionig. There are few leaks
which are being set right
on is complete and has presented to Md and C, Try Hd. The automation is under observation for amonth
He is absent therefore no progress can be reported
adav is at the site and monitoring the working fine.
The gasifier is working fine The monitoring is already attached
ASIFIERS UPDATED UPTO18th of Sept is attached.
6. WORK DONE BY GOVIND RAO
BEEN FINISHED. THE WORK ENCOMPASSES THE ANALYSIS OF GAS THUS BEING PRODUCED
IN THE FOLLOWING: THE ACTUAL AIR REQUIREMENT BASED ON THE PERCENTAGES OF VARIOUS
CALOMETRIC TEMPERATURE OF THE PRODUCER GAS THUS PRODUCED. AND MANY MORE
ND PUT IT ON THE POWER POINT. AS HAD ALREADY REQUESTED, WE WOULD BE NEEDING AN
Presentation of the conference is being done.