The New Leader in Global Copper
December 2013

TSX: FM; LSE: FQM
Cautionary Note Regarding Forward-Looking Statement
Some of the statements contained in the following material are
forward looking statements and not statement of facts. Such
statements are based on the current beliefs of management, as
well as assumptions based on management information currently
available.
Forward-looking statements are subject to various risks,
uncertainties and other factors that could cause actual results to
differ materially from expected results.
Readers must rely on their own evaluation of these uncertainties.
Note: all dollar amounts in US dollars unless otherwise indicated

2
First Quantum Minerals - The New Leader in Global Copper
• Geographically diversified asset base
• 7 high-quality, stable operations; current
total copper and nickel production
capacities of 445 ktpa and 45 ktpa,
respectively

• 6 major projects with completion targeted
from mid-2014 to 2017
• Total production capacities for copper and
nickel to rise to 1.3 Mtpa and 110 ktpa,
respectively by 2018
• Proven track record of building projects
efficiently and delivering superior
shareholder returns

• Low-cost producer: $1.37 - $1.45/lb
copper; $5.20 - $5.60/lb nickel

Pre-Acquisition First Quantum

Post-Acquisition First Quantum
Australia
10%

Australia
19%

Africa
36%
Europe
10%
Americas
45%

Africa
71%

1

Mtpa1

1.3
1 2018E

Copper production

Europe
9%
Mtpa1
3
Strong Q3 2013 Results
•
•
•
•

Copper production 36% higher to 114,488 tonnes
Nickel production up 26% to 12,485 tonnes
Gold production 29% higher to 65,368 ounces
Copper production cash costs lower by 19% to $1.16 per pound

• Comparative net earnings of $143.6 million or $0.24 per share
•
•

inclusive of $21.9 million or $0.04 per share of unfavorable, recurring acquisition-related
adjustments
Unfavorable impact of $112.9 million due to lower metal prices

As at September 30, 2013
•
•
•

$617 million of unrestricted cash and equivalents
$2,945 million of undrawn facilities
$2,892 million of drawn debt

Q3 '12 Q4 '12 Q1 '13 Q2'13 Q3'13

Copper Production

Q3 '12 Q4 '12 Q1 '13 Q2'13 Q3'13

Q3 '12 Q4 '12 Q1 '13 Q2'13 Q3'13

Q3 '12 Q4 '12 Q1 '13 Q2 '13 Q3 '13

Nickel Production

Gold Production

Copper Cash
Production Cost
4
High-Quality, Stable Operations

5
High-Quality, Stable Operations
Kansanshi Cu-Au mine, Zambia
• Located near Solwezi in the north
western Province of Zambia
• First production in 2005
• Open pit mining
• Flexible ore treatment to allow for
variation in ore type :
– sulphide circuit; oxide circuit;
gold facility
• As at December 31, 2012, the
estimated mine life was ~17 years
• Workforce = ~1,700

6
High-Quality, Stable Operations
Kansanshi Cu-Au mine, Zambia

• Higher year-over-year production reflecting
capacity expansion
• Q3 ‘13 performance

– 71,037 tonnes of copper;
43,904 ounces of gold
– C1 cash cost of US$1.25/lb.

Expansion
Estimate
Project Capacity Completion
Cost

Production
Impact

(US$M)

– 2012 – 2015

7.2 mtpa

Complete

34

Copper: 10,000 - 15,000 tpa

Oxide

• Multi-phase capacity expansion
project underway

Oxide

14.5 mtpa

Complete

268

Copper: 60,000 - 75,000 tpa

Smelter

1.2 mtpa

2014

690

Smelter Acid – 1.0 Mtpa

Sulphide

25 mtpa

2017

565

Copper: 60,000 - 70,000 tpa

60% increase in overall production
capacity
– 2012 – 2014
130% increase in oxide production capacity
– 2014 - 2017
90% increase in sulphide production capacity
7
High-Quality, Stable Operations
Guelb Moghrein Cu-Au mine, Mauritania
• 100% ownership
• Located 250 kilometres northeast of
the nation’s capital, Nouakchott
• As at December 31, 2012, the
estimated mine life was ~ 9 years
(including stockpiles) based on current
operations
• First production in 2006
• Workforce = ~1,470

8
High-Quality, Stable Operations
Guelb Moghrein Cu-Au mine, Mauritania
• Stronger, more sustained performance
over the past 12 months
• Focused on improving plant availability
• IOCG type deposit - structure and mineralogy
has common features with other IOCG
deposits elsewhere in the world
• Magnetite plant project:

– In detailed design stage
– Estimated capex of $50M
– Expected annual production of 1M - 2M tonnes
of 69% Fe magnetite concentrate
– Expected start up in mid 2014
– Expected to extend mine life through retreatment of
tailings dam

9
High-Quality, Stable Operations
Ravensthorpe Ni mine, Australia
• Acquired as a decommissioned plant
in 2010
• First production within 20 months
of purchase
• Estimated mine life of 32 years
• Commercial production declared
Dec 28 2011
• Workforce = ~405
• Q3 ‘13 performance

– 9.917 tonnes of contained nickel
– C1 cash cost of US$4.85/payable lb.

10
High-Quality, Stable Operations
Kevitsa Ni-Cu-PGE mine, Finland

• Built, commissioned and started
commercial operations within 36
months of board approval
• Estimated mine life of 29 years
• Commercial production declared
August 2012
• Workforce = ~290
• Further potential

– Process optimization
– Approval to increase throughput to a
maximum of 10Mtpa from 5.5Mtpa
– Public hearings & inspections held in
September; decision expected within 6
months
11
High-Quality, Stable Operations
Las Cruces Cu mine, Spain
• Acquired in March 2013
• Estimated mine life of 9 years;
potential for extension
• Current average reserve grade of
5.4% copper
• Workforce = 250 direct employees;
650 contractors
• Annual production capacity – 72,000
tonnes of copper cathode
• Q3 ‘13 cash cost of US$0.69/lb.
12
High-Quality, Stable Operations
Çayeli Cu-Zn mine, Turkey
• Acquired in March 2013
• Estimated mine life of 6 years with
potential for an additional 3 years
• Average grade of 3.1% copper and
3.6% zinc
• Workforce = 493 employees
• Q3 2013 C1 cash cost of US$0.98/lb.
copper
• 2013 Estimates:

– 23,000 – 26,000 tonnes of copper
– 30,000 – 32,000 tonnes of zinc

13
High-Quality, Stable Operations
Pyhäsalmi Cu-Zn mine, Finland

• Acquired in March 2013

• One of the most efficient underground
mines in the world
• Estimated mine life of 6 years
• Average grade of 1.1% copper and 1.9% zinc
• Workforce = 210 employees
• Q3 C1 cash cost of US$0.65/lb. copper
• 2013 Estimates:

– 9,000 – 11,000 tonnes of copper
– 16,000 – 18,000 tonnes of zinc
– 820,000 tonnes pyrite
14
Outlook for 2013
Production

Copper

Zinc

(000’s contained tonnes)

(000’s ounces)

(000’s tonnes)

397 - 416
260 - 267
37 - 41
15 - 16
23 - 26
53 - 55
9 - 11

44 - 47
35 – 37
9 - 10
-

232 – 250
155 – 165
56 – 61
11 - 12
4–5
6-7

46 - 50
30 - 32
16 - 18

Copper

Nickel

Unit cash cost

Capital
expenditure

Gold

(000’s tonnes)

Group
Kansanshi
Guelb Moghrein
Ravensthorpe
Kevitsa
Çayeli1
Las Cruces1
Pyhäsalmi1

Group

Nickel

(US$/lb.)

(US$/lb.)

$1.37 - $1.45

$5.20 - $5.60

Excluding
Cobre Panama
$2.0 billion
The production guidance shown above for Çayeli, Las Cruces and Pyhäsalmi
represents guidance from acquisition date of March 22, 2013 until the end of the year.

1

15
Our Development Project Pipeline

16
Our Project Pipeline
Copper Smelter, Zambia
•

Processing capacity of 1.2 Mtpa
—Combination of concentrate
from Kansanshi & Sentinel
—Average copper grade 26%

•

Copper production 300,000 tpa;
acid production 1.0 Mtpa

•

Estimates:
− Capital cost of US$690M
− Commissioning from mid 2014

• Estimated savings:
− US$340M - US$510M/year
• Expansion being planned to increase processing capacity to 2 Mtpa in 2017
17
Our Project Pipeline
Sentinel Cu project, Zambia
• Located ~ 140 km northwest of
Solwezi, northern Zambia
• M&I resource of 1,027 Mt at 0.51% Cu
grade, containing 5.2 Mt Cu
• Estimates:

– 2.2:1 LOM strip ratio
– >15 years mine life
– Annual production up to 300,000
tonnes
– US$2.0 billion capex (incl. Enterprise
nickel project)
– Completion targeted for mid-2014

• Includes 4 Mtpa nickel facility; flexibility
to augment copper capacity
18
Our Project Pipeline
Cobre Panama Cu project, Panama
• Acquired March 2013
• Large open pit copper project; Larger
project than the Panama Canal
• Est. mine life of 40 years
• Est. average annual production of
260,000 tonnes copper
• Progress since acquisition:
–
–
–
–
–

Several contracts modified or cancelled
Transformed to complete self-perform arrangement
All key aspects fully functional allowing activities to advance efficiently
Access to site improved
Biodiversity, environmental and social programs continuing

19
Our Project Pipeline
Haquira Cu project, Peru
• Focused on community &
environmental aspects
• Potential:
- 20 year mine life
– Avg 190k tonnes of
copper production
per year

20
One of the Few Mining Companies
Investing in Building Capacity
Forces at work in copper market suggest medium- to long-term
prices driven by greenfield incentive pricing as market tightens
$3.75 - 4.00/lb
Short- and medium-term
corrections to demand
especially if deficit is
expected to be prolonged
$3.25 - 3.50/lb
Incentive price for
marginal greenfield
projects needed to meet
modest demand growth

Design
adjustments and
substitution

Slowing growth
driven by
macroeconomics

Mines depleting,
projects difficult to
build and fund

~$3.00/lb
Strategic buyers see value
versus all-in cash costs and
future greenfield needs
$2.80 - $3.00/lb
90th percentile total cash
+ susex cost (growing at
2.5% p.a. on a real basis)
$2.20/lb
90th percentile C1 cash
cost (growing at 2.5% p.a.
on a real basis)

Price floor on a year over year basis

Medium- to
long-term
price
range
Short-term
price
range

Strategic buyers and
traders, disruptions and
project issues

Real cost inflation, strained balance
sheets and need for miners to have
cash to replace reserves

Analyst LT
consensus
price

Price floor on a quarter over quarter basis
22
The New Global Copper Leader
The New Go-To Copper Producer
Attractive Diverse Geographic Exposure
A Long-Standing Commitment to Social and Environmental Excellence
Creating Value with Our Project Development Expertise

1.8

2018E Copper Production, Mt

1.5

0.5

0.5

0.4

0.4

0.3

First Quantum
2012

0.5

Norilsk

0.6

Antofagasta

0.8

Teck Resources

0.8

Kazakhmys

Southern
Copper

BHP Billiton

First Quantum

Codelco

Glencore
Xstrata

FreeportMcMoRan

0.9

Vale

1.2

KGHM

1.3

Anglo American

1.5

Rio Tinto

•
•
•
•

Source: BrookHunt
23
The New Leader in Global Copper
December 2013

More Related Content

What's hot

English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 enshosein2011
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25thshosein2011
 
Solitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor PresentationSolitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor PresentationCompany Spotlight
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and ProcessingEnbridge Inc.
 
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...Objective Capital Conferences
 
Secutor Capital Management Corporation Interview with Chris Grove of Commerce...
Secutor Capital Management Corporation Interview with Chris Grove of Commerce...Secutor Capital Management Corporation Interview with Chris Grove of Commerce...
Secutor Capital Management Corporation Interview with Chris Grove of Commerce...Commerce Resources Corp. (TSXv:CCE)
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019MomentumPR
 
Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015Symposium
 
REIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFEREIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFESymposium
 
Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012ussilver
 
Corporate Presentation - February 2014
Corporate Presentation - February 2014Corporate Presentation - February 2014
Corporate Presentation - February 2014FirstQuantum
 
TMS Arctic Mining Petroleum Prospects helsinki Feb 2015
TMS Arctic Mining Petroleum Prospects helsinki Feb 2015TMS Arctic Mining Petroleum Prospects helsinki Feb 2015
TMS Arctic Mining Petroleum Prospects helsinki Feb 2015Dermot Loughnane
 
Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011TMX Equicom
 
Mining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectMining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectJames AH Campbell
 
Evolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path BlossomsEvolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path BlossomsCopper North Mining Corp.
 
Aal presentation-feb6
Aal presentation-feb6Aal presentation-feb6
Aal presentation-feb6maxsali
 
Fortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to Production
Fortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to ProductionFortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to Production
Fortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to ProductionResource Clips
 
Kings Bay Resources Fact Sheet
Kings Bay Resources Fact SheetKings Bay Resources Fact Sheet
Kings Bay Resources Fact SheetMomentumPR
 

What's hot (20)

English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 en
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
 
Angloamerican 2015
Angloamerican 2015Angloamerican 2015
Angloamerican 2015
 
Solitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor PresentationSolitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor Presentation
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
 
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
 
Secutor Capital Management Corporation Interview with Chris Grove of Commerce...
Secutor Capital Management Corporation Interview with Chris Grove of Commerce...Secutor Capital Management Corporation Interview with Chris Grove of Commerce...
Secutor Capital Management Corporation Interview with Chris Grove of Commerce...
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019
 
Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015
 
REIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFEREIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFE
 
Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012
 
Corporate Presentation - February 2014
Corporate Presentation - February 2014Corporate Presentation - February 2014
Corporate Presentation - February 2014
 
TMS Arctic Mining Petroleum Prospects helsinki Feb 2015
TMS Arctic Mining Petroleum Prospects helsinki Feb 2015TMS Arctic Mining Petroleum Prospects helsinki Feb 2015
TMS Arctic Mining Petroleum Prospects helsinki Feb 2015
 
Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011
 
Mining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectMining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan Project
 
Evolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path BlossomsEvolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path Blossoms
 
Aal presentation-feb6
Aal presentation-feb6Aal presentation-feb6
Aal presentation-feb6
 
Fortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to Production
Fortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to ProductionFortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to Production
Fortune Minerals Ltd. (TSX: FT) Seeks Partner as it Moves to Production
 
Kings Bay Resources Fact Sheet
Kings Bay Resources Fact SheetKings Bay Resources Fact Sheet
Kings Bay Resources Fact Sheet
 

Similar to Corporate Presentation December 2013

Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013FirstQuantum
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013FirstQuantum
 
First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014FirstQuantum
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015TVI_Pacific
 
20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutionalAdnet Communications
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013KGHM
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013Crocodile Gold
 
AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAlkane Resources
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - finalFirstQuantum
 
Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020MomentumPR
 
Noram Ventures Inc. Corporate Presentation May 2013
Noram Ventures Inc. Corporate Presentation May 2013Noram Ventures Inc. Corporate Presentation May 2013
Noram Ventures Inc. Corporate Presentation May 2013Resource Investing News
 
Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020MomentumPR
 
20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutionalAdnet Communications
 
Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020MomentumPR
 
Carmax Mining Corp Presentation Nov 2014
Carmax Mining Corp Presentation Nov 2014Carmax Mining Corp Presentation Nov 2014
Carmax Mining Corp Presentation Nov 2014Tsx Penny Stocks
 
Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017MomentumPR
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Symposium
 

Similar to Corporate Presentation December 2013 (20)

Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013
 
First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014
 
Los bronces 2007
Los bronces 2007Los bronces 2007
Los bronces 2007
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015
 
20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013
 
AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycle
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020
 
Noram Ventures Inc. Corporate Presentation May 2013
Noram Ventures Inc. Corporate Presentation May 2013Noram Ventures Inc. Corporate Presentation May 2013
Noram Ventures Inc. Corporate Presentation May 2013
 
Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020
 
20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional
 
Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020
 
Carmax Mining Corp Presentation Nov 2014
Carmax Mining Corp Presentation Nov 2014Carmax Mining Corp Presentation Nov 2014
Carmax Mining Corp Presentation Nov 2014
 
Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 

More from FirstQuantum

Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 finalFirstQuantum
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3FirstQuantum
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - finalFirstQuantum
 
Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - finalFirstQuantum
 
Presentation november final
Presentation   november finalPresentation   november final
Presentation november finalFirstQuantum
 
Presentation march - final
Presentation   march - finalPresentation   march - final
Presentation march - finalFirstQuantum
 
February 2017 Corporate Presentation
February 2017 Corporate PresentationFebruary 2017 Corporate Presentation
February 2017 Corporate PresentationFirstQuantum
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - finalFirstQuantum
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - finalFirstQuantum
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - finalFirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - finalFirstQuantum
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - finalFirstQuantum
 
Presentation december - final
Presentation   december - finalPresentation   december - final
Presentation december - finalFirstQuantum
 
Presentation september - fina lv2
Presentation   september - fina lv2Presentation   september - fina lv2
Presentation september - fina lv2FirstQuantum
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015FirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - finalFirstQuantum
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - finalFirstQuantum
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015FirstQuantum
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirstQuantum
 
Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013FirstQuantum
 

More from FirstQuantum (20)

Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 final
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - final
 
Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - final
 
Presentation november final
Presentation   november finalPresentation   november final
Presentation november final
 
Presentation march - final
Presentation   march - finalPresentation   march - final
Presentation march - final
 
February 2017 Corporate Presentation
February 2017 Corporate PresentationFebruary 2017 Corporate Presentation
February 2017 Corporate Presentation
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - final
 
Presentation december - final
Presentation   december - finalPresentation   december - final
Presentation december - final
 
Presentation september - fina lv2
Presentation   september - fina lv2Presentation   september - fina lv2
Presentation september - fina lv2
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - final
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor Presentation
 
Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013
 

Recently uploaded

Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 

Recently uploaded (20)

Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 

Corporate Presentation December 2013

  • 1. The New Leader in Global Copper December 2013 TSX: FM; LSE: FQM
  • 2. Cautionary Note Regarding Forward-Looking Statement Some of the statements contained in the following material are forward looking statements and not statement of facts. Such statements are based on the current beliefs of management, as well as assumptions based on management information currently available. Forward-looking statements are subject to various risks, uncertainties and other factors that could cause actual results to differ materially from expected results. Readers must rely on their own evaluation of these uncertainties. Note: all dollar amounts in US dollars unless otherwise indicated 2
  • 3. First Quantum Minerals - The New Leader in Global Copper • Geographically diversified asset base • 7 high-quality, stable operations; current total copper and nickel production capacities of 445 ktpa and 45 ktpa, respectively • 6 major projects with completion targeted from mid-2014 to 2017 • Total production capacities for copper and nickel to rise to 1.3 Mtpa and 110 ktpa, respectively by 2018 • Proven track record of building projects efficiently and delivering superior shareholder returns • Low-cost producer: $1.37 - $1.45/lb copper; $5.20 - $5.60/lb nickel Pre-Acquisition First Quantum Post-Acquisition First Quantum Australia 10% Australia 19% Africa 36% Europe 10% Americas 45% Africa 71% 1 Mtpa1 1.3 1 2018E Copper production Europe 9% Mtpa1 3
  • 4. Strong Q3 2013 Results • • • • Copper production 36% higher to 114,488 tonnes Nickel production up 26% to 12,485 tonnes Gold production 29% higher to 65,368 ounces Copper production cash costs lower by 19% to $1.16 per pound • Comparative net earnings of $143.6 million or $0.24 per share • • inclusive of $21.9 million or $0.04 per share of unfavorable, recurring acquisition-related adjustments Unfavorable impact of $112.9 million due to lower metal prices As at September 30, 2013 • • • $617 million of unrestricted cash and equivalents $2,945 million of undrawn facilities $2,892 million of drawn debt Q3 '12 Q4 '12 Q1 '13 Q2'13 Q3'13 Copper Production Q3 '12 Q4 '12 Q1 '13 Q2'13 Q3'13 Q3 '12 Q4 '12 Q1 '13 Q2'13 Q3'13 Q3 '12 Q4 '12 Q1 '13 Q2 '13 Q3 '13 Nickel Production Gold Production Copper Cash Production Cost 4
  • 6. High-Quality, Stable Operations Kansanshi Cu-Au mine, Zambia • Located near Solwezi in the north western Province of Zambia • First production in 2005 • Open pit mining • Flexible ore treatment to allow for variation in ore type : – sulphide circuit; oxide circuit; gold facility • As at December 31, 2012, the estimated mine life was ~17 years • Workforce = ~1,700 6
  • 7. High-Quality, Stable Operations Kansanshi Cu-Au mine, Zambia • Higher year-over-year production reflecting capacity expansion • Q3 ‘13 performance – 71,037 tonnes of copper; 43,904 ounces of gold – C1 cash cost of US$1.25/lb. Expansion Estimate Project Capacity Completion Cost Production Impact (US$M) – 2012 – 2015 7.2 mtpa Complete 34 Copper: 10,000 - 15,000 tpa Oxide • Multi-phase capacity expansion project underway Oxide 14.5 mtpa Complete 268 Copper: 60,000 - 75,000 tpa Smelter 1.2 mtpa 2014 690 Smelter Acid – 1.0 Mtpa Sulphide 25 mtpa 2017 565 Copper: 60,000 - 70,000 tpa 60% increase in overall production capacity – 2012 – 2014 130% increase in oxide production capacity – 2014 - 2017 90% increase in sulphide production capacity 7
  • 8. High-Quality, Stable Operations Guelb Moghrein Cu-Au mine, Mauritania • 100% ownership • Located 250 kilometres northeast of the nation’s capital, Nouakchott • As at December 31, 2012, the estimated mine life was ~ 9 years (including stockpiles) based on current operations • First production in 2006 • Workforce = ~1,470 8
  • 9. High-Quality, Stable Operations Guelb Moghrein Cu-Au mine, Mauritania • Stronger, more sustained performance over the past 12 months • Focused on improving plant availability • IOCG type deposit - structure and mineralogy has common features with other IOCG deposits elsewhere in the world • Magnetite plant project: – In detailed design stage – Estimated capex of $50M – Expected annual production of 1M - 2M tonnes of 69% Fe magnetite concentrate – Expected start up in mid 2014 – Expected to extend mine life through retreatment of tailings dam 9
  • 10. High-Quality, Stable Operations Ravensthorpe Ni mine, Australia • Acquired as a decommissioned plant in 2010 • First production within 20 months of purchase • Estimated mine life of 32 years • Commercial production declared Dec 28 2011 • Workforce = ~405 • Q3 ‘13 performance – 9.917 tonnes of contained nickel – C1 cash cost of US$4.85/payable lb. 10
  • 11. High-Quality, Stable Operations Kevitsa Ni-Cu-PGE mine, Finland • Built, commissioned and started commercial operations within 36 months of board approval • Estimated mine life of 29 years • Commercial production declared August 2012 • Workforce = ~290 • Further potential – Process optimization – Approval to increase throughput to a maximum of 10Mtpa from 5.5Mtpa – Public hearings & inspections held in September; decision expected within 6 months 11
  • 12. High-Quality, Stable Operations Las Cruces Cu mine, Spain • Acquired in March 2013 • Estimated mine life of 9 years; potential for extension • Current average reserve grade of 5.4% copper • Workforce = 250 direct employees; 650 contractors • Annual production capacity – 72,000 tonnes of copper cathode • Q3 ‘13 cash cost of US$0.69/lb. 12
  • 13. High-Quality, Stable Operations Çayeli Cu-Zn mine, Turkey • Acquired in March 2013 • Estimated mine life of 6 years with potential for an additional 3 years • Average grade of 3.1% copper and 3.6% zinc • Workforce = 493 employees • Q3 2013 C1 cash cost of US$0.98/lb. copper • 2013 Estimates: – 23,000 – 26,000 tonnes of copper – 30,000 – 32,000 tonnes of zinc 13
  • 14. High-Quality, Stable Operations Pyhäsalmi Cu-Zn mine, Finland • Acquired in March 2013 • One of the most efficient underground mines in the world • Estimated mine life of 6 years • Average grade of 1.1% copper and 1.9% zinc • Workforce = 210 employees • Q3 C1 cash cost of US$0.65/lb. copper • 2013 Estimates: – 9,000 – 11,000 tonnes of copper – 16,000 – 18,000 tonnes of zinc – 820,000 tonnes pyrite 14
  • 15. Outlook for 2013 Production Copper Zinc (000’s contained tonnes) (000’s ounces) (000’s tonnes) 397 - 416 260 - 267 37 - 41 15 - 16 23 - 26 53 - 55 9 - 11 44 - 47 35 – 37 9 - 10 - 232 – 250 155 – 165 56 – 61 11 - 12 4–5 6-7 46 - 50 30 - 32 16 - 18 Copper Nickel Unit cash cost Capital expenditure Gold (000’s tonnes) Group Kansanshi Guelb Moghrein Ravensthorpe Kevitsa Çayeli1 Las Cruces1 Pyhäsalmi1 Group Nickel (US$/lb.) (US$/lb.) $1.37 - $1.45 $5.20 - $5.60 Excluding Cobre Panama $2.0 billion The production guidance shown above for Çayeli, Las Cruces and Pyhäsalmi represents guidance from acquisition date of March 22, 2013 until the end of the year. 1 15
  • 16. Our Development Project Pipeline 16
  • 17. Our Project Pipeline Copper Smelter, Zambia • Processing capacity of 1.2 Mtpa —Combination of concentrate from Kansanshi & Sentinel —Average copper grade 26% • Copper production 300,000 tpa; acid production 1.0 Mtpa • Estimates: − Capital cost of US$690M − Commissioning from mid 2014 • Estimated savings: − US$340M - US$510M/year • Expansion being planned to increase processing capacity to 2 Mtpa in 2017 17
  • 18. Our Project Pipeline Sentinel Cu project, Zambia • Located ~ 140 km northwest of Solwezi, northern Zambia • M&I resource of 1,027 Mt at 0.51% Cu grade, containing 5.2 Mt Cu • Estimates: – 2.2:1 LOM strip ratio – >15 years mine life – Annual production up to 300,000 tonnes – US$2.0 billion capex (incl. Enterprise nickel project) – Completion targeted for mid-2014 • Includes 4 Mtpa nickel facility; flexibility to augment copper capacity 18
  • 19. Our Project Pipeline Cobre Panama Cu project, Panama • Acquired March 2013 • Large open pit copper project; Larger project than the Panama Canal • Est. mine life of 40 years • Est. average annual production of 260,000 tonnes copper • Progress since acquisition: – – – – – Several contracts modified or cancelled Transformed to complete self-perform arrangement All key aspects fully functional allowing activities to advance efficiently Access to site improved Biodiversity, environmental and social programs continuing 19
  • 20. Our Project Pipeline Haquira Cu project, Peru • Focused on community & environmental aspects • Potential: - 20 year mine life – Avg 190k tonnes of copper production per year 20
  • 21. One of the Few Mining Companies Investing in Building Capacity
  • 22. Forces at work in copper market suggest medium- to long-term prices driven by greenfield incentive pricing as market tightens $3.75 - 4.00/lb Short- and medium-term corrections to demand especially if deficit is expected to be prolonged $3.25 - 3.50/lb Incentive price for marginal greenfield projects needed to meet modest demand growth Design adjustments and substitution Slowing growth driven by macroeconomics Mines depleting, projects difficult to build and fund ~$3.00/lb Strategic buyers see value versus all-in cash costs and future greenfield needs $2.80 - $3.00/lb 90th percentile total cash + susex cost (growing at 2.5% p.a. on a real basis) $2.20/lb 90th percentile C1 cash cost (growing at 2.5% p.a. on a real basis) Price floor on a year over year basis Medium- to long-term price range Short-term price range Strategic buyers and traders, disruptions and project issues Real cost inflation, strained balance sheets and need for miners to have cash to replace reserves Analyst LT consensus price Price floor on a quarter over quarter basis 22
  • 23. The New Global Copper Leader The New Go-To Copper Producer Attractive Diverse Geographic Exposure A Long-Standing Commitment to Social and Environmental Excellence Creating Value with Our Project Development Expertise 1.8 2018E Copper Production, Mt 1.5 0.5 0.5 0.4 0.4 0.3 First Quantum 2012 0.5 Norilsk 0.6 Antofagasta 0.8 Teck Resources 0.8 Kazakhmys Southern Copper BHP Billiton First Quantum Codelco Glencore Xstrata FreeportMcMoRan 0.9 Vale 1.2 KGHM 1.3 Anglo American 1.5 Rio Tinto • • • • Source: BrookHunt 23
  • 24. The New Leader in Global Copper December 2013