SlideShare a Scribd company logo
1 of 2
DylanChase
Sustainability495
8 May 2016
Sustainability 495 Internship Final Report
My internshipatBay Bridge Brewingconsistedof twoareasof theirbusinesswhichcouldbe analyzed
and be givenimprovementsinordertomake a more sustainable atmosphere.One of those areaswas
improvingthe propylene glycolcoolingsystemtheyuse to ensure the waterusedinthe brewingprocess
isat the propertemperature.The secondiswaterusage.The brewingprocessrequiresanimmense
amountof waterand I foundseveral waysBayBridge canreduce theirconsumption.Bothfacetsof the
businessIaimedtoimprove specificallybenefittediteconomicallyandenvironmentally.
Propylene Glycol Pipe Insulation:Propylene glycol playsavital role inthe brewingprocess.Wateris
mixedwiththe chemical toactas antifreeze.Thisallowsthe watertodropto the desiredtemperature
(25-27 degreesFahrenheit)withoutfreezing.The cool waterflowsfromthe electrically-poweredchiller
to jacketssurroundingeachfermentingtank,therebyindirectlycoolingthe beermixtureinthe tankto
the desiredtemperature. PVCpipingactsas the vehicle fortransportingthe propyleneglycol-water
mixture toeach fermenter.The breweryhadseveralfeetof bare PVCwithnoinsulationsurroundingit.
Glycol-treatedwaterrangingintemperature from25-27 degreesFahrenheit travelingthrough
uninsulatedpipingsurroundedbyroomtemperatureaircausesa decrease incoldretention.Asaresult,
the temperature the waterleavesthe chillerhasto be lowerthan25 degreesinorderforthe water to
enterthe coolingjacketsof the fermentersatthe 25-27 degree range.Puttinginsulationaroundthe
pipingusedtocarry cool waterto the fermentershelpspreventthe needtochill the watermore than
normal,thususinglesselectricity. Iwenttoa local plumbingstore topurchase the insulationneededto
coverall of the pipinginthe brewery.The insulationcame asfoamwrappingwithadhesiveateachend
to ensure the wrapstayedonthe pipe.However,Ialso boughtzip tiesof appropriate lengthtotie the
foamwrappingas an added precautionjustincase the adhesive failedovertime.Aftermeasuringall of
the pipingof eachsize inthe breweryusingatape measure,Iwentto the local plumbingstore and
purchased these lengthsandsizes:
Hose (1.27 indiameter):260 in of insulation
VerySmall Chillerpipe (1.11indiameter):7in of insulation
Small ChillerPipe (1.59indiameter):35 inof insulation
Overhead(1.63 indiameter):35in of insulation
Total lengthof insulation:337 in(28.08 ft)
Applyingthe insulationtothe propylene glycol pipesdoestwothings.One,because the insulation
allowsformore coldretentionof the glycol,lessenergyisusedtocool the liquid,resultinginless
electricityuse (asexplainedabove).Becauseof this,BayBridge’selectricitybill goesdownalongwithits
reliance on energycreatedbynon-renewable fossilfuels.Second,constantlykeepingone batchof glycol
cyclingthroughthe chiller/pipe systemata steadycool temperature asaresultof insulationhelps
reduce the amountto propylene glycolintroducedintothe environment. Whenpropylene glycolenters
aquaticenvironments,fishandothercreaturesrequirelarge amountsof oxygeninordertodecompose
it whenthe chemical enterstheirbody.Thiscauses“deadzones”inareasof water lackingoxygen,which
causesmass deathto all species.
Water Usage:The brewingprocessrequiresalarge amountof water foreach batch of beer.Bay Bridge
brewingdoeswhatitcan to save waterby reducingthe amountitusesand alsoby recoveringand
reusingwater. Foran average 12 barrel batch (372 gallons),BayBridge usesthe followingamountof
water:
Mash in: 226 gallons
Sparge:263 gallons
Knockout(cooling):527gallons(70% recoveredfornext3-4batches)
Kegwashfor batch: 144 gallons
Total waterused:1,160 gallons
To combat wastingof such an enormousamountof water,Icomprisedalistof productsand systems
Bay Bridge couldimplementinthe future:
Kitchenstyle sink:The currentsinkusedtorinse glassesandcleanglassesatthe taster room bar isa
standardleverfaucet.Changingthistoa restaurantstyle systemoperatedbya footpedal wouldsave
waterbecause itreducesthe amountof time the waterruns freelywithoutbeingusedwhenswitching
the wateron and off or by leavingitrunningbyaccident(the userautomaticallyturnsthe wateroff
whenhe/she walksawayfromthe sink).
CIP(Clean-InPlace) systems:These typesof machinesandpipescleanthemselvesinternallyratherthan
themhavingto disassembledandcleaned.Thissaves waterbykeepingrinsingliquidinsideanapparatus
and notwastingit byover-rinsingandproducingunrecoverablewaste water.
LeakDetectors:Electronicsensorsplacedinareaswhere leaksare possible (Ground,hose portsinto
tanks,pipe joints,etc.) andcreate alarmwhenwaterispresent.These sensorssave waterbutalertingto
a leakimmediatelysothatcan be repaired.
Usingunrecoverable waterforplants:Plantsinside the breweryandtasterroomgrownfrom
wastewatercanheightenthe aestheticatmosphere,contributingamore positive environmentfor
currentor future customers.
Upside downglassrinser:automaticallycleanspintglassesusingpreciseamountof water.Thissaves
waterby eliminatingirregularityinwaterusage bya humancleaningeachdirtyglassbyhand.
It has beenapleasure workingwithJimandeverybodyatBayBridge Brewingthissemester.Ilearneda
lotabout howmy majorconnectswiththe brewingprocessandhow importantitisto incorporate
sustainabilityinto eachfacetof it. I leave college knowingthatImade a directimpact ontheir
sustainabilitypracticesandhope mysuggestionshelptheminthe future whenIleave.

More Related Content

Similar to sustainability report

Algae growth and long term storage
Algae growth and long term storageAlgae growth and long term storage
Algae growth and long term storageMichaelSmith808947
 
Optimise cooling rotational moulding
Optimise cooling rotational moulding Optimise cooling rotational moulding
Optimise cooling rotational moulding Ian Hansen
 
Case Study - GlassRite_16 10 08_1230
Case Study - GlassRite_16 10 08_1230Case Study - GlassRite_16 10 08_1230
Case Study - GlassRite_16 10 08_1230Kevin Holmes
 
Better Builder Magazine, Issue 35 / Autumn 2020
Better Builder Magazine, Issue 35 / Autumn 2020Better Builder Magazine, Issue 35 / Autumn 2020
Better Builder Magazine, Issue 35 / Autumn 2020Better Builder Magazine
 
Hashaikeh 2007 Fuel
Hashaikeh 2007 FuelHashaikeh 2007 Fuel
Hashaikeh 2007 FuelJalal Hawari
 
Indoor swimming pool environmental control system-BLUEWAY
Indoor swimming pool environmental control system-BLUEWAYIndoor swimming pool environmental control system-BLUEWAY
Indoor swimming pool environmental control system-BLUEWAYRoger Luo
 
Katara Project presentation slides
Katara Project presentation slidesKatara Project presentation slides
Katara Project presentation slidesZiggyGeorge
 
Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)Trena Wilson
 
Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)Trena Wilson
 
New Belgium Brewery
New Belgium Brewery New Belgium Brewery
New Belgium Brewery Jitendra Das
 
Copy of final ppt
Copy of final pptCopy of final ppt
Copy of final pptAJAY SHAHU
 
Frigel Process Cooling & Control for Brewery Applications
Frigel Process Cooling & Control for Brewery ApplicationsFrigel Process Cooling & Control for Brewery Applications
Frigel Process Cooling & Control for Brewery ApplicationsBenjamin Sutch
 
MgCl2 and KCl Recovery from Brine Wastewater Treatment
MgCl2 and KCl Recovery from Brine Wastewater Treatment MgCl2 and KCl Recovery from Brine Wastewater Treatment
MgCl2 and KCl Recovery from Brine Wastewater Treatment Kyra Berger
 
PARKERWONG - Saving Water-3
PARKERWONG - Saving Water-3PARKERWONG - Saving Water-3
PARKERWONG - Saving Water-3Alex Farren
 
Water Quality Management | Berg Chilling Systems - Part 2
Water Quality Management | Berg Chilling Systems - Part 2Water Quality Management | Berg Chilling Systems - Part 2
Water Quality Management | Berg Chilling Systems - Part 2Berg Chilling Systems Inc.
 

Similar to sustainability report (20)

Algae growth and long term storage
Algae growth and long term storageAlgae growth and long term storage
Algae growth and long term storage
 
Optimise cooling rotational moulding
Optimise cooling rotational moulding Optimise cooling rotational moulding
Optimise cooling rotational moulding
 
Case Study - GlassRite_16 10 08_1230
Case Study - GlassRite_16 10 08_1230Case Study - GlassRite_16 10 08_1230
Case Study - GlassRite_16 10 08_1230
 
36 x 72 1 (2)
36 x 72  1 (2)36 x 72  1 (2)
36 x 72 1 (2)
 
Better Builder Magazine, Issue 35 / Autumn 2020
Better Builder Magazine, Issue 35 / Autumn 2020Better Builder Magazine, Issue 35 / Autumn 2020
Better Builder Magazine, Issue 35 / Autumn 2020
 
Hashaikeh 2007 Fuel
Hashaikeh 2007 FuelHashaikeh 2007 Fuel
Hashaikeh 2007 Fuel
 
Indoor swimming pool environmental control system-BLUEWAY
Indoor swimming pool environmental control system-BLUEWAYIndoor swimming pool environmental control system-BLUEWAY
Indoor swimming pool environmental control system-BLUEWAY
 
Katara Project presentation slides
Katara Project presentation slidesKatara Project presentation slides
Katara Project presentation slides
 
Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)
 
Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)Ecolo blue corporate-presentation-2016-metric-low (1)
Ecolo blue corporate-presentation-2016-metric-low (1)
 
Klaas Visser, KAV Consulting
Klaas Visser, KAV ConsultingKlaas Visser, KAV Consulting
Klaas Visser, KAV Consulting
 
20180926230120_73171.pdf
20180926230120_73171.pdf20180926230120_73171.pdf
20180926230120_73171.pdf
 
New Belgium Brewery
New Belgium Brewery New Belgium Brewery
New Belgium Brewery
 
Copy of final ppt
Copy of final pptCopy of final ppt
Copy of final ppt
 
Frigel Process Cooling & Control for Brewery Applications
Frigel Process Cooling & Control for Brewery ApplicationsFrigel Process Cooling & Control for Brewery Applications
Frigel Process Cooling & Control for Brewery Applications
 
MgCl2 and KCl Recovery from Brine Wastewater Treatment
MgCl2 and KCl Recovery from Brine Wastewater Treatment MgCl2 and KCl Recovery from Brine Wastewater Treatment
MgCl2 and KCl Recovery from Brine Wastewater Treatment
 
Mjs Portfolio
Mjs PortfolioMjs Portfolio
Mjs Portfolio
 
D519 PPT.pptx
D519 PPT.pptxD519 PPT.pptx
D519 PPT.pptx
 
PARKERWONG - Saving Water-3
PARKERWONG - Saving Water-3PARKERWONG - Saving Water-3
PARKERWONG - Saving Water-3
 
Water Quality Management | Berg Chilling Systems - Part 2
Water Quality Management | Berg Chilling Systems - Part 2Water Quality Management | Berg Chilling Systems - Part 2
Water Quality Management | Berg Chilling Systems - Part 2
 

sustainability report

  • 1. DylanChase Sustainability495 8 May 2016 Sustainability 495 Internship Final Report My internshipatBay Bridge Brewingconsistedof twoareasof theirbusinesswhichcouldbe analyzed and be givenimprovementsinordertomake a more sustainable atmosphere.One of those areaswas improvingthe propylene glycolcoolingsystemtheyuse to ensure the waterusedinthe brewingprocess isat the propertemperature.The secondiswaterusage.The brewingprocessrequiresanimmense amountof waterand I foundseveral waysBayBridge canreduce theirconsumption.Bothfacetsof the businessIaimedtoimprove specificallybenefittediteconomicallyandenvironmentally. Propylene Glycol Pipe Insulation:Propylene glycol playsavital role inthe brewingprocess.Wateris mixedwiththe chemical toactas antifreeze.Thisallowsthe watertodropto the desiredtemperature (25-27 degreesFahrenheit)withoutfreezing.The cool waterflowsfromthe electrically-poweredchiller to jacketssurroundingeachfermentingtank,therebyindirectlycoolingthe beermixtureinthe tankto the desiredtemperature. PVCpipingactsas the vehicle fortransportingthe propyleneglycol-water mixture toeach fermenter.The breweryhadseveralfeetof bare PVCwithnoinsulationsurroundingit. Glycol-treatedwaterrangingintemperature from25-27 degreesFahrenheit travelingthrough uninsulatedpipingsurroundedbyroomtemperatureaircausesa decrease incoldretention.Asaresult, the temperature the waterleavesthe chillerhasto be lowerthan25 degreesinorderforthe water to enterthe coolingjacketsof the fermentersatthe 25-27 degree range.Puttinginsulationaroundthe pipingusedtocarry cool waterto the fermentershelpspreventthe needtochill the watermore than normal,thususinglesselectricity. Iwenttoa local plumbingstore topurchase the insulationneededto coverall of the pipinginthe brewery.The insulationcame asfoamwrappingwithadhesiveateachend to ensure the wrapstayedonthe pipe.However,Ialso boughtzip tiesof appropriate lengthtotie the foamwrappingas an added precautionjustincase the adhesive failedovertime.Aftermeasuringall of the pipingof eachsize inthe breweryusingatape measure,Iwentto the local plumbingstore and purchased these lengthsandsizes: Hose (1.27 indiameter):260 in of insulation VerySmall Chillerpipe (1.11indiameter):7in of insulation Small ChillerPipe (1.59indiameter):35 inof insulation Overhead(1.63 indiameter):35in of insulation Total lengthof insulation:337 in(28.08 ft) Applyingthe insulationtothe propylene glycol pipesdoestwothings.One,because the insulation allowsformore coldretentionof the glycol,lessenergyisusedtocool the liquid,resultinginless electricityuse (asexplainedabove).Becauseof this,BayBridge’selectricitybill goesdownalongwithits reliance on energycreatedbynon-renewable fossilfuels.Second,constantlykeepingone batchof glycol cyclingthroughthe chiller/pipe systemata steadycool temperature asaresultof insulationhelps reduce the amountto propylene glycolintroducedintothe environment. Whenpropylene glycolenters
  • 2. aquaticenvironments,fishandothercreaturesrequirelarge amountsof oxygeninordertodecompose it whenthe chemical enterstheirbody.Thiscauses“deadzones”inareasof water lackingoxygen,which causesmass deathto all species. Water Usage:The brewingprocessrequiresalarge amountof water foreach batch of beer.Bay Bridge brewingdoeswhatitcan to save waterby reducingthe amountitusesand alsoby recoveringand reusingwater. Foran average 12 barrel batch (372 gallons),BayBridge usesthe followingamountof water: Mash in: 226 gallons Sparge:263 gallons Knockout(cooling):527gallons(70% recoveredfornext3-4batches) Kegwashfor batch: 144 gallons Total waterused:1,160 gallons To combat wastingof such an enormousamountof water,Icomprisedalistof productsand systems Bay Bridge couldimplementinthe future: Kitchenstyle sink:The currentsinkusedtorinse glassesandcleanglassesatthe taster room bar isa standardleverfaucet.Changingthistoa restaurantstyle systemoperatedbya footpedal wouldsave waterbecause itreducesthe amountof time the waterruns freelywithoutbeingusedwhenswitching the wateron and off or by leavingitrunningbyaccident(the userautomaticallyturnsthe wateroff whenhe/she walksawayfromthe sink). CIP(Clean-InPlace) systems:These typesof machinesandpipescleanthemselvesinternallyratherthan themhavingto disassembledandcleaned.Thissaves waterbykeepingrinsingliquidinsideanapparatus and notwastingit byover-rinsingandproducingunrecoverablewaste water. LeakDetectors:Electronicsensorsplacedinareaswhere leaksare possible (Ground,hose portsinto tanks,pipe joints,etc.) andcreate alarmwhenwaterispresent.These sensorssave waterbutalertingto a leakimmediatelysothatcan be repaired. Usingunrecoverable waterforplants:Plantsinside the breweryandtasterroomgrownfrom wastewatercanheightenthe aestheticatmosphere,contributingamore positive environmentfor currentor future customers. Upside downglassrinser:automaticallycleanspintglassesusingpreciseamountof water.Thissaves waterby eliminatingirregularityinwaterusage bya humancleaningeachdirtyglassbyhand. It has beenapleasure workingwithJimandeverybodyatBayBridge Brewingthissemester.Ilearneda lotabout howmy majorconnectswiththe brewingprocessandhow importantitisto incorporate sustainabilityinto eachfacetof it. I leave college knowingthatImade a directimpact ontheir sustainabilitypracticesandhope mysuggestionshelptheminthe future whenIleave.