SlideShare a Scribd company logo
1 of 1
Download to read offline
Reference Drawings
Drawing No. Title
This drawing is the copyright of Crown House Technologies Ltd. and must
not be copied or reproduced in part or in whole without their permission.
COMPUTER AIDED DRAWING - AVOID MANUAL MODIFICATION
This drawing must not be scaled.
All dimensions to be checked on site
Site Key Plan
Checked:
Appr'd:
Drn.
Rev:Drawing Number:
Date:
Drawn:
Date:
Original Drawing Size A0
Scale: 1:20@A0
Project:
CAD File Name: AH-CHT-Z1-02-DR-M-XX-MOD-01
Department: CHT CAD
Drawing Title:
Project:
Status:
Revision ChkRev. Date
Manchester Office
Archway 3
Birley Fields
Hulme
Manchester M15 5QJ
Tel: +44(0)161 227 6300
Fax:+44(0)161 227 6399
www.crownhouse.com
Architect: Consulting Engineer:
Client:
HOARE LEA & Partners
Manchester office
Royal Exchange
Cross Street
Manchester
M2 7FL
BDP.
11 Ducie Street
PO. Box 85, Piccadilly Basin
Manchester
M60 3JA
CONSTRUCTION
Alder Hey Children's Health Park
V3365
D. HART SNR.
R.O.
22/11/13
C01
R.O.
22/11/13
DHSISSUED FOR COMMENT/APPROVAL ROP01 22/11/13
SECOND FLOOR.
ZONE 1.
PIPEWORK MODULE MOD-L2-Z1-01.
Legend:
F = FLOW
R = RETURN
N = NIPPLE
U = UNION
T = TEE
VC = VICTAULIC COUPLING
MP = MID POINT
SO = SLIP ON
SC = SLIP COUPLING
TE = THREADED END
GE = GROOVED END
FA = FLANGE ADAPTOR
DHSISSUED FOR CONSTRUCTION ROC01 20/01/14
RE-DRAWN TO SUIT REVISED DESIGN

More Related Content

What's hot

Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud M.Khairy
 
Mahmoud_Bakr_Portfolio
Mahmoud_Bakr_PortfolioMahmoud_Bakr_Portfolio
Mahmoud_Bakr_Portfolio
Mahmoud Bakr
 
CV -SADDAM HUSSAIN UPDATED
CV -SADDAM HUSSAIN UPDATEDCV -SADDAM HUSSAIN UPDATED
CV -SADDAM HUSSAIN UPDATED
saddam hussain
 
3D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 03D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 0
Rochelle Abrie
 
M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)
Zahy Haddad
 

What's hot (20)

6000-PD-53-1002-C01
6000-PD-53-1002-C016000-PD-53-1002-C01
6000-PD-53-1002-C01
 
C.V
C.VC.V
C.V
 
Analysis and design project titles
Analysis and design project titles Analysis and design project titles
Analysis and design project titles
 
6000-PD-53-1001-C01
6000-PD-53-1001-C016000-PD-53-1001-C01
6000-PD-53-1001-C01
 
6000-PD-61-1001-C04
6000-PD-61-1001-C046000-PD-61-1001-C04
6000-PD-61-1001-C04
 
Cv update
Cv updateCv update
Cv update
 
my resume
my resumemy resume
my resume
 
Khaled fahmy
Khaled fahmyKhaled fahmy
Khaled fahmy
 
TALLEST 20 IN 2020
TALLEST 20 IN 2020TALLEST 20 IN 2020
TALLEST 20 IN 2020
 
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)
 
Mahmoud_Bakr_Portfolio
Mahmoud_Bakr_PortfolioMahmoud_Bakr_Portfolio
Mahmoud_Bakr_Portfolio
 
CV -SADDAM HUSSAIN UPDATED
CV -SADDAM HUSSAIN UPDATEDCV -SADDAM HUSSAIN UPDATED
CV -SADDAM HUSSAIN UPDATED
 
CV RAFAEL CAMACHO MONTES
CV RAFAEL CAMACHO MONTESCV RAFAEL CAMACHO MONTES
CV RAFAEL CAMACHO MONTES
 
CV Efstathios Kanios 2017
CV Efstathios Kanios 2017CV Efstathios Kanios 2017
CV Efstathios Kanios 2017
 
Top CAD/Construction products and services
Top CAD/Construction products and servicesTop CAD/Construction products and services
Top CAD/Construction products and services
 
Mina 2016
Mina 2016Mina 2016
Mina 2016
 
3D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 03D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 0
 
mahmoud elsadat
mahmoud elsadatmahmoud elsadat
mahmoud elsadat
 
Design portfolio sample
Design portfolio sampleDesign portfolio sample
Design portfolio sample
 
M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)
M-BD6-2E2SS0-CA00-EDR-005010_00Bv02 (1)
 

Similar to AH_CHT_Z1_02_DR_M_XX_MOD_01_C1

Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016
Warren Tann
 
CHT-G(XX)X-X-MOD-02-UOG-MOD-02
CHT-G(XX)X-X-MOD-02-UOG-MOD-02CHT-G(XX)X-X-MOD-02-UOG-MOD-02
CHT-G(XX)X-X-MOD-02-UOG-MOD-02
Douglas Hart Snr
 
NDW Introduction Letter & Previous Completed Project Details.
NDW Introduction Letter & Previous Completed Project Details.NDW Introduction Letter & Previous Completed Project Details.
NDW Introduction Letter & Previous Completed Project Details.
Nilesh Wani
 

Similar to AH_CHT_Z1_02_DR_M_XX_MOD_01_C1 (18)

Mahendran CV
Mahendran CVMahendran CV
Mahendran CV
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016
 
AMW FIXTURES
AMW FIXTURESAMW FIXTURES
AMW FIXTURES
 
Donald Mitchell
Donald MitchellDonald Mitchell
Donald Mitchell
 
Narendra Singh_2016
Narendra Singh_2016Narendra Singh_2016
Narendra Singh_2016
 
CHT-G(XX)X-X-MOD-14-02-C2
CHT-G(XX)X-X-MOD-14-02-C2CHT-G(XX)X-X-MOD-14-02-C2
CHT-G(XX)X-X-MOD-14-02-C2
 
CHT-G(XX)X-X-MOD-02-UOG-MOD-02
CHT-G(XX)X-X-MOD-02-UOG-MOD-02CHT-G(XX)X-X-MOD-02-UOG-MOD-02
CHT-G(XX)X-X-MOD-02-UOG-MOD-02
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
HSNL VF ES (View 1).pdf
HSNL VF ES (View 1).pdfHSNL VF ES (View 1).pdf
HSNL VF ES (View 1).pdf
 
Project consultancy
Project consultancyProject consultancy
Project consultancy
 
Aashray Design Consultants - Institutional Projects
Aashray Design Consultants - Institutional ProjectsAashray Design Consultants - Institutional Projects
Aashray Design Consultants - Institutional Projects
 
CEESPL_COMPANY_PROFILE_F
CEESPL_COMPANY_PROFILE_FCEESPL_COMPANY_PROFILE_F
CEESPL_COMPANY_PROFILE_F
 
Mecci engineers pvt ltd, Mecci engineers noida, India
 Mecci engineers pvt ltd, Mecci engineers noida, India Mecci engineers pvt ltd, Mecci engineers noida, India
Mecci engineers pvt ltd, Mecci engineers noida, India
 
www.mecciengineers.com
www.mecciengineers.comwww.mecciengineers.com
www.mecciengineers.com
 
Angle Plan Annie Stage 12
Angle Plan  Annie Stage 12Angle Plan  Annie Stage 12
Angle Plan Annie Stage 12
 
NDW Introduction Letter & Previous Completed Project Details.
NDW Introduction Letter & Previous Completed Project Details.NDW Introduction Letter & Previous Completed Project Details.
NDW Introduction Letter & Previous Completed Project Details.
 
AStancescu Nov2014
AStancescu Nov2014AStancescu Nov2014
AStancescu Nov2014
 

More from Douglas Hart Snr (20)

TUNE-HOTEL-A-VENT-01
TUNE-HOTEL-A-VENT-01TUNE-HOTEL-A-VENT-01
TUNE-HOTEL-A-VENT-01
 
Stepps-PS
Stepps-PSStepps-PS
Stepps-PS
 
SLS-Duncanrigg
SLS-DuncanriggSLS-Duncanrigg
SLS-Duncanrigg
 
PRUDENTIAL-STIRLING-A-6245-M02
PRUDENTIAL-STIRLING-A-6245-M02PRUDENTIAL-STIRLING-A-6245-M02
PRUDENTIAL-STIRLING-A-6245-M02
 
PRUDENTIAL-STIRLING-A-6245-M01
PRUDENTIAL-STIRLING-A-6245-M01PRUDENTIAL-STIRLING-A-6245-M01
PRUDENTIAL-STIRLING-A-6245-M01
 
NAT-MUSEUM-Layout1
NAT-MUSEUM-Layout1NAT-MUSEUM-Layout1
NAT-MUSEUM-Layout1
 
HELENSBURGH-B-VENT-01
HELENSBURGH-B-VENT-01HELENSBURGH-B-VENT-01
HELENSBURGH-B-VENT-01
 
HANDM-EDINBURGH-AF-61-01
HANDM-EDINBURGH-AF-61-01HANDM-EDINBURGH-AF-61-01
HANDM-EDINBURGH-AF-61-01
 
GRI-8062-01
GRI-8062-01GRI-8062-01
GRI-8062-01
 
EDINBURGH-ACADEMY-E-VENT-01
EDINBURGH-ACADEMY-E-VENT-01EDINBURGH-ACADEMY-E-VENT-01
EDINBURGH-ACADEMY-E-VENT-01
 
DUNBLANE-DB-01
DUNBLANE-DB-01DUNBLANE-DB-01
DUNBLANE-DB-01
 
CUMNOCK-E-VENT-01
CUMNOCK-E-VENT-01CUMNOCK-E-VENT-01
CUMNOCK-E-VENT-01
 
CRAMOND-VENT-01
CRAMOND-VENT-01CRAMOND-VENT-01
CRAMOND-VENT-01
 
CASTLEMILK-VENT-01
CASTLEMILK-VENT-01CASTLEMILK-VENT-01
CASTLEMILK-VENT-01
 
BRIGHTON-M01-6232
BRIGHTON-M01-6232BRIGHTON-M01-6232
BRIGHTON-M01-6232
 
Bearsden-Academy
Bearsden-AcademyBearsden-Academy
Bearsden-Academy
 
BBC-HQ-Scotland-2
BBC-HQ-Scotland-2BBC-HQ-Scotland-2
BBC-HQ-Scotland-2
 
BBC-HQ-Scotland-1
BBC-HQ-Scotland-1BBC-HQ-Scotland-1
BBC-HQ-Scotland-1
 
Bargeddie-PS
Bargeddie-PSBargeddie-PS
Bargeddie-PS
 
AYR-COLLEGE-C-VENT-02-C
AYR-COLLEGE-C-VENT-02-CAYR-COLLEGE-C-VENT-02-C
AYR-COLLEGE-C-VENT-02-C
 

AH_CHT_Z1_02_DR_M_XX_MOD_01_C1

  • 1. Reference Drawings Drawing No. Title This drawing is the copyright of Crown House Technologies Ltd. and must not be copied or reproduced in part or in whole without their permission. COMPUTER AIDED DRAWING - AVOID MANUAL MODIFICATION This drawing must not be scaled. All dimensions to be checked on site Site Key Plan Checked: Appr'd: Drn. Rev:Drawing Number: Date: Drawn: Date: Original Drawing Size A0 Scale: 1:20@A0 Project: CAD File Name: AH-CHT-Z1-02-DR-M-XX-MOD-01 Department: CHT CAD Drawing Title: Project: Status: Revision ChkRev. Date Manchester Office Archway 3 Birley Fields Hulme Manchester M15 5QJ Tel: +44(0)161 227 6300 Fax:+44(0)161 227 6399 www.crownhouse.com Architect: Consulting Engineer: Client: HOARE LEA & Partners Manchester office Royal Exchange Cross Street Manchester M2 7FL BDP. 11 Ducie Street PO. Box 85, Piccadilly Basin Manchester M60 3JA CONSTRUCTION Alder Hey Children's Health Park V3365 D. HART SNR. R.O. 22/11/13 C01 R.O. 22/11/13 DHSISSUED FOR COMMENT/APPROVAL ROP01 22/11/13 SECOND FLOOR. ZONE 1. PIPEWORK MODULE MOD-L2-Z1-01. Legend: F = FLOW R = RETURN N = NIPPLE U = UNION T = TEE VC = VICTAULIC COUPLING MP = MID POINT SO = SLIP ON SC = SLIP COUPLING TE = THREADED END GE = GROOVED END FA = FLANGE ADAPTOR DHSISSUED FOR CONSTRUCTION ROC01 20/01/14 RE-DRAWN TO SUIT REVISED DESIGN