1. Reference Drawings
Drawing No. Title
This drawing is the copyright of Crown House Technologies Ltd. and must
not be copied or reproduced in part or in whole without their permission.
COMPUTER AIDED DRAWING - AVOID MANUAL MODIFICATION
This drawing must not be scaled.
All dimensions to be checked on site
Site Key Plan
Checked:
Appr'd:
Drn.
Rev:Drawing Number:
Date:
Drawn:
Date:
Original Drawing Size A0
Scale: 1:20@A0
Project:
CAD File Name: AH-CHT-Z1-02-DR-M-XX-MOD-01
Department: CHT CAD
Drawing Title:
Project:
Status:
Revision ChkRev. Date
Manchester Office
Archway 3
Birley Fields
Hulme
Manchester M15 5QJ
Tel: +44(0)161 227 6300
Fax:+44(0)161 227 6399
www.crownhouse.com
Architect: Consulting Engineer:
Client:
HOARE LEA & Partners
Manchester office
Royal Exchange
Cross Street
Manchester
M2 7FL
BDP.
11 Ducie Street
PO. Box 85, Piccadilly Basin
Manchester
M60 3JA
CONSTRUCTION
Alder Hey Children's Health Park
V3365
D. HART SNR.
R.O.
22/11/13
C01
R.O.
22/11/13
DHSISSUED FOR COMMENT/APPROVAL ROP01 22/11/13
SECOND FLOOR.
ZONE 1.
PIPEWORK MODULE MOD-L2-Z1-01.
Legend:
F = FLOW
R = RETURN
N = NIPPLE
U = UNION
T = TEE
VC = VICTAULIC COUPLING
MP = MID POINT
SO = SLIP ON
SC = SLIP COUPLING
TE = THREADED END
GE = GROOVED END
FA = FLANGE ADAPTOR
DHSISSUED FOR CONSTRUCTION ROC01 20/01/14
RE-DRAWN TO SUIT REVISED DESIGN