Apart from targeting rural development, the Finance Ministry’s new budget
announcement at the end of February 2016 prioritised the need to upgrade
infrastructure and reinvigorate investment in the sector. The finance minister,
Arun Jaitley, acknowledged in his budget speech that India had fallen short of its
targets for modernising its infrastructure and that many of the projects have
been stalled by disputes, red tape and lack of finance. In order to sustain India’s
rapid economic growth, the government is dedicated to reviving investments in
infrastructure and allocating more funds through various proposals. With the
new budget, the government allocated USD 32 billion for infrastructure
development in 2016-17, a 22.5% (or USD 5.9 Billion) increase YoY. A year
earlier, the 2015 budget, had additional spend of USD 11 billion on
infrastructure outlay.
However, with a huge infrastructure supply gap the country’s funding
requirement is much larger. A CRISIL study stated that India needs INR 6 trillion
of investments every year or around INR 17 billion every day from April 2015 to
March 2020. In short, India needs INR 31 trillion in investment over the next five
years to provide uninterrupted power to homes and factories, and improve
roads, telecom, transport and other urban infrastructure. Over each of the last
three government’s five-year plans, estimated investments in infrastructure
have doubled and a larger share of investments was projected to come from
the private sector. One of the main challenges in scaling up private investment
was the mobilisation of debt financing for meeting the ambitious targets set by
the Government.
Dharish	David	
Dharish.David@Uzabase.com	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
20160518	Dharish	David				dharish.david@Uzabase.com
02	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
	
India’s	Five-year	Plans	 Time	Period	
Proposed	Investments	in	
Infrastructure	
(USD	Billion)	
Private	Sector	Investments	
(Share	as	%)	
Tenth	Five-year	Plan	 2002	-	2007	 240	 22%	
Eleventh	Five-year	Plan	 2007	-	2012	 500	 37%	
Twelfth	Five-year	Plan	 2012	-	2017	 1,025	 49%	
Source:	Uzabase	from	various	sources	
	
Under the current Prime Minister, Narendra Modi, whose unwavering goal has
been to boost economic growth, the daunting task has been to attract private
sector capital to improve roads, rail, ports, power and other infrastructure. The
government is now opting to use public money to kick-start investments in the
sector, as many projects have been stalled by a lack of private funding. This
year’s budget included USD 11 billion in increased commitments through
Private Sector Enterprises for infrastructure investment.
More involvement by the private sector through investments and project
operations has become a reality through models like Public-Private Participation
(PPP), which not only allows the private sector to raise capital but also improve
the efficiency of projects. Given the fiscal constraints that exist, there has
always been pressure on public investments at the scale required, PPP has
emerged as the principal vehicle for attracting private investment in
infrastructure, and India has attracted a lot of PPP investments over the years. A
large portion of theses PPP projects rely on private capital that has to be raised
from domestic financial institutions.
03	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
The challenge in India and in a lot of other developing countries is that they do
not have the capacity or instruments to provide long-tenure debt for projects
having a long payback period. Since PPP projects have been usually financed on
a 30:70 ratio of equity and debt, mobilisation of the requisite debt resources
has become a mounting challenge, and many infrastructure project promoters
are now submerged under huge loans that have turned non-performing. To pay
off at least a portion of their bad debt these large project developers are
desperately selling their cash-generating assets, crippling cash flows and
financial capacity. On the other hand, banks and financial institutions (FIs) are
seeing their books turn bad, and cannot lend any further to these borrowers.
The big dilemma facing the government, banks and corporates in recent years is
raising resources for many stalled infrastructure projects. According to the
Centre for Monitoring Indian Economy (CMIE), the number of stalled
projects touched an all-time high of 893 ventures worth INR 11.36 trillion at the
end of 2015-16, which are held up due to the lack of promoter interest,
unfavourable market conditions and lack of funds. Over the last few years
especially, stressed assets have been detrimental to the infrastructure sector.
This is a grave concern, as non-recovery of loans from the sector has affected
ongoing projects and projects hitting completion. Worst of all it has impeded
investment in Greenfield projects.
04	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Plummeting	Private	Sector	Investments	in	Indian	
Infrastructure	
	
Private sector participation in infrastructure investment reached a 10-year low
in 2015 as the country fell out of the top five countries globally, for private
sector investments in infrastructure. But this has been in line with the global
trends as private participation in infrastructure (PPI) in the emerging markets of
Brazil, India, and China saw declining investments. These countries have been
traditionally the large players in PPI, however investments tumbled in China,
India, and most notably Brazil, where the combined commitments dwindled to
just USD 1.8 billion in H1 2015 from USD 30.9 billion in H1 2014.
	
Source:	World	Bank,	PPI	Project	Database	
	
Private investment in infrastructure in India had increased rapidly from 2006,
and peaked in 2010, but ever since it has been on a rapid decline. The World
Bank predicted in 2013 that the slowdown would continue in the longer term
due to rising domestic concerns, especially with financing.
- 
20,000 
40,000 
60,000 
80,000 
100,000 
120,000 
140,000 
160,000 
180,000 
200,000 
1991-1995
 1996-2000
 2001-2005
 2006-2010
 2011-2015 H1
InvestmentinProjectsbySector
USDMillion
Five Year Period
Private Sector Investment in Infrastructure Projects in India by Sector 
1990 - 2015 H1
Water and
sewerage
Telecom
Seaports
Roads
Railroads
Natural Gas
Electricity
Airports
05	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
	Source:	World	Bank,	PPI	Project	Database		
	
The largest investments have been traditionally in electricity, telecoms and
roads. However investments in the telecom and power sector have declined
significantly in the last five years. Though sector specific decline was expected in
transport and energy, there have been larger, looming reasons for the decline.
The biggest challenge has been that public banks, which have been the main
source for infrastructure financing, have been overstretched and are reaching
their exposure limits. Moreover there has been an absence of a domestic
corporate debt market (which is only 2% of GDP) and a lack of foreign equity
and credit (equity FDI is only 1.2% of GDP) in India’s private infrastructure
market to relieve this exposure.
The current infrastructure-financing gap is estimated to be USD 750 billion of
the targeted USD 1 trillion spending on roads, ports, power and other
infrastructure for the current five-year plan (2012 - 2017). The USD 750 billion is
essentially 75% of the required funding that would need to come through debt,
much higher than what the government had in mind initially when planned. This
figure is also five times the existing INR 9.2 trillion (USD 144 billion) of bank
loans that have been disbursed to Indian infrastructure projects to date.
- 
10,000 
20,000 
30,000 
40,000 
50,000 
60,000 
70,000 
80,000 
2010
 2011
 2012
 2013
 2014
 2015 H1
InvestmentinProjects(USDmillion)
Year
Private Investment in Infrastructure Projects in India by Sector 
2010 - 2015 H1
Water and
sewerage
Telecom
Seaports
Roads
Railroads
Natural Gas
Electricity
Airports
06	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Government	to	Kickstart	Infrastructure	Finance	and	Remove	
Regulatory	Hurdles	
	
A year earlier, the 2015 budget proposed the creation of a ‘National Investment
in Infrastructure Fund’ with an initial annual allocation of USD 3.25 billion. The
NIIF is structured like a fund of funds, where it will invest in more sector specific
funds or at different phases of funding, based on investor appetite. The fund,
which is still being set up, is expected to invest in public sector infrastructure
finance companies. The companies in turn will be able to leverage their higher
credit rating to access domestic and international debt markets, including
foreign pension and insurance funds and institutional investors.
The government has budgeted to contribute INR 200 billion to the fund in the
current fiscal year (2016-2017) while another INR 200 billion will be raised
through sovereign wealth funds. It will, however, be interesting to see whether
the NIIF will complement or invest directly in other infrastructure investment
special purpose vehicles (SPVs) that already finance infrastructure projects,
such as the Infrastructure Development Finance Company (IDFC) and Indian
Infrastructure Finance Company Limited (IIFCL).
To mobilize additional finances for infrastructure spending the government
proposed that it will permit infrastructure regulatory agencies, including the
National Highway Authority of India (NHAI), Power Finance Corporation (PFC),
Rural Electrification Company (REC), Indian Renewable Energy Development
Agency (IREDA), National Bank for Agriculture and Rural Development (NABARD)
and Inland Water Authority to raise bonds up to the extent of INR 313 billion in
the current year.
The government’s fresh allocation of USD 2.25 billion to roads and USD 1.6
billion to railways in the current fiscal year is also expected to improve liquidity
in the system by encouraging public sector led investments in infrastructure,
through EPC, Cash Contract and Annuity models for the awarding of projects in
these sectors.
07	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
The government has also sought to improve the regulatory setup and reboot
the PPP framework by improving the PPP dispute resolution process. The new
budget put forward recommends a ‘Public Contracts (Resolution of Disputes)
Bill’ and a ‘Regulatory Reform Bill’ that would aim to ensure greater consistency
across the country’s various regulators and regulations.
With bad loans and stressed assets on the rise, the government also sought to
improve the investment environment, by pushing for the recapitalization of
Public Sector Banks (PSBs). Under project Indradhanush, the government had
proposed that it will infuse INR 250 billion into public sector banks in each of
fiscal years 2016 and 2017, and INR 100 billion each in fiscal years 2018 and
2019. These proposed amounts are still short of the estimated INR 2.3 trillion of
capital that Indian public sector banks need by 2019. Most of the support is
expected to come through government capital infusions as banks still find it
difficult to raise capital from the equity capital markets.
This year’s budget also sought to improve the last-mile connectivity in many
infrastructure sub-sectors, including power, railways and ports. The budget
included provisions to help electrify the last remaining 20,000 villages that are
still not connected to the grid by 2020. The last-mile connectivity plans for ports
and railways propose to link the 12 major ports to the rail network to move
cargo, which is expected to increase efficiency and reduce cost, when
compared with road transport.
08	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Investments	in	Power	and	Roads	Continue	to	Dominate	
The top three sectors in terms of investments through PPI have been in
electricity, telecoms and roads, but over the last 5 years investment has been
mainly in roads/highways and electricity. Until 2010, the largest investments
went into the telecoms sector, but more recently electricity and highway
projects have garnered more investment.
	
	
Source:	World	Bank,	PPI	Project	Database		
Road and highway projects though large in number are still small based on
project costs, when compared to telecoms and electricity. Over the last 25
years, the largest 10 projects in India with PPI investments are listed in the
following table.
	 	
141,873
100,231
73,238
8,744
 7,826
 5,111
 1,015
 605
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
361
 37
 386
 39
 8
 7
 5
 14
Electricity
 Telecom
 Roads
 Seaports
 Railroads
 Airports
 Natural Gas
 Water and
sewerage
TotalInvestment(USDmillion)
No. of Projects in each Sector
Investments by Private Sector in India by Infra Sub-sector 
1990 - 2015 H1
09	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Private	Participation	in	Infrastructure	in	India	-	Top	Projects	1990	–	2015	H1	
Project	 Sector	 Type	of	PPI	 Termination	Year	 Contract	Period	
Investment	
(USD	million)	
Reliance	
Communications	
Limited	
Telecom	 Greenfield	Project	 2001	 20	 29,001	
Bharti	Airtel	
Limited	
Telecom	 Greenfield	Project	 2024	 20	 23,879	
Vodafone	Essar	 Telecom	 Greenfield	Project	 -	 -	 17,053	
Idea	Cellular	 Telecom	 Greenfield	Project	 -	 15	 11,284	
Tata	Teleservices	
Limited	
Telecom	 Greenfield	Project	 2013	 15	 7,538	
NTPC	Limited	
Electricity	-	
Generation	
Divestiture	 -	 -	 5,992	
Shyam	Telelink	
Ltd.	
Telecom	 Greenfield	Project	 2012	 15	 5,313	
Mundra	Ultra	
Mega	Power	Plant	
Electricity	-	
Generation	
Greenfield	Project	 2033	 25	 4,200	
Sasan	Ultra	Mega	
Power	Plant	
Electricity	-	
Generation	
Greenfield	Project	 -	 -	 3,986	
Jindal	Tamnar	
Power	Plant	Phase	
I	and	II	
Electricity	-	
Generation	
Greenfield	Project	 -	 -	 3,983	
Source:	World	Bank,	PPI	Project	Database		
	 	
The government's allocation to roads in the 2016 budget through the road
transport and highways ministry now stands significantly higher at INR 579.76
billion (up 23.1% from INR 471.07 billion in FY16). Overall, the budgetary
allocation towards the key transport segments - roads and railways - stands at
INR 2.18 trillion, and if the allocation towards the upgrade of state highways is
included, the figure expands further to INR 2.21 trillion. These investments will
dramatically improve transit timing and are expected to reduce the per km cost
of transportation.
For the current fiscal year, the government plans to build 10,000 km of national
highways and upgrade another 50,000 km. It is slowly making progress in terms
of efficiency in road construction, building 13 km of roads a day, which is still
less than half the speed at which the government aimed to build (30 km/day).
10	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
The railways are also seeing a major push in the proposed investment plan of
INR 1.21 trillion for 2016-17, with the government providing budgetary support
of INR 43.01 billion. This is about 43% higher than the proposed investment
plan for fiscal 2015-16. The plan will also invest in developing railside logistics
parks that will allow terminals and sheds to handle container traffic to create an
integrated transport system with ports. These investments will dramatically
improve efficiency in logistics by reducing transit timing and the per km cost of
transportation. The railway logistics and freight container trains proposed to
run on time-tables, will give new options for logistics managers to lower costs
and improve timeliness.
The Renewable Energy sector has globally attracted a lot of private equity
investment in recent years, and it has fared well in India too. The sector is
expected to expand from 32 GW to 175 GW by 2022. Against this backdrop, the
government has allocated an outlay of more than INR 100 billion for 2016-17.
This outlay includes INR 50 billion from the National Clean Energy Fund (NCEF)
with the balance coming from Internal & Extra Budgetary Resource
(IEBR). Moreover, India is emerging as a key destination for renewable energy
projects, as the government has provided incentives to infrastructure and
programs designed to attract investment. India topped the ranks in 2015 with
USD 11.8bn of announced FDI in the sector, which included Lightsource
Renewable Energy’s plans to invest USD 3 billion, to design, install and manage
more than 3 GW of solar power within the country.
11	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
The	Real	Concerns	in	Sustaining	Infrastructure	Investment	and	
the	High	Financial	Leverage	of	Infrastructure	Companies	
While the public sector in India had opted out of infrastructure development
spending to free up fiscal resources since the early 1990s, more has been left to
the private sector and bank financing. Most often infrastructure lending was
done by commercial banks that lent on a large scale to private sector
infrastructure companies, and over time this has presented another set of
challenges. Not only are the private sector companies involved in infrastructure
development now excessively reliant on bank financing, they do not have any
other options for raising capital, as they cannot tap corporate bond markets or
other long term funds such as insurance and pension funds.
With bank credit being the principal source of debt funding for infrastructure
projects, credit is only available for a maximum tenure of 10-15 years, which
does not match the typical 20-30 year tenure of an infrastructure concession
contract. The issue is exacerbated when considering infrastructure project loans
have tenures of 10 to 15 years, bank deposits, the main source of funds;
typically have a maturity of less than 3 years. With the rapid growth in lending
to the infrastructure sector between 2000 and 2010 there has been a growing
risk of an asset-liability mismatch (ALM). The Reserve Bank of India (RBI – India’s
central bank and banking supervisor) and banks have become cautious on the
issue related to financing infrastructure loans. Several domestic public and
private sector banks have neared their group exposure limits set by the RBI for
lending to large infrastructure players.
Over the last few years, the banking supervisor has expressed serious concerns
about the level of non-performing assets of the banking system, especially due
to the loans provided to the infrastructure sector. As these loans have had a
disproportionate share in the aggregate non-performing assets, banks are
reluctant to increase their exposure. This has taken toll on many of the
infrastructure firms, which are unable to complete their current projects
without cleaning up their balance sheets. With this situation it is expected that
private infrastructure investment is going to stall for a few more years, with
new investments in Greenfield projects to be most negatively affected. There is
now a growing onus on the public sector to revive infrastructure investments.
12	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
In real terms the consolidated debt of over 250 companies in the steel,
construction, infrastructure development, power generation and distribution
sectors rose by around 10% in 2014-15 from the previous year. Power
generation and distribution have been the most indebted sub-sectors, with the
consolidated debt of these companies rising to INR 4,730 billion in 2014-15
from INR 4,263 billion in 2013-14. India is already known to have one of the
world’s highest levels of electricity transmission and distribution (T&D) losses,
due to technical inefficiency and theft. Apart from that many of India's utilities
also lose significant electricity-related revenue because of poor collection
efficiency, and retailers are forced by their state governments to sell electricity
at subsidized rates, which now accounts for INR 600 billion (USD 9.1 billion)
every year as costs exceed tariffs.
With such large amounts of debt, private sector investments have virtually
ground to a halt, and the difficulties that these companies face reflect the
problems that the Indian financial system is grappling with. Where the cost of
capital has been high, banks are reluctant to extend credit because they have
too many bad loans.
The RBI has conditionally allowed banks to roll over loans to indebted
infrastructure companies, only if they have good assets. So until these indebted
groups can raise the cash to repay the banks, either by selling assets or
completing projects to generate the required cash flow, new investments are
not going to meet the scale of funds required for the country to upgrade its
infrastructure assets and meet the growing demand.
A Credit Suisse report titled “House of Debt”, which was first released in 2012
and then updated in 2015, has outlined the financial stress and indebtedness
that ten large Indian corporate groups went through. Most of the corporate
groups are in the infrastructure space, and their indebtedness has intensified
over the last 3 years. These companies included the following groups: Lanco
Group, Jaypee Group, GMR Group, Videocon Group, GVK Group, Essar Group,
Adani Group, Reliance Group, JSW Group and Vedanta Group. All the three
major ratios of debt servicing of these groups have suffered deterioration:
interest cover, debt-to-earnings and debt-to-equity. Their overall debt has risen
to INR 7,335 billion from INR 6,532 billion between 2012-13 and 2014-15.
13	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
With many of the projects stranded due to insufficient financing, the companies
have been caught up in high financial leverage, and debt repayment. Over the
past eight years, the corporate debt of these 10 over-leveraged corporate
groups covered by the Credit Suisse list grew by an alarming seven times.
Source:	Credit	Suisse;	*Essar	P&L	numbers	are	for	FY14,	debt	is	based	on	data	available	for	FY15,	with	remaining	figures	
assumed	to	be	the	same	as	in	FY14	
	
These figures also take into account the fact that these companies, despite
resorting to asset sales in order to deleverage their balance sheets, have seen
their stress levels rise. This is evident by looking at how debt has eaten into the
equity of these companies, especially those operating in infrastructure and
power projects, which were initially built at a debt-to-equity ratio of 70:30, as
that ratio has now shifted to 90:10. For example the market cap-to-debt ratio in
the case of GVK Group is 95:5.
	
Declinining	Debt	Servicing	Ability	of	Groups	Operating	in	the	Infrastructure	Space	in	India	
INR Billion Gross Debt EBITDA EBIT PAT Interest Cover Debt/EBITDA (x) Debt/Equity (x)
FY2013 FY2014 FY2015 FY2015 FY2015 FY2015 FY2014 FY2015 FY2014 FY2015 FY2014 FY2015
Vedanta Group 996.10 1012.27 1033.40 231.95 107.6 -234.83 1.6 1.3 1.8 2.3 0.4 0.7
Essar Group* 986.44 999.49 1014.64 83.7 28.36 -7.87 0.3 0.8 11.1 8.5 4.6 3.9
Adani Group 811.22 844.40 960.31 123.7 88.48 19.48 1.1 1.3 7.3 6.5 2.9 3.1
Jaypee Group 636.54 729.79 751.63 61.38 44.51 -17.27 0.8 0.6 11.1 11.9 6.9 7.1
JSW Group 461.18 530.27 581.71 130.25 88.01 31.46 2 1.9 4.1 4.2 1.8 1.8
GMR Group 408.24 450.45 479.76 25.54 7.42 -27.33 0.4 0.2 16 16.8 5.4 7.1
Lanco Group 410.84 440.82 471.02 16.93 5.8 -20.36 0.1 0.2 24.6 23.1 16.1 43.8
Videocon Group 407.68 N/A 454.05 -1.12 -16.49 51.19 -0.3 -0.3 285.5 NM 8.4 3.8
GVK Group 269.64 310.26 339.33 7.39 0.34 -8.34 0.5 0 21.7 32 7.4 12.2
14	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
In any case, the corporate debt ratio in India, which is only a moderate 50% of
GDP, has been highly concentrated, with the top 1% of firms accounting for
about half of the debt, as do corporates in the infrastructure (including power,
telecommunications and roads) and metals sectors (including iron and steel).
Ever since the global financial crisis, the median debt-to-equity ratio of these
corporations have been at more than 175%, not only higher than corporates in
other sectors in the country, but also among the highest among corporates
across emerging economies.
BMI Research expects Indian banks to continue to report a significant amount
of bad debt, this is not surprising as the financial position of the country’s
infrastructure conglomerates continues to deteriorate. With no signs of
improvement, the RBI has been vigorous in promoting regulation and norms
regarding restructuring loan repayments and refinancing, and in cleaning up the
banking system. While the RBI has been in the balancing act of safeguarding
banks from the mounting NPAs and restructured loans, the government has
been keen on easing non-performing asset norms for bank loans to revive
projects.
15	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Public	Sector	Banks	(PSBs)	most	Exposed	to	Stressed	Loans	in	
the	Infrastructure	Sector	
Though India has been able to sustain itself as an emerging market ‘bright spot’,
there has been growing apprehension about its banking system which has been
weighed down by bad loans and the growing level of stressed or restructured
loans.
Over time, the public-sector banks (PSBs) have taken the largest share in
lending to large-scale infrastructure projects. The main issue has been with the
long gestation periods of these projects, making recoveries very difficult. The
Economic Survey for 2014-15 held that infrastructure, iron &
steel, textiles, mining (including coal) and aviation, held 54 per cent of total
stressed advances of PSBs as on June 2014. The survey noted that the exposure
of PSBs to infrastructure stood at 17.5 per cent of their gross advances and was
significantly higher than private sector and foreign banks.
Gross NPAs of Banks in India Mar-2010 – Mar-2015
Public Sector Banks Private Sector Banks Foreign Banks All Banks
Year
Amount
INR Billion
Gross
NPAs (%)
Amount
INR Billion
Gross
NPAs (%)
Amount
INR Billion
Gross
NPAs (%)
Amount
INR Billion
Gross
NPAs (%)
Mar-2015 2,785 5.0 337 2.1 108 3.2 3,229 4.3
Mar-2014 2,273 4.4 242 1.8 116 3.9 2,630 3.8
Mar-2013 1,645 3.6 208 1.8 80 3.0 1,932 3.2
Mar-2012 1,173 3.0 185 1.9 63 2.7 1,420 2.8
Mar-2011 747 2.2 182 2.2 51 2.5 979 2.3
Mar-2010 599 2.2 176 2.7 71 4.3 847 2.4
Source:	Department	of	Banking	Supervision,	RBI	
	 	
The RBI also conducted sectoral credit stress tests for the infrastructure sector
and the largest sub-sectors that included power, transport and
telecommunications. The infrastructure sector as a whole has been assessed as
highly stressed, with its share of NPAs standing at 12.7% and standard
restructured assets at 46%. Among the sub-sectors, the power sector was the
most stressed with a share of 29.3% in restructured assets and 5% in total NPAs.
In contrast, the transport sectors share of restructured assets was 14.6% and
3.8% of NPAs, while for the telecom sector these figures were 1.8% and 1.7%
respectively.
16	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
	
Source:	Credit	Suisse	
	
The stressed loans of Indian banks were to the tune of 14 % of gross advances
(USD 161 billion) as of March 2015. Reviewing the trend of growth in the
number of stressed loans, over 30 per cent were from the Infrastructure sector
– primarily in the power space. A large proportion of these loans were to
government-controlled power generation and distribution companies.
Operating inefficiencies (technical and commercial), lack of adequate availability
of cheaper domestic coal and inability to pass on the increased costs to
consumers have impacted these companies adversely.
	
	
Infrastructure and
Construcoon
25%
Metals
12%
Industrials
10%
Uolioes
10%
Services
9%
Energy
5%
IT/Telecoms
5%
Other
24%
Stressed Loans by Sector in India
Q2 2015 (5)
17	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
The	Regulators	Scramble	to	Plug	the	System	through	
Opportunities	for	Refinancing	
	
Over the next four years, New Delhi says the state banks will need about USD
28bn in new capital. Of that, the government for its part has already provided a
USD 11 billion bailout to struggling PSBs, while also promising structural reforms.
With the RBI not completely receptive to the idea of setting up a special
purpose infrastructure fund or a development financial institution which would
lend to projects that require last-mile funding, these assets end up being
classified as stressed assets. As aside from NPAs, banks also carry loans that
were restructured — where borrowers have sought more lenient terms such as
reduced interest rates or extended repayment period, in order to make
payments and allow banks to classify the loans as standard assets.
But while the RBI closed the restructuring window for banks in April 2015, listing
various measures taken to provide impetus to infrastructure lending and
address the stress in the sector, the RBI and Finance Ministry are allowing banks
and FIs to enter into a take-out financing arrangement with IDFC and other
Financial Institutions (FIs) under the 5:25 scheme. Banks are now allowed to
have flexible structuring and refinancing of project loans under the 5:25 scheme,
and banks can issue long-term bonds with a minimum maturity period of seven
years with certain incentives.
The central bank has recommended that the lenders should take advantage of
the 5:25 scheme, a provision that allows banks to refinance loans for
infrastructure for up to 25 years, and the strategic debt-restructuring scheme,
which allows debt-for-equity swaps. Essentially banks now have the right to
convert their loans into a majority equity stake if they feel that a change in
ownership can help turnaround the borrower’s business. Under the 5:25
scheme, banks can fix longer repayment schedules, even for say 25 years, for
loans to infrastructure projects.
18	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Additionally, the Securities and Exchange Board of India (SEBI) has recently
relaxed the norms on debt – equity conversion by banks in stressed listed
entities. This could enable the banks to get a controlling equity stake in such
companies so as to enforce a change in the management, and eventually
improve efficiency.
The flexible loan restructuring scheme stipulates that loans given to
infrastructure and core industries in which the aggregate exposure of all
institutional lenders exceeds INR 5 billion, the debt can now be repaid over a
maximum of 25 years and the banks will refinance the loan every five years. The
repayment at the end of each refinancing period would be structured as a bullet
repayment, being specifically mentioned upfront that the loan will be
refinanced and that it would be considered in the asset liability management
(ALM) of banks. According to some recent estimates the loan amount already
refinanced under this scheme is on the order of INR 1 trillion.
The RBI is also allowing the creation of infrastructure debt funds as Non-banking
financial corporations (NBFCs) or mutual funds. However, while capital infusion
and restructuring might provide short-term relief, it is clearly not a sustainable
answer to a complex problem. The argument against the 5:25 scheme is that it
is largely being used as just another tool to postpone the write-offs, even
though they admit that the scheme is a better way of restructuring loans
compared with corporate debt restructuring (CDR). Though the 5:25 guidelines
allows banks to increase the tenure of the loans so that they can match each
project’s inflows and outflows, the issue is whether these loans eventually
default.
Taking for example the power sector with its INR 750 billion worth of loans,
even if these debts are put under the 5:25 scheme, not all of them will
eventually turn positive. Given that about 35-40% of the restructured accounts
have eventually defaulted, there may be a large percentage of debt being
shifted to the 5:25 scheme that will eventually end up in default.
19	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
In terms of dealing with the stressed loans, banks have preferred to address the
problem through restructuring debt under the Corporate Debt Restructuring
(CDR) mechanism. While recovery of assets has mainly been the responsibility
of banks, they are not well equipped to manage recoveries and so there is the
dire need to promote agencies that can manage distressed funds such as Asset
Reconstruction Companies (ARCs).
A two-pronged strategy that needs to be implemented has been Asset
Reconstruction and Asset Disposal. Currently, the banking industry has resorted
to the former, which is the sale of the distressed assets of the bank to an Asset
Reconstruction Company (ARC), thereby disposing of the debt. After the sale,
bad loans become the responsibility of the ARCs and relieve banks from the
pressure of recovering loans, while also generating capital. According to media
reports, the Finance Ministry is working towards creating a public-funded ARC,
which will help in the bailout. Along with reconstruction, currently a ‘Bankruptcy
Code’ is also being worked out, as this is expected to go a long way towards
helping local lenders to better manage their non-performing and stressed
assets.
The real challenge in the current environment has been the RBIs call for banks
to clean up their account books by early 2017, the central bank has implicitly
implied that it would be closely scrutinizing whether concessions made to the
lenders are being misused. The RBI governor, Raghuram Rajan, stressed the
importance of such a clean-up in his speech on 11 February 2016, where he
reiterated that the profitability of some banks may be impaired in the short run,
but that once the system was cleaned up, it will be able to support economic
growth in a sustainable and profitable way. With the RBI intent on getting banks
to clean up their loan books, the likely credit costs which were supposed to be
spread over the next three to four years will have a much higher incidence in
FY16/FY17.
20	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
Infrastructure	Investments	Unlikely	to	Make	Headway	in	the	
Short-Term	
The main issues for infrastructure projects in India have been their commercial
viability and long gestation periods, but more recently the focus has shifted to
stalling private investments in the sector due to growing indebtedness and the
high financial leverage of firms operating in the infrastructure space. Lending to
infrastructure companies has pushed up the NPLs and stressed loans in the
banking sector, as these companies completely rely on banks for lending, due to
the absence of a deep corporate bond market in India and muted participation
by pension funds that have inhibited credit availability for long-term financing.
While the 10-15 year tenure of lending is too long for banks, it is too short from
the point of view of project companies, resulting in an asset-liability mismatch
issue.
Further regulations such as sector specific resolution of stressed assets,
implementation of a strong bankruptcy code and institutionalising a formal
mechanism to revive sick companies are needed to resolve stressed loans.
Above all, a credible, timely and realistic mindset is required to ensure
sustained recovery management. The quick action in enacting a modern
bankruptcy law, will also allow infrastructure projects that have turned into bad
loans to be speedily handed over to new promoters capable of attracting fresh
financing.
The Finance Ministry, in a mid-term review of the economy last year, had
acknowledged the concerns springing from over-leveraged private balance
sheets and the need for higher public investments to compensate for India Inc’s
inability to take up Greenfield projects. But even after a year, investments by
the public sector have yet to see an improvement. Hopefully with more funds
committed to the road sector, where the award of projects both under EPC
(engineering-procurement-construction) and a new ‘hybrid annuity’ model may
make headway, more can be done to support the power and railway sector.
Though in the short run (3-5 years) the private sector involvement in the
infrastructure investment space is going to be constrained, with reviving
demand and continued economic growth, continued reforms in cleaning up the
banking system and a public sector push in infrastructure spending, the sector is
likely to see growth in the medium to long term.
21	
Stalling	Investments	in	Infrastructure	and		
the	Expanding	Infra	Debt	Burden	in	India	
		
	
	
	
	
	 	
	
	
	
	
	
	
TOKYO	
Uzabase,	Inc.	
Ebisu	First	Square.	10F	1-18-14	Ebisu,	Shibuya-ku,	Tokyo	150-0013,	Japan	
	+81-3-4574-6552	
	+81-3-4574-6553	
	customer@uzabase.com	
Singapore	
20	Collyer	Quay,	#23-01,	Singapore	049319	
+65-6653-8314	
		customer@uzabase.com	
Hong	Kong	
30/F	Entertainment	Building,	30	Queen's	
Road	Central,	Central,	Hong	Kong	
	+852-5808-3148	 		+852-3103-1011	
	customer@uzabase.com	
Sri	Lanka	
48/4/1,	Parkway	building,	park	street,	
colombo	2.	Sri	Lanka.	
+94-114-232-622	
	customer@uzabase.com	
Shanghai	
Building	G,	327	Tianyaoqiao	Road,	Xuhui	
District,	Shanghai	China	
	+86-21-2419-3086			
	customer@uzabase.com	
©2016	UZABASE,	Inc.	
About	US

More Related Content

What's hot

New Dawn for India
New Dawn for IndiaNew Dawn for India
New Dawn for IndiaVarun Jain
 
India Budget 2012-13 - Analysis by Prabhu Srinivasan
India Budget 2012-13 - Analysis by Prabhu SrinivasanIndia Budget 2012-13 - Analysis by Prabhu Srinivasan
India Budget 2012-13 - Analysis by Prabhu SrinivasanPrabhu Srinivasan
 
Indian budget 2018 19 ire perspective
Indian budget 2018 19 ire perspectiveIndian budget 2018 19 ire perspective
Indian budget 2018 19 ire perspectiveCMA .Pankaj Jain
 
Blog - A New Beginning for Indonesia, Nov '14
Blog - A New Beginning for Indonesia, Nov '14Blog - A New Beginning for Indonesia, Nov '14
Blog - A New Beginning for Indonesia, Nov '14Praneet Mehrotra
 
Doing Business in India, 2011
Doing Business in India, 2011Doing Business in India, 2011
Doing Business in India, 2011Devanshu Singhal
 
Union budget 2015 16
Union budget 2015 16Union budget 2015 16
Union budget 2015 16Inves Trekk
 
What will it really take to build healthcare infrastructure for the masses? V...
What will it really take to build healthcare infrastructure for the masses? V...What will it really take to build healthcare infrastructure for the masses? V...
What will it really take to build healthcare infrastructure for the masses? V...Kapil Khandelwal (KK)
 
Budget 2019 Analysis by Axis Direct
Budget 2019 Analysis by Axis DirectBudget 2019 Analysis by Axis Direct
Budget 2019 Analysis by Axis DirectAnahitaSharma3
 
Weekly media update 30 12_2019
Weekly media update 30 12_2019Weekly media update 30 12_2019
Weekly media update 30 12_2019BalmerLawrie
 
Realty bytes real estate and construction sector - issue 1
Realty bytes   real estate and construction sector - issue 1Realty bytes   real estate and construction sector - issue 1
Realty bytes real estate and construction sector - issue 1Misbah Hussain
 
DNS Budget Highlights 2012
DNS Budget Highlights 2012DNS Budget Highlights 2012
DNS Budget Highlights 2012cadeepak2228
 
Weekly media update 25.08.2014
Weekly media update 25.08.2014Weekly media update 25.08.2014
Weekly media update 25.08.2014BalmerLawrie
 
Impact of budget 2010 on capital market
Impact of budget 2010 on capital marketImpact of budget 2010 on capital market
Impact of budget 2010 on capital marketAbhishek
 
National monetisation project by Bhawna Bhardwaj
National monetisation project by Bhawna BhardwajNational monetisation project by Bhawna Bhardwaj
National monetisation project by Bhawna BhardwajBhawnaBhardwaj24
 

What's hot (20)

New Dawn for India
New Dawn for IndiaNew Dawn for India
New Dawn for India
 
India Budget 2012-13 - Analysis by Prabhu Srinivasan
India Budget 2012-13 - Analysis by Prabhu SrinivasanIndia Budget 2012-13 - Analysis by Prabhu Srinivasan
India Budget 2012-13 - Analysis by Prabhu Srinivasan
 
Union Budget :- A Special Report By CapitalHeight
Union Budget :- A Special Report By CapitalHeightUnion Budget :- A Special Report By CapitalHeight
Union Budget :- A Special Report By CapitalHeight
 
Indian budget 2018 19 ire perspective
Indian budget 2018 19 ire perspectiveIndian budget 2018 19 ire perspective
Indian budget 2018 19 ire perspective
 
Blog - A New Beginning for Indonesia, Nov '14
Blog - A New Beginning for Indonesia, Nov '14Blog - A New Beginning for Indonesia, Nov '14
Blog - A New Beginning for Indonesia, Nov '14
 
Policy Watch, September 2017
Policy Watch, September 2017Policy Watch, September 2017
Policy Watch, September 2017
 
Doing Business in India, 2011
Doing Business in India, 2011Doing Business in India, 2011
Doing Business in India, 2011
 
Economic Capsule - September 2015
Economic Capsule - September 2015Economic Capsule - September 2015
Economic Capsule - September 2015
 
Uday Ujjwal
Uday UjjwalUday Ujjwal
Uday Ujjwal
 
Union budget 2015 16
Union budget 2015 16Union budget 2015 16
Union budget 2015 16
 
What will it really take to build healthcare infrastructure for the masses? V...
What will it really take to build healthcare infrastructure for the masses? V...What will it really take to build healthcare infrastructure for the masses? V...
What will it really take to build healthcare infrastructure for the masses? V...
 
Budget 2019 Analysis by Axis Direct
Budget 2019 Analysis by Axis DirectBudget 2019 Analysis by Axis Direct
Budget 2019 Analysis by Axis Direct
 
Budget 2012 - 2013
Budget 2012 - 2013 Budget 2012 - 2013
Budget 2012 - 2013
 
Weekly media update 30 12_2019
Weekly media update 30 12_2019Weekly media update 30 12_2019
Weekly media update 30 12_2019
 
Economic Capsule - November 2020
Economic Capsule - November 2020Economic Capsule - November 2020
Economic Capsule - November 2020
 
Realty bytes real estate and construction sector - issue 1
Realty bytes   real estate and construction sector - issue 1Realty bytes   real estate and construction sector - issue 1
Realty bytes real estate and construction sector - issue 1
 
DNS Budget Highlights 2012
DNS Budget Highlights 2012DNS Budget Highlights 2012
DNS Budget Highlights 2012
 
Weekly media update 25.08.2014
Weekly media update 25.08.2014Weekly media update 25.08.2014
Weekly media update 25.08.2014
 
Impact of budget 2010 on capital market
Impact of budget 2010 on capital marketImpact of budget 2010 on capital market
Impact of budget 2010 on capital market
 
National monetisation project by Bhawna Bhardwaj
National monetisation project by Bhawna BhardwajNational monetisation project by Bhawna Bhardwaj
National monetisation project by Bhawna Bhardwaj
 

Viewers also liked

The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeThe multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeMining On Top
 
Social Media Presence
Social Media Presence Social Media Presence
Social Media Presence Paras Pundir
 
Investments in public infrastructure and fdi 12th sept 2012
Investments in public infrastructure and fdi 12th sept 2012Investments in public infrastructure and fdi 12th sept 2012
Investments in public infrastructure and fdi 12th sept 2012Mahammad Azharuddin
 
Julie Ann Youssef - Business Management
Julie Ann Youssef - Business ManagementJulie Ann Youssef - Business Management
Julie Ann Youssef - Business ManagementJulie Ann Youssef
 
Dicas para agilizar os cálculos matemáticos parte1
Dicas para agilizar os cálculos matemáticos   parte1Dicas para agilizar os cálculos matemáticos   parte1
Dicas para agilizar os cálculos matemáticos parte1Arthur Lima
 
The Multiplier Effect
The Multiplier EffectThe Multiplier Effect
The Multiplier Effecttutor2u
 

Viewers also liked (11)

The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeThe multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
 
Social Media Presence
Social Media Presence Social Media Presence
Social Media Presence
 
Master
MasterMaster
Master
 
Investments in public infrastructure and fdi 12th sept 2012
Investments in public infrastructure and fdi 12th sept 2012Investments in public infrastructure and fdi 12th sept 2012
Investments in public infrastructure and fdi 12th sept 2012
 
Standard
StandardStandard
Standard
 
Standard
StandardStandard
Standard
 
Apostila pm pa
Apostila pm paApostila pm pa
Apostila pm pa
 
Julie Ann Youssef - Business Management
Julie Ann Youssef - Business ManagementJulie Ann Youssef - Business Management
Julie Ann Youssef - Business Management
 
Dicas para agilizar os cálculos matemáticos parte1
Dicas para agilizar os cálculos matemáticos   parte1Dicas para agilizar os cálculos matemáticos   parte1
Dicas para agilizar os cálculos matemáticos parte1
 
The Multiplier Effect
The Multiplier EffectThe Multiplier Effect
The Multiplier Effect
 
Resumão anpad
Resumão anpadResumão anpad
Resumão anpad
 

Similar to Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in india

Infrastructure bottlenecks affect india
Infrastructure bottlenecks affect indiaInfrastructure bottlenecks affect india
Infrastructure bottlenecks affect indiaSambit Biswal
 
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...Centre for Financial Accountability
 
Sectoral Infrastructure Development
Sectoral Infrastructure DevelopmentSectoral Infrastructure Development
Sectoral Infrastructure DevelopmentGAURAV. H .TANDON
 
Construction development in Energy & Infrastructures
Construction development in Energy & InfrastructuresConstruction development in Energy & Infrastructures
Construction development in Energy & InfrastructuresEdwinJacob5
 
India's relationship with world in infrastructre and opportunities in fdi
India's relationship with world in infrastructre and opportunities in fdiIndia's relationship with world in infrastructre and opportunities in fdi
India's relationship with world in infrastructre and opportunities in fdiJinto Cv
 
National Real Estate Development Council (NAREDCO) speech building a New Ind...
National Real Estate Development Council (NAREDCO) speech  building a New Ind...National Real Estate Development Council (NAREDCO) speech  building a New Ind...
National Real Estate Development Council (NAREDCO) speech building a New Ind...Manoj Benjamin
 
20210906 b co-p pemna_indonesia_1)
20210906 b co-p pemna_indonesia_1)20210906 b co-p pemna_indonesia_1)
20210906 b co-p pemna_indonesia_1)kiswanto dja
 
2012 gs indian econ lecture 12
2012 gs indian econ lecture 122012 gs indian econ lecture 12
2012 gs indian econ lecture 12Dr. Subir Maitra
 
2012 gs indian econ lecture 12
2012 gs indian econ lecture 122012 gs indian econ lecture 12
2012 gs indian econ lecture 12Dr. Subir Maitra
 
Emerging markets’ infrastructural sector — at a tipping point aranca special ...
Emerging markets’ infrastructural sector — at a tipping point aranca special ...Emerging markets’ infrastructural sector — at a tipping point aranca special ...
Emerging markets’ infrastructural sector — at a tipping point aranca special ...Aranca
 
Infrastructure Financing
Infrastructure FinancingInfrastructure Financing
Infrastructure FinancingResurgent India
 
Dennis Gada, Infosys, Asia Business Week Dublin 2014
Dennis Gada, Infosys,  Asia Business Week Dublin 2014Dennis Gada, Infosys,  Asia Business Week Dublin 2014
Dennis Gada, Infosys, Asia Business Week Dublin 2014Asia Matters
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaEmpowerhosting
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...atulpkhekade
 
Debt restructuring options_adani
Debt restructuring options_adaniDebt restructuring options_adani
Debt restructuring options_adanikalpesh7777
 

Similar to Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in india (20)

Infrastructure bottlenecks affect india
Infrastructure bottlenecks affect indiaInfrastructure bottlenecks affect india
Infrastructure bottlenecks affect india
 
Indian budget 2011 2012
Indian budget 2011 2012Indian budget 2011 2012
Indian budget 2011 2012
 
Budget Presentation
Budget PresentationBudget Presentation
Budget Presentation
 
Cement India
Cement IndiaCement India
Cement India
 
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
 
Sectoral Infrastructure Development
Sectoral Infrastructure DevelopmentSectoral Infrastructure Development
Sectoral Infrastructure Development
 
Construction development in Energy & Infrastructures
Construction development in Energy & InfrastructuresConstruction development in Energy & Infrastructures
Construction development in Energy & Infrastructures
 
Mis
MisMis
Mis
 
India's relationship with world in infrastructre and opportunities in fdi
India's relationship with world in infrastructre and opportunities in fdiIndia's relationship with world in infrastructre and opportunities in fdi
India's relationship with world in infrastructre and opportunities in fdi
 
National monetisation pipeline
National monetisation pipelineNational monetisation pipeline
National monetisation pipeline
 
National Real Estate Development Council (NAREDCO) speech building a New Ind...
National Real Estate Development Council (NAREDCO) speech  building a New Ind...National Real Estate Development Council (NAREDCO) speech  building a New Ind...
National Real Estate Development Council (NAREDCO) speech building a New Ind...
 
20210906 b co-p pemna_indonesia_1)
20210906 b co-p pemna_indonesia_1)20210906 b co-p pemna_indonesia_1)
20210906 b co-p pemna_indonesia_1)
 
2012 gs indian econ lecture 12
2012 gs indian econ lecture 122012 gs indian econ lecture 12
2012 gs indian econ lecture 12
 
2012 gs indian econ lecture 12
2012 gs indian econ lecture 122012 gs indian econ lecture 12
2012 gs indian econ lecture 12
 
Emerging markets’ infrastructural sector — at a tipping point aranca special ...
Emerging markets’ infrastructural sector — at a tipping point aranca special ...Emerging markets’ infrastructural sector — at a tipping point aranca special ...
Emerging markets’ infrastructural sector — at a tipping point aranca special ...
 
Infrastructure Financing
Infrastructure FinancingInfrastructure Financing
Infrastructure Financing
 
Dennis Gada, Infosys, Asia Business Week Dublin 2014
Dennis Gada, Infosys,  Asia Business Week Dublin 2014Dennis Gada, Infosys,  Asia Business Week Dublin 2014
Dennis Gada, Infosys, Asia Business Week Dublin 2014
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
 
Debt restructuring options_adani
Debt restructuring options_adaniDebt restructuring options_adani
Debt restructuring options_adani
 

Recently uploaded

Attachment Of Assets......................
Attachment Of Assets......................Attachment Of Assets......................
Attachment Of Assets......................AmanBajaj36
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfHenry Tapper
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...Avanish Goel
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...shivangimorya083
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantagesjayjaymabutot13
 

Recently uploaded (20)

Attachment Of Assets......................
Attachment Of Assets......................Attachment Of Assets......................
Attachment Of Assets......................
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantages
 

Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in india

  • 1. 01 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Apart from targeting rural development, the Finance Ministry’s new budget announcement at the end of February 2016 prioritised the need to upgrade infrastructure and reinvigorate investment in the sector. The finance minister, Arun Jaitley, acknowledged in his budget speech that India had fallen short of its targets for modernising its infrastructure and that many of the projects have been stalled by disputes, red tape and lack of finance. In order to sustain India’s rapid economic growth, the government is dedicated to reviving investments in infrastructure and allocating more funds through various proposals. With the new budget, the government allocated USD 32 billion for infrastructure development in 2016-17, a 22.5% (or USD 5.9 Billion) increase YoY. A year earlier, the 2015 budget, had additional spend of USD 11 billion on infrastructure outlay. However, with a huge infrastructure supply gap the country’s funding requirement is much larger. A CRISIL study stated that India needs INR 6 trillion of investments every year or around INR 17 billion every day from April 2015 to March 2020. In short, India needs INR 31 trillion in investment over the next five years to provide uninterrupted power to homes and factories, and improve roads, telecom, transport and other urban infrastructure. Over each of the last three government’s five-year plans, estimated investments in infrastructure have doubled and a larger share of investments was projected to come from the private sector. One of the main challenges in scaling up private investment was the mobilisation of debt financing for meeting the ambitious targets set by the Government. Dharish David Dharish.David@Uzabase.com Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India 20160518 Dharish David dharish.david@Uzabase.com
  • 2. 02 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India India’s Five-year Plans Time Period Proposed Investments in Infrastructure (USD Billion) Private Sector Investments (Share as %) Tenth Five-year Plan 2002 - 2007 240 22% Eleventh Five-year Plan 2007 - 2012 500 37% Twelfth Five-year Plan 2012 - 2017 1,025 49% Source: Uzabase from various sources Under the current Prime Minister, Narendra Modi, whose unwavering goal has been to boost economic growth, the daunting task has been to attract private sector capital to improve roads, rail, ports, power and other infrastructure. The government is now opting to use public money to kick-start investments in the sector, as many projects have been stalled by a lack of private funding. This year’s budget included USD 11 billion in increased commitments through Private Sector Enterprises for infrastructure investment. More involvement by the private sector through investments and project operations has become a reality through models like Public-Private Participation (PPP), which not only allows the private sector to raise capital but also improve the efficiency of projects. Given the fiscal constraints that exist, there has always been pressure on public investments at the scale required, PPP has emerged as the principal vehicle for attracting private investment in infrastructure, and India has attracted a lot of PPP investments over the years. A large portion of theses PPP projects rely on private capital that has to be raised from domestic financial institutions.
  • 3. 03 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India The challenge in India and in a lot of other developing countries is that they do not have the capacity or instruments to provide long-tenure debt for projects having a long payback period. Since PPP projects have been usually financed on a 30:70 ratio of equity and debt, mobilisation of the requisite debt resources has become a mounting challenge, and many infrastructure project promoters are now submerged under huge loans that have turned non-performing. To pay off at least a portion of their bad debt these large project developers are desperately selling their cash-generating assets, crippling cash flows and financial capacity. On the other hand, banks and financial institutions (FIs) are seeing their books turn bad, and cannot lend any further to these borrowers. The big dilemma facing the government, banks and corporates in recent years is raising resources for many stalled infrastructure projects. According to the Centre for Monitoring Indian Economy (CMIE), the number of stalled projects touched an all-time high of 893 ventures worth INR 11.36 trillion at the end of 2015-16, which are held up due to the lack of promoter interest, unfavourable market conditions and lack of funds. Over the last few years especially, stressed assets have been detrimental to the infrastructure sector. This is a grave concern, as non-recovery of loans from the sector has affected ongoing projects and projects hitting completion. Worst of all it has impeded investment in Greenfield projects.
  • 4. 04 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Plummeting Private Sector Investments in Indian Infrastructure Private sector participation in infrastructure investment reached a 10-year low in 2015 as the country fell out of the top five countries globally, for private sector investments in infrastructure. But this has been in line with the global trends as private participation in infrastructure (PPI) in the emerging markets of Brazil, India, and China saw declining investments. These countries have been traditionally the large players in PPI, however investments tumbled in China, India, and most notably Brazil, where the combined commitments dwindled to just USD 1.8 billion in H1 2015 from USD 30.9 billion in H1 2014. Source: World Bank, PPI Project Database Private investment in infrastructure in India had increased rapidly from 2006, and peaked in 2010, but ever since it has been on a rapid decline. The World Bank predicted in 2013 that the slowdown would continue in the longer term due to rising domestic concerns, especially with financing. - 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 1991-1995 1996-2000 2001-2005 2006-2010 2011-2015 H1 InvestmentinProjectsbySector USDMillion Five Year Period Private Sector Investment in Infrastructure Projects in India by Sector 1990 - 2015 H1 Water and sewerage Telecom Seaports Roads Railroads Natural Gas Electricity Airports
  • 5. 05 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Source: World Bank, PPI Project Database The largest investments have been traditionally in electricity, telecoms and roads. However investments in the telecom and power sector have declined significantly in the last five years. Though sector specific decline was expected in transport and energy, there have been larger, looming reasons for the decline. The biggest challenge has been that public banks, which have been the main source for infrastructure financing, have been overstretched and are reaching their exposure limits. Moreover there has been an absence of a domestic corporate debt market (which is only 2% of GDP) and a lack of foreign equity and credit (equity FDI is only 1.2% of GDP) in India’s private infrastructure market to relieve this exposure. The current infrastructure-financing gap is estimated to be USD 750 billion of the targeted USD 1 trillion spending on roads, ports, power and other infrastructure for the current five-year plan (2012 - 2017). The USD 750 billion is essentially 75% of the required funding that would need to come through debt, much higher than what the government had in mind initially when planned. This figure is also five times the existing INR 9.2 trillion (USD 144 billion) of bank loans that have been disbursed to Indian infrastructure projects to date. - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 2010 2011 2012 2013 2014 2015 H1 InvestmentinProjects(USDmillion) Year Private Investment in Infrastructure Projects in India by Sector 2010 - 2015 H1 Water and sewerage Telecom Seaports Roads Railroads Natural Gas Electricity Airports
  • 6. 06 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Government to Kickstart Infrastructure Finance and Remove Regulatory Hurdles A year earlier, the 2015 budget proposed the creation of a ‘National Investment in Infrastructure Fund’ with an initial annual allocation of USD 3.25 billion. The NIIF is structured like a fund of funds, where it will invest in more sector specific funds or at different phases of funding, based on investor appetite. The fund, which is still being set up, is expected to invest in public sector infrastructure finance companies. The companies in turn will be able to leverage their higher credit rating to access domestic and international debt markets, including foreign pension and insurance funds and institutional investors. The government has budgeted to contribute INR 200 billion to the fund in the current fiscal year (2016-2017) while another INR 200 billion will be raised through sovereign wealth funds. It will, however, be interesting to see whether the NIIF will complement or invest directly in other infrastructure investment special purpose vehicles (SPVs) that already finance infrastructure projects, such as the Infrastructure Development Finance Company (IDFC) and Indian Infrastructure Finance Company Limited (IIFCL). To mobilize additional finances for infrastructure spending the government proposed that it will permit infrastructure regulatory agencies, including the National Highway Authority of India (NHAI), Power Finance Corporation (PFC), Rural Electrification Company (REC), Indian Renewable Energy Development Agency (IREDA), National Bank for Agriculture and Rural Development (NABARD) and Inland Water Authority to raise bonds up to the extent of INR 313 billion in the current year. The government’s fresh allocation of USD 2.25 billion to roads and USD 1.6 billion to railways in the current fiscal year is also expected to improve liquidity in the system by encouraging public sector led investments in infrastructure, through EPC, Cash Contract and Annuity models for the awarding of projects in these sectors.
  • 7. 07 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India The government has also sought to improve the regulatory setup and reboot the PPP framework by improving the PPP dispute resolution process. The new budget put forward recommends a ‘Public Contracts (Resolution of Disputes) Bill’ and a ‘Regulatory Reform Bill’ that would aim to ensure greater consistency across the country’s various regulators and regulations. With bad loans and stressed assets on the rise, the government also sought to improve the investment environment, by pushing for the recapitalization of Public Sector Banks (PSBs). Under project Indradhanush, the government had proposed that it will infuse INR 250 billion into public sector banks in each of fiscal years 2016 and 2017, and INR 100 billion each in fiscal years 2018 and 2019. These proposed amounts are still short of the estimated INR 2.3 trillion of capital that Indian public sector banks need by 2019. Most of the support is expected to come through government capital infusions as banks still find it difficult to raise capital from the equity capital markets. This year’s budget also sought to improve the last-mile connectivity in many infrastructure sub-sectors, including power, railways and ports. The budget included provisions to help electrify the last remaining 20,000 villages that are still not connected to the grid by 2020. The last-mile connectivity plans for ports and railways propose to link the 12 major ports to the rail network to move cargo, which is expected to increase efficiency and reduce cost, when compared with road transport.
  • 8. 08 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Investments in Power and Roads Continue to Dominate The top three sectors in terms of investments through PPI have been in electricity, telecoms and roads, but over the last 5 years investment has been mainly in roads/highways and electricity. Until 2010, the largest investments went into the telecoms sector, but more recently electricity and highway projects have garnered more investment. Source: World Bank, PPI Project Database Road and highway projects though large in number are still small based on project costs, when compared to telecoms and electricity. Over the last 25 years, the largest 10 projects in India with PPI investments are listed in the following table. 141,873 100,231 73,238 8,744 7,826 5,111 1,015 605 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 361 37 386 39 8 7 5 14 Electricity Telecom Roads Seaports Railroads Airports Natural Gas Water and sewerage TotalInvestment(USDmillion) No. of Projects in each Sector Investments by Private Sector in India by Infra Sub-sector 1990 - 2015 H1
  • 9. 09 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Private Participation in Infrastructure in India - Top Projects 1990 – 2015 H1 Project Sector Type of PPI Termination Year Contract Period Investment (USD million) Reliance Communications Limited Telecom Greenfield Project 2001 20 29,001 Bharti Airtel Limited Telecom Greenfield Project 2024 20 23,879 Vodafone Essar Telecom Greenfield Project - - 17,053 Idea Cellular Telecom Greenfield Project - 15 11,284 Tata Teleservices Limited Telecom Greenfield Project 2013 15 7,538 NTPC Limited Electricity - Generation Divestiture - - 5,992 Shyam Telelink Ltd. Telecom Greenfield Project 2012 15 5,313 Mundra Ultra Mega Power Plant Electricity - Generation Greenfield Project 2033 25 4,200 Sasan Ultra Mega Power Plant Electricity - Generation Greenfield Project - - 3,986 Jindal Tamnar Power Plant Phase I and II Electricity - Generation Greenfield Project - - 3,983 Source: World Bank, PPI Project Database The government's allocation to roads in the 2016 budget through the road transport and highways ministry now stands significantly higher at INR 579.76 billion (up 23.1% from INR 471.07 billion in FY16). Overall, the budgetary allocation towards the key transport segments - roads and railways - stands at INR 2.18 trillion, and if the allocation towards the upgrade of state highways is included, the figure expands further to INR 2.21 trillion. These investments will dramatically improve transit timing and are expected to reduce the per km cost of transportation. For the current fiscal year, the government plans to build 10,000 km of national highways and upgrade another 50,000 km. It is slowly making progress in terms of efficiency in road construction, building 13 km of roads a day, which is still less than half the speed at which the government aimed to build (30 km/day).
  • 10. 10 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India The railways are also seeing a major push in the proposed investment plan of INR 1.21 trillion for 2016-17, with the government providing budgetary support of INR 43.01 billion. This is about 43% higher than the proposed investment plan for fiscal 2015-16. The plan will also invest in developing railside logistics parks that will allow terminals and sheds to handle container traffic to create an integrated transport system with ports. These investments will dramatically improve efficiency in logistics by reducing transit timing and the per km cost of transportation. The railway logistics and freight container trains proposed to run on time-tables, will give new options for logistics managers to lower costs and improve timeliness. The Renewable Energy sector has globally attracted a lot of private equity investment in recent years, and it has fared well in India too. The sector is expected to expand from 32 GW to 175 GW by 2022. Against this backdrop, the government has allocated an outlay of more than INR 100 billion for 2016-17. This outlay includes INR 50 billion from the National Clean Energy Fund (NCEF) with the balance coming from Internal & Extra Budgetary Resource (IEBR). Moreover, India is emerging as a key destination for renewable energy projects, as the government has provided incentives to infrastructure and programs designed to attract investment. India topped the ranks in 2015 with USD 11.8bn of announced FDI in the sector, which included Lightsource Renewable Energy’s plans to invest USD 3 billion, to design, install and manage more than 3 GW of solar power within the country.
  • 11. 11 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India The Real Concerns in Sustaining Infrastructure Investment and the High Financial Leverage of Infrastructure Companies While the public sector in India had opted out of infrastructure development spending to free up fiscal resources since the early 1990s, more has been left to the private sector and bank financing. Most often infrastructure lending was done by commercial banks that lent on a large scale to private sector infrastructure companies, and over time this has presented another set of challenges. Not only are the private sector companies involved in infrastructure development now excessively reliant on bank financing, they do not have any other options for raising capital, as they cannot tap corporate bond markets or other long term funds such as insurance and pension funds. With bank credit being the principal source of debt funding for infrastructure projects, credit is only available for a maximum tenure of 10-15 years, which does not match the typical 20-30 year tenure of an infrastructure concession contract. The issue is exacerbated when considering infrastructure project loans have tenures of 10 to 15 years, bank deposits, the main source of funds; typically have a maturity of less than 3 years. With the rapid growth in lending to the infrastructure sector between 2000 and 2010 there has been a growing risk of an asset-liability mismatch (ALM). The Reserve Bank of India (RBI – India’s central bank and banking supervisor) and banks have become cautious on the issue related to financing infrastructure loans. Several domestic public and private sector banks have neared their group exposure limits set by the RBI for lending to large infrastructure players. Over the last few years, the banking supervisor has expressed serious concerns about the level of non-performing assets of the banking system, especially due to the loans provided to the infrastructure sector. As these loans have had a disproportionate share in the aggregate non-performing assets, banks are reluctant to increase their exposure. This has taken toll on many of the infrastructure firms, which are unable to complete their current projects without cleaning up their balance sheets. With this situation it is expected that private infrastructure investment is going to stall for a few more years, with new investments in Greenfield projects to be most negatively affected. There is now a growing onus on the public sector to revive infrastructure investments.
  • 12. 12 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India In real terms the consolidated debt of over 250 companies in the steel, construction, infrastructure development, power generation and distribution sectors rose by around 10% in 2014-15 from the previous year. Power generation and distribution have been the most indebted sub-sectors, with the consolidated debt of these companies rising to INR 4,730 billion in 2014-15 from INR 4,263 billion in 2013-14. India is already known to have one of the world’s highest levels of electricity transmission and distribution (T&D) losses, due to technical inefficiency and theft. Apart from that many of India's utilities also lose significant electricity-related revenue because of poor collection efficiency, and retailers are forced by their state governments to sell electricity at subsidized rates, which now accounts for INR 600 billion (USD 9.1 billion) every year as costs exceed tariffs. With such large amounts of debt, private sector investments have virtually ground to a halt, and the difficulties that these companies face reflect the problems that the Indian financial system is grappling with. Where the cost of capital has been high, banks are reluctant to extend credit because they have too many bad loans. The RBI has conditionally allowed banks to roll over loans to indebted infrastructure companies, only if they have good assets. So until these indebted groups can raise the cash to repay the banks, either by selling assets or completing projects to generate the required cash flow, new investments are not going to meet the scale of funds required for the country to upgrade its infrastructure assets and meet the growing demand. A Credit Suisse report titled “House of Debt”, which was first released in 2012 and then updated in 2015, has outlined the financial stress and indebtedness that ten large Indian corporate groups went through. Most of the corporate groups are in the infrastructure space, and their indebtedness has intensified over the last 3 years. These companies included the following groups: Lanco Group, Jaypee Group, GMR Group, Videocon Group, GVK Group, Essar Group, Adani Group, Reliance Group, JSW Group and Vedanta Group. All the three major ratios of debt servicing of these groups have suffered deterioration: interest cover, debt-to-earnings and debt-to-equity. Their overall debt has risen to INR 7,335 billion from INR 6,532 billion between 2012-13 and 2014-15.
  • 13. 13 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India With many of the projects stranded due to insufficient financing, the companies have been caught up in high financial leverage, and debt repayment. Over the past eight years, the corporate debt of these 10 over-leveraged corporate groups covered by the Credit Suisse list grew by an alarming seven times. Source: Credit Suisse; *Essar P&L numbers are for FY14, debt is based on data available for FY15, with remaining figures assumed to be the same as in FY14 These figures also take into account the fact that these companies, despite resorting to asset sales in order to deleverage their balance sheets, have seen their stress levels rise. This is evident by looking at how debt has eaten into the equity of these companies, especially those operating in infrastructure and power projects, which were initially built at a debt-to-equity ratio of 70:30, as that ratio has now shifted to 90:10. For example the market cap-to-debt ratio in the case of GVK Group is 95:5. Declinining Debt Servicing Ability of Groups Operating in the Infrastructure Space in India INR Billion Gross Debt EBITDA EBIT PAT Interest Cover Debt/EBITDA (x) Debt/Equity (x) FY2013 FY2014 FY2015 FY2015 FY2015 FY2015 FY2014 FY2015 FY2014 FY2015 FY2014 FY2015 Vedanta Group 996.10 1012.27 1033.40 231.95 107.6 -234.83 1.6 1.3 1.8 2.3 0.4 0.7 Essar Group* 986.44 999.49 1014.64 83.7 28.36 -7.87 0.3 0.8 11.1 8.5 4.6 3.9 Adani Group 811.22 844.40 960.31 123.7 88.48 19.48 1.1 1.3 7.3 6.5 2.9 3.1 Jaypee Group 636.54 729.79 751.63 61.38 44.51 -17.27 0.8 0.6 11.1 11.9 6.9 7.1 JSW Group 461.18 530.27 581.71 130.25 88.01 31.46 2 1.9 4.1 4.2 1.8 1.8 GMR Group 408.24 450.45 479.76 25.54 7.42 -27.33 0.4 0.2 16 16.8 5.4 7.1 Lanco Group 410.84 440.82 471.02 16.93 5.8 -20.36 0.1 0.2 24.6 23.1 16.1 43.8 Videocon Group 407.68 N/A 454.05 -1.12 -16.49 51.19 -0.3 -0.3 285.5 NM 8.4 3.8 GVK Group 269.64 310.26 339.33 7.39 0.34 -8.34 0.5 0 21.7 32 7.4 12.2
  • 14. 14 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India In any case, the corporate debt ratio in India, which is only a moderate 50% of GDP, has been highly concentrated, with the top 1% of firms accounting for about half of the debt, as do corporates in the infrastructure (including power, telecommunications and roads) and metals sectors (including iron and steel). Ever since the global financial crisis, the median debt-to-equity ratio of these corporations have been at more than 175%, not only higher than corporates in other sectors in the country, but also among the highest among corporates across emerging economies. BMI Research expects Indian banks to continue to report a significant amount of bad debt, this is not surprising as the financial position of the country’s infrastructure conglomerates continues to deteriorate. With no signs of improvement, the RBI has been vigorous in promoting regulation and norms regarding restructuring loan repayments and refinancing, and in cleaning up the banking system. While the RBI has been in the balancing act of safeguarding banks from the mounting NPAs and restructured loans, the government has been keen on easing non-performing asset norms for bank loans to revive projects.
  • 15. 15 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Public Sector Banks (PSBs) most Exposed to Stressed Loans in the Infrastructure Sector Though India has been able to sustain itself as an emerging market ‘bright spot’, there has been growing apprehension about its banking system which has been weighed down by bad loans and the growing level of stressed or restructured loans. Over time, the public-sector banks (PSBs) have taken the largest share in lending to large-scale infrastructure projects. The main issue has been with the long gestation periods of these projects, making recoveries very difficult. The Economic Survey for 2014-15 held that infrastructure, iron & steel, textiles, mining (including coal) and aviation, held 54 per cent of total stressed advances of PSBs as on June 2014. The survey noted that the exposure of PSBs to infrastructure stood at 17.5 per cent of their gross advances and was significantly higher than private sector and foreign banks. Gross NPAs of Banks in India Mar-2010 – Mar-2015 Public Sector Banks Private Sector Banks Foreign Banks All Banks Year Amount INR Billion Gross NPAs (%) Amount INR Billion Gross NPAs (%) Amount INR Billion Gross NPAs (%) Amount INR Billion Gross NPAs (%) Mar-2015 2,785 5.0 337 2.1 108 3.2 3,229 4.3 Mar-2014 2,273 4.4 242 1.8 116 3.9 2,630 3.8 Mar-2013 1,645 3.6 208 1.8 80 3.0 1,932 3.2 Mar-2012 1,173 3.0 185 1.9 63 2.7 1,420 2.8 Mar-2011 747 2.2 182 2.2 51 2.5 979 2.3 Mar-2010 599 2.2 176 2.7 71 4.3 847 2.4 Source: Department of Banking Supervision, RBI The RBI also conducted sectoral credit stress tests for the infrastructure sector and the largest sub-sectors that included power, transport and telecommunications. The infrastructure sector as a whole has been assessed as highly stressed, with its share of NPAs standing at 12.7% and standard restructured assets at 46%. Among the sub-sectors, the power sector was the most stressed with a share of 29.3% in restructured assets and 5% in total NPAs. In contrast, the transport sectors share of restructured assets was 14.6% and 3.8% of NPAs, while for the telecom sector these figures were 1.8% and 1.7% respectively.
  • 16. 16 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Source: Credit Suisse The stressed loans of Indian banks were to the tune of 14 % of gross advances (USD 161 billion) as of March 2015. Reviewing the trend of growth in the number of stressed loans, over 30 per cent were from the Infrastructure sector – primarily in the power space. A large proportion of these loans were to government-controlled power generation and distribution companies. Operating inefficiencies (technical and commercial), lack of adequate availability of cheaper domestic coal and inability to pass on the increased costs to consumers have impacted these companies adversely. Infrastructure and Construcoon 25% Metals 12% Industrials 10% Uolioes 10% Services 9% Energy 5% IT/Telecoms 5% Other 24% Stressed Loans by Sector in India Q2 2015 (5)
  • 17. 17 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India The Regulators Scramble to Plug the System through Opportunities for Refinancing Over the next four years, New Delhi says the state banks will need about USD 28bn in new capital. Of that, the government for its part has already provided a USD 11 billion bailout to struggling PSBs, while also promising structural reforms. With the RBI not completely receptive to the idea of setting up a special purpose infrastructure fund or a development financial institution which would lend to projects that require last-mile funding, these assets end up being classified as stressed assets. As aside from NPAs, banks also carry loans that were restructured — where borrowers have sought more lenient terms such as reduced interest rates or extended repayment period, in order to make payments and allow banks to classify the loans as standard assets. But while the RBI closed the restructuring window for banks in April 2015, listing various measures taken to provide impetus to infrastructure lending and address the stress in the sector, the RBI and Finance Ministry are allowing banks and FIs to enter into a take-out financing arrangement with IDFC and other Financial Institutions (FIs) under the 5:25 scheme. Banks are now allowed to have flexible structuring and refinancing of project loans under the 5:25 scheme, and banks can issue long-term bonds with a minimum maturity period of seven years with certain incentives. The central bank has recommended that the lenders should take advantage of the 5:25 scheme, a provision that allows banks to refinance loans for infrastructure for up to 25 years, and the strategic debt-restructuring scheme, which allows debt-for-equity swaps. Essentially banks now have the right to convert their loans into a majority equity stake if they feel that a change in ownership can help turnaround the borrower’s business. Under the 5:25 scheme, banks can fix longer repayment schedules, even for say 25 years, for loans to infrastructure projects.
  • 18. 18 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Additionally, the Securities and Exchange Board of India (SEBI) has recently relaxed the norms on debt – equity conversion by banks in stressed listed entities. This could enable the banks to get a controlling equity stake in such companies so as to enforce a change in the management, and eventually improve efficiency. The flexible loan restructuring scheme stipulates that loans given to infrastructure and core industries in which the aggregate exposure of all institutional lenders exceeds INR 5 billion, the debt can now be repaid over a maximum of 25 years and the banks will refinance the loan every five years. The repayment at the end of each refinancing period would be structured as a bullet repayment, being specifically mentioned upfront that the loan will be refinanced and that it would be considered in the asset liability management (ALM) of banks. According to some recent estimates the loan amount already refinanced under this scheme is on the order of INR 1 trillion. The RBI is also allowing the creation of infrastructure debt funds as Non-banking financial corporations (NBFCs) or mutual funds. However, while capital infusion and restructuring might provide short-term relief, it is clearly not a sustainable answer to a complex problem. The argument against the 5:25 scheme is that it is largely being used as just another tool to postpone the write-offs, even though they admit that the scheme is a better way of restructuring loans compared with corporate debt restructuring (CDR). Though the 5:25 guidelines allows banks to increase the tenure of the loans so that they can match each project’s inflows and outflows, the issue is whether these loans eventually default. Taking for example the power sector with its INR 750 billion worth of loans, even if these debts are put under the 5:25 scheme, not all of them will eventually turn positive. Given that about 35-40% of the restructured accounts have eventually defaulted, there may be a large percentage of debt being shifted to the 5:25 scheme that will eventually end up in default.
  • 19. 19 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India In terms of dealing with the stressed loans, banks have preferred to address the problem through restructuring debt under the Corporate Debt Restructuring (CDR) mechanism. While recovery of assets has mainly been the responsibility of banks, they are not well equipped to manage recoveries and so there is the dire need to promote agencies that can manage distressed funds such as Asset Reconstruction Companies (ARCs). A two-pronged strategy that needs to be implemented has been Asset Reconstruction and Asset Disposal. Currently, the banking industry has resorted to the former, which is the sale of the distressed assets of the bank to an Asset Reconstruction Company (ARC), thereby disposing of the debt. After the sale, bad loans become the responsibility of the ARCs and relieve banks from the pressure of recovering loans, while also generating capital. According to media reports, the Finance Ministry is working towards creating a public-funded ARC, which will help in the bailout. Along with reconstruction, currently a ‘Bankruptcy Code’ is also being worked out, as this is expected to go a long way towards helping local lenders to better manage their non-performing and stressed assets. The real challenge in the current environment has been the RBIs call for banks to clean up their account books by early 2017, the central bank has implicitly implied that it would be closely scrutinizing whether concessions made to the lenders are being misused. The RBI governor, Raghuram Rajan, stressed the importance of such a clean-up in his speech on 11 February 2016, where he reiterated that the profitability of some banks may be impaired in the short run, but that once the system was cleaned up, it will be able to support economic growth in a sustainable and profitable way. With the RBI intent on getting banks to clean up their loan books, the likely credit costs which were supposed to be spread over the next three to four years will have a much higher incidence in FY16/FY17.
  • 20. 20 Stalling Investments in Infrastructure and the Expanding Infra Debt Burden in India Infrastructure Investments Unlikely to Make Headway in the Short-Term The main issues for infrastructure projects in India have been their commercial viability and long gestation periods, but more recently the focus has shifted to stalling private investments in the sector due to growing indebtedness and the high financial leverage of firms operating in the infrastructure space. Lending to infrastructure companies has pushed up the NPLs and stressed loans in the banking sector, as these companies completely rely on banks for lending, due to the absence of a deep corporate bond market in India and muted participation by pension funds that have inhibited credit availability for long-term financing. While the 10-15 year tenure of lending is too long for banks, it is too short from the point of view of project companies, resulting in an asset-liability mismatch issue. Further regulations such as sector specific resolution of stressed assets, implementation of a strong bankruptcy code and institutionalising a formal mechanism to revive sick companies are needed to resolve stressed loans. Above all, a credible, timely and realistic mindset is required to ensure sustained recovery management. The quick action in enacting a modern bankruptcy law, will also allow infrastructure projects that have turned into bad loans to be speedily handed over to new promoters capable of attracting fresh financing. The Finance Ministry, in a mid-term review of the economy last year, had acknowledged the concerns springing from over-leveraged private balance sheets and the need for higher public investments to compensate for India Inc’s inability to take up Greenfield projects. But even after a year, investments by the public sector have yet to see an improvement. Hopefully with more funds committed to the road sector, where the award of projects both under EPC (engineering-procurement-construction) and a new ‘hybrid annuity’ model may make headway, more can be done to support the power and railway sector. Though in the short run (3-5 years) the private sector involvement in the infrastructure investment space is going to be constrained, with reviving demand and continued economic growth, continued reforms in cleaning up the banking system and a public sector push in infrastructure spending, the sector is likely to see growth in the medium to long term.