FORWARD-LOOKING INFORMATION AND QUALIFIED PERSON
2
This presentation contains “forward looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance of
the Company and its subsidiaries (collectively, “Dalradian”) and its mineral projects, the future price of metals, the estimation of mineral resources, the realization of mineral
resource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of the
development of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks,
reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcome of pending regulatory matters. Often, but not always,
forward looking statements can be identified by the use of words and phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,
“intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”,
“would”, “might” or “will” be taken, occur or be achieved.
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions such as
the continued political stability in Northern Ireland, that permits required for Dalradian’s operations will be obtained on a timely basis in order to permit Dalradian to proceed on
schedule with its planned exploration and development programs, that skilled personnel and contractors will be available as Dalradian’s operations continue to grow, that the
price of gold will be at levels that render Dalradian’s mineral projects economic, that the Company will be able to continue raising the necessary capital to finance its operations
and realize on mineral resource estimates and current mine plans and that the assumptions contained in the Company’s PEA (as defined herein) are accurate and complete.
Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Dalradian to
be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others,
general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamation
activities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible
variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents,
labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or
construction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form for the year ended December 31, 2014
dated March 24, 2015 (the “AIF”) .
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward looking
statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward looking statements contained
herein are made as of the date of this presentation and the Company disclaims any obligation to update any forward looking statements, whether as a result of new
information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward looking statements will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward
looking statements.
Certain technical data in this presentation was taken from the technical report dated October 30, 2014 and titled "An Updated Preliminary Economic Assessment of the
Curraghinalt Gold Deposit, Tyrone Project, Northern Ireland” (the “PEA”), prepared by Mr. Tim Maunula, P.Geo., of T. Maunula & Associates Consulting Inc., Mr. Barnard Foo,
P.Eng., Mr. Richard M. Gowans, P.Eng., Mr. Andre Villeneuve, P.Eng., and Mr. Christopher Jacobs, CEng MIMMM, of Micon International Limited (“Micon”) and is subject to all of
the assumptions, qualifications and procedures described therein.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes inferred mineral resources that are
considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no
certainty that the results of the PEA will be realized.
Eric Tremblay, P.Eng., Chief Operating Officer, Dalradian Resources Inc., is the Qualified Person who reviewed and approved the technical information in this presentation. The
exploration data was based on the procedures described in the Company’s PEA and is subject to all of the assumptions, qualifications and procedures described therein.
3
PREMIUM ASSET IN A SCARCITY MARKET
1
Ranking by Natural Resource Holdings, based on 2012 data
 High grade gold in the first world
 Major work program ongoing
 Strong government and community
support
 Feasibility Study and submission of
mine construction permit targeted
during 2016
4
269
81
345
10
30,800
days working underground
blasts
m of development
underground drill bays
m of infill drilling
CORPORATE
6
THE BOARD:
TRACK RECORD OF FINDING, FUNDING AND BUILDING MINES
PATRICK F. N. ANDERSON
CHAIRMAN & CHIEF EXECUTIVE OFFICER
 Founder & Former CEO of Aurelian Resources
 ‘08 – PDAC International Mineral Discovery
 ‘08 – Northern Miner Man of the Year
RONALD GAGEL
 CFO of TMAC Resources; Former CFO of FNX
Mining and Aur Resources
 Director of Adriana Resources and Stonegate
Agricom
 Former board member of HudBay Minerals
and Central Sun Mining
 ‘13 – PDAC Distinguished Service Award
THOMAS OBRADOVICH
LEAD INDEPENDENT DIRECTOR
 Founder & Former CEO of Young-Davidson
Mines
 Former Director of Aurelian Resources
SEAN ROOSEN
 Founder & CEO of Osisko Mining Corporation
 Also Director of Astur Gold
 ‘06 – Prospector of the Year - Quebec
 ‘08 – Prospector of the Year - Canada
 ‘09 – Northern Miner Man of the Year
JONATHAN RUBENSTEIN
 Director of Eldorado Gold
 Director of Detour Gold
 Chairman & Director of MAG Silver
 Former Director of Aurelian Resources,
Sutton Resources, Canico Resource and
Cumberland Resources
PATRICK “PADDY” DOWNEY
 Former CEO of Elgin Mining, Aura Minerals
and Viceroy Exploration
 Director of Claude Resources and Orezone
 Native of Northern Ireland
GRENVILLE THOMAS
 Founder & Chairman of Strongbow
Exploration
 Founder & Former Chairman & President of
Aber Resources (now Dominion Diamond)
 ‘99 – PDAC Prospector of the Year
 ‘01 – Northern Miner Man of the Year
 ‘09 – Canadian Mining Hall of Fame
JIM RUTHERFORD
 Director of Anglo American
 Former senior vice president of Capital
International Investors, responsible for
mining investments
 Native of Northern Ireland
7
ANALYST COVERAGE
All dollars quoted in $ CAD
$0.00
$0.25
$0.50
$0.75
$1.00
$1.25
$1.50
$1.75
$2.00
N D J F M A M J J A S O
2014
$0.71
November 16, 2015
$1.75
Michael
Curran
$1.70Ryan
Walker
$1.50
Tyron
Breytenbach
Targets range from $1.10-$1.75
$1.25
Andrew
Breichmanas
$1.10
Adam
Melnyk
2015
$1.40 $1.40
Matthew
O’Keefe
90p
$1.10
Joe
Mazumdar
$1.50
Jamie
Spratt
8
CORPORATE SUMMARY
TSX: DNA STOCK PRICE
Shares outstanding of 214 million and
fully diluted of 298 million as of November 11, 2015
Cash position of $24 million as of Sept. 30, 2015; closed
financing for gross proceeds of $40.25 million Oct. 7
SHARE CAPITALIZATION AND CASH POSITION
All dollars quoted in $ CAD
Local listing (AIM:DALR) for a local project
TOP TEN SHAREHOLDERS
(REPRESENTING ~50%)
GEOGRAPHIC OWNERSHIP
FOR IDENTIFIED SHAREHOLDERS
Canada
50%
US 28%
Europe
20%
M&G (on behalf of Vanguard)
Sprott (Sprott Asset Mgmt, Sprott Global and Sprott Wealth)
Ross Beaty
Sun Valley
Front Street
Rosseau
Insiders (2.9%)
Aegis
RBC
Julius Baer
CURRAGHINALT DEPOSIT
10
 Our flagship asset: Curraghinalt, orogenic high-grade gold deposit
 Excellent regional infrastructure
 Over 84,000 hectares under license
Gold
Base Metals
Other
Gortin
Omagh
Curraghinalt
BELFAST
N O R T H E R N
I R E L A N D
Galantas
Gold
Conroy
Diamonds
& Gold
Lonmin
Irish Salt
Mining
Irish Salt (Kilroot)
UG Mine
Curraghinalt Gold
Deposit
Galantas (Cavanacaw)
Permitted UG mine
Scotgold (Cononish)
Permitted
Vedanta (Lisheen)
In production
Boliden (Tara)
In production
Lundin (Galmoy)
Previous producer
Conroy (Clontibret)
Gold exploration
Xstrata (Pallas Green)
Feasibility
Wolf (Hemerdon)
Tungsten Developer
Mineral Projects in Ireland and the UK
Cleveland
Potash (Boulby)
In Production
Sirius (York Potash)
In Development
Croagh Patrick
Gold deposit
IMC Exploration (Avoca)
Exploration
Gold Mines of Wales
(Gwynfynydd/Clogau)
exploration/former mines
Calliacher-Urlar Burn
Exploration
11
CURRAGHINALT RESOURCE
 Since 2010, we have grown the
resource more than 5-fold over
3 updates
 High-grade gold resource1
 Measured:
0.02 MT grading 20.15 g/t Au
for 15,100 contained ounces
 Indicated:
2.98 MT grading 10.34 g/t Au
for 989,000 contained ounces
 Inferred:
8.01 MT grading 9.67 g/t Au
for 2.49 million contained ounces
 Deposit is open in all directions
 Infill drilling to support FS began
in March 2015
1 Refer to PEA
12
EXCELLENT POTENTIAL FOR RESOURCE GROWTH
Curraghinalt
Deposit
12km
Curraghinalt
Trend
1 Refer to Technical Report
2 12-CT-162 drilled at 180/-55. 12-CT-173 drilled at 150/-60; 2a from 186.00m- 188.22m, 2b from 229.08m - 230.55m ; true width undetermined
3 11-CT-99 drilled from 471.14-474.34m
4 12-CT-167 drilled from 201.93-204.40m
Vein and Vein Intersections
Curraghinalt
Deposit
Attagh Burn
2.47m @ 18.99 g/t Au
4
Curraghinalt Deposit
Resource effective as of Jan 2014
1
–
Measured: 0.02 Moz Au (0.02 MT @ 20.15 g/t)
Indicated: 0.99 Moz Au (2.98 MT @ 10.34 g/t)
Inferred: 2.49 Moz Au (8.01 MT @ 9.67 g/t)
Alwories Discovery Holes
2
4.72m @ 14.82 g/t Au (12-CT-173)
2.22m @ 14.10 g/t Au (12-CT-162)
2a
1.47m @ 23.60 g/t Au (12-CT-162)
2b
400 m Step-out
3.2m @ 5.34 g/t Au (11-CT-99)
3
900 m Step-out
0.65m @ 15.04 g/t Au (12-CT-154)
Commenced 3,400 metre drill program at Alwories in August 2015
13
GLACIATED TERRAIN WITH MINIMAL OUTCROP
Curraghinalt
Deposit
Curraghinalt
Trend
1 12-CT-162 drilled at 180/-55. 12-CT-173 drilled at 150/-60; 2a from 186.00 m- 188.22m, 2b from 229.08m - 230.55 m ; true width undetermined
2 11-CT-99 drilled at 200/-60, from 471.14-474.34 m
3 12-CT-167 drilled from 201.93-204.40 m
Curraghinalt
Deposit
Attagh Burn
2.47m @ 18.99 g/t Au (12-CT-167)
3
Golan Burn
Outcropping veins including
60cm @ 61.43 g/t Au
Gold Anomalies
1
kilometres
0 2
Vein and Vein Intersections
Scotch Town
Peak of 10.52 g/t Au
In mineralized boulders
400 m Step-out
3.2m @ 5.34 g/t Au (11-CT-99)
2
Alwories Discovery Holes
1
4.72m @ 14.82 g/t Au (12-CT-173)
2.22m @ 14.10 g/t Au (12-CT-162)
2a
1.47m @ 23.60 g/t Au (12-CT-162)
2b
12KM GOLD TREND IS MOSTLY UNEXPLORED
14
OROGENIC VEIN SYSTEM
PEA ECONOMICS
16
PEA SHOWED STRONG ECONOMICS
KEY PEA DATA*
GOLD PRICE:
US$1,200/ounce
GOLD PRICE:
US$1,054/ounce
NPV with 8% discount rate (After-tax) US$504 million US$366 million
IRR (After-tax) 36.2% 29.9%
Average Annual Gold Production 162,000 ounces/year
Processing Rate 1,700 tonnes/day
Life of Mine 18 years
Initial Capex ($48M contingency) US$249 million
Cash Costs US$485/ounce; US$132/tonne
Diluted Grade 9.3 g/t Au
Gold Recovery 92%
* Prepared by Micon International Limited. PEA results released on October 30, 2014. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes inferred mineral
resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the results of the PEA will be realized.
All dollars quoted in $ USD unless stated otherwise.
WORK PROGRAM
18
FEASIBILITY STUDY
FS supported by UG program,
including 885 m of new
development with 2 test stopes
and ~50,000 m of infill drilling
FS proceeding on the basis of:
 Mining primarily by longhole
but with additional methods
as required;
 Processing incorporating a
flotation circuit;
 Dry stack tailings; and
 ~ 50% of waste rock to be
returned underground as
paste backfill
19
SITE OVERVIEW
Crow
106-16
No. 1
T-17
Mullan
Sheep Dip
Road
Water treatment plant
Waste pad
Ore storage
Explosives magazine Elevator and ventilation
Veins
Existing
Development
Planned
Development
PERMITTING
Planning
decision
MINE CONSTRUCTION PERMIT SUBMISSION IN Q3 2016
Draft Project
Description
(pre-consultation with
stakeholders via PAD)
Prepare EIA
Submit
Planning
Application
H2 2016
Planning NI
Review
Permission to construct a mine will be based
on a Planning Application, which will consist
of a Project Description and an Environmental
Impact Assessment (EIA)
Review and approval is
estimated to take 1-2 years
Curraghinalt has been designated a project
of “regional significance”, which allows
ministerial involvement in the planning decision
Pre-engage with DOE
via a Pre-Application
Discussion (PAD)
Granted
Refused
Referred to Public
Local Inquiry
22
STRONG GOVERNMENT & COMMUNITY SUPPORT
 Top priority of government is jobs & investment
 Cross-party support:
“Pat Doherty, the area’s Sinn Fein
MP, believes the Curraghinalt mine
should go ahead provided it
complies with planning and
environmental requirements,
with most people in the area
supportive.” Financial Times,
Dec. 5, 2014
 Invest NI grant to Dalradian for
$590,000 to support jobs and
training during UG Program
 78% of local residents are positive
about the prospect of a mine
in their area
Aug 2014 site visit by Arlene Foster, MLA,
Minister for Enterprise, Trade and Investment
23
ESTIMATED TIMELINE
Nov
2015 Dec
Jan
2016 Feb Mar Apr May June July Aug Sept Oct
UG development Test stoping
Infill drilling
Resource update
EIA preparation Stakeholder consultation Submission of
Planning Application
Feasibility study
SUMMARY
25
DNA HIGHLIGHTS
 Team in place to permit,
finance and build a mine
at Curraghinalt
 We are de-risking the
project through:
 UG exploration
 Drilling
 FS
 Environmental and
permitting work
26
Patrick F.N. Anderson
Chairman & CEO
info@dalradian.com
416.583.5622
Trading Symbol:
DNA on TSX
DALR on AIM
Corporate Office:
Dalradian Resources Inc.
Queen’s Quay Terminal
207 Queen’s Quay West
Suite 416
Toronto, Ontario
Canada M5J 1A7
www.dalradian.com

More Related Content

What's hot

Dalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradianResource
 
Dalradian corporate presentation jan7 2014 final v2
Dalradian corporate presentation jan7 2014 final   v2Dalradian corporate presentation jan7 2014 final   v2
Dalradian corporate presentation jan7 2014 final v2DalradianResource
 
Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016DalradianResource
 
Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014DalradianResource
 
Dalradian presentation march 2016 final
Dalradian presentation march 2016 finalDalradian presentation march 2016 final
Dalradian presentation march 2016 finalDalradianResource
 
Dalradian presentation may 25 2015 final
Dalradian presentation may 25 2015 finalDalradian presentation may 25 2015 final
Dalradian presentation may 25 2015 finalDalradianResource
 
Dalradian presentation may 13 2015 final
Dalradian presentation may 13 2015 finalDalradian presentation may 13 2015 final
Dalradian presentation may 13 2015 finalDalradianResource
 
Dalradian presentation july 3 2015 final
Dalradian presentation july 3 2015 finalDalradian presentation july 3 2015 final
Dalradian presentation july 3 2015 finalDalradianResource
 
Dalradian presentation aug 17 2015 final
Dalradian presentation aug 17 2015 finalDalradian presentation aug 17 2015 final
Dalradian presentation aug 17 2015 finalDalradianResource
 
Dalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradianResource
 
Dalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradianResource
 
Dalradian Presentation April 2015
Dalradian Presentation April 2015Dalradian Presentation April 2015
Dalradian Presentation April 2015DalradianResource
 
Dalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradianResource
 
Dalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 finalDalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 finalDalradianResource
 
Dalradian Presentation February 2015
Dalradian Presentation February 2015Dalradian Presentation February 2015
Dalradian Presentation February 2015DalradianResource
 
Dalradian Presentation January 19 2015
Dalradian Presentation January 19 2015Dalradian Presentation January 19 2015
Dalradian Presentation January 19 2015DalradianResource
 
Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014DalradianResource
 
Dalradian presentation jan 7 2015 final for web
Dalradian presentation jan 7 2015 final for webDalradian presentation jan 7 2015 final for web
Dalradian presentation jan 7 2015 final for webDalradianResource
 
Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2DalradianResource
 
Dalradian presentation july 25 2016
Dalradian presentation july 25 2016Dalradian presentation july 25 2016
Dalradian presentation july 25 2016DalradianResource
 

What's hot (20)

Dalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 FinalDalradian Presentation September 30 2015 Final
Dalradian Presentation September 30 2015 Final
 
Dalradian corporate presentation jan7 2014 final v2
Dalradian corporate presentation jan7 2014 final   v2Dalradian corporate presentation jan7 2014 final   v2
Dalradian corporate presentation jan7 2014 final v2
 
Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016Dalradian Investor Presentation January 2016
Dalradian Investor Presentation January 2016
 
Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014Dalradian presentation bmo final 2014
Dalradian presentation bmo final 2014
 
Dalradian presentation march 2016 final
Dalradian presentation march 2016 finalDalradian presentation march 2016 final
Dalradian presentation march 2016 final
 
Dalradian presentation may 25 2015 final
Dalradian presentation may 25 2015 finalDalradian presentation may 25 2015 final
Dalradian presentation may 25 2015 final
 
Dalradian presentation may 13 2015 final
Dalradian presentation may 13 2015 finalDalradian presentation may 13 2015 final
Dalradian presentation may 13 2015 final
 
Dalradian presentation july 3 2015 final
Dalradian presentation july 3 2015 finalDalradian presentation july 3 2015 final
Dalradian presentation july 3 2015 final
 
Dalradian presentation aug 17 2015 final
Dalradian presentation aug 17 2015 finalDalradian presentation aug 17 2015 final
Dalradian presentation aug 17 2015 final
 
Dalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 finalDalradian presentation may 14 2016 final
Dalradian presentation may 14 2016 final
 
Dalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 finalDalradian presentation may 24 2016 final
Dalradian presentation may 24 2016 final
 
Dalradian Presentation April 2015
Dalradian Presentation April 2015Dalradian Presentation April 2015
Dalradian Presentation April 2015
 
Dalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 finalDalradian presentation april 10 2014 final
Dalradian presentation april 10 2014 final
 
Dalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 finalDalradian presentation june 20 2016 final
Dalradian presentation june 20 2016 final
 
Dalradian Presentation February 2015
Dalradian Presentation February 2015Dalradian Presentation February 2015
Dalradian Presentation February 2015
 
Dalradian Presentation January 19 2015
Dalradian Presentation January 19 2015Dalradian Presentation January 19 2015
Dalradian Presentation January 19 2015
 
Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014Dalradian Presentation October 16, 2014
Dalradian Presentation October 16, 2014
 
Dalradian presentation jan 7 2015 final for web
Dalradian presentation jan 7 2015 final for webDalradian presentation jan 7 2015 final for web
Dalradian presentation jan 7 2015 final for web
 
Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2Dalradian presentation june 1 2016 final2
Dalradian presentation june 1 2016 final2
 
Dalradian presentation july 25 2016
Dalradian presentation july 25 2016Dalradian presentation july 25 2016
Dalradian presentation july 25 2016
 

Viewers also liked

Presentation salud publica2o copia
Presentation salud publica2o  copiaPresentation salud publica2o  copia
Presentation salud publica2o copialareynadelsur
 
Diskusi sabiq mitos mitos barat seputar demokrasi
Diskusi sabiq mitos mitos barat seputar demokrasiDiskusi sabiq mitos mitos barat seputar demokrasi
Diskusi sabiq mitos mitos barat seputar demokrasirizkyazzahra
 
SKATs 500 dages plan 2015-16 for afdelingen Kundecentret i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Kundecentret i KundeserviceSKATs 500 dages plan 2015-16 for afdelingen Kundecentret i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Kundecentret i KundeserviceJonatan Schloss
 
Evidencia 3 modelos de calidad
Evidencia 3 modelos de calidadEvidencia 3 modelos de calidad
Evidencia 3 modelos de calidadvemac
 
Lineas de investigacion
Lineas de investigacionLineas de investigacion
Lineas de investigacionDEIXIMAR
 
Windows 8
Windows 8Windows 8
Windows 8quintoI
 
Resume Current with references
Resume Current with referencesResume Current with references
Resume Current with referencesKaylan Maloney
 
incjobs-digital Ads
incjobs-digital Adsincjobs-digital Ads
incjobs-digital AdsGeorge Maier
 
Tutor de grupos en entorno virtual
Tutor de grupos en entorno virtualTutor de grupos en entorno virtual
Tutor de grupos en entorno virtualsusana baccon
 
Politicas Revistas Indexadas
Politicas Revistas IndexadasPoliticas Revistas Indexadas
Politicas Revistas IndexadasUEES
 
How to Start a Non-profit Corporation in Florida
How to Start a Non-profit Corporation in FloridaHow to Start a Non-profit Corporation in Florida
How to Start a Non-profit Corporation in Floridacity of dania beach
 
SKATs 500 dages plan 2015-16 for afdelingen Erhverv i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Erhverv i KundeserviceSKATs 500 dages plan 2015-16 for afdelingen Erhverv i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Erhverv i KundeserviceJonatan Schloss
 
Políticas y Procedimientos Investigaciones
Políticas y Procedimientos InvestigacionesPolíticas y Procedimientos Investigaciones
Políticas y Procedimientos InvestigacionesUEES
 
Esfuerzo resistencia de materiales
Esfuerzo resistencia de materialesEsfuerzo resistencia de materiales
Esfuerzo resistencia de materialesjuandiegorubioaldave
 

Viewers also liked (20)

Presentation salud publica2o copia
Presentation salud publica2o  copiaPresentation salud publica2o  copia
Presentation salud publica2o copia
 
Diskusi sabiq mitos mitos barat seputar demokrasi
Diskusi sabiq mitos mitos barat seputar demokrasiDiskusi sabiq mitos mitos barat seputar demokrasi
Diskusi sabiq mitos mitos barat seputar demokrasi
 
Paulo freire presentacion
Paulo freire presentacionPaulo freire presentacion
Paulo freire presentacion
 
SKATs 500 dages plan 2015-16 for afdelingen Kundecentret i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Kundecentret i KundeserviceSKATs 500 dages plan 2015-16 for afdelingen Kundecentret i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Kundecentret i Kundeservice
 
Evidencia 3 modelos de calidad
Evidencia 3 modelos de calidadEvidencia 3 modelos de calidad
Evidencia 3 modelos de calidad
 
Lineas de investigacion
Lineas de investigacionLineas de investigacion
Lineas de investigacion
 
Windows 8
Windows 8Windows 8
Windows 8
 
Resume Current with references
Resume Current with referencesResume Current with references
Resume Current with references
 
incjobs-digital Ads
incjobs-digital Adsincjobs-digital Ads
incjobs-digital Ads
 
Tutor de grupos en entorno virtual
Tutor de grupos en entorno virtualTutor de grupos en entorno virtual
Tutor de grupos en entorno virtual
 
Formulacion
FormulacionFormulacion
Formulacion
 
Herramientas ofimáticas
Herramientas ofimáticasHerramientas ofimáticas
Herramientas ofimáticas
 
Politicas Revistas Indexadas
Politicas Revistas IndexadasPoliticas Revistas Indexadas
Politicas Revistas Indexadas
 
How to Start a Non-profit Corporation in Florida
How to Start a Non-profit Corporation in FloridaHow to Start a Non-profit Corporation in Florida
How to Start a Non-profit Corporation in Florida
 
Mi equipo 4
Mi equipo 4Mi equipo 4
Mi equipo 4
 
FtBliss_Directory
FtBliss_DirectoryFtBliss_Directory
FtBliss_Directory
 
SKATs 500 dages plan 2015-16 for afdelingen Erhverv i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Erhverv i KundeserviceSKATs 500 dages plan 2015-16 for afdelingen Erhverv i Kundeservice
SKATs 500 dages plan 2015-16 for afdelingen Erhverv i Kundeservice
 
Políticas y Procedimientos Investigaciones
Políticas y Procedimientos InvestigacionesPolíticas y Procedimientos Investigaciones
Políticas y Procedimientos Investigaciones
 
Idea_Pitch
Idea_PitchIdea_Pitch
Idea_Pitch
 
Esfuerzo resistencia de materiales
Esfuerzo resistencia de materialesEsfuerzo resistencia de materiales
Esfuerzo resistencia de materiales
 

Similar to Dalradian presentation nov16 2015 final

Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016DalradianResource
 
Dalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 finalDalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 finalDalradianResource
 
Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014DalradianResource
 
Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016DalradianResource
 
Dalradian presentation july 18 2016 final
Dalradian presentation july 18 2016 finalDalradian presentation july 18 2016 final
Dalradian presentation july 18 2016 finalDalradianResource
 
Investor Presentation - August 2016
Investor Presentation - August 2016Investor Presentation - August 2016
Investor Presentation - August 2016DalradianResource
 
Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London DalradianResource
 
Dalradian Presentation - December 2014
Dalradian Presentation - December 2014Dalradian Presentation - December 2014
Dalradian Presentation - December 2014DalradianResource
 
Dalradian presentation july 5 2016 final
Dalradian presentation july 5 2016 finalDalradian presentation july 5 2016 final
Dalradian presentation july 5 2016 finalDalradianResource
 
Dalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 finalDalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 finalDalradianResource
 
Dalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 finalDalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 finalDalradianResource
 
Dalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 finalDalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 finalDalradianResource
 
Dalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 finalDalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 finalDalradianResource
 
Dalradian presentation april 29 final2
Dalradian presentation april 29 final2Dalradian presentation april 29 final2
Dalradian presentation april 29 final2DalradianResource
 

Similar to Dalradian presentation nov16 2015 final (14)

Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016Dalradian presentation feb 1 2016
Dalradian presentation feb 1 2016
 
Dalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 finalDalradian presentation march 5 2016 final
Dalradian presentation march 5 2016 final
 
Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014Dalradian Presentation September 10, 2014
Dalradian Presentation September 10, 2014
 
Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016Dalradian Corporate Presentation December 12, 2016
Dalradian Corporate Presentation December 12, 2016
 
Dalradian presentation july 18 2016 final
Dalradian presentation july 18 2016 finalDalradian presentation july 18 2016 final
Dalradian presentation july 18 2016 final
 
Investor Presentation - August 2016
Investor Presentation - August 2016Investor Presentation - August 2016
Investor Presentation - August 2016
 
Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London Dalradian Presentation at Mines and Money London
Dalradian Presentation at Mines and Money London
 
Dalradian Presentation - December 2014
Dalradian Presentation - December 2014Dalradian Presentation - December 2014
Dalradian Presentation - December 2014
 
Dalradian presentation july 5 2016 final
Dalradian presentation july 5 2016 finalDalradian presentation july 5 2016 final
Dalradian presentation july 5 2016 final
 
Dalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 finalDalradian presentation nov5 2014 final
Dalradian presentation nov5 2014 final
 
Dalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 finalDalradian presentation october 20 2016 final
Dalradian presentation october 20 2016 final
 
Dalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 finalDalradian presentation november 8 2016 final
Dalradian presentation november 8 2016 final
 
Dalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 finalDalradian presentation september 14 2016 final
Dalradian presentation september 14 2016 final
 
Dalradian presentation april 29 final2
Dalradian presentation april 29 final2Dalradian presentation april 29 final2
Dalradian presentation april 29 final2
 

More from DalradianResource

Dalradian Corporate Presentation May 2018
Dalradian Corporate Presentation May 2018Dalradian Corporate Presentation May 2018
Dalradian Corporate Presentation May 2018DalradianResource
 
Dalradian Corporate Presentation April 2018
Dalradian Corporate Presentation April 2018Dalradian Corporate Presentation April 2018
Dalradian Corporate Presentation April 2018DalradianResource
 
Dalradian Corporate Presentation February 2018
Dalradian Corporate Presentation February 2018Dalradian Corporate Presentation February 2018
Dalradian Corporate Presentation February 2018DalradianResource
 
Dalradian Corporate Presentation January 2018
Dalradian Corporate Presentation January 2018Dalradian Corporate Presentation January 2018
Dalradian Corporate Presentation January 2018DalradianResource
 
Dalradian Corporate Presentation November 2017
Dalradian Corporate Presentation November 2017Dalradian Corporate Presentation November 2017
Dalradian Corporate Presentation November 2017DalradianResource
 
Dalradian Corporate Presentation October 2017
Dalradian Corporate Presentation October 2017Dalradian Corporate Presentation October 2017
Dalradian Corporate Presentation October 2017DalradianResource
 
Dalradian Corporate Presentation September 2017
Dalradian Corporate Presentation September 2017Dalradian Corporate Presentation September 2017
Dalradian Corporate Presentation September 2017DalradianResource
 
Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017DalradianResource
 
Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017DalradianResource
 
Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017DalradianResource
 
Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017DalradianResource
 
Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017DalradianResource
 

More from DalradianResource (12)

Dalradian Corporate Presentation May 2018
Dalradian Corporate Presentation May 2018Dalradian Corporate Presentation May 2018
Dalradian Corporate Presentation May 2018
 
Dalradian Corporate Presentation April 2018
Dalradian Corporate Presentation April 2018Dalradian Corporate Presentation April 2018
Dalradian Corporate Presentation April 2018
 
Dalradian Corporate Presentation February 2018
Dalradian Corporate Presentation February 2018Dalradian Corporate Presentation February 2018
Dalradian Corporate Presentation February 2018
 
Dalradian Corporate Presentation January 2018
Dalradian Corporate Presentation January 2018Dalradian Corporate Presentation January 2018
Dalradian Corporate Presentation January 2018
 
Dalradian Corporate Presentation November 2017
Dalradian Corporate Presentation November 2017Dalradian Corporate Presentation November 2017
Dalradian Corporate Presentation November 2017
 
Dalradian Corporate Presentation October 2017
Dalradian Corporate Presentation October 2017Dalradian Corporate Presentation October 2017
Dalradian Corporate Presentation October 2017
 
Dalradian Corporate Presentation September 2017
Dalradian Corporate Presentation September 2017Dalradian Corporate Presentation September 2017
Dalradian Corporate Presentation September 2017
 
Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017
 
Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017Dalradian Corporate Presentation March 30, 2017
Dalradian Corporate Presentation March 30, 2017
 
Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017Dalradian Corporate Presentation March 1, 2017
Dalradian Corporate Presentation March 1, 2017
 
Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017
 
Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017Dalradian Corporate Presentation January 10, 2017
Dalradian Corporate Presentation January 10, 2017
 

Recently uploaded

Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663Call Girls Mumbai
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call Girladitipandeya
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 

Recently uploaded (20)

Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Call Girls 🫤 Mahipalpur ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Mahipalpur ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Mahipalpur ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Mahipalpur ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamirpet high-profile Call Girl
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 

Dalradian presentation nov16 2015 final

  • 1. November 2015 Patrick F.N. Anderson Chairman & Chief Executive Officer High-Grade Gold in Northern Ireland
  • 2. 2 FORWARD-LOOKING INFORMATION AND QUALIFIED PERSON 2 This presentation contains “forward looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its subsidiaries (collectively, “Dalradian”) and its mineral projects, the future price of metals, the estimation of mineral resources, the realization of mineral resource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of the development of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks, reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcome of pending regulatory matters. Often, but not always, forward looking statements can be identified by the use of words and phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions such as the continued political stability in Northern Ireland, that permits required for Dalradian’s operations will be obtained on a timely basis in order to permit Dalradian to proceed on schedule with its planned exploration and development programs, that skilled personnel and contractors will be available as Dalradian’s operations continue to grow, that the price of gold will be at levels that render Dalradian’s mineral projects economic, that the Company will be able to continue raising the necessary capital to finance its operations and realize on mineral resource estimates and current mine plans and that the assumptions contained in the Company’s PEA (as defined herein) are accurate and complete. Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Dalradian to be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamation activities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form for the year ended December 31, 2014 dated March 24, 2015 (the “AIF”) . Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward looking statements contained herein are made as of the date of this presentation and the Company disclaims any obligation to update any forward looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Certain technical data in this presentation was taken from the technical report dated October 30, 2014 and titled "An Updated Preliminary Economic Assessment of the Curraghinalt Gold Deposit, Tyrone Project, Northern Ireland” (the “PEA”), prepared by Mr. Tim Maunula, P.Geo., of T. Maunula & Associates Consulting Inc., Mr. Barnard Foo, P.Eng., Mr. Richard M. Gowans, P.Eng., Mr. Andre Villeneuve, P.Eng., and Mr. Christopher Jacobs, CEng MIMMM, of Micon International Limited (“Micon”) and is subject to all of the assumptions, qualifications and procedures described therein. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the results of the PEA will be realized. Eric Tremblay, P.Eng., Chief Operating Officer, Dalradian Resources Inc., is the Qualified Person who reviewed and approved the technical information in this presentation. The exploration data was based on the procedures described in the Company’s PEA and is subject to all of the assumptions, qualifications and procedures described therein.
  • 3. 3 PREMIUM ASSET IN A SCARCITY MARKET 1 Ranking by Natural Resource Holdings, based on 2012 data  High grade gold in the first world  Major work program ongoing  Strong government and community support  Feasibility Study and submission of mine construction permit targeted during 2016
  • 4. 4 269 81 345 10 30,800 days working underground blasts m of development underground drill bays m of infill drilling
  • 6. 6 THE BOARD: TRACK RECORD OF FINDING, FUNDING AND BUILDING MINES PATRICK F. N. ANDERSON CHAIRMAN & CHIEF EXECUTIVE OFFICER  Founder & Former CEO of Aurelian Resources  ‘08 – PDAC International Mineral Discovery  ‘08 – Northern Miner Man of the Year RONALD GAGEL  CFO of TMAC Resources; Former CFO of FNX Mining and Aur Resources  Director of Adriana Resources and Stonegate Agricom  Former board member of HudBay Minerals and Central Sun Mining  ‘13 – PDAC Distinguished Service Award THOMAS OBRADOVICH LEAD INDEPENDENT DIRECTOR  Founder & Former CEO of Young-Davidson Mines  Former Director of Aurelian Resources SEAN ROOSEN  Founder & CEO of Osisko Mining Corporation  Also Director of Astur Gold  ‘06 – Prospector of the Year - Quebec  ‘08 – Prospector of the Year - Canada  ‘09 – Northern Miner Man of the Year JONATHAN RUBENSTEIN  Director of Eldorado Gold  Director of Detour Gold  Chairman & Director of MAG Silver  Former Director of Aurelian Resources, Sutton Resources, Canico Resource and Cumberland Resources PATRICK “PADDY” DOWNEY  Former CEO of Elgin Mining, Aura Minerals and Viceroy Exploration  Director of Claude Resources and Orezone  Native of Northern Ireland GRENVILLE THOMAS  Founder & Chairman of Strongbow Exploration  Founder & Former Chairman & President of Aber Resources (now Dominion Diamond)  ‘99 – PDAC Prospector of the Year  ‘01 – Northern Miner Man of the Year  ‘09 – Canadian Mining Hall of Fame JIM RUTHERFORD  Director of Anglo American  Former senior vice president of Capital International Investors, responsible for mining investments  Native of Northern Ireland
  • 7. 7 ANALYST COVERAGE All dollars quoted in $ CAD $0.00 $0.25 $0.50 $0.75 $1.00 $1.25 $1.50 $1.75 $2.00 N D J F M A M J J A S O 2014 $0.71 November 16, 2015 $1.75 Michael Curran $1.70Ryan Walker $1.50 Tyron Breytenbach Targets range from $1.10-$1.75 $1.25 Andrew Breichmanas $1.10 Adam Melnyk 2015 $1.40 $1.40 Matthew O’Keefe 90p $1.10 Joe Mazumdar $1.50 Jamie Spratt
  • 8. 8 CORPORATE SUMMARY TSX: DNA STOCK PRICE Shares outstanding of 214 million and fully diluted of 298 million as of November 11, 2015 Cash position of $24 million as of Sept. 30, 2015; closed financing for gross proceeds of $40.25 million Oct. 7 SHARE CAPITALIZATION AND CASH POSITION All dollars quoted in $ CAD Local listing (AIM:DALR) for a local project TOP TEN SHAREHOLDERS (REPRESENTING ~50%) GEOGRAPHIC OWNERSHIP FOR IDENTIFIED SHAREHOLDERS Canada 50% US 28% Europe 20% M&G (on behalf of Vanguard) Sprott (Sprott Asset Mgmt, Sprott Global and Sprott Wealth) Ross Beaty Sun Valley Front Street Rosseau Insiders (2.9%) Aegis RBC Julius Baer
  • 10. 10  Our flagship asset: Curraghinalt, orogenic high-grade gold deposit  Excellent regional infrastructure  Over 84,000 hectares under license Gold Base Metals Other Gortin Omagh Curraghinalt BELFAST N O R T H E R N I R E L A N D Galantas Gold Conroy Diamonds & Gold Lonmin Irish Salt Mining Irish Salt (Kilroot) UG Mine Curraghinalt Gold Deposit Galantas (Cavanacaw) Permitted UG mine Scotgold (Cononish) Permitted Vedanta (Lisheen) In production Boliden (Tara) In production Lundin (Galmoy) Previous producer Conroy (Clontibret) Gold exploration Xstrata (Pallas Green) Feasibility Wolf (Hemerdon) Tungsten Developer Mineral Projects in Ireland and the UK Cleveland Potash (Boulby) In Production Sirius (York Potash) In Development Croagh Patrick Gold deposit IMC Exploration (Avoca) Exploration Gold Mines of Wales (Gwynfynydd/Clogau) exploration/former mines Calliacher-Urlar Burn Exploration
  • 11. 11 CURRAGHINALT RESOURCE  Since 2010, we have grown the resource more than 5-fold over 3 updates  High-grade gold resource1  Measured: 0.02 MT grading 20.15 g/t Au for 15,100 contained ounces  Indicated: 2.98 MT grading 10.34 g/t Au for 989,000 contained ounces  Inferred: 8.01 MT grading 9.67 g/t Au for 2.49 million contained ounces  Deposit is open in all directions  Infill drilling to support FS began in March 2015 1 Refer to PEA
  • 12. 12 EXCELLENT POTENTIAL FOR RESOURCE GROWTH Curraghinalt Deposit 12km Curraghinalt Trend 1 Refer to Technical Report 2 12-CT-162 drilled at 180/-55. 12-CT-173 drilled at 150/-60; 2a from 186.00m- 188.22m, 2b from 229.08m - 230.55m ; true width undetermined 3 11-CT-99 drilled from 471.14-474.34m 4 12-CT-167 drilled from 201.93-204.40m Vein and Vein Intersections Curraghinalt Deposit Attagh Burn 2.47m @ 18.99 g/t Au 4 Curraghinalt Deposit Resource effective as of Jan 2014 1 – Measured: 0.02 Moz Au (0.02 MT @ 20.15 g/t) Indicated: 0.99 Moz Au (2.98 MT @ 10.34 g/t) Inferred: 2.49 Moz Au (8.01 MT @ 9.67 g/t) Alwories Discovery Holes 2 4.72m @ 14.82 g/t Au (12-CT-173) 2.22m @ 14.10 g/t Au (12-CT-162) 2a 1.47m @ 23.60 g/t Au (12-CT-162) 2b 400 m Step-out 3.2m @ 5.34 g/t Au (11-CT-99) 3 900 m Step-out 0.65m @ 15.04 g/t Au (12-CT-154) Commenced 3,400 metre drill program at Alwories in August 2015
  • 13. 13 GLACIATED TERRAIN WITH MINIMAL OUTCROP Curraghinalt Deposit Curraghinalt Trend 1 12-CT-162 drilled at 180/-55. 12-CT-173 drilled at 150/-60; 2a from 186.00 m- 188.22m, 2b from 229.08m - 230.55 m ; true width undetermined 2 11-CT-99 drilled at 200/-60, from 471.14-474.34 m 3 12-CT-167 drilled from 201.93-204.40 m Curraghinalt Deposit Attagh Burn 2.47m @ 18.99 g/t Au (12-CT-167) 3 Golan Burn Outcropping veins including 60cm @ 61.43 g/t Au Gold Anomalies 1 kilometres 0 2 Vein and Vein Intersections Scotch Town Peak of 10.52 g/t Au In mineralized boulders 400 m Step-out 3.2m @ 5.34 g/t Au (11-CT-99) 2 Alwories Discovery Holes 1 4.72m @ 14.82 g/t Au (12-CT-173) 2.22m @ 14.10 g/t Au (12-CT-162) 2a 1.47m @ 23.60 g/t Au (12-CT-162) 2b 12KM GOLD TREND IS MOSTLY UNEXPLORED
  • 16. 16 PEA SHOWED STRONG ECONOMICS KEY PEA DATA* GOLD PRICE: US$1,200/ounce GOLD PRICE: US$1,054/ounce NPV with 8% discount rate (After-tax) US$504 million US$366 million IRR (After-tax) 36.2% 29.9% Average Annual Gold Production 162,000 ounces/year Processing Rate 1,700 tonnes/day Life of Mine 18 years Initial Capex ($48M contingency) US$249 million Cash Costs US$485/ounce; US$132/tonne Diluted Grade 9.3 g/t Au Gold Recovery 92% * Prepared by Micon International Limited. PEA results released on October 30, 2014. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the results of the PEA will be realized. All dollars quoted in $ USD unless stated otherwise.
  • 18. 18 FEASIBILITY STUDY FS supported by UG program, including 885 m of new development with 2 test stopes and ~50,000 m of infill drilling FS proceeding on the basis of:  Mining primarily by longhole but with additional methods as required;  Processing incorporating a flotation circuit;  Dry stack tailings; and  ~ 50% of waste rock to be returned underground as paste backfill
  • 19. 19 SITE OVERVIEW Crow 106-16 No. 1 T-17 Mullan Sheep Dip Road Water treatment plant Waste pad Ore storage Explosives magazine Elevator and ventilation Veins Existing Development Planned Development
  • 21. Planning decision MINE CONSTRUCTION PERMIT SUBMISSION IN Q3 2016 Draft Project Description (pre-consultation with stakeholders via PAD) Prepare EIA Submit Planning Application H2 2016 Planning NI Review Permission to construct a mine will be based on a Planning Application, which will consist of a Project Description and an Environmental Impact Assessment (EIA) Review and approval is estimated to take 1-2 years Curraghinalt has been designated a project of “regional significance”, which allows ministerial involvement in the planning decision Pre-engage with DOE via a Pre-Application Discussion (PAD) Granted Refused Referred to Public Local Inquiry
  • 22. 22 STRONG GOVERNMENT & COMMUNITY SUPPORT  Top priority of government is jobs & investment  Cross-party support: “Pat Doherty, the area’s Sinn Fein MP, believes the Curraghinalt mine should go ahead provided it complies with planning and environmental requirements, with most people in the area supportive.” Financial Times, Dec. 5, 2014  Invest NI grant to Dalradian for $590,000 to support jobs and training during UG Program  78% of local residents are positive about the prospect of a mine in their area Aug 2014 site visit by Arlene Foster, MLA, Minister for Enterprise, Trade and Investment
  • 23. 23 ESTIMATED TIMELINE Nov 2015 Dec Jan 2016 Feb Mar Apr May June July Aug Sept Oct UG development Test stoping Infill drilling Resource update EIA preparation Stakeholder consultation Submission of Planning Application Feasibility study
  • 25. 25 DNA HIGHLIGHTS  Team in place to permit, finance and build a mine at Curraghinalt  We are de-risking the project through:  UG exploration  Drilling  FS  Environmental and permitting work
  • 26. 26 Patrick F.N. Anderson Chairman & CEO info@dalradian.com 416.583.5622 Trading Symbol: DNA on TSX DALR on AIM Corporate Office: Dalradian Resources Inc. Queen’s Quay Terminal 207 Queen’s Quay West Suite 416 Toronto, Ontario Canada M5J 1A7 www.dalradian.com