The document summarizes a new indoor track and field facility for the Colorado Buffaloes in Boulder, Colorado designed by Lloyd Civil and Sports and Populous Architecture and Planning. The facility includes a 300 meter synthetic running track surrounding an artificial turf football field to accommodate the high-altitude weather, and also incorporates long jump and pole vault areas into the track systems. It was completed in 2016 to provide an indoor space for the track and field team.