COBRE DEL MAYO
Investor Presentation
Data as of 1Q15
(all amounts in USD unless otherwise noted)
COBRE DEL MAYO 2"
13
Disclaimer and Forward Looking Statements
The information contained herein has been prepared to assist interested parties in making their own evaluation of the Company and does not purport to be all inclusive or to
contain all of the information that a prospective purchaser may desire. You should refer to the information in the Preliminary Offering Circular before making any investment
decision to purchase the offered Notes.
Forward Looking Statements
This Investor Presentation and other communication with investors include forward-looking statements. These forward- looking statements include, without limitation, statements
regarding our future financial position and results of operations, our strategy, plans, objectives, goals and targets, future developments in the markets in which we participate or are
seeking to participate or anticipated regulatory changes in the markets in which we operate or intend to operate. In some cases, forward-looking statements can be identified by
terminology such as “aim,” “anticipate,” “believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “guidance,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should” or
“will” or the negative of such terms or other comparable terminology.
By their nature, forward-looking statements involve risks and uncertainties because they relate to events and depend on circumstances that may or may not occur in the future.
We caution potential investors that forward-looking statements are not guarantees of future performance and are based on numerous assumptions and that our actual results of
operations, financial condition and liquidity may differ materially from (and be more negative than) those made in, or suggested by, the forward-looking statements contained in this
Offering Memorandum. In addition, even if our results of operations, financial condition and liquidity and the development of the industry in which we operate, are consistent with
the forward-looking statements contained in this Investor Presentation, those results or developments may not be indicative of results or developments in subsequent periods.
Important factors that could cause these differences include, but are not limited to:
In light of these risks, uncertainties and assumptions, the forward-looking events described in this Investor Presentation may not occur. We undertake no obligation to update or
revise any forward-looking statement, whether as a result of new information or future events or developments.
•  risks related to our competitive position;
•  risks related to our strategy and expectations about growth in demand for copper
and business operations, financial condition and results of operations;
•  risks related to the revocation, expropriation or termination of our mining
concessions or our water concessions or of the agreements pursuant to which we
explore or exploit mining concessions belonging to third parties;
•  the inability to be compensated fairly in the event of termination of our mining
concessions or our water concessions;
•  the impact of fluctuations in the market price for copper;
•  the impact of changes in the prices of raw materials, labor and our products;
•  our relationship with unions and our ability to negotiate collective bargaining
agreements;
•  the availability of materials and equipment;
•  our access to funding sources, and the cost of the funding;
•  changes in regulatory, administrative or economic conditions affecting the
mining industry, including government interpretations and policies;
•  the application and enforcement of environmental laws and regulations;
•  risks related to Mexico’s social, political or economic environment;
•  the impact of changes in the end uses of our products;
•  fluctuations in the value of the U.S. dollar against the Mexican peso;
•  risks associated with market demand for and liquidity of the notes; and
•  changes in the taxation of our business.
3"
COBRE DEL MAYO
Index
I.  Company Overview
II.  Industry and Commodity Overview
III.  Operational Environment
IV.  Historical Financial Performance
V.  Conclusion
4
15
19
21
24
3"
I. Company Overview
COBRE DEL MAYO 5"
13
Cobre del Mayo Snapshot
!  Cobre del Mayo is a Mexican mining company that operates the Piedras Verdes (PV) open-pit copper mine in Sonora,
Mexico
!  PV is the third largest copper mine in Mexico as measured by production
!  It began commercial production in 2006
!  Purchased by Invecture in mid 2009
!  During 2012 a flotation circuit operated by Kupari Metals with capacity of ~5,500 tons per day (“tpd”) was built and in April
2013 copper concentrate production began
!  Produces LME Grade A copper cathode and sells refractory and vein type ore for processing into concentrate
!  Mineral Reserves of 1.13 million tons of copper and 15+ year mine life
Piedras Verdes Advantaged Location and Access:
Huatabampo
Chihuahua
Sinaloa
Piedras
Verdes Alamos
Navojoa
Sonora
Ciudad
Obregon
Guaymas
Baja
California
P
C
Deep Water Port
Commercial Airport
Railway
Rail Station
Major Highway
Private Airport
C
P
!  All infrastructure is in place
!  Easily accessible by air, road, rail and ports
!  Extremely competitive transportation costs for off-takers given
PV’s location and nearby infrastructure
!  Power: Connected to CFE (Federal Electricity Commission) grid
to the mine owned and maintained substation with continuous
capacity of 25 MW; CDM is CFE’s single largest customer in the
area
!  Water: CDM holds 7 titled water concessions for ~3.9 Mm³/yr
while the requirement for the operation of the PV Mine is ~3.0
Mm³/yr
COBRE DEL MAYO 6"
13
Key Initiatives Implemented Since Invecture Acquisition
!  In 2009, changed from contract mining to owner operation and purchased the former contractor’s equipment fleet.
Purchased, re-engineered and installed a crushing, screening, conveying and stacking system
!  Diversification of processes:
—  Crush for Leach, Run of Mine (ROM) leach, and SX/EW produce copper cathode
•  Installed capacity of 87 tpd, increasing to ~100 tpd in 2H15
—  Sales of refractory and vein type ore for concentrate production
•  Flotation plant current installed capacity of ~5.5 ktpd + ~1.7 ktpd of high clay slimes from the Fines Classification
System1
Copper Cathode Monthly Production Evolution (t)
!2,331!!
!&!!!!
!1,000!!
!2,000!!
!3,000!!
!4,000!!
!5,000!!
!6,000!!
Jan!
Feb!
Mar!
Apr!
May!
Jun!
Jul!
Aug!
Sep!
Oct!
Nov!
Dec!
Jan!
Feb!
Mar!
Apr!
May!
Jun!
Jul!
Aug!
Sep!
Oct!
Nov!
Dec!
Jan!
Feb!
Mar!
Apr!
May!
Jun!
Jul!
Aug!
Sep!
Oct!
Nov!
Dec!
Jan!
Feb!
Mar!
Apr!
May!
Jun!
Jul!
Aug!
Sep!
Oct!
Nov!
Dec!
Jan!
Feb!
Mar!
Apr!
May!
Jun!
Jul!
Aug!
Sep!
Oct!
Nov!
Dec!
Jan!
Feb!
Mar!
Apr!
May!
Jun!
Jul!
Aug!
Sep!
Oct!
Nov!
Dec!
Jan!
Feb!
Mar!
Tons!
2009! 2013!2012!2011!2010! 2014!
Acquisi'on*by*
Invecture*
2015!2009! 2013!2012!2011!2010! 2014!
Acquisi'on*by*
Invecture*
2015!
1. See slide 11 for further reference
COBRE DEL MAYO 7"
13
Stable Low Risk Operations and Processes
!  $302.9 M in capex has been invested since 2009 with limited sustaining capex going forward of ~ $13 M/yr LOM
!  Ore processing method is chosen according to grade, mineralization, and leaching and flotation characteristics to provide the
best overall allocation using: (i) ROM heap leach (ii) crushed ore heap leach (iii) ore for concentration
COBRE DEL MAYO 8"
13
Cobre del Mayo Today
!  The PV Mine has been transformed into a high quality copper producing asset with strong operating metrics and competitive
Cash Cost
—  Since January 2012, PV cathode production has averaged 80 tpd
—  1Q15 LTM sales totaled $218.2 M
•  Copper cathode production of 27,384 t generating $192.2 M of sales
•  Copper contained in ore totaled 15,755 t generating $25.9 M of sales1
—  1Q15 LTM EBITDA of $64.7 M
—  Credit metrics2:
•  Leverage is 3.44x Net Debt / 1Q15 LTM EBITDA
•  Debt / Total Capitalization is 40.7% (1Q15 LTM)
—  Strip Ratio has declined from 3.28x in FY 2012 to 2.00x during 1Q15 LTM
1. Pursuant to the agreement between Kupari Metals and Cobre del Mayo, the amount payable to the Company is dependent, among other variables, on the grade of the ore sold by Cobre
del Mayo and on the grade of the concentrate produced by Kupari Metals.
2. Considering 1Q15 LTM total debt of $240.1 M (weighted average interest rate of 10.02%) and $17.8 M of Cash and Equivalents
Cu Cathode Production and Total Sales EBITDA and EBITDA Margin
$78.2 $197.7 $238.2 $225.2 $194.8 $192.2
$26.8
$31.1 $25.9
10.9
22.8
30.7 30.4
27.5 27.4
$0
$50
$100
$150
$200
$250
$300
0
6
12
18
24
30
36
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
$M
kt
Cathode Sales ($M) Sales of Ore ($M) Cathode Production (Kt)
$26.0 $65.6 $105.7 $92.0 $67.4 $64.7
33% 33%
44%
37%
30% 30%
$0
$25
$50
$75
$100
$125
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
0%
10%
20%
30%
40%
50%
$M
%
EBITDA ($M) EBITDA Margin (%)
COBRE DEL MAYO 9"
13
$2.59
$2.40
-$0.09
-$0.11
$2.50
$2.30
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
4Q14 C1 Cash
Cost
40% KM
Contribution
4Q14 Adjusted
C1 CC
1Q15 C1 Cash
Cost
40% KM
Contribution
1Q15 Adjusted
C1 CC
$/lb
$12.6
$14.3$1.6
$1.7
$14.3
$16.0
$0
$3
$6
$9
$12
$15
$18
4Q14 EBITDA 40% KM
Contribution
4Q14 Adjusted
EBITDA
1Q15 EBITDA 40% KM
Contribution
1Q15 Adjusted
EBITDA
$M
Kupari Acquisition
!  During 4Q14, Cobre del Mayo acquired 40% of the common stock of Kupari Holdings, which owns the flotation plant adjacent
to the Piedras Verdes Mine. As a result, Cobre del Mayo now accounts for its 40% participation in Kupari Holdings by using
the equity method.
!  Cobre del Mayo’s participation in Kupari Holdings:
—  Simplifies and optimizes ore allocation among processes
—  Facilitates process improvements that involve both heap leaching and flotation
—  Diversifies operational risk across two processes and products
Adjusted 1Q15 LTM EBITDA Adjusted 1Q15 LTM C1 Cash Cost
4Q14 1Q15 4Q14 1Q15
COBRE DEL MAYO 10"
13
On a Path to Achieve a Competitive Cash Cost
!$0.50&
$0.00&
$0.50&
$1.00&
$1.50&
$2.00&
$2.50&
$3.00&
$3.50&
$4.00&
$4.50&
$5.00&
0%& 4%& 7%& 11%& 15%& 19%& 22%& 26%& 30%& 34%& 37%& 41%& 45%& 49%& 52%& 56%& 60%& 64%& 67%& 71%& 75%& 79%& 82%& 86%& 90%& 94%& 97%&
($/lb)'
Percen-le'of'Cumula-ve'Metal'
C1&Cash&Cost&
C1&CC&+&Sustaining&Capex&&
1. Source: Wood Mackenzie
1Q15 Estimated Global Copper C1 Cash Cost Curve1
C1 CC <$1.20/lb C1 CC <$2.00/lb C1 CC <$3.83/lb
C1 Cash Cost
+ Sustaining
1Q15 LTM: $2.57
C1 CC <$1.63/lb
C1 Cash Cost:
1Q15 LTM $2.30
C1 Cash Cost:
LOM $1.65
C1 Cash Cost
+ Sustaining:
LOM $1.83
Cobre del Mayo Historical C1 Cash Cost
$3.63 $2.69 $2.08 $1.99 $2.22 $2.30
$0.00
$1.00
$2.00
$3.00
$4.00
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
$/lb
COBRE DEL MAYO 11"
13
Significant Opportunity for Low Capex to Achieve Significant Cash Cost Reduction
!  Cu production and recovery improvement projects will reduce unit cost by increasing Cu production and lowering unit opex
without major capex commitment
Fines Classification
System (FCS)
(Cathode production
increase)
Completed
$6.9M /
$5.5M
Project Benefit Timing
Capex /
EBITDA per yrDescription
$0.1M /
$0.9M
Flotation of
Classified Fines
Overflow
(Sales of ore for concentrate
increase)
•  Separates screened fines producing coarse
leachable sands (70%) and high clay slimes
(30%)
•  Total Installed Capacity of 6.5ktpd @ 0.35% TCu
!  1st Stage (comm. Feb15) : 4.0 ktpd
!  2nd Stage (comm. May15): 2.5 ktpd
•  Cu recovery estimated at 80% of coarse fines
•  Improved recovery from highly altered
fines
•  Improved ROM recovery by eliminating
fines
•  Increase Cu cathode production by
between 5 - 7 tpd
•  Kupari Flotation Plant recovers approx. 55% of
copper contained in slimes sold to them and that
are generated bye the FCS
•  Additional sales of ore for concentrate &
concentrate production Completed
Heap Leaching
Cleaner Tails
(Cathode production increase
& acid production)
•  +0.5 tpd of add. Cu cathode production
($0.7M/yr)
•  90 tpd of additional sulphuric acid
generation of 90 tpd ($4.0M/yr)
Completed
$1.0M /
$3.2M
•  Cu and pyrite in cleaner tails purchased from
Kupari flotation plant are leached
Replace SXEW Lead
Anodes with Titanium
Anodes
(Increase nameplate capacity
& reduce opex)
4Q14 to
2Q15
$3.0M /
$1.7M
•  Replacement of lead anodes with titanium
anodes reduces power consumption and
increases EW capacity
•  ~"12% reduction in unit electricity
consumption ($0.9M/yr)
•  Elimination of the use of cobalt sulphate
($0.9M/yr)
•  Increase in effective nameplate capacity to
102 tpd
Note:
* The engineering, analysis and investment cases for each individual project reflect preliminary estimates which will vary when the respective projects are in stable operation
** Calculations were made considering a copper price of $2.95/lb
COBRE DEL MAYO 12"
13
43 – 101 Reserves and Resources completed in 3Q14
!  Updated 43-101 compliant Reserve Report released in August 2014 (published October 13, 2014)
!  Reserve of 1.13 million tons of copper with a mine life of 15+ years
!  Elaborated optimizing both copper cathode and copper concentrate production of the Piedras Verdes deposit
!  Annual average production of ~30 kt/a of copper cathode and 8.2 ktpd of ore for copper concentrate
!  LOM Blended C1 Cash Costs are estimated at $1.65/lb copper
Summary Mineral Reserves and Resources
Ore$(kt) Grade$(%) Total$Cu$(t)
!!!Ore!to!ROM 211,817 0.18 388,261
!!!Ore!to!Crushing 151,375 0.30 454,283
!!!Ore!for!Concentrate 57,148 0.51 292,374
Proven$&$Probable 420,340 0.27 1,134,918
!!!Waste 548,998
!!!Strip!Ratio 1.31x
Ore$(kt) Grade$(%) Total$Cu$(t)
!!!!!!Measured 304,970 0.26 792,922
!!!!!!Indicated! 210,060 0.25 525,150
!!!Total!M+I 515,030 0.26 1,318,072
!!!Inferred 52,690 0.24 126,456
Total$Resource 567,720 0.25 1,444,528
Estimated$Reserves
Resources
A"new"43*101"will"be"released"during"2H15"
COBRE DEL MAYO 13"
13
Relevant Agreements and Risk Management
Copper Cathode
!  Agreement for sale of 100% of 2015 PV cathode production to two internationally renowned,
credit-worthy commodity traders (50% of cathode production to each trader).
—  Both agreements are valid from January 1, 2015 through and including December 31, 2015.
—  Cathode sold FOB at the mine and paid twice weekly against holding certificates
Mining Concessions
!  We have the exclusive right to explore and exploit 30 mining concessions with an initial term of
50 years which terminate between 2043 and 2062
—  25 mining concessions owned by PV
—  5 mining concessions owned by Grupo Rexgo. The right to exploit these concessions is
governed by a contract subject to international arbitration
!  Royalties: Grupo Rexgo charges PV a 3% net sales royalty for the copper mined from their
underground resource concessions
!  Land Ownership: PV owns all of the land at the mine in addition to a reserve for leach pad and
waste dump expansion
Ore for Concentrate
!  CDM sells copper ore to KM to produce copper concentrate
—  Purchase Price of Ore: Purchase of the ore is a function of the copper recovered and the
current LME copper price with certain freight, handling and operating charges
—  Term: Initial fixed term of 10 years and provides for renewals
—  Volume: Since April, 2013, CDM has sold an average of 5,219 tpd with 46 tpd of copper
contained
COBRE DEL MAYO 14"
13
Relevant Agreements and Risk Management
Mining Tax
!  Mexican government implemented a special duty on mining concessions roughly equivalent to
7.5% of EBITDA starting January, 2014
!  As roughly 95% of CDM ore is derived from Grupo Rexgo mining concessions, tax is payable
by the concession holder with respect to its EBITDA
Labor / Environmental
!  Safety, environmental compliance and labor relations are key areas of focus
!  Since Invecture’s acquisition, CDM has had a solid safety track record
—  Lowest premium for “Riesgo de Trabajo” (worker risk) as classified by IMSS (Mexican
Social Security Institute), demonstrating high safety standards
!  Approx. 409 of our 918 employees are represented by the Confederación de Trabajadores de
Mexico (“CTM”)
!  Certified as a Socially Responsible company by the Mexican Center for Philanthropy (Centro
Mexicano para la Filantropía) and certified as a Clean Industry by the Mexican Federal Attorney
for Environmental Protection (Procuraduría Federal de Protección al Ambiente), the
enforcement arm of the Mexican environmental ministry
Insurance Policy
!  Insurance policy coverage for all risk with business interruption
—  Policy underwritten by Royal & SunAlliance with general coverage up to $200 M
II. Industry and Commodity Overview
COBRE DEL MAYO 16"
13
Copper Price Forecasts Over Time
!  The market has consistently underestimated the copper price when forecasting long term prices
!  Copper prices have been much higher due to continuing shortfalls in supply. Delays in new projects, supply interruption and
declining production from existing mines have been the main drivers
Copper Historical Price vs. Forecasts
Source: Broker Research, Jefferies
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.00
$4.50
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
2010
2009
2008
Actual
2010 LT
2009 LT
2008 LT
2007 LT
2006 LT
2005 LT2004 LT
2003 LT2002 LT
2001 LT2000 LT
2011 LT
2011
2012
Current LT:
US$3.06 / lb
Long Term Price (as forecast during Q4 of year indicated)
Actual Copper Price
Broker Consensus (as forecast during Q4 of year indicated)
2012 LT
2014
2013 LT
2013
Current
2014 LT
($/lb)
COBRE DEL MAYO 17"
13
Incentive Price Drives the Floor Value of Copper
"  Investment in large projects is very capital intensive and is increasingly so as head grade declines
"  The incentive price required to justify investments in the expansion of existing mines and the construction of new ones is
estimated at $3.30/lb ($7,275/t)
—  Incentive price considers required Cu price to achieve specified rate of return on expansion capex(1)
—  Incentive price has been adjusted downward by $0.20/lb from $3.50/lb ($7,716/t) to reflect the decline in oil driven input
prices since 2Q14 and the USD strength.
"  Although short term copper prices are unpredictable, we believe that long term prices must be driven by the increase over time
of the incentive price (necessary to justify the investment in new production to maintain global output)
Incentive Prices for Major Projects
Source: Wood Mackenzie
1.  Analysis based on long term price required to give a 12.0% risk adjusted IRR on a pre-tax 100% equity basis.
c/lb
Paid Metal (M lbs)
Adjusted"incen;ve"
price"$3.30/lb"
COBRE DEL MAYO 18"
13
$1.11 $1.62 $2.57 $2.55 $2.39 $2.42 $2.44
$1.67
$3.42
$4.00
$3.61
$3.32
$3.11
$2.65
$0.00
$1.00
$2.00
$3.00
$4.00
$5.00
2005 2010 2011 2012 2013 2014 1Q 2015
$/lb
C1 Cash Cost 90th Percentile ($/lb) Average LME Spot Cu Price ($/lb)
Cu Pricing Considerations
!  Copper has traded in the market at a premium to the 90th percentile of the C1 cash cost curve
—  C1 cash cost as estimated by Wood Mackenzie
Source: Wood Mackenzie, LME
1. 90th percentile as estimated by Wood Mackenzie.
C1 90th Percentile Costs1 vs. Cu Price
III. Operational Environment
COBRE DEL MAYO 20"
13
Stable Operating Environment in Mexico1
!  Mexico is an economic leader in Latin America and is the world’s 13th largest economy by GDP (2015E and 2016E real GDP
growth of 3.0% and 3.3%, respectively)
—  High degree of political stability
—  OECD/WTO country and member of 12 free trade agreements, including NAFTA
—  Mexican Peso has a long history as one of the ten most traded global currencies
!  As a result of mining-supportive governmental policies, stability, OECD tax regime and abundance of resources, Mexico has
attracted extensive investment from international mining companies
—  There are over 900 mining projects with foreign investment; 95 of which are producing projects. The exploration,
development and operation of these projects is carried out by over 275 foreign companies.
!  Mexico is recognized as a mining friendly jurisdiction
—  Largest producer of silver globally (18% of global production)
—  3rd largest producer of copper in Latin America
!  Sonora is among the most prolific mining areas and one of the safest states in Mexico
Sonora:
27%
Zacatecas:
25%
Chihuahua:
13%
Others:
35%
Total Mining Production in Mexico2
Sonora:
79%
Zacatecas:
9%
San Luis
Potosí: 5%
Others: 7%
2014 Copper Production in Mexico3
Sources:
1. IMF, World Bank, April 2015
2. Secretariat of the Economy, 2015
3. National Institute of Statistics & Geography
COBRE DEL MAYO 21"
13
IV. Historical Financial Performance
COBRE DEL MAYO 22"
13
$87.3 $135.6 $141.1 $160.0 $166.2 $164.7
$0
$25
$50
$75
$100
$125
$150
$175
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
$M
Summary of Historical Financials
Cathode Produced & Copper Contained in Ore Sold
29.8
62.6
84.1 83.3
75.5 75.0
36.7
45.4 43.2
0
20
40
60
80
100
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
tpd
Cathode Production (tpd) Copper contained in ore sold (tpd)
$78.2 $197.7 $238.2 $225.2 $194.8 $192.2
$26.8
$31.1 $25.9
$3.28 $3.91
$3.57
$3.31 $3.21 $3.25
$0
$75
$150
$225
$300
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
$0.00
$1.00
$2.00
$3.00
$4.00
$M
$/lb
Cathode Sales ($M) Sales of Ore ($M) Cu Price ($/lb)
Operating Costs1
$3.63 $2.69 $2.08 $1.99 $2.22 $2.30
29.8
62.6
84.1 83.3
75.5 75.0
0
10
20
30
40
50
60
70
80
90
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.00
$4.50
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
tpd
$/lb
Cu Price ($/lb) Cathode Production (tpd)
C1 Cash Costs
1.  Operating cost exclude: Depreciation & amortization, change in Cu process inventory, ARO amortization, external exploration expenditure, and royalties
Total Sales and Realized Cu Price
COBRE DEL MAYO 23"
13
Summary Historical Financials (cont’d)
$75.7
$16.1
$31.4
$41.6
$49.1
$33.0
$0
$10
$20
$30
$40
$50
$60
$70
$80
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
$M
Capital Expenditures1EBITDA and EBITDA Margin
$26.0 $65.6 $105.7 $92.0 $67.4 $64.7
33% 33%
44%
37%
30% 31%
$0
$25
$50
$75
$100
$125
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q 2015
0%
10%
20%
30%
40%
50%
$M
%
EBITDA ($M) EBITDA Margin (%)
EBITDA minus Capex
-$49.7
$49.5 $74.3 $50.4 $18.3 $31.7
-$60
-$40
-$20
$0
$20
$40
$60
$80
$100
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM
$M
1. Capital expenditures: the acquisition of six CAT 789 trucks in 1Q14 and a CAT 6050 hydraulic mining shovel in 3Q14 did not have any significant impact on the cash flow as they were
financed by capital lease agreements with Caterpillar Crédito S.A. de C.V.
V. Conclusion
COBRE DEL MAYO 25"
13
Conclusion
Company Ticker Rating YTM1
Attractive Yield/Risk Profile vs. Comparables: COBREM bonds yield substantially wide of
any reasonable comparable
!  Operating mine without new project development risk
!  Favorable logistics and infrastructure
!  Good labour relations
!  Long life of mine of 15+ years
!  Implementing low capex program to achieve a significant reduction in C1 cash costs
!  Reasonable leverage, very strong credit metrics by comparison with other B/B3 rated companies
Comparable Issuers:
Hudbay HBMCN 9½
(1Oct20)
B3/B 8.7%
Taseko Mines TKOCN 7¾
(15Apr19)
B3/B 15.7%
Thompson Creek TCMCN 9¾
(1Dec17)
Ba3/B 7.3%
Cobre del Mayo COBREM 10¾
(15Nov18)
B3/B 16.4%
Thompson Creek TCMCN 12½
(1May19)
Caa1/CCC- 13.6%
Imperial Metals IIICN 7
(15Mar19)
Caa2/CCC+ 8.3%
Source: Bloomberg
1. May 29, 2015

More Related Content

What's hot

Cdm ir (1 q17) 170619 vfinal
Cdm ir (1 q17) 170619 vfinalCdm ir (1 q17) 170619 vfinal
Cdm ir (1 q17) 170619 vfinalCobreDelMayo
 
Cdm ir (4 q16) 170417 v3
Cdm ir (4 q16) 170417 v3Cdm ir (4 q16) 170417 v3
Cdm ir (4 q16) 170417 v3CobreDelMayo
 
Investor Presentation - October 2014
Investor Presentation - October 2014Investor Presentation - October 2014
Investor Presentation - October 2014CobreDelMayo
 
Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28CobreDelMayo
 
Pmd investor presentation may 2012.v7
Pmd   investor presentation may 2012.v7Pmd   investor presentation may 2012.v7
Pmd investor presentation may 2012.v7PetroMagdalena
 
July 2016 - Corporate Presentation
July 2016 - Corporate PresentationJuly 2016 - Corporate Presentation
July 2016 - Corporate Presentationsilverwheaton2016
 
Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)RoyalGold
 
16 09-14 slw presentation final (for web and print)
16 09-14 slw presentation final (for web and print)16 09-14 slw presentation final (for web and print)
16 09-14 slw presentation final (for web and print)silverwheaton2016
 
16 09-13 slw presentation final (for web and print)
16 09-13 slw presentation final (for web and print)16 09-13 slw presentation final (for web and print)
16 09-13 slw presentation final (for web and print)silverwheaton2016
 
Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)PetroMagdalena
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDetourGold
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012PetroMagdalena
 
Pmd -investor_presentation__jan_2012__final
Pmd  -investor_presentation__jan_2012__finalPmd  -investor_presentation__jan_2012__final
Pmd -investor_presentation__jan_2012__finalPetroMagdalena
 
Exelon Corporation Investor Conference
Exelon Corporation Investor ConferenceExelon Corporation Investor Conference
Exelon Corporation Investor Conferencefinance14
 
Investor Presentation April 2012
Investor Presentation April 2012Investor Presentation April 2012
Investor Presentation April 2012PetroMagdalena
 
Hooray, Hooray: Ximen Mining is Back!
Hooray, Hooray: Ximen Mining is Back!Hooray, Hooray: Ximen Mining is Back!
Hooray, Hooray: Ximen Mining is Back!Stephan Bogner
 

What's hot (19)

Cdm ir (1 q17) 170619 vfinal
Cdm ir (1 q17) 170619 vfinalCdm ir (1 q17) 170619 vfinal
Cdm ir (1 q17) 170619 vfinal
 
Cdm ir (4 q16) 170417 v3
Cdm ir (4 q16) 170417 v3Cdm ir (4 q16) 170417 v3
Cdm ir (4 q16) 170417 v3
 
Investor Presentation - October 2014
Investor Presentation - October 2014Investor Presentation - October 2014
Investor Presentation - October 2014
 
Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28
 
Pmd investor presentation may 2012.v7
Pmd   investor presentation may 2012.v7Pmd   investor presentation may 2012.v7
Pmd investor presentation may 2012.v7
 
July 2016 - Corporate Presentation
July 2016 - Corporate PresentationJuly 2016 - Corporate Presentation
July 2016 - Corporate Presentation
 
Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)
 
Nap investor presentation november 2011
Nap investor presentation november 2011Nap investor presentation november 2011
Nap investor presentation november 2011
 
16 09-14 slw presentation final (for web and print)
16 09-14 slw presentation final (for web and print)16 09-14 slw presentation final (for web and print)
16 09-14 slw presentation final (for web and print)
 
16 09-13 slw presentation final (for web and print)
16 09-13 slw presentation final (for web and print)16 09-13 slw presentation final (for web and print)
16 09-13 slw presentation final (for web and print)
 
Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forum
 
Nap Investor Presentation
Nap Investor PresentationNap Investor Presentation
Nap Investor Presentation
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012
 
Pmd -investor_presentation__jan_2012__final
Pmd  -investor_presentation__jan_2012__finalPmd  -investor_presentation__jan_2012__final
Pmd -investor_presentation__jan_2012__final
 
Exelon Corporation Investor Conference
Exelon Corporation Investor ConferenceExelon Corporation Investor Conference
Exelon Corporation Investor Conference
 
Investor Presentation April 2012
Investor Presentation April 2012Investor Presentation April 2012
Investor Presentation April 2012
 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014
 
Hooray, Hooray: Ximen Mining is Back!
Hooray, Hooray: Ximen Mining is Back!Hooray, Hooray: Ximen Mining is Back!
Hooray, Hooray: Ximen Mining is Back!
 

Similar to Cdm investor presentation 01 jun15

CDM Investor Presentation - August
CDM Investor Presentation - AugustCDM Investor Presentation - August
CDM Investor Presentation - AugustCobreDelMayo
 
Cdm investor presentation 16 jun14
Cdm investor presentation 16 jun14 Cdm investor presentation 16 jun14
Cdm investor presentation 16 jun14 CobreDelMayo
 
Cdm ir (2 q16) 160802 v1
Cdm ir (2 q16) 160802 v1Cdm ir (2 q16) 160802 v1
Cdm ir (2 q16) 160802 v1CobreDelMayo
 
Cdm ip 27 jun14(1)
Cdm ip 27 jun14(1)Cdm ip 27 jun14(1)
Cdm ip 27 jun14(1)CobreDelMayo
 
Thompson creek Q2 2015 Presentation
Thompson creek Q2 2015 PresentationThompson creek Q2 2015 Presentation
Thompson creek Q2 2015 PresentationAdnet Communications
 
2014 January 2014 - Investor Presentation
2014 January 2014 - Investor Presentation2014 January 2014 - Investor Presentation
2014 January 2014 - Investor Presentationcliffsnaturalresources
 
BMO Capital Markets Global Metals & Mining Conference 2015
BMO Capital Markets Global Metals & Mining Conference 2015BMO Capital Markets Global Metals & Mining Conference 2015
BMO Capital Markets Global Metals & Mining Conference 2015TeckResourcesLtd
 
Denver gold forum rgld final for screen 2
Denver gold forum rgld final for screen   2Denver gold forum rgld final for screen   2
Denver gold forum rgld final for screen 2RoyalGold
 
Royal gold slides final august 7 2014 v2
Royal gold slides   final august 7 2014 v2Royal gold slides   final august 7 2014 v2
Royal gold slides final august 7 2014 v2RoyalGold
 
Rex Energy Latest Company Presentation - Feb 2015
Rex Energy Latest Company Presentation - Feb 2015Rex Energy Latest Company Presentation - Feb 2015
Rex Energy Latest Company Presentation - Feb 2015Marcellus Drilling News
 
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference Webcast
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference WebcastBank of America Merrill Lynch Global Metals, Mining & Steel Conference Webcast
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference WebcastTeckResourcesLtd
 
Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Teranga Gold
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoDetourGold
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDetourGold
 
October presentation (cibc) october 2014
October presentation   (cibc) october 2014October presentation   (cibc) october 2014
October presentation (cibc) october 2014RoyalGold
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyalGold
 
Q4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation SlidesQ4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation SlidesTeckResourcesLtd
 
Barclays select screen march 2015
Barclays select screen   march 2015Barclays select screen   march 2015
Barclays select screen march 2015RoyalGold
 
Vancouver Investors Luncheon 2015
Vancouver Investors Luncheon 2015Vancouver Investors Luncheon 2015
Vancouver Investors Luncheon 2015TeckResourcesLtd
 

Similar to Cdm investor presentation 01 jun15 (20)

CDM Investor Presentation - August
CDM Investor Presentation - AugustCDM Investor Presentation - August
CDM Investor Presentation - August
 
Cdm investor presentation 16 jun14
Cdm investor presentation 16 jun14 Cdm investor presentation 16 jun14
Cdm investor presentation 16 jun14
 
Cdm ir (2 q16) 160802 v1
Cdm ir (2 q16) 160802 v1Cdm ir (2 q16) 160802 v1
Cdm ir (2 q16) 160802 v1
 
Cdm ip 27 jun14(1)
Cdm ip 27 jun14(1)Cdm ip 27 jun14(1)
Cdm ip 27 jun14(1)
 
Thompson creek Q2 2015 Presentation
Thompson creek Q2 2015 PresentationThompson creek Q2 2015 Presentation
Thompson creek Q2 2015 Presentation
 
2014 January 2014 - Investor Presentation
2014 January 2014 - Investor Presentation2014 January 2014 - Investor Presentation
2014 January 2014 - Investor Presentation
 
BMO Capital Markets Global Metals & Mining Conference 2015
BMO Capital Markets Global Metals & Mining Conference 2015BMO Capital Markets Global Metals & Mining Conference 2015
BMO Capital Markets Global Metals & Mining Conference 2015
 
Denver gold forum rgld final for screen 2
Denver gold forum rgld final for screen   2Denver gold forum rgld final for screen   2
Denver gold forum rgld final for screen 2
 
Royal gold slides final august 7 2014 v2
Royal gold slides   final august 7 2014 v2Royal gold slides   final august 7 2014 v2
Royal gold slides final august 7 2014 v2
 
Rex Energy Latest Company Presentation - Feb 2015
Rex Energy Latest Company Presentation - Feb 2015Rex Energy Latest Company Presentation - Feb 2015
Rex Energy Latest Company Presentation - Feb 2015
 
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference Webcast
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference WebcastBank of America Merrill Lynch Global Metals, Mining & Steel Conference Webcast
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference Webcast
 
Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, Toronto
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conference
 
October presentation (cibc) october 2014
October presentation   (cibc) october 2014October presentation   (cibc) october 2014
October presentation (cibc) october 2014
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 Presentation
 
Q4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation SlidesQ4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation Slides
 
Barclays select screen march 2015
Barclays select screen   march 2015Barclays select screen   march 2015
Barclays select screen march 2015
 
Nap investor presentation january 2014
Nap investor presentation january 2014Nap investor presentation january 2014
Nap investor presentation january 2014
 
Vancouver Investors Luncheon 2015
Vancouver Investors Luncheon 2015Vancouver Investors Luncheon 2015
Vancouver Investors Luncheon 2015
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 

Recently uploaded (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 

Cdm investor presentation 01 jun15

  • 1. 1" COBRE DEL MAYO Investor Presentation Data as of 1Q15 (all amounts in USD unless otherwise noted)
  • 2. COBRE DEL MAYO 2" 13 Disclaimer and Forward Looking Statements The information contained herein has been prepared to assist interested parties in making their own evaluation of the Company and does not purport to be all inclusive or to contain all of the information that a prospective purchaser may desire. You should refer to the information in the Preliminary Offering Circular before making any investment decision to purchase the offered Notes. Forward Looking Statements This Investor Presentation and other communication with investors include forward-looking statements. These forward- looking statements include, without limitation, statements regarding our future financial position and results of operations, our strategy, plans, objectives, goals and targets, future developments in the markets in which we participate or are seeking to participate or anticipated regulatory changes in the markets in which we operate or intend to operate. In some cases, forward-looking statements can be identified by terminology such as “aim,” “anticipate,” “believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “guidance,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should” or “will” or the negative of such terms or other comparable terminology. By their nature, forward-looking statements involve risks and uncertainties because they relate to events and depend on circumstances that may or may not occur in the future. We caution potential investors that forward-looking statements are not guarantees of future performance and are based on numerous assumptions and that our actual results of operations, financial condition and liquidity may differ materially from (and be more negative than) those made in, or suggested by, the forward-looking statements contained in this Offering Memorandum. In addition, even if our results of operations, financial condition and liquidity and the development of the industry in which we operate, are consistent with the forward-looking statements contained in this Investor Presentation, those results or developments may not be indicative of results or developments in subsequent periods. Important factors that could cause these differences include, but are not limited to: In light of these risks, uncertainties and assumptions, the forward-looking events described in this Investor Presentation may not occur. We undertake no obligation to update or revise any forward-looking statement, whether as a result of new information or future events or developments. •  risks related to our competitive position; •  risks related to our strategy and expectations about growth in demand for copper and business operations, financial condition and results of operations; •  risks related to the revocation, expropriation or termination of our mining concessions or our water concessions or of the agreements pursuant to which we explore or exploit mining concessions belonging to third parties; •  the inability to be compensated fairly in the event of termination of our mining concessions or our water concessions; •  the impact of fluctuations in the market price for copper; •  the impact of changes in the prices of raw materials, labor and our products; •  our relationship with unions and our ability to negotiate collective bargaining agreements; •  the availability of materials and equipment; •  our access to funding sources, and the cost of the funding; •  changes in regulatory, administrative or economic conditions affecting the mining industry, including government interpretations and policies; •  the application and enforcement of environmental laws and regulations; •  risks related to Mexico’s social, political or economic environment; •  the impact of changes in the end uses of our products; •  fluctuations in the value of the U.S. dollar against the Mexican peso; •  risks associated with market demand for and liquidity of the notes; and •  changes in the taxation of our business.
  • 3. 3" COBRE DEL MAYO Index I.  Company Overview II.  Industry and Commodity Overview III.  Operational Environment IV.  Historical Financial Performance V.  Conclusion 4 15 19 21 24 3"
  • 5. COBRE DEL MAYO 5" 13 Cobre del Mayo Snapshot !  Cobre del Mayo is a Mexican mining company that operates the Piedras Verdes (PV) open-pit copper mine in Sonora, Mexico !  PV is the third largest copper mine in Mexico as measured by production !  It began commercial production in 2006 !  Purchased by Invecture in mid 2009 !  During 2012 a flotation circuit operated by Kupari Metals with capacity of ~5,500 tons per day (“tpd”) was built and in April 2013 copper concentrate production began !  Produces LME Grade A copper cathode and sells refractory and vein type ore for processing into concentrate !  Mineral Reserves of 1.13 million tons of copper and 15+ year mine life Piedras Verdes Advantaged Location and Access: Huatabampo Chihuahua Sinaloa Piedras Verdes Alamos Navojoa Sonora Ciudad Obregon Guaymas Baja California P C Deep Water Port Commercial Airport Railway Rail Station Major Highway Private Airport C P !  All infrastructure is in place !  Easily accessible by air, road, rail and ports !  Extremely competitive transportation costs for off-takers given PV’s location and nearby infrastructure !  Power: Connected to CFE (Federal Electricity Commission) grid to the mine owned and maintained substation with continuous capacity of 25 MW; CDM is CFE’s single largest customer in the area !  Water: CDM holds 7 titled water concessions for ~3.9 Mm³/yr while the requirement for the operation of the PV Mine is ~3.0 Mm³/yr
  • 6. COBRE DEL MAYO 6" 13 Key Initiatives Implemented Since Invecture Acquisition !  In 2009, changed from contract mining to owner operation and purchased the former contractor’s equipment fleet. Purchased, re-engineered and installed a crushing, screening, conveying and stacking system !  Diversification of processes: —  Crush for Leach, Run of Mine (ROM) leach, and SX/EW produce copper cathode •  Installed capacity of 87 tpd, increasing to ~100 tpd in 2H15 —  Sales of refractory and vein type ore for concentrate production •  Flotation plant current installed capacity of ~5.5 ktpd + ~1.7 ktpd of high clay slimes from the Fines Classification System1 Copper Cathode Monthly Production Evolution (t) !2,331!! !&!!!! !1,000!! !2,000!! !3,000!! !4,000!! !5,000!! !6,000!! Jan! Feb! Mar! Apr! May! Jun! Jul! Aug! Sep! Oct! Nov! Dec! Jan! Feb! Mar! Apr! May! Jun! Jul! Aug! Sep! Oct! Nov! Dec! Jan! Feb! Mar! Apr! May! Jun! Jul! Aug! Sep! Oct! Nov! Dec! Jan! Feb! Mar! Apr! May! Jun! Jul! Aug! Sep! Oct! Nov! Dec! Jan! Feb! Mar! Apr! May! Jun! Jul! Aug! Sep! Oct! Nov! Dec! Jan! Feb! Mar! Apr! May! Jun! Jul! Aug! Sep! Oct! Nov! Dec! Jan! Feb! Mar! Tons! 2009! 2013!2012!2011!2010! 2014! Acquisi'on*by* Invecture* 2015!2009! 2013!2012!2011!2010! 2014! Acquisi'on*by* Invecture* 2015! 1. See slide 11 for further reference
  • 7. COBRE DEL MAYO 7" 13 Stable Low Risk Operations and Processes !  $302.9 M in capex has been invested since 2009 with limited sustaining capex going forward of ~ $13 M/yr LOM !  Ore processing method is chosen according to grade, mineralization, and leaching and flotation characteristics to provide the best overall allocation using: (i) ROM heap leach (ii) crushed ore heap leach (iii) ore for concentration
  • 8. COBRE DEL MAYO 8" 13 Cobre del Mayo Today !  The PV Mine has been transformed into a high quality copper producing asset with strong operating metrics and competitive Cash Cost —  Since January 2012, PV cathode production has averaged 80 tpd —  1Q15 LTM sales totaled $218.2 M •  Copper cathode production of 27,384 t generating $192.2 M of sales •  Copper contained in ore totaled 15,755 t generating $25.9 M of sales1 —  1Q15 LTM EBITDA of $64.7 M —  Credit metrics2: •  Leverage is 3.44x Net Debt / 1Q15 LTM EBITDA •  Debt / Total Capitalization is 40.7% (1Q15 LTM) —  Strip Ratio has declined from 3.28x in FY 2012 to 2.00x during 1Q15 LTM 1. Pursuant to the agreement between Kupari Metals and Cobre del Mayo, the amount payable to the Company is dependent, among other variables, on the grade of the ore sold by Cobre del Mayo and on the grade of the concentrate produced by Kupari Metals. 2. Considering 1Q15 LTM total debt of $240.1 M (weighted average interest rate of 10.02%) and $17.8 M of Cash and Equivalents Cu Cathode Production and Total Sales EBITDA and EBITDA Margin $78.2 $197.7 $238.2 $225.2 $194.8 $192.2 $26.8 $31.1 $25.9 10.9 22.8 30.7 30.4 27.5 27.4 $0 $50 $100 $150 $200 $250 $300 0 6 12 18 24 30 36 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM $M kt Cathode Sales ($M) Sales of Ore ($M) Cathode Production (Kt) $26.0 $65.6 $105.7 $92.0 $67.4 $64.7 33% 33% 44% 37% 30% 30% $0 $25 $50 $75 $100 $125 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM 0% 10% 20% 30% 40% 50% $M % EBITDA ($M) EBITDA Margin (%)
  • 9. COBRE DEL MAYO 9" 13 $2.59 $2.40 -$0.09 -$0.11 $2.50 $2.30 $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 $3.00 4Q14 C1 Cash Cost 40% KM Contribution 4Q14 Adjusted C1 CC 1Q15 C1 Cash Cost 40% KM Contribution 1Q15 Adjusted C1 CC $/lb $12.6 $14.3$1.6 $1.7 $14.3 $16.0 $0 $3 $6 $9 $12 $15 $18 4Q14 EBITDA 40% KM Contribution 4Q14 Adjusted EBITDA 1Q15 EBITDA 40% KM Contribution 1Q15 Adjusted EBITDA $M Kupari Acquisition !  During 4Q14, Cobre del Mayo acquired 40% of the common stock of Kupari Holdings, which owns the flotation plant adjacent to the Piedras Verdes Mine. As a result, Cobre del Mayo now accounts for its 40% participation in Kupari Holdings by using the equity method. !  Cobre del Mayo’s participation in Kupari Holdings: —  Simplifies and optimizes ore allocation among processes —  Facilitates process improvements that involve both heap leaching and flotation —  Diversifies operational risk across two processes and products Adjusted 1Q15 LTM EBITDA Adjusted 1Q15 LTM C1 Cash Cost 4Q14 1Q15 4Q14 1Q15
  • 10. COBRE DEL MAYO 10" 13 On a Path to Achieve a Competitive Cash Cost !$0.50& $0.00& $0.50& $1.00& $1.50& $2.00& $2.50& $3.00& $3.50& $4.00& $4.50& $5.00& 0%& 4%& 7%& 11%& 15%& 19%& 22%& 26%& 30%& 34%& 37%& 41%& 45%& 49%& 52%& 56%& 60%& 64%& 67%& 71%& 75%& 79%& 82%& 86%& 90%& 94%& 97%& ($/lb)' Percen-le'of'Cumula-ve'Metal' C1&Cash&Cost& C1&CC&+&Sustaining&Capex&& 1. Source: Wood Mackenzie 1Q15 Estimated Global Copper C1 Cash Cost Curve1 C1 CC <$1.20/lb C1 CC <$2.00/lb C1 CC <$3.83/lb C1 Cash Cost + Sustaining 1Q15 LTM: $2.57 C1 CC <$1.63/lb C1 Cash Cost: 1Q15 LTM $2.30 C1 Cash Cost: LOM $1.65 C1 Cash Cost + Sustaining: LOM $1.83 Cobre del Mayo Historical C1 Cash Cost $3.63 $2.69 $2.08 $1.99 $2.22 $2.30 $0.00 $1.00 $2.00 $3.00 $4.00 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM $/lb
  • 11. COBRE DEL MAYO 11" 13 Significant Opportunity for Low Capex to Achieve Significant Cash Cost Reduction !  Cu production and recovery improvement projects will reduce unit cost by increasing Cu production and lowering unit opex without major capex commitment Fines Classification System (FCS) (Cathode production increase) Completed $6.9M / $5.5M Project Benefit Timing Capex / EBITDA per yrDescription $0.1M / $0.9M Flotation of Classified Fines Overflow (Sales of ore for concentrate increase) •  Separates screened fines producing coarse leachable sands (70%) and high clay slimes (30%) •  Total Installed Capacity of 6.5ktpd @ 0.35% TCu !  1st Stage (comm. Feb15) : 4.0 ktpd !  2nd Stage (comm. May15): 2.5 ktpd •  Cu recovery estimated at 80% of coarse fines •  Improved recovery from highly altered fines •  Improved ROM recovery by eliminating fines •  Increase Cu cathode production by between 5 - 7 tpd •  Kupari Flotation Plant recovers approx. 55% of copper contained in slimes sold to them and that are generated bye the FCS •  Additional sales of ore for concentrate & concentrate production Completed Heap Leaching Cleaner Tails (Cathode production increase & acid production) •  +0.5 tpd of add. Cu cathode production ($0.7M/yr) •  90 tpd of additional sulphuric acid generation of 90 tpd ($4.0M/yr) Completed $1.0M / $3.2M •  Cu and pyrite in cleaner tails purchased from Kupari flotation plant are leached Replace SXEW Lead Anodes with Titanium Anodes (Increase nameplate capacity & reduce opex) 4Q14 to 2Q15 $3.0M / $1.7M •  Replacement of lead anodes with titanium anodes reduces power consumption and increases EW capacity •  ~"12% reduction in unit electricity consumption ($0.9M/yr) •  Elimination of the use of cobalt sulphate ($0.9M/yr) •  Increase in effective nameplate capacity to 102 tpd Note: * The engineering, analysis and investment cases for each individual project reflect preliminary estimates which will vary when the respective projects are in stable operation ** Calculations were made considering a copper price of $2.95/lb
  • 12. COBRE DEL MAYO 12" 13 43 – 101 Reserves and Resources completed in 3Q14 !  Updated 43-101 compliant Reserve Report released in August 2014 (published October 13, 2014) !  Reserve of 1.13 million tons of copper with a mine life of 15+ years !  Elaborated optimizing both copper cathode and copper concentrate production of the Piedras Verdes deposit !  Annual average production of ~30 kt/a of copper cathode and 8.2 ktpd of ore for copper concentrate !  LOM Blended C1 Cash Costs are estimated at $1.65/lb copper Summary Mineral Reserves and Resources Ore$(kt) Grade$(%) Total$Cu$(t) !!!Ore!to!ROM 211,817 0.18 388,261 !!!Ore!to!Crushing 151,375 0.30 454,283 !!!Ore!for!Concentrate 57,148 0.51 292,374 Proven$&$Probable 420,340 0.27 1,134,918 !!!Waste 548,998 !!!Strip!Ratio 1.31x Ore$(kt) Grade$(%) Total$Cu$(t) !!!!!!Measured 304,970 0.26 792,922 !!!!!!Indicated! 210,060 0.25 525,150 !!!Total!M+I 515,030 0.26 1,318,072 !!!Inferred 52,690 0.24 126,456 Total$Resource 567,720 0.25 1,444,528 Estimated$Reserves Resources A"new"43*101"will"be"released"during"2H15"
  • 13. COBRE DEL MAYO 13" 13 Relevant Agreements and Risk Management Copper Cathode !  Agreement for sale of 100% of 2015 PV cathode production to two internationally renowned, credit-worthy commodity traders (50% of cathode production to each trader). —  Both agreements are valid from January 1, 2015 through and including December 31, 2015. —  Cathode sold FOB at the mine and paid twice weekly against holding certificates Mining Concessions !  We have the exclusive right to explore and exploit 30 mining concessions with an initial term of 50 years which terminate between 2043 and 2062 —  25 mining concessions owned by PV —  5 mining concessions owned by Grupo Rexgo. The right to exploit these concessions is governed by a contract subject to international arbitration !  Royalties: Grupo Rexgo charges PV a 3% net sales royalty for the copper mined from their underground resource concessions !  Land Ownership: PV owns all of the land at the mine in addition to a reserve for leach pad and waste dump expansion Ore for Concentrate !  CDM sells copper ore to KM to produce copper concentrate —  Purchase Price of Ore: Purchase of the ore is a function of the copper recovered and the current LME copper price with certain freight, handling and operating charges —  Term: Initial fixed term of 10 years and provides for renewals —  Volume: Since April, 2013, CDM has sold an average of 5,219 tpd with 46 tpd of copper contained
  • 14. COBRE DEL MAYO 14" 13 Relevant Agreements and Risk Management Mining Tax !  Mexican government implemented a special duty on mining concessions roughly equivalent to 7.5% of EBITDA starting January, 2014 !  As roughly 95% of CDM ore is derived from Grupo Rexgo mining concessions, tax is payable by the concession holder with respect to its EBITDA Labor / Environmental !  Safety, environmental compliance and labor relations are key areas of focus !  Since Invecture’s acquisition, CDM has had a solid safety track record —  Lowest premium for “Riesgo de Trabajo” (worker risk) as classified by IMSS (Mexican Social Security Institute), demonstrating high safety standards !  Approx. 409 of our 918 employees are represented by the Confederación de Trabajadores de Mexico (“CTM”) !  Certified as a Socially Responsible company by the Mexican Center for Philanthropy (Centro Mexicano para la Filantropía) and certified as a Clean Industry by the Mexican Federal Attorney for Environmental Protection (Procuraduría Federal de Protección al Ambiente), the enforcement arm of the Mexican environmental ministry Insurance Policy !  Insurance policy coverage for all risk with business interruption —  Policy underwritten by Royal & SunAlliance with general coverage up to $200 M
  • 15. II. Industry and Commodity Overview
  • 16. COBRE DEL MAYO 16" 13 Copper Price Forecasts Over Time !  The market has consistently underestimated the copper price when forecasting long term prices !  Copper prices have been much higher due to continuing shortfalls in supply. Delays in new projects, supply interruption and declining production from existing mines have been the main drivers Copper Historical Price vs. Forecasts Source: Broker Research, Jefferies $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 $3.00 $3.50 $4.00 $4.50 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2010 2009 2008 Actual 2010 LT 2009 LT 2008 LT 2007 LT 2006 LT 2005 LT2004 LT 2003 LT2002 LT 2001 LT2000 LT 2011 LT 2011 2012 Current LT: US$3.06 / lb Long Term Price (as forecast during Q4 of year indicated) Actual Copper Price Broker Consensus (as forecast during Q4 of year indicated) 2012 LT 2014 2013 LT 2013 Current 2014 LT ($/lb)
  • 17. COBRE DEL MAYO 17" 13 Incentive Price Drives the Floor Value of Copper "  Investment in large projects is very capital intensive and is increasingly so as head grade declines "  The incentive price required to justify investments in the expansion of existing mines and the construction of new ones is estimated at $3.30/lb ($7,275/t) —  Incentive price considers required Cu price to achieve specified rate of return on expansion capex(1) —  Incentive price has been adjusted downward by $0.20/lb from $3.50/lb ($7,716/t) to reflect the decline in oil driven input prices since 2Q14 and the USD strength. "  Although short term copper prices are unpredictable, we believe that long term prices must be driven by the increase over time of the incentive price (necessary to justify the investment in new production to maintain global output) Incentive Prices for Major Projects Source: Wood Mackenzie 1.  Analysis based on long term price required to give a 12.0% risk adjusted IRR on a pre-tax 100% equity basis. c/lb Paid Metal (M lbs) Adjusted"incen;ve" price"$3.30/lb"
  • 18. COBRE DEL MAYO 18" 13 $1.11 $1.62 $2.57 $2.55 $2.39 $2.42 $2.44 $1.67 $3.42 $4.00 $3.61 $3.32 $3.11 $2.65 $0.00 $1.00 $2.00 $3.00 $4.00 $5.00 2005 2010 2011 2012 2013 2014 1Q 2015 $/lb C1 Cash Cost 90th Percentile ($/lb) Average LME Spot Cu Price ($/lb) Cu Pricing Considerations !  Copper has traded in the market at a premium to the 90th percentile of the C1 cash cost curve —  C1 cash cost as estimated by Wood Mackenzie Source: Wood Mackenzie, LME 1. 90th percentile as estimated by Wood Mackenzie. C1 90th Percentile Costs1 vs. Cu Price
  • 20. COBRE DEL MAYO 20" 13 Stable Operating Environment in Mexico1 !  Mexico is an economic leader in Latin America and is the world’s 13th largest economy by GDP (2015E and 2016E real GDP growth of 3.0% and 3.3%, respectively) —  High degree of political stability —  OECD/WTO country and member of 12 free trade agreements, including NAFTA —  Mexican Peso has a long history as one of the ten most traded global currencies !  As a result of mining-supportive governmental policies, stability, OECD tax regime and abundance of resources, Mexico has attracted extensive investment from international mining companies —  There are over 900 mining projects with foreign investment; 95 of which are producing projects. The exploration, development and operation of these projects is carried out by over 275 foreign companies. !  Mexico is recognized as a mining friendly jurisdiction —  Largest producer of silver globally (18% of global production) —  3rd largest producer of copper in Latin America !  Sonora is among the most prolific mining areas and one of the safest states in Mexico Sonora: 27% Zacatecas: 25% Chihuahua: 13% Others: 35% Total Mining Production in Mexico2 Sonora: 79% Zacatecas: 9% San Luis Potosí: 5% Others: 7% 2014 Copper Production in Mexico3 Sources: 1. IMF, World Bank, April 2015 2. Secretariat of the Economy, 2015 3. National Institute of Statistics & Geography
  • 21. COBRE DEL MAYO 21" 13 IV. Historical Financial Performance
  • 22. COBRE DEL MAYO 22" 13 $87.3 $135.6 $141.1 $160.0 $166.2 $164.7 $0 $25 $50 $75 $100 $125 $150 $175 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM $M Summary of Historical Financials Cathode Produced & Copper Contained in Ore Sold 29.8 62.6 84.1 83.3 75.5 75.0 36.7 45.4 43.2 0 20 40 60 80 100 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM tpd Cathode Production (tpd) Copper contained in ore sold (tpd) $78.2 $197.7 $238.2 $225.2 $194.8 $192.2 $26.8 $31.1 $25.9 $3.28 $3.91 $3.57 $3.31 $3.21 $3.25 $0 $75 $150 $225 $300 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM $0.00 $1.00 $2.00 $3.00 $4.00 $M $/lb Cathode Sales ($M) Sales of Ore ($M) Cu Price ($/lb) Operating Costs1 $3.63 $2.69 $2.08 $1.99 $2.22 $2.30 29.8 62.6 84.1 83.3 75.5 75.0 0 10 20 30 40 50 60 70 80 90 $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 $3.00 $3.50 $4.00 $4.50 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM tpd $/lb Cu Price ($/lb) Cathode Production (tpd) C1 Cash Costs 1.  Operating cost exclude: Depreciation & amortization, change in Cu process inventory, ARO amortization, external exploration expenditure, and royalties Total Sales and Realized Cu Price
  • 23. COBRE DEL MAYO 23" 13 Summary Historical Financials (cont’d) $75.7 $16.1 $31.4 $41.6 $49.1 $33.0 $0 $10 $20 $30 $40 $50 $60 $70 $80 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM $M Capital Expenditures1EBITDA and EBITDA Margin $26.0 $65.6 $105.7 $92.0 $67.4 $64.7 33% 33% 44% 37% 30% 31% $0 $25 $50 $75 $100 $125 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q 2015 0% 10% 20% 30% 40% 50% $M % EBITDA ($M) EBITDA Margin (%) EBITDA minus Capex -$49.7 $49.5 $74.3 $50.4 $18.3 $31.7 -$60 -$40 -$20 $0 $20 $40 $60 $80 $100 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 1Q15 LTM $M 1. Capital expenditures: the acquisition of six CAT 789 trucks in 1Q14 and a CAT 6050 hydraulic mining shovel in 3Q14 did not have any significant impact on the cash flow as they were financed by capital lease agreements with Caterpillar Crédito S.A. de C.V.
  • 25. COBRE DEL MAYO 25" 13 Conclusion Company Ticker Rating YTM1 Attractive Yield/Risk Profile vs. Comparables: COBREM bonds yield substantially wide of any reasonable comparable !  Operating mine without new project development risk !  Favorable logistics and infrastructure !  Good labour relations !  Long life of mine of 15+ years !  Implementing low capex program to achieve a significant reduction in C1 cash costs !  Reasonable leverage, very strong credit metrics by comparison with other B/B3 rated companies Comparable Issuers: Hudbay HBMCN 9½ (1Oct20) B3/B 8.7% Taseko Mines TKOCN 7¾ (15Apr19) B3/B 15.7% Thompson Creek TCMCN 9¾ (1Dec17) Ba3/B 7.3% Cobre del Mayo COBREM 10¾ (15Nov18) B3/B 16.4% Thompson Creek TCMCN 12½ (1May19) Caa1/CCC- 13.6% Imperial Metals IIICN 7 (15Mar19) Caa2/CCC+ 8.3% Source: Bloomberg 1. May 29, 2015