 Work accomplishments from the week: Updated Load Screen activities, presented at UGRD,
made minor display changes to screen view.
 Personal Report: I am PM. I don’t know what else to say about it. All tasks have been
completed based on client input. We are adding to the wiki.
 Right now we are entering into polish mode. Not much coding needing to be done at this
point. I hope that before the end of the semester we can get things looking great. If not
there is after wards. But our goal is to have it borderline perfect before then.
 Project Overview
o Discussions with the client team: The newest version of the app was used by client team
with minimal change requests being the mandatory MPG field.
o Upcoming Tasks/Deadlines : end of the semester/Save Load.
o Group flow: Great. Per usual. I think if I had any other team this semester I’d be gone. I
do not know what I would do without them. Jonathan has been a lifesaver and has done
so much to help those of us with less experience.
o Greatest Risks: Meow.
 This week we are pushing for completion of saving and loading tasks in full, bug free
error free.
Project Logistics
Name Phase Task Push Listing (content, date, tag, total additions)
Jonathan 3 App Dev Generate Modified view 04.20.215 d124466 17
Modification to GUI 04.10.2015 5d4c1cd 5
Remove error statements 04.13.2015 8957a9b 2
Updated Generate Text 04.13.2015 aed0c20 1
Week4?5? Phase 3
Charlotte Rose Hamilton(PM)
JonathanCollins(LeadProgrammer)
JustinRoberts(Programmer)
04.23.2015, Team4
Justin 3 Loading,
Saving
Merge 04.13.2015 4a7f14f 347
SaveScreen Fix 04.13.2015 2063f61 69
Sync Push 04.13.2015 715d441 17
LoadProfile Bug Fix 04.16.2015 ffdb18d 2
Delete
Implementation
04.13.2015 30ee224 28
Delete File Option 04.12.2015 2da1d06 28
Charlotte 3 Loading
Screen
No code this round

More Related Content

Similar to week_3_Phase_3_report

Reference_Success_Story_GoSend
Reference_Success_Story_GoSendReference_Success_Story_GoSend
Reference_Success_Story_GoSendKarlo Magdic
 
ZenTao and Scrum roles
ZenTao and Scrum rolesZenTao and Scrum roles
ZenTao and Scrum rolesFei TENG
 
Scrum With TFS 2010
Scrum With TFS 2010Scrum With TFS 2010
Scrum With TFS 2010adrian8three
 
2016 bookmatter ace_thepmi-acp_exam
2016 bookmatter ace_thepmi-acp_exam2016 bookmatter ace_thepmi-acp_exam
2016 bookmatter ace_thepmi-acp_examNguyen Hai
 
I am interested in the Getta Byte Software Project from MGMT 404. .docx
I am interested in the Getta Byte Software Project from MGMT 404. .docxI am interested in the Getta Byte Software Project from MGMT 404. .docx
I am interested in the Getta Byte Software Project from MGMT 404. .docxeugeniadean34240
 
LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...Mehran Misaghi
 
2.1 Automation Nation: Keeping your Process Builders in Check
2.1 Automation Nation: Keeping your Process Builders in Check2.1 Automation Nation: Keeping your Process Builders in Check
2.1 Automation Nation: Keeping your Process Builders in CheckTargetX
 
Why you should care about Go (Golang)
Why you should care about Go (Golang)Why you should care about Go (Golang)
Why you should care about Go (Golang)Aaron Schlesinger
 
Workbook answers
Workbook answersWorkbook answers
Workbook answersqtntpam
 
Android development at mercari 2015
Android development at mercari 2015Android development at mercari 2015
Android development at mercari 2015Tomoaki Imai
 
GeoMapFish User-Group - November 2020
GeoMapFish User-Group - November 2020GeoMapFish User-Group - November 2020
GeoMapFish User-Group - November 2020remyguillaume
 
Dissertation Hardcopy (My Version)
Dissertation Hardcopy (My Version)Dissertation Hardcopy (My Version)
Dissertation Hardcopy (My Version)Christopher Blackman
 
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena
 

Similar to week_3_Phase_3_report (20)

Reference_Success_Story_GoSend
Reference_Success_Story_GoSendReference_Success_Story_GoSend
Reference_Success_Story_GoSend
 
CV Coral
CV CoralCV Coral
CV Coral
 
BSDCan '19 Core Update
BSDCan '19 Core UpdateBSDCan '19 Core Update
BSDCan '19 Core Update
 
ZenTao and Scrum roles
ZenTao and Scrum rolesZenTao and Scrum roles
ZenTao and Scrum roles
 
Scrum With TFS 2010
Scrum With TFS 2010Scrum With TFS 2010
Scrum With TFS 2010
 
2016 bookmatter ace_thepmi-acp_exam
2016 bookmatter ace_thepmi-acp_exam2016 bookmatter ace_thepmi-acp_exam
2016 bookmatter ace_thepmi-acp_exam
 
I am interested in the Getta Byte Software Project from MGMT 404. .docx
I am interested in the Getta Byte Software Project from MGMT 404. .docxI am interested in the Getta Byte Software Project from MGMT 404. .docx
I am interested in the Getta Byte Software Project from MGMT 404. .docx
 
LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
 
2.1 Automation Nation: Keeping your Process Builders in Check
2.1 Automation Nation: Keeping your Process Builders in Check2.1 Automation Nation: Keeping your Process Builders in Check
2.1 Automation Nation: Keeping your Process Builders in Check
 
GSOC 2016 mifos
GSOC 2016 mifosGSOC 2016 mifos
GSOC 2016 mifos
 
Why you should care about Go (Golang)
Why you should care about Go (Golang)Why you should care about Go (Golang)
Why you should care about Go (Golang)
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Workbook answers
Workbook answersWorkbook answers
Workbook answers
 
EFL Release Status
EFL Release StatusEFL Release Status
EFL Release Status
 
Android development at mercari 2015
Android development at mercari 2015Android development at mercari 2015
Android development at mercari 2015
 
GeoMapFish User-Group - November 2020
GeoMapFish User-Group - November 2020GeoMapFish User-Group - November 2020
GeoMapFish User-Group - November 2020
 
Rovi bit dashboard
Rovi bit dashboard Rovi bit dashboard
Rovi bit dashboard
 
Dissertation Hardcopy (My Version)
Dissertation Hardcopy (My Version)Dissertation Hardcopy (My Version)
Dissertation Hardcopy (My Version)
 
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product Development
 
Self test engine PSP-PMI-SP
Self test engine PSP-PMI-SPSelf test engine PSP-PMI-SP
Self test engine PSP-PMI-SP
 

More from Charlotte Rose Hamilton (13)

Attention Staff
Attention    StaffAttention    Staff
Attention Staff
 
Semaphores
SemaphoresSemaphores
Semaphores
 
test1_361
test1_361test1_361
test1_361
 
Version numbering system
Version numbering systemVersion numbering system
Version numbering system
 
Phase_3_submission_Tracker
Phase_3_submission_TrackerPhase_3_submission_Tracker
Phase_3_submission_Tracker
 
Final
FinalFinal
Final
 
Linear Paper final
Linear Paper finalLinear Paper final
Linear Paper final
 
helpdocAlum
helpdocAlumhelpdocAlum
helpdocAlum
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 
helpDoc
helpDochelpDoc
helpDoc
 
Cheap A - User
Cheap A - UserCheap A - User
Cheap A - User
 
Frames Poster Template
Frames Poster TemplateFrames Poster Template
Frames Poster Template
 

week_3_Phase_3_report

  • 1. Week4?5? Phase 3 Charlotte Rose Hamilton(PM) JonathanCollins(LeadProgrammer) JustinRoberts(Programmer) 04.23.2015, Team4  Work accomplishments from the week: Updated Load Screen activities, presented at UGRD, made minor display changes to screen view.  Personal Report: I am PM. I don’t know what else to say about it. All tasks have been completed based on client input. We are adding to the wiki.  Right now we are entering into polish mode. Not much coding needing to be done at this point. I hope that before the end of the semester we can get things looking great. If not there is after wards. But our goal is to have it borderline perfect before then.  Project Overview o Discussions with the client team: The newest version of the app was used by client team with minimal change requests being the mandatory MPG field. o Upcoming Tasks/Deadlines : end of the semester/Save Load. o Group flow: Great. Per usual. I think if I had any other team this semester I’d be gone. I do not know what I would do without them. Jonathan has been a lifesaver and has done so much to help those of us with less experience. o Greatest Risks: Meow.  This week we are pushing for completion of saving and loading tasks in full, bug free error free. Project Logistics Name Phase Task Push Listing (content, date, tag, total additions) Jonathan 3 App Dev Generate Modified view 04.20.215 d124466 17 Modification to GUI 04.10.2015 5d4c1cd 5 Remove error statements 04.13.2015 8957a9b 2 Updated Generate Text 04.13.2015 aed0c20 1
  • 2. Week4?5? Phase 3 Charlotte Rose Hamilton(PM) JonathanCollins(LeadProgrammer) JustinRoberts(Programmer) 04.23.2015, Team4 Justin 3 Loading, Saving Merge 04.13.2015 4a7f14f 347 SaveScreen Fix 04.13.2015 2063f61 69 Sync Push 04.13.2015 715d441 17 LoadProfile Bug Fix 04.16.2015 ffdb18d 2 Delete Implementation 04.13.2015 30ee224 28 Delete File Option 04.12.2015 2da1d06 28 Charlotte 3 Loading Screen No code this round