4. content
• Company introduction
• Objective
• Formation of groups
• Training Session
• Process flow
• Area of Study (Article)
• MFCA over all Flow Model
• Area of concern
• Wastage identification
• Summary of improvement
14. Sr # Name Designation
1 Mr. Muhammad Sarwat Admin Manager
2 Mr. Muhammad Awais I.E
3 Mr. Yahya Illyas Account& finance
4 Mr. Maqsud-ul-Hassan Production Head
5 Mr. Arif Quality
6 Mr. Fysal Incharge Electrical
19. Compressed Air Assessment
Cover the Electric Motor Properly
Need to replace the Air
regulator valve due to the
air leakage.
Need to replace the rubber pipe with S.S
pipe
23. Suggestion & Recommendation
Electrical
• Sub meter installed but not working properly please its is strongly recommended,
It is requested Please calibration the meter for correct training.
• Please allocate separate connection for each department from L.T panels.
Steam Boiler
• Use the proper Steam line wiring for avoided the steam losses Specially on the
condensate water tank
• Leakage
Air Compressors
• Keep the compressor in proper compressor room
• Replace the Air pressure regulator with new one
• Proper cover the compressor motor for protection from rain and dust
• Replace the Air pressure rubber line with SS Line