6. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Eliminate Existing Loop EB92 to NB880
7. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Proposed Direct Connector EB92 to NB880
8. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EB92/NB880 Connector Column Forms
9. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EB 92 / NB 880 Connector Abutment form
10. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EB 92 / NB 880 Connector
Construction over 12 Lanes of Traffic
11. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EB 92 / NB 880 Soffit
/2008
12. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EB 92 / NB 880 Connector
13. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Eliminate Existing LoopWB92 to SB880
XV V
14. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Proposed Direct Connector WB92 to SB880
15. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Replace SR 92/1-880 Separation
16. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Proposed Replacement for EldridgeAvenue Pedestrian Overcrossing
17. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Replace EldridgeAve. Pedestrian Overcrossing
18. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EldridgeAve POC Pile Driving
19. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EldridgeAve POC Columns
20. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
EldridgeAve POC Soffit
21. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Replace CalarogaAvenue Overcrossing
22. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Staging Plan - CalarogaAve Overcrossing
23. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Pile Drivingwith Tight Access and Space Contraints
CalarogaAve OCTemp Structure
24. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Staging Plan - Route 92 / I- 880 Separation
25. FLATIRON
Buildthe Best. Be the Best.
92 880 Interchange Project
Hayward California
Staging Plan - Route 92 / I- 880 Separation