SlideShare a Scribd company logo
1 of 4
C U R R I C U L U M
.:: B.S. Computer Systems Engineer::.
Ariel González Díaz.
044 (55)4390 0639
(844)417 49 71
@ ariel_omar@hotmail.com
.:: PERSONAL GOAL::.
Made my professional growth based in integrity and honesty; improving talents & skill to accomplish my
professional goals in the lower time as possible
.::TALENTS & SKILLS::.
• Languages: English Proficiency (Write / Speak)
• Information Technology: Microsoft Office (Word, Excel, PowerPoint), Internet, Visual Basic, Language C , C++,
Macromedia Dream Weaver, Flash, Director7/ HTML;
• Challenge acceptance, Leadership, persistence, team work, creative, learning on the fly, action oriented, customer
focus, carrier ambition.
.::ACHIEVEMENTS MADE & EXTRACURRICULAR ACTIVITIES::.
• Promoted to higher level into GMM Central Offices at Mexico D.F.
• Acknowledgment by GMM President’s Award for “ VDC Transition project” (September 2012)
• Acknowledgment by GMM President’s Award for “Reach the Revenue recognition” (September 2011)
• Planner for Logistic area
• Planner for Indirect Purchasing area
• Capitan of Logistics Bowling GMM Ramos Arizpe 2010
.:: EXPERIENCE::.
• GENERAL MOTOR DE MÉXICO Supplier Quality (Jan 2015 – Actual day )
• Sr. Supplier Quality Engineer
o Responsible for assuring the quality of the products from Tiers 1, 2 that supplies direct parts to the
GMNA plants as raw material.
o On charge to provide PPAP to the parts and assure that complies with the safety requirements
o Greenbelt on Run at Rate; in order to assure the performance of supplier according to hired rate.
o Greenbelt on PFMEA.
o Certified QSB+, GD&T auditor, PFMEA, 5’S
o Perform Audits for specific controls and problem solving.
• Responsible for being the bridge between related areas; engineering; purchasing; direct customer; and suppliers to
provide support on:
Launches /Fast Response /Continuous Improvements/Risk Reduction Strategy/ Procedures /Auditing;
etc.
• GENERAL MOTOR DE MÉXICO Purchasing Indirect Material (Aug 2013- Jan 2015 )
• Sr. Buyer for Blue Print, Material Handling & Packaging
Current position:
1
C U R R I C U L U M
o On charge of purchase the services for Blue Print services machined parts for die cast, refurbish services
for dies and components, tools etc for all North America plants.
o Leading negotiation; running competitive BID’s and sourcing’s focused on saving initiatives and the
services for the stakeholders.
o Purchase material handling services; racks, services for repair, maintenance of racks dollies and
minomies; dynamic & statics racks; conveyors and spare parts to fix any down machine.
o Purchase packaging for the services of spare parts & productive material that complies with all regulation
to ship by land, airfreight or overseas any export complains; in wood or corrugated boxes; new
development with treatment of VCI for machined or metal parts (blocks, cylinders; cylinder heads,
transmissions, cases etc)
• Logistic Coordinator Toluca & SLP plants (inbound) (Sep 2008- Aug 2013 )
o Related with material area; and packaging for Assembly & Power train plants of San Luis Potosi &
Toluca
o Giving follow up to critical shipment; via I/O; air shipments and over the road
o Supporting with claims analysis
o Champion for I/O operation reviewing lanes assignation and correct Transit Times to deliver on time at
different plants.
o Dealing with Ocean carriers; truck and freight forwarders to achieve the material is deliver on time
o Improving cost reduction initiatives to improve optimal cube utilization and seeking obtain the best
performance for lanes contracted for plants.
o Constant audit for logistic cost for plants and suppliers payments on time.
o Give support for critical shipments; as expedited & charters according the operation requirement.
Heavy Haul Machinery & Equipment coordinator (Projects)
(2012)
o Coordinate special move request for new projects & launches
o Follow up the master dot to assure the flawless launches
o Keep custom process and provide paperwork to reach the transit time.
o Set up specialized equipment to pick up at OEM’s facilities
o Coordinate the Logistic operation for prototype vehicles to the proving test areas
o Giving follow up to critical shipment (Airfreights, intercontinental, over the road); to assure delivering on
time.
o Give follow up to shipments and provide status with reporting in a weekly meeting review.
o Run bid to obtain the better supplier and savings for the project and company.
o Improve and search solution to common problems to reach the objectives and generate new process to
solve any issue in the future.
o Continuous improvement with standard procedures and deviation according the needs for each shipment.
o Developing suppliers that bring to the company saving cost initiatives & proposal for reach the
organization objectives.
Procurement Buyer (Purchasing Logistics Services)
(2012)
o Run for BID’s for contract expirations
o Running studies for supplier performance and running Pre RFQ’s and Sourcing recommendations;
Technical Review etc.
o Write contacts to hire Logistics services as yard managing & related
o Hire services for accessorial proposes
o Looking for cost reduction initiatives and performing recommendation with logistics operation team.
Transportation Quality Analyst (Logistic Quality)
2
C U R R I C U L U M
(September 2008-2012)
o Responsible for transportation process get followed by yard management suppliers
o Responsible that the export vehicles arrive to final destination without discrepancies
o Claims follow up to assure find the rout cause and solve the problem to avoid & prevent damages.
o Responsible for the preparation for export vehicles; with ocean cover and all insolation for export
vehicles for different markets for Mexican plants (coating protection, accessorial installed and VIN
etching).
o Provide the propel instruction and process for the suppliers to secure the vehicles into different
transportation modes; for Rail, Truck & Vessel.
o Active participation in meeting as CPIT, and customer reports; and quality to solve problems related with
transportation.
o Project; initiatives support; for new launches on changes of model years vehicles; new markets; or
prototype vehicles.
o Assure all GM process is implemented with suppliers for our products.
o Oriented to the customer service & oriented to the results.
• Previous experience in GMM August 2007 – September 2008
Team Group Leader (Production)
o Responsible for sub assembly trims doors area.
o Leading operation team as TGL for operation achieving the production target
o Implementing GMS at area and seeking for scrap reduction initiative.
o Active participation with solving process operation team
Process Control Manager (Quality)
o Responsible for Trim, Chassis, Power train & Final line for assembly line
o On charge to assure the quality of the production.
o Avoid claims by customer by GMS implementation
o Solving problems detected in GCA area; and customer reports
o Leading camping to solve problems before the vehicles are delivered to the final customer
o Red X studies and solution.
• Internship at BHER Mexico Jan 2007 – Aug 2007
- Responsible of security project for access plant and CCTV video, installation and functionality.
- Teaching Office curses advanced and elementary level and induction curses.
- On charge of purchasing for I.T. department and also Help Desk.
• Internship at MAHLE Pistones May 2001 – Dec 2001
- Programming capacitating classes
- Teaching elementary courses.
- Control and pursuit of labor curricula.
.::School::.
Level Career Institute Date
Master Degree MBA U.A.N.L. 2010 – 2015
3
C U R R I C U L U M
University B.S. Computer Systems
Engineer
Instituto Tecnológico de
Saltillo
2002 – 2007
College T.S.U. Ofimática
Universidad Tecnológica
de Coahuila 1999 – 2001
.::General Information::.
Born in April 30, 1981 in Reynosa, Tamps. Mx.
Living in Saltillo; Since January 2015.
Marital Status: Single.
4

More Related Content

What's hot

Jit tm-007-c1.0-leveling.ppt[1]
Jit tm-007-c1.0-leveling.ppt[1]Jit tm-007-c1.0-leveling.ppt[1]
Jit tm-007-c1.0-leveling.ppt[1]Antonio Parga
 
MichaelMorrisresume (1)
MichaelMorrisresume (1)MichaelMorrisresume (1)
MichaelMorrisresume (1)michael morris
 
RESUME Ann Cooper
RESUME Ann CooperRESUME Ann Cooper
RESUME Ann CooperAnn Cooper
 
DJ Resume Revised Final Complete 2
DJ Resume Revised Final Complete 2DJ Resume Revised Final Complete 2
DJ Resume Revised Final Complete 2Dennis Jones
 
Tim White Resume 6.20.16.docx Final
Tim White Resume 6.20.16.docx FinalTim White Resume 6.20.16.docx Final
Tim White Resume 6.20.16.docx FinalTimothy White
 
John Moore res #1
John Moore res #1John Moore res #1
John Moore res #1John Moore
 
Jake Horaist resume
Jake Horaist resumeJake Horaist resume
Jake Horaist resumeJake Horaist
 
Kristian G. Johnson 8:5:14
Kristian G. Johnson 8:5:14Kristian G. Johnson 8:5:14
Kristian G. Johnson 8:5:14Kristian Johnson
 
Brian Price Manufacturing
Brian Price ManufacturingBrian Price Manufacturing
Brian Price ManufacturingBrian Price
 
Hammers' Hydraulic Breaker Introdution
Hammers' Hydraulic Breaker IntrodutionHammers' Hydraulic Breaker Introdution
Hammers' Hydraulic Breaker Introdutionsteveyun
 

What's hot (20)

Jit tm-007-c1.0-leveling.ppt[1]
Jit tm-007-c1.0-leveling.ppt[1]Jit tm-007-c1.0-leveling.ppt[1]
Jit tm-007-c1.0-leveling.ppt[1]
 
resume ben
resume benresume ben
resume ben
 
MichaelMorrisresume (1)
MichaelMorrisresume (1)MichaelMorrisresume (1)
MichaelMorrisresume (1)
 
Justin Carroll
Justin CarrollJustin Carroll
Justin Carroll
 
seemaCV
seemaCVseemaCV
seemaCV
 
RESUME Ann Cooper
RESUME Ann CooperRESUME Ann Cooper
RESUME Ann Cooper
 
Resume_Updated
Resume_UpdatedResume_Updated
Resume_Updated
 
Braden Holbrook Resume
Braden Holbrook ResumeBraden Holbrook Resume
Braden Holbrook Resume
 
DJ Resume Revised Final Complete 2
DJ Resume Revised Final Complete 2DJ Resume Revised Final Complete 2
DJ Resume Revised Final Complete 2
 
Tim White Resume 6.20.16.docx Final
Tim White Resume 6.20.16.docx FinalTim White Resume 6.20.16.docx Final
Tim White Resume 6.20.16.docx Final
 
MACKEY Plant Construction
MACKEY Plant ConstructionMACKEY Plant Construction
MACKEY Plant Construction
 
John Moore res #1
John Moore res #1John Moore res #1
John Moore res #1
 
Jake Horaist resume
Jake Horaist resumeJake Horaist resume
Jake Horaist resume
 
Kristian G. Johnson 8:5:14
Kristian G. Johnson 8:5:14Kristian G. Johnson 8:5:14
Kristian G. Johnson 8:5:14
 
Brian Price Manufacturing
Brian Price ManufacturingBrian Price Manufacturing
Brian Price Manufacturing
 
Wael Elhlfawy C.V.
Wael Elhlfawy C.V.Wael Elhlfawy C.V.
Wael Elhlfawy C.V.
 
Daniel Bougen C.V
Daniel Bougen C.V Daniel Bougen C.V
Daniel Bougen C.V
 
Hammers' Hydraulic Breaker Introdution
Hammers' Hydraulic Breaker IntrodutionHammers' Hydraulic Breaker Introdution
Hammers' Hydraulic Breaker Introdution
 
JAY'S CV DEC-16
JAY'S CV DEC-16JAY'S CV DEC-16
JAY'S CV DEC-16
 
workoholic
workoholicworkoholic
workoholic
 

Viewers also liked

Public scholarship in abms switzerland university
Public scholarship in abms switzerland universityPublic scholarship in abms switzerland university
Public scholarship in abms switzerland universitytomii01
 
17 hoyos shirley mapa conceptual curricular
17 hoyos shirley mapa conceptual curricular17 hoyos shirley mapa conceptual curricular
17 hoyos shirley mapa conceptual curricularShirleyHoyos
 
20 leon surani correcion de la evaluacion
20 leon surani correcion de la evaluacion20 leon surani correcion de la evaluacion
20 leon surani correcion de la evaluacionsuranileon
 
Clinical & Pharmaceutical Management of ABMS UNIVERSITY
Clinical & Pharmaceutical Management of ABMS UNIVERSITYClinical & Pharmaceutical Management of ABMS UNIVERSITY
Clinical & Pharmaceutical Management of ABMS UNIVERSITYtomii01
 
Business administration of abms university
Business administration of abms universityBusiness administration of abms university
Business administration of abms universitytomii01
 

Viewers also liked (7)

Public scholarship in abms switzerland university
Public scholarship in abms switzerland universityPublic scholarship in abms switzerland university
Public scholarship in abms switzerland university
 
17 hoyos shirley mapa conceptual curricular
17 hoyos shirley mapa conceptual curricular17 hoyos shirley mapa conceptual curricular
17 hoyos shirley mapa conceptual curricular
 
20 leon surani correcion de la evaluacion
20 leon surani correcion de la evaluacion20 leon surani correcion de la evaluacion
20 leon surani correcion de la evaluacion
 
New Doc 2
New Doc 2New Doc 2
New Doc 2
 
Clinical & Pharmaceutical Management of ABMS UNIVERSITY
Clinical & Pharmaceutical Management of ABMS UNIVERSITYClinical & Pharmaceutical Management of ABMS UNIVERSITY
Clinical & Pharmaceutical Management of ABMS UNIVERSITY
 
Yessika
YessikaYessika
Yessika
 
Business administration of abms university
Business administration of abms universityBusiness administration of abms university
Business administration of abms university
 

Similar to B.S. Computer Systems Engineer curriculum

Similar to B.S. Computer Systems Engineer curriculum (20)

Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Kumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-ResumeKumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-Resume
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
 
CV BPiccoli - 04-16 - English
CV BPiccoli - 04-16 - EnglishCV BPiccoli - 04-16 - English
CV BPiccoli - 04-16 - English
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Rohrs, Brent Resume Sept1009
Rohrs, Brent Resume Sept1009Rohrs, Brent Resume Sept1009
Rohrs, Brent Resume Sept1009
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 
Rohrs, Brent Resume June 09
Rohrs, Brent Resume June 09Rohrs, Brent Resume June 09
Rohrs, Brent Resume June 09
 
TPG CV_update 04042016
TPG CV_update 04042016TPG CV_update 04042016
TPG CV_update 04042016
 
din_CVM2[2]
din_CVM2[2]din_CVM2[2]
din_CVM2[2]
 
C.V. Ingles CMM-2-3
C.V. Ingles CMM-2-3C.V. Ingles CMM-2-3
C.V. Ingles CMM-2-3
 
Resume_K.L.Neelakandan
Resume_K.L.NeelakandanResume_K.L.Neelakandan
Resume_K.L.Neelakandan
 
dgwCV June 2015
dgwCV June 2015dgwCV June 2015
dgwCV June 2015
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 
Resume
ResumeResume
Resume
 
Resume - Ravinder Singh_New
Resume - Ravinder Singh_NewResume - Ravinder Singh_New
Resume - Ravinder Singh_New
 
Rohrs, Brent Resume July1809
Rohrs, Brent Resume July1809Rohrs, Brent Resume July1809
Rohrs, Brent Resume July1809
 
RESUME
RESUMERESUME
RESUME
 

B.S. Computer Systems Engineer curriculum

  • 1. C U R R I C U L U M .:: B.S. Computer Systems Engineer::. Ariel González Díaz. 044 (55)4390 0639 (844)417 49 71 @ ariel_omar@hotmail.com .:: PERSONAL GOAL::. Made my professional growth based in integrity and honesty; improving talents & skill to accomplish my professional goals in the lower time as possible .::TALENTS & SKILLS::. • Languages: English Proficiency (Write / Speak) • Information Technology: Microsoft Office (Word, Excel, PowerPoint), Internet, Visual Basic, Language C , C++, Macromedia Dream Weaver, Flash, Director7/ HTML; • Challenge acceptance, Leadership, persistence, team work, creative, learning on the fly, action oriented, customer focus, carrier ambition. .::ACHIEVEMENTS MADE & EXTRACURRICULAR ACTIVITIES::. • Promoted to higher level into GMM Central Offices at Mexico D.F. • Acknowledgment by GMM President’s Award for “ VDC Transition project” (September 2012) • Acknowledgment by GMM President’s Award for “Reach the Revenue recognition” (September 2011) • Planner for Logistic area • Planner for Indirect Purchasing area • Capitan of Logistics Bowling GMM Ramos Arizpe 2010 .:: EXPERIENCE::. • GENERAL MOTOR DE MÉXICO Supplier Quality (Jan 2015 – Actual day ) • Sr. Supplier Quality Engineer o Responsible for assuring the quality of the products from Tiers 1, 2 that supplies direct parts to the GMNA plants as raw material. o On charge to provide PPAP to the parts and assure that complies with the safety requirements o Greenbelt on Run at Rate; in order to assure the performance of supplier according to hired rate. o Greenbelt on PFMEA. o Certified QSB+, GD&T auditor, PFMEA, 5’S o Perform Audits for specific controls and problem solving. • Responsible for being the bridge between related areas; engineering; purchasing; direct customer; and suppliers to provide support on: Launches /Fast Response /Continuous Improvements/Risk Reduction Strategy/ Procedures /Auditing; etc. • GENERAL MOTOR DE MÉXICO Purchasing Indirect Material (Aug 2013- Jan 2015 ) • Sr. Buyer for Blue Print, Material Handling & Packaging Current position: 1
  • 2. C U R R I C U L U M o On charge of purchase the services for Blue Print services machined parts for die cast, refurbish services for dies and components, tools etc for all North America plants. o Leading negotiation; running competitive BID’s and sourcing’s focused on saving initiatives and the services for the stakeholders. o Purchase material handling services; racks, services for repair, maintenance of racks dollies and minomies; dynamic & statics racks; conveyors and spare parts to fix any down machine. o Purchase packaging for the services of spare parts & productive material that complies with all regulation to ship by land, airfreight or overseas any export complains; in wood or corrugated boxes; new development with treatment of VCI for machined or metal parts (blocks, cylinders; cylinder heads, transmissions, cases etc) • Logistic Coordinator Toluca & SLP plants (inbound) (Sep 2008- Aug 2013 ) o Related with material area; and packaging for Assembly & Power train plants of San Luis Potosi & Toluca o Giving follow up to critical shipment; via I/O; air shipments and over the road o Supporting with claims analysis o Champion for I/O operation reviewing lanes assignation and correct Transit Times to deliver on time at different plants. o Dealing with Ocean carriers; truck and freight forwarders to achieve the material is deliver on time o Improving cost reduction initiatives to improve optimal cube utilization and seeking obtain the best performance for lanes contracted for plants. o Constant audit for logistic cost for plants and suppliers payments on time. o Give support for critical shipments; as expedited & charters according the operation requirement. Heavy Haul Machinery & Equipment coordinator (Projects) (2012) o Coordinate special move request for new projects & launches o Follow up the master dot to assure the flawless launches o Keep custom process and provide paperwork to reach the transit time. o Set up specialized equipment to pick up at OEM’s facilities o Coordinate the Logistic operation for prototype vehicles to the proving test areas o Giving follow up to critical shipment (Airfreights, intercontinental, over the road); to assure delivering on time. o Give follow up to shipments and provide status with reporting in a weekly meeting review. o Run bid to obtain the better supplier and savings for the project and company. o Improve and search solution to common problems to reach the objectives and generate new process to solve any issue in the future. o Continuous improvement with standard procedures and deviation according the needs for each shipment. o Developing suppliers that bring to the company saving cost initiatives & proposal for reach the organization objectives. Procurement Buyer (Purchasing Logistics Services) (2012) o Run for BID’s for contract expirations o Running studies for supplier performance and running Pre RFQ’s and Sourcing recommendations; Technical Review etc. o Write contacts to hire Logistics services as yard managing & related o Hire services for accessorial proposes o Looking for cost reduction initiatives and performing recommendation with logistics operation team. Transportation Quality Analyst (Logistic Quality) 2
  • 3. C U R R I C U L U M (September 2008-2012) o Responsible for transportation process get followed by yard management suppliers o Responsible that the export vehicles arrive to final destination without discrepancies o Claims follow up to assure find the rout cause and solve the problem to avoid & prevent damages. o Responsible for the preparation for export vehicles; with ocean cover and all insolation for export vehicles for different markets for Mexican plants (coating protection, accessorial installed and VIN etching). o Provide the propel instruction and process for the suppliers to secure the vehicles into different transportation modes; for Rail, Truck & Vessel. o Active participation in meeting as CPIT, and customer reports; and quality to solve problems related with transportation. o Project; initiatives support; for new launches on changes of model years vehicles; new markets; or prototype vehicles. o Assure all GM process is implemented with suppliers for our products. o Oriented to the customer service & oriented to the results. • Previous experience in GMM August 2007 – September 2008 Team Group Leader (Production) o Responsible for sub assembly trims doors area. o Leading operation team as TGL for operation achieving the production target o Implementing GMS at area and seeking for scrap reduction initiative. o Active participation with solving process operation team Process Control Manager (Quality) o Responsible for Trim, Chassis, Power train & Final line for assembly line o On charge to assure the quality of the production. o Avoid claims by customer by GMS implementation o Solving problems detected in GCA area; and customer reports o Leading camping to solve problems before the vehicles are delivered to the final customer o Red X studies and solution. • Internship at BHER Mexico Jan 2007 – Aug 2007 - Responsible of security project for access plant and CCTV video, installation and functionality. - Teaching Office curses advanced and elementary level and induction curses. - On charge of purchasing for I.T. department and also Help Desk. • Internship at MAHLE Pistones May 2001 – Dec 2001 - Programming capacitating classes - Teaching elementary courses. - Control and pursuit of labor curricula. .::School::. Level Career Institute Date Master Degree MBA U.A.N.L. 2010 – 2015 3
  • 4. C U R R I C U L U M University B.S. Computer Systems Engineer Instituto Tecnológico de Saltillo 2002 – 2007 College T.S.U. Ofimática Universidad Tecnológica de Coahuila 1999 – 2001 .::General Information::. Born in April 30, 1981 in Reynosa, Tamps. Mx. Living in Saltillo; Since January 2015. Marital Status: Single. 4