ASRoadWorks_windsor results
- 1. 0 1 2 3 4 5 6 7 8 9 10
GoodFairPoor
SL-RAT
Acoustic Score
# of
Segments
Obstructed CleanBlocked Very Few ObstructionsMinor Obstructions
Poor - Immediate attention required (Pole Camera or CCTV and Combo Unit)
Fair - SL-RAT Preventive Maintenance Schedule Recommended in 6 - 12 Months
Good - No Action Required for next 18 Months
100
200
300
400
500
600
700
800
900
47
29 34
54
90 90
158
282
609
629
141
www.asroadworks.caAnthony Peticca
apeticca@asroadworks.ca
Sewer Segments Inspected
2163
Pole Camera Pictures
623
Total Length Inspected
519, 700 ft
158,405 m
226-345-9605
Condition Assessment:
ASRoadworks
City of Windsor
Manhole to Manhole Inspection Results using the SL-RAT