2. 2
100%
100%
High Grade
“Lumpy Chrome
Ore” & High
Quality HC
Ferrochrome
Producer in
Turkey
High Quality HC
Ferrochrome &
Ferrosilicon
Producer in
Sweden
High Quality HC
Ferrochrome
Producer in
Russia
High Quality
Chrome Ore &
Concentrate
Producer in
Kazakhstan
Mining
Exploration,
Production and
Investments in
Turkey and
Abroad
100%100%100%100% 100% 100%
Underground &
Open Pit
Clean Coal
Mines in
Colombia
FeV & FeMo
Production
Company in the
USA
Structure
8. 8
YILMADEN’s Corporate Social Responsibility
is our continued ethical commitment to economic development by
improving the quality of life of the local community and the society
at large.
C OR POR ATE SOC IA L R ESPON SIB ILITY
Financial Social Environmental
9. 9
CSR is not a fad, a source of pressure for the company
executives or a passing thing…
It is the opportunity to create SHARED VALUE!
Small
Projects
Philanthropy
Branding
Partnering
for shared
value
BENEFIT TO BUSINESS
BENEFITTOSOCIETY
10. 10
Extension of
Gas pipeline to
ONGAR Village
Projects with
community
Contributions
to local mosques
and churches
Working
with local
mining
colleges
for training
Scaling
machine
projects
with vendors
Working with
contractors and
monitoring their
performance
A picture from
Contractor HSE Training
Improved
relations with
Ongar Village
Special designs
for our mines
Eti Krom Team
Restoration projects
Internal
activities
Relations with local authorities
Elevating our
operations to
global standards
Voskhod Team
Relations
with
schools
Other sport events
Social activities
Football tournaments
BENEFIT TO BUSINESS
BENEFITTOSOCIETY
11. 11
Voskhod Mining Company utilizes electricity
to heat up the mine at the suction side of
ventilation system.
Usually heating up the system is not required during summer,
half of spring and fall. However, temperature drops below -40°C
during harsh winters. It even drops further down by turbid air
generated by ventilation force in the mine.
Voskhod led the introduction of natural
gas to the village as Ongar, which is the
closest village to the mine.
The village did never receive natural gas service
in its history.
Therefore Yilmaden Holding took responsibility,
invested in, and built the pipeline that runs 12
kilometers in total. The entire cost of the
project, calculated at USD 731,600 was met by
Yilmaden.
Cogeneration project & gas pipeline to Ongar Village
12. 12
Yilmaden Holding invested more than 350,000 USD and refurbished two elementary schools in
Kazakhstan’s Khromtau oblast. The schools of Don and Ongar villages were not repaired for nearly 30 years.
School renovation projects in the near villages