INTERNAL USE ONLYINTERNAL USE ONLY 0 Copyright 2012 FUJITSU
Estimation for
Metal Part and Tooling
FTS PDG SV SYE 6 Chiang Akina Dec 7th. 2013
INTERNAL USE ONLYINTERNAL USE ONLY 1 Copyright 2012 FUJITSU
Index
Item Content Page
1 Tooling Introduction 2~11
2 Part Data 12
3 Tooling Estimation 13~22
4 Single Part Estimation 23~28
5 Practice 29
6 END 31
Purpose
First of all; I would like to thank for Jamie’s efforts, she collected all of
cost data during working here; I just take advantage of her data to
integrate my experiences into this metal estimation.
This is a general principle, it can help colleagues know how to estimate
for the Metal Tooling and Part, as well as bargain with vendors easily.
INTERNAL USE ONLYINTERNAL USE ONLY 2 Copyright 2012 FUJITSU
1. Tooling Introduction
L-Stripper 下脫料板
L-Moldbase 下模座
U-stripper 上脫料板
Male-Die 沖頭
U-plate 上固定板
Female-Die 下模
U-Moldbase 上模座
INTERNAL USE ONLYINTERNAL USE ONLY 3 Copyright 2012 FUJITSU
1.1 Tooling Structure
U-Moldbase
上模座
L-Moldbase
下模座
U-Stripper
上脫料板
L-Stripper
下脫料版
Male-Die
沖頭
Female-Die
下模冲頭
U-Plate
上固定板
INTERNAL USE ONLYINTERNAL USE ONLY 4 Copyright 2012 FUJITSU
1.1-1 Function of Tooling Part
Item Part Content
1
Mold base
模座
It makes the tooling be fixed to the punching
machine easily
2
U-Stripper
上脫料板
It presses the part for location before punching.
It pushes back the cut parts after punching
3
Male Die
衝頭
It is a cutting tool, as well as a forming tool.
4
Plate
上固定板
It fixes the Die parts and Stripper
5
L-stripper
下脫料板
It pre-pushes the part to avoid the interfere.
It pushes back the cut part after punching.
6
Female-Die
下模衝頭
It is a cutting tool, as well as a forming tool.
INTERNAL USE ONLYINTERNAL USE ONLY 5 Copyright 2012 FUJITSU
1.2 Tooling Type-Blanking (下料)
Before After
INTERNAL USE ONLYINTERNAL USE ONLY 6 Copyright 2012 FUJITSU
1.3 Tooling Type- Cutting (沖孔)
Before After
INTERNAL USE ONLYINTERNAL USE ONLY 7 Copyright 2012 FUJITSU
1.4 Tooling Type- De-burr (壓毛邊)
Before After
Chamfer
Chamfer
INTERNAL USE ONLYINTERNAL USE ONLY 8 Copyright 2012 FUJITSU
1.5 Tooling Type- Bending (折彎)
Before After
INTERNAL USE ONLYINTERNAL USE ONLY 9 Copyright 2012 FUJITSU
1.6 Tooling Type- Folding (反摺)
Before After
INTERNAL USE ONLYINTERNAL USE ONLY 2 Copyright 2012 FUJITSU
1. Tooling Introduction
L-Stripper 下脫料板
L-Moldbase 下模座
U-stripper 上脫料板
Male-Die 沖頭
U-plate 上固定板
Female-Die 下模
U-Moldbase 上模座
INTERNAL USE ONLYINTERNAL USE ONLY 11 Copyright 2012 FUJITSU
1.8 Tooling Type- Progressive (連續模)
Pitch = W+P
Blanking
Cutting
De-burr
Bending
Forming
P
INTERNAL USE ONLYINTERNAL USE ONLY 12 Copyright 2012 FUJITSU
Part Data
Blanking Size
*L (mm) *W (mm) *T (mm) *Stage/Pitch Q'TY
*Material
*Tooling type
1.Stage, 2.Progressive)
2. Part Data
Unbend W
L
Thickness
Material
ITEM
SGCC
鍍鋅鋼板
SECC
鍍鋅鋼板
SPCC
鍍鋅鋼板
SUS301
不鏽鋼
SUS304
不鏽鋼
TIN
馬口鐵
1
5
SGCC
INTERNAL USE ONLYINTERNAL USE ONLY 13 Copyright 2012 FUJITSU
3. Tooling Estimation
1. Tooling Material Fee
2. Tooling Manufacture Fee
3. Tooling Accessary Fee
4. Tooling Assembly Fee
5. Tooling Design Fee
6. Tooling Profit
Tooling Total Cost
Cost Items
INTERNAL USE ONLYINTERNAL USE ONLY 14 Copyright 2012 FUJITSU
3.1 Tooling Material Fee
1. Tooling Material Fee
= Sum(Mold Plate+ Base)*N Stage Quantity
OR= Sum(Mold Plate+ Base)*1 Progressive
Item Material L1 (mm) W1 (mm) H1 (mm) Price
Mold Plate SKD11 L1*W1*H1*D* 7.2 $/kg
Mold Base SS41 L1*W1*H1*D*1.51 $/kg
Low Mold (下模) Up Mold (上模)
Mold Base Mold Base
Mold Plate Mold Plate
INTERNAL USE ONLYINTERNAL USE ONLY 15 Copyright 2012 FUJITSU
3.1-1 Tooling Material size
Item L1 (mm) W1 (mm) H1 (mm)
Mold Plate L+2A
=W+2A Stage
OR=(W+P)*PN+2A Progressive
Mold Base L+2(A+B)
=W+2(A+B) Stage
OR=(W+P)*PN+2(A+B) Progressive
A=40mm, B=60 mm, C= 60mm, D=60mm
D D
A
C
W
P
PN=Pitch Number
INTERNAL USE ONLYINTERNAL USE ONLY 16 Copyright 2012 FUJITSU
3.2 Tooling Manufacture
Heat Treatment( 熱處理)
Keeping
Time
Temp.
Critical Temp.
(臨界溫度)
Copper
Die
Before Manufacturing After
EDM(放電加工)Milling 銑削
2. Tooling Manufacture Fee: = SUM
Item: Wire-Cutting Heat Treatment CNC/EDM/Milling
Price: L2*H2*0.006 $/mm2 V*D*N*1.66 $/kg Time*16 $/hr
Wire-Cutting(線割)
H2
L2
INTERNAL USE ONLYINTERNAL USE ONLY 17 Copyright 2012 FUJITSU
3.2-1 Wire-Cutting price
Wire-Cutting = L2*H2*0.006 $/mm2
L2
= (L+W)* (2+0.5) Stage tooling
OR = (L+W)* (2+2.5) Progressive or (L+W)>800 mm 
H2
= 2C*3
3= Times Blanking, De-burr, Cutting, Bending Tooling
W
L
C C
Female die/L-Stripper/ Male die/U-Stripper/ U-plate
下模冲頭 / 下脫料板 / 冲頭 / 上脫料板 /上固定板
Part Unbent Size
成品展開尺寸
INTERNAL USE ONLYINTERNAL USE ONLY 18 Copyright 2012 FUJITSU
3.2-2 Heat Treatment Price
Heat Treatment =V*D*N*1.6 $/kg; V=Volume, D=Density, N= Stage Quantity,
V = L2*W2*H2
W2
= (W+2A) Stage tooling
OR = (W+P)* PN+2A Progressive (PN= Pitch number)
H2 =2C- 40mm (Only Die parts have to do the Heat Treatment.)
C W2
Female die/L-Stripper/ Male die/U-Stripper/ U-plate
下模冲頭 / 下脫料板 / 冲頭 / 上脫料板 /上固定板
W
L
Part Unbent Size
成品展開尺寸
L2
INTERNAL USE ONLYINTERNAL USE ONLY 19 Copyright 2012 FUJITSU
3.2-3 CNC/EDM/Milling Price
CNC/EDM/Milling
Time* 16 $/hr
= $250* N Stage Quantity
OR = $300 Progressive
INTERNAL USE ONLYINTERNAL USE ONLY 20 Copyright 2012 FUJITSU
3.3 Tooling Accessary, Assembly
3. Tooling Accessary Fee = (Material fee + Manufacture fee)*0.03
Screw Spring
Assembly
4. Tooling Assembly Fee = Stage Quantity * $200 or Progressive * $200*2
INTERNAL USE ONLYINTERNAL USE ONLY 21 Copyright 2012 FUJITSU
3.4 Tooling Design, Handling & Profit
5. Tooling Design Fee = (Material fee + Manufacture fee)*0.05
1. Tooling Material Fee
2. Tooling Manufacture Fee
3. Tooling Accessary Fee
4. Tooling Assembly Fee
5. Tooling Design Fee
6. Handing and Profit = Sum *25%
INTERNAL USE ONLYINTERNAL USE ONLY 22 Copyright 2012 FUJITSU
3.5 Summary
The Metal tooling cost is to calculate
both Material and Wire-cutting fee.
INTERNAL USE ONLYINTERNAL USE ONLY 23 Copyright 2012 FUJITSU
4. Single Part Estimation
1. Part Raw Material Fee
2. Part Accessary Fee
3. Part Manufacturing Fee
4. Transport & Package Fee
5. Handling & Profit
Single Part Cost
Cost Items
INTERNAL USE ONLYINTERNAL USE ONLY 24 Copyright 2012 FUJITSU
4.1 Part Raw Material Fee
1. Part Raw Material Fee: =L2*W2*T*D*Loss%*(Unit Price)
L2 (mm) W2 (mm) T (mm) Loss % Unit Price $/kg
Material NTD/kg USD/kg
SECC (鍍鋅鋼板) US$1.05
SGCC (鍍鋅鋼板) US$1.05
SPCC (鍍鋅鋼板) US$1.05
SUS301 (不鏽鋼) US$4.94
SUS301(0.1t) NT$ 420.00 US$14.48
SUS304 (不鏽鋼) US$7.40
TIN (馬口鐵) NT$ 75.00 US$2.59
Raw Material
W
L
Thickness
E
D=Density
E
Blanking
E = 5mm
+2 +2 3%
INTERNAL USE ONLYINTERNAL USE ONLY 25 Copyright 2012 FUJITSU
4.2 Part Accessary Fee
2. Part Accessary Fee: =SUM
Item Picture Q'ty U/P Price
Usually, Stand-Off is for screw function.
Rivet is to fasten both metal parts together.
Metal 1 Metal 2
Screw
Stand-Off US$0.031
Rivet (拉釘) US$0.002
Screw US$0.09
INTERNAL USE ONLYINTERNAL USE ONLY 26 Copyright 2012 FUJITSU
Item Description
Riveting
Stacking
Stand-off Riveted
4.3 Part Manufacturing
1.Pulling
3.Broken
2. Fully Formed
Press
Press
INTERNAL USE ONLYINTERNAL USE ONLY 27 Copyright 2012 FUJITSU
4.3-1 Part Manufacturing Fee
3. Part Manufacturing Fee: =Sum
Item Estimation Q'ty U/P Price
Stamping
Riveting
Staking
Stand-off
Riveted
Taping
Spot Welding
Print
Painting
Cleaning =
(Area)*(U/P)
1000000
Stage quantity
Working Plane quantity
US$0.06
US$0.02
US$0.02
US$0.02
Working Plane quantity
Working Plane quantity
Working Plane quantity US$0.02
Working Plane quantity US$0.02
Color Quantity US$0.07
By Case
Cleaning Area
N/A
US$1.79/mm2
INTERNAL USE ONLYINTERNAL USE ONLY 28 Copyright 2012 FUJITSU
4.4 Transport & Packing/Handling & Profit
4. Transport & Package: Sum( Transport + Packing Fee)
Item U/P
Transport N/A
Packing N/A
1. Part Raw material Fee
2. Part Accessary Fee
3. Part Manufacture Fee
4. Transport &Packing Fee
5. Handing and Profit = Sum
5% 20%
*25%
INTERNAL USE ONLYINTERNAL USE ONLY 29 Copyright 2012 FUJITSU
Let’s Practice it
metal estimation
INTERNAL USE ONLYINTERNAL USE ONLY 30 Copyright 2012 FUJITSU
Congratulation!
You are an expert of estimation for the metal tooling and part
from now on.
Thanks you
INTERNAL USE ONLYINTERNAL USE ONLY 3 Copyright 2012 FUJITSU
1.1 Tooling Structure
U-Moldbase
上模座
L-Moldbase
下模座
U-Stripper
上脫料板
L-Stripper
下脫料版
Male-Die
沖頭
Female-Die
下模冲頭
U-Plate
上固定板
INTERNAL USE ONLYINTERNAL USE ONLY 32 Copyright 2012 FUJITSU
1.3 Tooling Type- Cutting (沖孔)
Before After

More Related Content

Viewers also liked

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
 
Analysis and simulation of progressive die
Analysis and simulation of progressive dieAnalysis and simulation of progressive die
Analysis and simulation of progressive dieeSAT Publishing House
 
Ptc creo progressive die extension (pdx) sales presentation
Ptc creo progressive die extension (pdx) sales presentationPtc creo progressive die extension (pdx) sales presentation
Ptc creo progressive die extension (pdx) sales presentationVictor Mitov
 
Ke hoach to chuc van nghe khoa ufm quan tri hoc
Ke hoach to chuc van nghe khoa ufm quan tri hocKe hoach to chuc van nghe khoa ufm quan tri hoc
Ke hoach to chuc van nghe khoa ufm quan tri hocMyLan2014
 
CRiskCo - value deck
CRiskCo - value deckCRiskCo - value deck
CRiskCo - value deckErez Saf
 
Tic sesion1 daniel monsalve pedraza
Tic sesion1 daniel monsalve pedrazaTic sesion1 daniel monsalve pedraza
Tic sesion1 daniel monsalve pedrazaAlinedark
 
El teatro gloria y hanny
El teatro gloria y hannyEl teatro gloria y hanny
El teatro gloria y hannyMrsMendoza
 

Viewers also liked (10)

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
Analysis and simulation of progressive die
Analysis and simulation of progressive dieAnalysis and simulation of progressive die
Analysis and simulation of progressive die
 
Ptc creo progressive die extension (pdx) sales presentation
Ptc creo progressive die extension (pdx) sales presentationPtc creo progressive die extension (pdx) sales presentation
Ptc creo progressive die extension (pdx) sales presentation
 
Ke hoach to chuc van nghe khoa ufm quan tri hoc
Ke hoach to chuc van nghe khoa ufm quan tri hocKe hoach to chuc van nghe khoa ufm quan tri hoc
Ke hoach to chuc van nghe khoa ufm quan tri hoc
 
CRiskCo - value deck
CRiskCo - value deckCRiskCo - value deck
CRiskCo - value deck
 
Tic sesion1 daniel monsalve pedraza
Tic sesion1 daniel monsalve pedrazaTic sesion1 daniel monsalve pedraza
Tic sesion1 daniel monsalve pedraza
 
Motivation PPT
Motivation PPTMotivation PPT
Motivation PPT
 
El teatro gloria y hanny
El teatro gloria y hannyEl teatro gloria y hanny
El teatro gloria y hanny
 
Hartland_Web
Hartland_WebHartland_Web
Hartland_Web
 

Similar to Estimation Metal part and Tooling

Solid Carbide Thread Mills
Solid Carbide Thread MillsSolid Carbide Thread Mills
Solid Carbide Thread MillsErwin Marpaung
 
All Product 1 All Product 1All Product 1.pptx
All Product 1 All Product 1All Product 1.pptxAll Product 1 All Product 1All Product 1.pptx
All Product 1 All Product 1All Product 1.pptxsatrioindoseiki
 
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...IRJET Journal
 
IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...
IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...
IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...IRJET Journal
 
EXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESS
EXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESSEXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESS
EXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESSIRJET Journal
 
Jeff Chang resume - 2015
Jeff Chang resume - 2015Jeff Chang resume - 2015
Jeff Chang resume - 2015Jeff Chang
 
IRJET- Design and Analysis of Progressive Tool for U-Bracket of Power Met...
IRJET-  	  Design and Analysis of Progressive Tool for U-Bracket of Power Met...IRJET-  	  Design and Analysis of Progressive Tool for U-Bracket of Power Met...
IRJET- Design and Analysis of Progressive Tool for U-Bracket of Power Met...IRJET Journal
 

Similar to Estimation Metal part and Tooling (9)

Production Engg. Theory
Production Engg. TheoryProduction Engg. Theory
Production Engg. Theory
 
Solid Carbide Thread Mills
Solid Carbide Thread MillsSolid Carbide Thread Mills
Solid Carbide Thread Mills
 
All Product 1 All Product 1All Product 1.pptx
All Product 1 All Product 1All Product 1.pptxAll Product 1 All Product 1All Product 1.pptx
All Product 1 All Product 1All Product 1.pptx
 
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...
 
IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...
IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...
IRJET- Optimisation Technique for Design and Fabrication of ASTM Based Multit...
 
EXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESS
EXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESSEXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESS
EXPERIMENTAL STUDY AND THERMAL MODEL DEVELOPMENT OF DRY PROCESS
 
Jeff Chang resume - 2015
Jeff Chang resume - 2015Jeff Chang resume - 2015
Jeff Chang resume - 2015
 
Piezo switch
Piezo switchPiezo switch
Piezo switch
 
IRJET- Design and Analysis of Progressive Tool for U-Bracket of Power Met...
IRJET-  	  Design and Analysis of Progressive Tool for U-Bracket of Power Met...IRJET-  	  Design and Analysis of Progressive Tool for U-Bracket of Power Met...
IRJET- Design and Analysis of Progressive Tool for U-Bracket of Power Met...
 

Estimation Metal part and Tooling

  • 1. INTERNAL USE ONLYINTERNAL USE ONLY 0 Copyright 2012 FUJITSU Estimation for Metal Part and Tooling FTS PDG SV SYE 6 Chiang Akina Dec 7th. 2013
  • 2. INTERNAL USE ONLYINTERNAL USE ONLY 1 Copyright 2012 FUJITSU Index Item Content Page 1 Tooling Introduction 2~11 2 Part Data 12 3 Tooling Estimation 13~22 4 Single Part Estimation 23~28 5 Practice 29 6 END 31 Purpose First of all; I would like to thank for Jamie’s efforts, she collected all of cost data during working here; I just take advantage of her data to integrate my experiences into this metal estimation. This is a general principle, it can help colleagues know how to estimate for the Metal Tooling and Part, as well as bargain with vendors easily.
  • 3. INTERNAL USE ONLYINTERNAL USE ONLY 2 Copyright 2012 FUJITSU 1. Tooling Introduction L-Stripper 下脫料板 L-Moldbase 下模座 U-stripper 上脫料板 Male-Die 沖頭 U-plate 上固定板 Female-Die 下模 U-Moldbase 上模座
  • 4. INTERNAL USE ONLYINTERNAL USE ONLY 3 Copyright 2012 FUJITSU 1.1 Tooling Structure U-Moldbase 上模座 L-Moldbase 下模座 U-Stripper 上脫料板 L-Stripper 下脫料版 Male-Die 沖頭 Female-Die 下模冲頭 U-Plate 上固定板
  • 5. INTERNAL USE ONLYINTERNAL USE ONLY 4 Copyright 2012 FUJITSU 1.1-1 Function of Tooling Part Item Part Content 1 Mold base 模座 It makes the tooling be fixed to the punching machine easily 2 U-Stripper 上脫料板 It presses the part for location before punching. It pushes back the cut parts after punching 3 Male Die 衝頭 It is a cutting tool, as well as a forming tool. 4 Plate 上固定板 It fixes the Die parts and Stripper 5 L-stripper 下脫料板 It pre-pushes the part to avoid the interfere. It pushes back the cut part after punching. 6 Female-Die 下模衝頭 It is a cutting tool, as well as a forming tool.
  • 6. INTERNAL USE ONLYINTERNAL USE ONLY 5 Copyright 2012 FUJITSU 1.2 Tooling Type-Blanking (下料) Before After
  • 7. INTERNAL USE ONLYINTERNAL USE ONLY 6 Copyright 2012 FUJITSU 1.3 Tooling Type- Cutting (沖孔) Before After
  • 8. INTERNAL USE ONLYINTERNAL USE ONLY 7 Copyright 2012 FUJITSU 1.4 Tooling Type- De-burr (壓毛邊) Before After Chamfer Chamfer
  • 9. INTERNAL USE ONLYINTERNAL USE ONLY 8 Copyright 2012 FUJITSU 1.5 Tooling Type- Bending (折彎) Before After
  • 10. INTERNAL USE ONLYINTERNAL USE ONLY 9 Copyright 2012 FUJITSU 1.6 Tooling Type- Folding (反摺) Before After
  • 11. INTERNAL USE ONLYINTERNAL USE ONLY 2 Copyright 2012 FUJITSU 1. Tooling Introduction L-Stripper 下脫料板 L-Moldbase 下模座 U-stripper 上脫料板 Male-Die 沖頭 U-plate 上固定板 Female-Die 下模 U-Moldbase 上模座
  • 12. INTERNAL USE ONLYINTERNAL USE ONLY 11 Copyright 2012 FUJITSU 1.8 Tooling Type- Progressive (連續模) Pitch = W+P Blanking Cutting De-burr Bending Forming P
  • 13. INTERNAL USE ONLYINTERNAL USE ONLY 12 Copyright 2012 FUJITSU Part Data Blanking Size *L (mm) *W (mm) *T (mm) *Stage/Pitch Q'TY *Material *Tooling type 1.Stage, 2.Progressive) 2. Part Data Unbend W L Thickness Material ITEM SGCC 鍍鋅鋼板 SECC 鍍鋅鋼板 SPCC 鍍鋅鋼板 SUS301 不鏽鋼 SUS304 不鏽鋼 TIN 馬口鐵 1 5 SGCC
  • 14. INTERNAL USE ONLYINTERNAL USE ONLY 13 Copyright 2012 FUJITSU 3. Tooling Estimation 1. Tooling Material Fee 2. Tooling Manufacture Fee 3. Tooling Accessary Fee 4. Tooling Assembly Fee 5. Tooling Design Fee 6. Tooling Profit Tooling Total Cost Cost Items
  • 15. INTERNAL USE ONLYINTERNAL USE ONLY 14 Copyright 2012 FUJITSU 3.1 Tooling Material Fee 1. Tooling Material Fee = Sum(Mold Plate+ Base)*N Stage Quantity OR= Sum(Mold Plate+ Base)*1 Progressive Item Material L1 (mm) W1 (mm) H1 (mm) Price Mold Plate SKD11 L1*W1*H1*D* 7.2 $/kg Mold Base SS41 L1*W1*H1*D*1.51 $/kg Low Mold (下模) Up Mold (上模) Mold Base Mold Base Mold Plate Mold Plate
  • 16. INTERNAL USE ONLYINTERNAL USE ONLY 15 Copyright 2012 FUJITSU 3.1-1 Tooling Material size Item L1 (mm) W1 (mm) H1 (mm) Mold Plate L+2A =W+2A Stage OR=(W+P)*PN+2A Progressive Mold Base L+2(A+B) =W+2(A+B) Stage OR=(W+P)*PN+2(A+B) Progressive A=40mm, B=60 mm, C= 60mm, D=60mm D D A C W P PN=Pitch Number
  • 17. INTERNAL USE ONLYINTERNAL USE ONLY 16 Copyright 2012 FUJITSU 3.2 Tooling Manufacture Heat Treatment( 熱處理) Keeping Time Temp. Critical Temp. (臨界溫度) Copper Die Before Manufacturing After EDM(放電加工)Milling 銑削 2. Tooling Manufacture Fee: = SUM Item: Wire-Cutting Heat Treatment CNC/EDM/Milling Price: L2*H2*0.006 $/mm2 V*D*N*1.66 $/kg Time*16 $/hr Wire-Cutting(線割) H2 L2
  • 18. INTERNAL USE ONLYINTERNAL USE ONLY 17 Copyright 2012 FUJITSU 3.2-1 Wire-Cutting price Wire-Cutting = L2*H2*0.006 $/mm2 L2 = (L+W)* (2+0.5) Stage tooling OR = (L+W)* (2+2.5) Progressive or (L+W)>800 mm  H2 = 2C*3 3= Times Blanking, De-burr, Cutting, Bending Tooling W L C C Female die/L-Stripper/ Male die/U-Stripper/ U-plate 下模冲頭 / 下脫料板 / 冲頭 / 上脫料板 /上固定板 Part Unbent Size 成品展開尺寸
  • 19. INTERNAL USE ONLYINTERNAL USE ONLY 18 Copyright 2012 FUJITSU 3.2-2 Heat Treatment Price Heat Treatment =V*D*N*1.6 $/kg; V=Volume, D=Density, N= Stage Quantity, V = L2*W2*H2 W2 = (W+2A) Stage tooling OR = (W+P)* PN+2A Progressive (PN= Pitch number) H2 =2C- 40mm (Only Die parts have to do the Heat Treatment.) C W2 Female die/L-Stripper/ Male die/U-Stripper/ U-plate 下模冲頭 / 下脫料板 / 冲頭 / 上脫料板 /上固定板 W L Part Unbent Size 成品展開尺寸 L2
  • 20. INTERNAL USE ONLYINTERNAL USE ONLY 19 Copyright 2012 FUJITSU 3.2-3 CNC/EDM/Milling Price CNC/EDM/Milling Time* 16 $/hr = $250* N Stage Quantity OR = $300 Progressive
  • 21. INTERNAL USE ONLYINTERNAL USE ONLY 20 Copyright 2012 FUJITSU 3.3 Tooling Accessary, Assembly 3. Tooling Accessary Fee = (Material fee + Manufacture fee)*0.03 Screw Spring Assembly 4. Tooling Assembly Fee = Stage Quantity * $200 or Progressive * $200*2
  • 22. INTERNAL USE ONLYINTERNAL USE ONLY 21 Copyright 2012 FUJITSU 3.4 Tooling Design, Handling & Profit 5. Tooling Design Fee = (Material fee + Manufacture fee)*0.05 1. Tooling Material Fee 2. Tooling Manufacture Fee 3. Tooling Accessary Fee 4. Tooling Assembly Fee 5. Tooling Design Fee 6. Handing and Profit = Sum *25%
  • 23. INTERNAL USE ONLYINTERNAL USE ONLY 22 Copyright 2012 FUJITSU 3.5 Summary The Metal tooling cost is to calculate both Material and Wire-cutting fee.
  • 24. INTERNAL USE ONLYINTERNAL USE ONLY 23 Copyright 2012 FUJITSU 4. Single Part Estimation 1. Part Raw Material Fee 2. Part Accessary Fee 3. Part Manufacturing Fee 4. Transport & Package Fee 5. Handling & Profit Single Part Cost Cost Items
  • 25. INTERNAL USE ONLYINTERNAL USE ONLY 24 Copyright 2012 FUJITSU 4.1 Part Raw Material Fee 1. Part Raw Material Fee: =L2*W2*T*D*Loss%*(Unit Price) L2 (mm) W2 (mm) T (mm) Loss % Unit Price $/kg Material NTD/kg USD/kg SECC (鍍鋅鋼板) US$1.05 SGCC (鍍鋅鋼板) US$1.05 SPCC (鍍鋅鋼板) US$1.05 SUS301 (不鏽鋼) US$4.94 SUS301(0.1t) NT$ 420.00 US$14.48 SUS304 (不鏽鋼) US$7.40 TIN (馬口鐵) NT$ 75.00 US$2.59 Raw Material W L Thickness E D=Density E Blanking E = 5mm +2 +2 3%
  • 26. INTERNAL USE ONLYINTERNAL USE ONLY 25 Copyright 2012 FUJITSU 4.2 Part Accessary Fee 2. Part Accessary Fee: =SUM Item Picture Q'ty U/P Price Usually, Stand-Off is for screw function. Rivet is to fasten both metal parts together. Metal 1 Metal 2 Screw Stand-Off US$0.031 Rivet (拉釘) US$0.002 Screw US$0.09
  • 27. INTERNAL USE ONLYINTERNAL USE ONLY 26 Copyright 2012 FUJITSU Item Description Riveting Stacking Stand-off Riveted 4.3 Part Manufacturing 1.Pulling 3.Broken 2. Fully Formed Press Press
  • 28. INTERNAL USE ONLYINTERNAL USE ONLY 27 Copyright 2012 FUJITSU 4.3-1 Part Manufacturing Fee 3. Part Manufacturing Fee: =Sum Item Estimation Q'ty U/P Price Stamping Riveting Staking Stand-off Riveted Taping Spot Welding Print Painting Cleaning = (Area)*(U/P) 1000000 Stage quantity Working Plane quantity US$0.06 US$0.02 US$0.02 US$0.02 Working Plane quantity Working Plane quantity Working Plane quantity US$0.02 Working Plane quantity US$0.02 Color Quantity US$0.07 By Case Cleaning Area N/A US$1.79/mm2
  • 29. INTERNAL USE ONLYINTERNAL USE ONLY 28 Copyright 2012 FUJITSU 4.4 Transport & Packing/Handling & Profit 4. Transport & Package: Sum( Transport + Packing Fee) Item U/P Transport N/A Packing N/A 1. Part Raw material Fee 2. Part Accessary Fee 3. Part Manufacture Fee 4. Transport &Packing Fee 5. Handing and Profit = Sum 5% 20% *25%
  • 30. INTERNAL USE ONLYINTERNAL USE ONLY 29 Copyright 2012 FUJITSU Let’s Practice it metal estimation
  • 31. INTERNAL USE ONLYINTERNAL USE ONLY 30 Copyright 2012 FUJITSU Congratulation! You are an expert of estimation for the metal tooling and part from now on. Thanks you
  • 32. INTERNAL USE ONLYINTERNAL USE ONLY 3 Copyright 2012 FUJITSU 1.1 Tooling Structure U-Moldbase 上模座 L-Moldbase 下模座 U-Stripper 上脫料板 L-Stripper 下脫料版 Male-Die 沖頭 Female-Die 下模冲頭 U-Plate 上固定板
  • 33. INTERNAL USE ONLYINTERNAL USE ONLY 32 Copyright 2012 FUJITSU 1.3 Tooling Type- Cutting (沖孔) Before After