S10 Página 1
Presupuesto
INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO,
DISTRITO DE AGALLPAMPA- LA LIBERTAD.
1204010Presupuesto
CASERIO DE CUSHPIORCO001Subpresupuesto
MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente
Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA
Precio S/. Parcial S/.Item Descripción Und. Metrado
OBRAS PROVISIONALES01 5,378.47
3,500.001.00MOVILIZACION Y DESMOVILIZACION glb01.01 3,500.00
1,343.181.00CASETA DE GUARDIANIA Y ALMACEN und01.02 1,343.18
535.291.00CARTEL DE IDEINTIFICACION DE OBRA DE 3.60 X 2.40 M und01.03 535.29
AGUA POTABLE02 396,485.32
CAPTACION (04 UNIDADES)02.01 10,546.68
38.6325.58TRAZO Y REPLANTEO PRELIMINAR m202.01.01 1.51
506.0318.17EXCAVACION EN TERRENO NATURAL m302.01.02 27.85
317.7422.81ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.01.03 13.93
36.091.73SOLADO DE CONCRETO ch 1:12 m202.01.04 20.86
2,490.467.43CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.01.05 335.19
2,504.1794.64ENCOFRADO Y DESENCOFRADO NORMAL m202.01.06 26.46
616.7220.80TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:4 E=2CM m202.01.07 29.65
869.6242.40TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.01.08 20.51
357.8642.40PINTURA CON ESMALTE m202.01.09 8.44
1,268.568.00TAPAS SANITARIA METALICA und02.01.10 158.57
720.004.00ACCESORIOS PARA CAPTACION glb02.01.11 180.00
820.8060.00CERCO PERIMETRICO CON PUAS PARA CAPTACIONES m02.01.12 13.68
RESERVORIO 9 M3 (1 unid)02.02 8,290.11
16.9411.22TRAZO Y REPLANTEO PRELIMINAR m202.02.01 1.51
187.436.73EXCAVACION EN TERRENO NATURAL m302.02.02 27.85
113.958.18ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.02.03 13.93
39.0511.22NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.02.04 3.48
288.881.12CONCRETO f´c = 100 kg/cm2 m302.02.05 257.93
2,424.736.29CONCRETO f'c=175 kg/cm2 m302.02.06 385.49
1,044.3839.47ENCOFRADO Y DESENCOFRADO NORMAL m202.02.07 26.46
684.15162.12ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.02.08 4.22
200.8211.20JUNTA DE WATER STOP DE 1/4" X 6" m02.02.09 17.93
670.3223.94TARRAJEO CON IMPERMEABILIZANTE EN ESTRUCTURAS HIDRAULICAS m202.02.10 28.00
558.2827.22TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.02.11 20.51
300.7827.22PINTURA EN EXTERIORES DE ESTRUCTURAS m202.02.12 11.05
158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.02.13 158.57
353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO glb02.02.14 353.17
152.731.00DESINFECCION DE RESERVORIO glb02.02.15 152.73
268.820.85CONCRETO f'c=140 kg/cm2 EN VEREDAS PERIMETRAL m302.02.16 316.26
827.1121.40CERCO PERIMETRICO PARA RESERVORIO m02.02.17 38.65
CASETA DE VALVULAS PARA RESERVORIO 9 M302.03 866.79
1.691.12TRAZO Y REPLANTEO PRELIMINAR m202.03.01 1.51
7.800.28EXCAVACION EN TERRENO NATURAL m302.03.02 27.85
6.130.44ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.03.03 13.93
3.901.12NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.03.04 3.48
131.070.34CONCRETO f'c=175 kg/cm2 m302.03.05 385.49
147.655.58ENCOFRADO Y DESENCOFRADO NORMAL m202.03.06 26.46
36.921.80TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.03.07 20.51
19.891.80PINTURA EN EXTERIORES DE ESTRUCTURAS m202.03.08 11.05
158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.03.09 158.57
353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS DE
RESERVORIO
glb02.03.10 353.17
RESERVORIO 4M3 (1 unid)02.04 4,708.01
S10 Página 2
Presupuesto
INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO,
DISTRITO DE AGALLPAMPA- LA LIBERTAD.
1204010Presupuesto
CASERIO DE CUSHPIORCO001Subpresupuesto
MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente
Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA
Precio S/. Parcial S/.Item Descripción Und. Metrado
9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.04.01 1.51
100.263.60EXCAVACION EN TERRENO NATURAL m302.04.02 27.85
61.574.42ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.04.03 13.93
20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.04.04 3.48
154.760.60CONCRETO f´c = 100 kg/cm2 m302.04.05 257.93
1,156.473.00CONCRETO f'c=175 kg/cm2 m302.04.06 385.49
635.8324.03ENCOFRADO Y DESENCOFRADO NORMAL m202.04.07 26.46
403.8595.70ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.04.08 4.22
139.857.80JUNTA DE WATER STOP DE 1/4" X 6" m02.04.09 17.93
405.7214.49TARRAJEO CON IMPERMEABILIZANTE EN ESTRUCTURAS HIDRAULICAS m202.04.10 28.00
331.0316.14TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.04.11 20.51
178.3516.14PINTURA EN EXTERIORES DE ESTRUCTURAS m202.04.12 11.05
158.571.00TAPAS SANITARIA METALICA und02.04.13 158.57
353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO glb02.04.14 353.17
152.731.00DESINFECCION DE RESERVORIO glb02.04.15 152.73
202.410.64CONCRETO f'c=140 kg/cm2 EN VEREDAS m302.04.16 316.26
243.5017.80CERCO PERIMETRICO CON PUAS PARA CAPTACIONES m02.04.17 13.68
CASETA DE VALVULAS PARA RESERVORIO 4 M302.05 866.79
1.691.12TRAZO Y REPLANTEO PRELIMINAR m202.05.01 1.51
3.901.12NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.05.02 3.48
7.800.28EXCAVACION EN TERRENO NATURAL m302.05.03 27.85
6.130.44ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.05.04 13.93
131.070.34CONCRETO f'c=175 kg/cm2 m302.05.05 385.49
147.655.58ENCOFRADO Y DESENCOFRADO NORMAL m202.05.06 26.46
36.921.80TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.05.07 20.51
19.891.80PINTURA EN EXTERIORES DE ESTRUCTURAS m202.05.08 11.05
158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.05.09 158.57
353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS DE
RESERVORIO
glb02.05.10 353.17
RESERVORIO 3M3 (1 unid)02.06 4,256.26
9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.06.01 1.51
100.263.60EXCAVACION EN TERRENO NATURAL m302.06.02 27.85
61.574.42ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.06.03 13.93
20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.06.04 3.48
154.760.60CONCRETO f´c = 100 kg/cm2 m302.06.05 257.93
1,040.822.70CONCRETO f'c=175 kg/cm2 m302.06.06 385.49
553.2820.91ENCOFRADO Y DESENCOFRADO NORMAL m202.06.07 26.46
248.5258.89ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.06.08 4.22
139.857.80JUNTA DE WATER STOP DE 1/4" X 6" m02.06.09 17.93
364.5613.02TARRAJEO CON IMPERMEABILIZANTE EN ESTRUCTURAS HIDRAULICAS m202.06.10 28.00
297.4014.50TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.06.11 20.51
154.9214.02PINTURA EN EXTERIORES DE ESTRUCTURAS m202.06.12 11.05
158.571.00TAPAS SANITARIA METALICA und02.06.13 158.57
353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO glb02.06.14 353.17
152.731.00DESINFECCION DE RESERVORIO glb02.06.15 152.73
202.410.64CONCRETO f'c=140 kg/cm2 EN VEREDAS m302.06.16 316.26
243.5017.80CERCO PERIMETRICO CON PUAS PARA CAPTACIONES m02.06.17 13.68
CASETA DE VALVULAS PARA RESERVORIO 3 M302.07 866.79
1.691.12TRAZO Y REPLANTEO PRELIMINAR m202.07.01 1.51
S10 Página 3
Presupuesto
INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO,
DISTRITO DE AGALLPAMPA- LA LIBERTAD.
1204010Presupuesto
CASERIO DE CUSHPIORCO001Subpresupuesto
MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente
Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA
Precio S/. Parcial S/.Item Descripción Und. Metrado
3.901.12NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.07.02 3.48
7.800.28EXCAVACION EN TERRENO NATURAL m302.07.03 27.85
6.130.44ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.07.04 13.93
131.070.34CONCRETO f'c=175 kg/cm2 m302.07.05 385.49
147.655.58ENCOFRADO Y DESENCOFRADO NORMAL m202.07.06 26.46
36.921.80TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.07.07 20.51
19.891.80PINTURA EN EXTERIORES DE ESTRUCTURAS m202.07.08 11.05
158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.07.09 158.57
353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS DE
RESERVORIO
glb02.07.10 353.17
CAMARA ROMPE PRESION TIPO 7 (25 UNID)02.08 36,285.78
69.8446.25TRAZO Y REPLANTEO PRELIMINAR m202.08.01 1.51
1,094.7839.31EXCAVACION EN TERRENO NATURAL m302.08.02 27.85
658.6147.28ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.08.03 13.93
160.9546.25NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.08.04 3.48
1,194.224.63CONCRETO f´c = 100 kg/cm2 m302.08.05 257.93
8,342.8824.89CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.08.06 335.19
6,277.64237.25ENCOFRADO Y DESENCOFRADO NORMAL m202.08.07 26.46
4,729.351,120.70ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.08.08 4.22
2,312.7078.00TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:4 E=2CM m202.08.09 29.65
2,948.31143.75TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.08.10 20.51
1,213.25143.75PINTURA CON ESMALTE m202.08.11 8.44
3,964.2525.00TAPAS SANITARIA METALICA und02.08.12 158.57
3,319.0025.00ACCESORIOS PARA CAMARA ROMPE PRESION glb02.08.13 132.76
VALVULA DE AIRE (24 UNIDADES)02.09 11,411.97
9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.09.01 1.51
133.684.80EXCAVACION EN TERRENO NATURAL m302.09.02 27.85
81.635.86ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.09.03 13.93
20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.09.04 3.48
154.760.60CONCRETO f´c = 100 kg/cm2 m302.09.05 257.93
1,350.824.03CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.09.06 335.19
1,625.7061.44ENCOFRADO Y DESENCOFRADO NORMAL m202.09.07 26.46
3,805.6824.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.09.08 158.57
4,229.7624.00ACCESORIOS VALVULAS DE AIRE und02.09.09 176.24
VALVULA DE PURGA (24 UNIDADES)02.10 9,026.05
9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.10.01 1.51
133.684.80EXCAVACION EN TERRENO NATURAL m302.10.02 27.85
81.635.86ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.10.03 13.93
20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.10.04 3.48
154.760.60CONCRETO f´c = 100 kg/cm2 m302.10.05 257.93
1,592.154.75CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.10.06 335.19
2,517.8161.44ENCOFRADO Y DESENCOFRADO m202.10.07 40.98
3,805.6824.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.10.08 158.57
710.4024.00ACCESORIOS VALVULA DE PURGA glb02.10.09 29.60
VALVULA DE CONTROL (17 UNIDADES)02.11 8,257.94
6.424.25TRAZO Y REPLANTEO PRELIMINAR m202.11.01 1.51
94.693.40EXCAVACION EN TERRENO NATURAL m302.11.02 27.85
58.234.18ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.11.03 13.93
14.794.25NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.11.04 3.48
S10 Página 4
Presupuesto
INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO,
DISTRITO DE AGALLPAMPA- LA LIBERTAD.
1204010Presupuesto
CASERIO DE CUSHPIORCO001Subpresupuesto
MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente
Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA
Precio S/. Parcial S/.Item Descripción Und. Metrado
110.910.43CONCRETO f´c = 100 kg/cm2 m302.11.05 257.93
1,129.593.37CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.11.06 335.19
1,151.5443.52ENCOFRADO Y DESENCOFRADO NORMAL m202.11.07 26.46
2,695.6917.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.11.08 158.57
2,996.0817.00ACCESORIOS VALVULAS DE CONTROL glb02.11.09 176.24
LINEA DE CONDUCCION (1126.57 ML)02.12 17,847.76
2,343.271,126.57TRAZO, NIVELES Y REPLANTEO m02.12.01 2.08
6,274.991,126.57EXCAVACION EN TERRENO NATURAL m02.12.02 5.57
1,589.331,431.83REFINE Y NIVELACION DE ZANJAS m02.12.03 1.11
1,059.551,431.83CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m02.12.04 0.74
1,960.231,126.57RELLENO Y COMPACTACION DE ZANJAS MANUAL m02.12.05 1.74
1,022.62302.55TUBERIA Ø 1" C-10 PVC NTP 399.002 m02.12.06 3.38
2,225.48518.76TUBERIA Ø 1 1/4" C-10 PVC NTP 399.002 m02.12.07 4.29
955.46305.26TUBERIA Ø 3/4" C-10 PVC NTP 399.002 m02.12.08 3.13
416.831,126.57PRUEBA HIDRÁULICA Y DESINFECCIÓN m02.12.09 0.37
RED DE DISTRIBUCION (13711.61 ML)02.13 202,876.85
28,520.1513,711.61TRAZO, NIVELES Y REPLANTEO m02.13.01 2.08
76,373.6713,711.61EXCAVACION EN TERRENO NATURAL m02.13.02 5.57
15,219.8913,711.61REFINE Y NIVELACION DE ZANJAS m02.13.03 1.11
10,146.5913,711.61CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m02.13.04 0.74
23,858.2013,711.61RELLENO Y COMPACTACION DE ZANJAS MANUAL m02.13.05 1.74
20,255.206,471.31TUBERIA Ø 3/4" C-10 PVC NTP 399.002 m02.13.06 3.13
5,552.461,642.74TUBERIA Ø 1" C-10 PVC NTP 399.002 m02.13.07 3.38
4,221.02983.92TUBERIA Ø 1 1/4" C-10 PVC NTP 399.002 m02.13.08 4.29
13,656.374,613.64TUBERIA Ø 1/2" C-10 PVC NTP 399.002 m02.13.09 2.96
5,073.3013,711.61PRUEBA HIDRÁULICA Y DESINFECCIÓN m02.13.10 0.37
CONEXIONES DOMICILIARIAS AGUA POTABLE (1,967.67 ML)02.14 45,032.69
4,971.512,390.15TRAZO, NIVELES Y REPLANTEO m02.14.01 2.08
13,313.142,390.15EXCAVACION EN TERRENO NATURAL m02.14.02 5.57
2,653.072,390.15REFINE Y NIVELACION DE ZANJAS m02.14.03 1.11
1,768.712,390.15CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m02.14.04 0.74
4,158.862,390.15RELLENO Y COMPACTACION DE ZANJAS MANUAL m02.14.05 1.74
7,074.842,390.15TUBERIA Ø 1/2" C-10 PVC NTP 399.002 m02.14.06 2.96
884.362,390.15PRUEBA HIDRÁULICA Y DESINFECCIÓN m02.14.07 0.37
10,208.2086.00CAJA DE PASO 0.30 x 0.30 und02.14.08 118.70
PASES AEREOS (06 UNIDADES)02.15 35,344.85
PASE AEREO 99.74 M02.15.01 35,344.85
150.6199.74TRAZO Y REPLANTEO PRELIMINAR m202.15.01.01 1.51
2,222.9979.82EXCAVACION MASIVA MANUAL m302.15.01.02 27.85
8,007.38574.83ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.15.01.03 13.93
191.2654.96NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.15.01.04 3.48
16,035.4947.84CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.15.01.05 335.19
476.2818.00ENCOFRADO Y DESENCOFRADO NORMAL m202.15.01.06 26.46
1,315.84311.81ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.15.01.07 4.22
2,220.9030.00CABLE TIPO BOA DE 3/8" m02.15.01.08 74.03
4,724.1030.00PENDOLA DE 1/4" m02.15.01.09 157.47
UNIDAD BASICA DE SANEAMIENTO (UBS) CON BIODIGESTOR (86 unidades)03 464,542.11
TRABAJOS PRELIMINARES03.01 1,560.90
1,560.90567.60TRAZO Y REPLANTEO INICAL m203.01.01 2.75
S10 Página 5
Presupuesto
INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO,
DISTRITO DE AGALLPAMPA- LA LIBERTAD.
1204010Presupuesto
CASERIO DE CUSHPIORCO001Subpresupuesto
MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente
Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA
Precio S/. Parcial S/.Item Descripción Und. Metrado
MOVILIZACION DE EQUIPOS Y HERRAMIENTAS03.02 4,331.50
2,299.3082.56EXCAVACION DE ZANJA PARA CIMIENTOS CORRIDOS m303.02.01 27.85
650.76255.20NIVELACION INTERIOR Y APISONADO PARA PISO m203.02.02 2.55
1,381.4499.17ELIMINACION MANUAL DE MATERIAL EXCEDENTE m303.02.03 13.93
OBRAS DE CONCRETO SIMPLE03.03 46,344.06
19,937.3684.97CIMIENTOS CORRIDOS MEZCLA 1:8+30% PG m303.03.01 234.64
10,444.82394.74ENCOFRADO Y DESENCOFRADO NORMAL m203.03.02 26.46
6,034.4821.09SOBRE CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 25%
PIEDRA MEDIANA
m303.03.03 286.13
9,927.4031.39CONCRETO f'c=140 kg/cm2 EN VEREDAS m303.03.04 316.26
OBRAS DE CONCRETO ARMADO03.04 7,985.75
3,140.27118.68ENCOFRADO Y DESENCOFRADO NORMAL m203.04.01 26.46
2,398.468.64CONCRETO f'c=140 kg/cm2 EN LAVADERO m303.04.02 277.60
2,447.02575.77ACERO fy=4,200 kg/cm2 EN LAVADERO kg03.04.03 4.25
ALBAÑILERIA03.05 69,058.40
69,058.401,166.33MURO DE LADRILLO ASENTADO DE SOGA (CARAVISTA) m203.05.01 59.21
REVOQUES, ENLUCIDOS Y MOLDADURAS03.06 19,264.72
19,264.72712.98TARRAJEO MUROS DE INTERIORES Y EXTERIORES m203.06.01 27.02
PISOS Y PAVIMENTOS03.07 3,674.26
3,674.26189.20PISO DE CEMENTO PULIDO Y BRUÑADO E=4" m203.07.01 19.42
CARPINTERIA DE MADERA03.08 18,573.42
16,581.6686.00PUERTA DE MADERA CONTRAPLACADA 0.60 X 2.00 und03.08.01 192.81
1,991.7686.00MARCO PARA VENTANA 0.90 X 0.30, LISTON DE 1 1/2" x 1 1/2" und03.08.02 23.16
COBERTURAS03.09 29,592.80
3,310.14258.00LISTONES DE MADERA DE 3"X2"X2.40M und03.09.01 12.83
4,802.24344.00CORREAS DE MADERA DE 2"X2"X2.80M und03.09.02 13.96
21,480.42692.47COBERTURA DE PLANCHA FIBRAFORTE 2.44 x 1.10 COLOR m203.09.03 31.02
CERRAJERIA03.10 2,147.42
1,044.90258.00BISAGRA DE 4" x 4" PESADA EN PUERTAS und03.10.01 4.05
555.5686.00CERROJO DE BRONCE MEDIANO und03.10.02 6.46
546.9686.00MANIJA DE BRONCE DE 4" PARA PUERTA pza03.10.03 6.36
INSTALACIONES SANITARIAS03.11 91,590.86
903.00172.00CODO PVC PARA DESAGUE 2" X 90° pza03.11.01 5.25
713.80172.00TEE PVC PARA DESAGUE Ø 2" pza03.11.02 4.15
5,278.6886.00CAJA DE REGISTRO.12" x 24 " DE DESAGUE und03.11.03 61.38
12,951.60344.00SALIDA DE DESAGUE EN PVC pto03.11.04 37.65
2,107.8686.00SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL DE 2" PARA VENTILACION m03.11.05 24.51
5,269.2286.00REGISTRO DE BRONCE 4" und03.11.06 61.27
11,226.44172.00SUMIDERO DE BRONCE 2" SUMINISTRO Y COLOCACION und03.11.07 65.27
10,870.40344.00SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto03.11.08 31.60
6,495.5886.00VALVULA DE COMPUERTA DE BRONCE 1/2" pza03.11.09 75.53
4,518.4486.00SUMINISTRO E INSTALACION DE LLAVE DE DUCHA Y DIFUSOR pza03.11.10 52.54
13,838.2686.00INODORO TANQUE BAJO COLOR BLANCO pza03.11.11 160.91
17,417.5886.00LAVATORIO COLOR BLANCO pza03.11.12 202.53
INSTALACIONES ELECTRICAS03.12 9,117.72
5,763.7286.00SALIDA PARA CENTRO DE LUZ pto03.12.01 67.02
1,818.90258.00TUBERIA PVC 20mm m03.12.02 7.05
1,535.1086.00CAJA DE PASO F°G° 4x4 1.5" und03.12.03 17.85
INSTALACION DE BIODIGESTOR03.13 114,982.05
S10 Página 6
Presupuesto
INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO,
DISTRITO DE AGALLPAMPA- LA LIBERTAD.
1204010Presupuesto
CASERIO DE CUSHPIORCO001Subpresupuesto
MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente
Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA
Precio S/. Parcial S/.Item Descripción Und. Metrado
201.0373.10TRAZO Y REPLANTEO m203.13.01 2.75
3,242.58116.43CORTE MANUAL SUPERFICIAL EN TERRENO NORMAL PARA BIODIGESTOR m303.13.02 27.85
1,946.30139.72ELIMINACION MANUAL DE MATERIAL EXCEDENTE m303.13.03 13.93
919.6133.02EXCAVACION MASIVA PARA CAJA REGISTRO DE LODOS m303.13.04 27.85
2,024.556.04CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m303.13.05 335.19
4,202.20108.36MURO DE LADRILLO ASENTADO DE CANTO m203.13.06 38.78
6,413.0286.00ACCESORIOS CAJA DE LODO und03.13.07 74.57
96,032.7686.00SUMINISTRO E INSTALACION DE BIDIGESTOR DE 600 lts und03.13.08 1,116.66
INSTALACION DE ZANJAS DE PERCOLACION03.14 46,318.25
2,394.56870.75TRAZO Y REPLANTEO m203.14.01 2.75
13,849.74140.35COLOCACION DE MATERIAL DE RELLENO DE ZANJA DE PERCOLACION m303.14.02 98.68
21,225.661,634.00SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" PERFORADOS inc.
Accesorios
m03.14.03 12.99
4,656.61250.76EXCAVACION DE ZANJA PARA TUBERIA PVCSAL Y ZANJA DE PERCOLACION
HASTA Df=0.70m
m303.14.04 18.57
4,191.68300.91ELIMINACION MANUAL DE MATERIAL EXCEDENTE m303.14.05 13.93
TRANSPORTE DE MATERIALES04 149,031.83
47,797.13318,647.50FLETE TERRESTRE DE MATERIALES kg04.01 0.15
67,500.0045.00FLETE TERRESTRE AGREGADOS Y TUBERIA vje04.02 1,500.00
33,734.701.00TRANSPORTE DE MATERIALES EN ACEMILA glb04.03 33,734.70
EDUCACION SANITARIA Y CAPACITACION A LA JASS05 7,664.97
7,664.971.00EDUCACION SANITARIA Y CAPACITACION A LA JASS glb05.01 7,664.97
MITIGACION AMBIENTAL06 11,450.00
11,450.001.00MITIGACION DEL IMPACTO AMBIENTAL glb06.01 11,450.00
COSTO TOTAL 1,034,552.70
GASTOS GENERALES 10% 103,455.27
UTILIDAD 5% 51,727.64
--------------------
SUB TOTAL 1,189,735.61
IGV 18% 214,152.41
-------------------- =============
VALOR REFERENCIAL 1,403,888.02
SUPERVISION 70,194.40
----------------------------- =============
PRESUPUESTO TOTAL 1,474,082.42
SON : UN MILLON CUATROCIENTOS SETENTICUATRO MIL OCHENTIDOS Y 42/100 NUEVOS SOLES

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Presupuesto cliente cushpiorco

  • 1. S10 Página 1 Presupuesto INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO, DISTRITO DE AGALLPAMPA- LA LIBERTAD. 1204010Presupuesto CASERIO DE CUSHPIORCO001Subpresupuesto MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA Precio S/. Parcial S/.Item Descripción Und. Metrado OBRAS PROVISIONALES01 5,378.47 3,500.001.00MOVILIZACION Y DESMOVILIZACION glb01.01 3,500.00 1,343.181.00CASETA DE GUARDIANIA Y ALMACEN und01.02 1,343.18 535.291.00CARTEL DE IDEINTIFICACION DE OBRA DE 3.60 X 2.40 M und01.03 535.29 AGUA POTABLE02 396,485.32 CAPTACION (04 UNIDADES)02.01 10,546.68 38.6325.58TRAZO Y REPLANTEO PRELIMINAR m202.01.01 1.51 506.0318.17EXCAVACION EN TERRENO NATURAL m302.01.02 27.85 317.7422.81ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.01.03 13.93 36.091.73SOLADO DE CONCRETO ch 1:12 m202.01.04 20.86 2,490.467.43CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.01.05 335.19 2,504.1794.64ENCOFRADO Y DESENCOFRADO NORMAL m202.01.06 26.46 616.7220.80TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:4 E=2CM m202.01.07 29.65 869.6242.40TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.01.08 20.51 357.8642.40PINTURA CON ESMALTE m202.01.09 8.44 1,268.568.00TAPAS SANITARIA METALICA und02.01.10 158.57 720.004.00ACCESORIOS PARA CAPTACION glb02.01.11 180.00 820.8060.00CERCO PERIMETRICO CON PUAS PARA CAPTACIONES m02.01.12 13.68 RESERVORIO 9 M3 (1 unid)02.02 8,290.11 16.9411.22TRAZO Y REPLANTEO PRELIMINAR m202.02.01 1.51 187.436.73EXCAVACION EN TERRENO NATURAL m302.02.02 27.85 113.958.18ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.02.03 13.93 39.0511.22NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.02.04 3.48 288.881.12CONCRETO f´c = 100 kg/cm2 m302.02.05 257.93 2,424.736.29CONCRETO f'c=175 kg/cm2 m302.02.06 385.49 1,044.3839.47ENCOFRADO Y DESENCOFRADO NORMAL m202.02.07 26.46 684.15162.12ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.02.08 4.22 200.8211.20JUNTA DE WATER STOP DE 1/4" X 6" m02.02.09 17.93 670.3223.94TARRAJEO CON IMPERMEABILIZANTE EN ESTRUCTURAS HIDRAULICAS m202.02.10 28.00 558.2827.22TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.02.11 20.51 300.7827.22PINTURA EN EXTERIORES DE ESTRUCTURAS m202.02.12 11.05 158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.02.13 158.57 353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO glb02.02.14 353.17 152.731.00DESINFECCION DE RESERVORIO glb02.02.15 152.73 268.820.85CONCRETO f'c=140 kg/cm2 EN VEREDAS PERIMETRAL m302.02.16 316.26 827.1121.40CERCO PERIMETRICO PARA RESERVORIO m02.02.17 38.65 CASETA DE VALVULAS PARA RESERVORIO 9 M302.03 866.79 1.691.12TRAZO Y REPLANTEO PRELIMINAR m202.03.01 1.51 7.800.28EXCAVACION EN TERRENO NATURAL m302.03.02 27.85 6.130.44ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.03.03 13.93 3.901.12NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.03.04 3.48 131.070.34CONCRETO f'c=175 kg/cm2 m302.03.05 385.49 147.655.58ENCOFRADO Y DESENCOFRADO NORMAL m202.03.06 26.46 36.921.80TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.03.07 20.51 19.891.80PINTURA EN EXTERIORES DE ESTRUCTURAS m202.03.08 11.05 158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.03.09 158.57 353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS DE RESERVORIO glb02.03.10 353.17 RESERVORIO 4M3 (1 unid)02.04 4,708.01
  • 2. S10 Página 2 Presupuesto INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO, DISTRITO DE AGALLPAMPA- LA LIBERTAD. 1204010Presupuesto CASERIO DE CUSHPIORCO001Subpresupuesto MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA Precio S/. Parcial S/.Item Descripción Und. Metrado 9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.04.01 1.51 100.263.60EXCAVACION EN TERRENO NATURAL m302.04.02 27.85 61.574.42ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.04.03 13.93 20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.04.04 3.48 154.760.60CONCRETO f´c = 100 kg/cm2 m302.04.05 257.93 1,156.473.00CONCRETO f'c=175 kg/cm2 m302.04.06 385.49 635.8324.03ENCOFRADO Y DESENCOFRADO NORMAL m202.04.07 26.46 403.8595.70ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.04.08 4.22 139.857.80JUNTA DE WATER STOP DE 1/4" X 6" m02.04.09 17.93 405.7214.49TARRAJEO CON IMPERMEABILIZANTE EN ESTRUCTURAS HIDRAULICAS m202.04.10 28.00 331.0316.14TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.04.11 20.51 178.3516.14PINTURA EN EXTERIORES DE ESTRUCTURAS m202.04.12 11.05 158.571.00TAPAS SANITARIA METALICA und02.04.13 158.57 353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO glb02.04.14 353.17 152.731.00DESINFECCION DE RESERVORIO glb02.04.15 152.73 202.410.64CONCRETO f'c=140 kg/cm2 EN VEREDAS m302.04.16 316.26 243.5017.80CERCO PERIMETRICO CON PUAS PARA CAPTACIONES m02.04.17 13.68 CASETA DE VALVULAS PARA RESERVORIO 4 M302.05 866.79 1.691.12TRAZO Y REPLANTEO PRELIMINAR m202.05.01 1.51 3.901.12NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.05.02 3.48 7.800.28EXCAVACION EN TERRENO NATURAL m302.05.03 27.85 6.130.44ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.05.04 13.93 131.070.34CONCRETO f'c=175 kg/cm2 m302.05.05 385.49 147.655.58ENCOFRADO Y DESENCOFRADO NORMAL m202.05.06 26.46 36.921.80TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.05.07 20.51 19.891.80PINTURA EN EXTERIORES DE ESTRUCTURAS m202.05.08 11.05 158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.05.09 158.57 353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS DE RESERVORIO glb02.05.10 353.17 RESERVORIO 3M3 (1 unid)02.06 4,256.26 9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.06.01 1.51 100.263.60EXCAVACION EN TERRENO NATURAL m302.06.02 27.85 61.574.42ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.06.03 13.93 20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.06.04 3.48 154.760.60CONCRETO f´c = 100 kg/cm2 m302.06.05 257.93 1,040.822.70CONCRETO f'c=175 kg/cm2 m302.06.06 385.49 553.2820.91ENCOFRADO Y DESENCOFRADO NORMAL m202.06.07 26.46 248.5258.89ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.06.08 4.22 139.857.80JUNTA DE WATER STOP DE 1/4" X 6" m02.06.09 17.93 364.5613.02TARRAJEO CON IMPERMEABILIZANTE EN ESTRUCTURAS HIDRAULICAS m202.06.10 28.00 297.4014.50TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.06.11 20.51 154.9214.02PINTURA EN EXTERIORES DE ESTRUCTURAS m202.06.12 11.05 158.571.00TAPAS SANITARIA METALICA und02.06.13 158.57 353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO glb02.06.14 353.17 152.731.00DESINFECCION DE RESERVORIO glb02.06.15 152.73 202.410.64CONCRETO f'c=140 kg/cm2 EN VEREDAS m302.06.16 316.26 243.5017.80CERCO PERIMETRICO CON PUAS PARA CAPTACIONES m02.06.17 13.68 CASETA DE VALVULAS PARA RESERVORIO 3 M302.07 866.79 1.691.12TRAZO Y REPLANTEO PRELIMINAR m202.07.01 1.51
  • 3. S10 Página 3 Presupuesto INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO, DISTRITO DE AGALLPAMPA- LA LIBERTAD. 1204010Presupuesto CASERIO DE CUSHPIORCO001Subpresupuesto MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA Precio S/. Parcial S/.Item Descripción Und. Metrado 3.901.12NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.07.02 3.48 7.800.28EXCAVACION EN TERRENO NATURAL m302.07.03 27.85 6.130.44ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.07.04 13.93 131.070.34CONCRETO f'c=175 kg/cm2 m302.07.05 385.49 147.655.58ENCOFRADO Y DESENCOFRADO NORMAL m202.07.06 26.46 36.921.80TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.07.07 20.51 19.891.80PINTURA EN EXTERIORES DE ESTRUCTURAS m202.07.08 11.05 158.571.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.07.09 158.57 353.171.00SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS DE RESERVORIO glb02.07.10 353.17 CAMARA ROMPE PRESION TIPO 7 (25 UNID)02.08 36,285.78 69.8446.25TRAZO Y REPLANTEO PRELIMINAR m202.08.01 1.51 1,094.7839.31EXCAVACION EN TERRENO NATURAL m302.08.02 27.85 658.6147.28ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.08.03 13.93 160.9546.25NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.08.04 3.48 1,194.224.63CONCRETO f´c = 100 kg/cm2 m302.08.05 257.93 8,342.8824.89CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.08.06 335.19 6,277.64237.25ENCOFRADO Y DESENCOFRADO NORMAL m202.08.07 26.46 4,729.351,120.70ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.08.08 4.22 2,312.7078.00TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:4 E=2CM m202.08.09 29.65 2,948.31143.75TARRAJEO EN MUROS EXTERIIORES (MORTERO 1:5) m202.08.10 20.51 1,213.25143.75PINTURA CON ESMALTE m202.08.11 8.44 3,964.2525.00TAPAS SANITARIA METALICA und02.08.12 158.57 3,319.0025.00ACCESORIOS PARA CAMARA ROMPE PRESION glb02.08.13 132.76 VALVULA DE AIRE (24 UNIDADES)02.09 11,411.97 9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.09.01 1.51 133.684.80EXCAVACION EN TERRENO NATURAL m302.09.02 27.85 81.635.86ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.09.03 13.93 20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.09.04 3.48 154.760.60CONCRETO f´c = 100 kg/cm2 m302.09.05 257.93 1,350.824.03CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.09.06 335.19 1,625.7061.44ENCOFRADO Y DESENCOFRADO NORMAL m202.09.07 26.46 3,805.6824.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.09.08 158.57 4,229.7624.00ACCESORIOS VALVULAS DE AIRE und02.09.09 176.24 VALVULA DE PURGA (24 UNIDADES)02.10 9,026.05 9.066.00TRAZO Y REPLANTEO PRELIMINAR m202.10.01 1.51 133.684.80EXCAVACION EN TERRENO NATURAL m302.10.02 27.85 81.635.86ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.10.03 13.93 20.886.00NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.10.04 3.48 154.760.60CONCRETO f´c = 100 kg/cm2 m302.10.05 257.93 1,592.154.75CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.10.06 335.19 2,517.8161.44ENCOFRADO Y DESENCOFRADO m202.10.07 40.98 3,805.6824.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.10.08 158.57 710.4024.00ACCESORIOS VALVULA DE PURGA glb02.10.09 29.60 VALVULA DE CONTROL (17 UNIDADES)02.11 8,257.94 6.424.25TRAZO Y REPLANTEO PRELIMINAR m202.11.01 1.51 94.693.40EXCAVACION EN TERRENO NATURAL m302.11.02 27.85 58.234.18ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.11.03 13.93 14.794.25NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.11.04 3.48
  • 4. S10 Página 4 Presupuesto INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO, DISTRITO DE AGALLPAMPA- LA LIBERTAD. 1204010Presupuesto CASERIO DE CUSHPIORCO001Subpresupuesto MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA Precio S/. Parcial S/.Item Descripción Und. Metrado 110.910.43CONCRETO f´c = 100 kg/cm2 m302.11.05 257.93 1,129.593.37CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.11.06 335.19 1,151.5443.52ENCOFRADO Y DESENCOFRADO NORMAL m202.11.07 26.46 2,695.6917.00TAPA SANITARIA METALICA 0.60 x 0.60 m und02.11.08 158.57 2,996.0817.00ACCESORIOS VALVULAS DE CONTROL glb02.11.09 176.24 LINEA DE CONDUCCION (1126.57 ML)02.12 17,847.76 2,343.271,126.57TRAZO, NIVELES Y REPLANTEO m02.12.01 2.08 6,274.991,126.57EXCAVACION EN TERRENO NATURAL m02.12.02 5.57 1,589.331,431.83REFINE Y NIVELACION DE ZANJAS m02.12.03 1.11 1,059.551,431.83CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m02.12.04 0.74 1,960.231,126.57RELLENO Y COMPACTACION DE ZANJAS MANUAL m02.12.05 1.74 1,022.62302.55TUBERIA Ø 1" C-10 PVC NTP 399.002 m02.12.06 3.38 2,225.48518.76TUBERIA Ø 1 1/4" C-10 PVC NTP 399.002 m02.12.07 4.29 955.46305.26TUBERIA Ø 3/4" C-10 PVC NTP 399.002 m02.12.08 3.13 416.831,126.57PRUEBA HIDRÁULICA Y DESINFECCIÓN m02.12.09 0.37 RED DE DISTRIBUCION (13711.61 ML)02.13 202,876.85 28,520.1513,711.61TRAZO, NIVELES Y REPLANTEO m02.13.01 2.08 76,373.6713,711.61EXCAVACION EN TERRENO NATURAL m02.13.02 5.57 15,219.8913,711.61REFINE Y NIVELACION DE ZANJAS m02.13.03 1.11 10,146.5913,711.61CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m02.13.04 0.74 23,858.2013,711.61RELLENO Y COMPACTACION DE ZANJAS MANUAL m02.13.05 1.74 20,255.206,471.31TUBERIA Ø 3/4" C-10 PVC NTP 399.002 m02.13.06 3.13 5,552.461,642.74TUBERIA Ø 1" C-10 PVC NTP 399.002 m02.13.07 3.38 4,221.02983.92TUBERIA Ø 1 1/4" C-10 PVC NTP 399.002 m02.13.08 4.29 13,656.374,613.64TUBERIA Ø 1/2" C-10 PVC NTP 399.002 m02.13.09 2.96 5,073.3013,711.61PRUEBA HIDRÁULICA Y DESINFECCIÓN m02.13.10 0.37 CONEXIONES DOMICILIARIAS AGUA POTABLE (1,967.67 ML)02.14 45,032.69 4,971.512,390.15TRAZO, NIVELES Y REPLANTEO m02.14.01 2.08 13,313.142,390.15EXCAVACION EN TERRENO NATURAL m02.14.02 5.57 2,653.072,390.15REFINE Y NIVELACION DE ZANJAS m02.14.03 1.11 1,768.712,390.15CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m02.14.04 0.74 4,158.862,390.15RELLENO Y COMPACTACION DE ZANJAS MANUAL m02.14.05 1.74 7,074.842,390.15TUBERIA Ø 1/2" C-10 PVC NTP 399.002 m02.14.06 2.96 884.362,390.15PRUEBA HIDRÁULICA Y DESINFECCIÓN m02.14.07 0.37 10,208.2086.00CAJA DE PASO 0.30 x 0.30 und02.14.08 118.70 PASES AEREOS (06 UNIDADES)02.15 35,344.85 PASE AEREO 99.74 M02.15.01 35,344.85 150.6199.74TRAZO Y REPLANTEO PRELIMINAR m202.15.01.01 1.51 2,222.9979.82EXCAVACION MASIVA MANUAL m302.15.01.02 27.85 8,007.38574.83ELIMINACION MANUAL DE MATERIAL EXCEDENTE m302.15.01.03 13.93 191.2654.96NIVELACION INTERIOR Y APISONADO PARA FALSO PISO m202.15.01.04 3.48 16,035.4947.84CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m302.15.01.05 335.19 476.2818.00ENCOFRADO Y DESENCOFRADO NORMAL m202.15.01.06 26.46 1,315.84311.81ACERO DE REFUERZO fy=4,200 kg/cm2 kg02.15.01.07 4.22 2,220.9030.00CABLE TIPO BOA DE 3/8" m02.15.01.08 74.03 4,724.1030.00PENDOLA DE 1/4" m02.15.01.09 157.47 UNIDAD BASICA DE SANEAMIENTO (UBS) CON BIODIGESTOR (86 unidades)03 464,542.11 TRABAJOS PRELIMINARES03.01 1,560.90 1,560.90567.60TRAZO Y REPLANTEO INICAL m203.01.01 2.75
  • 5. S10 Página 5 Presupuesto INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO, DISTRITO DE AGALLPAMPA- LA LIBERTAD. 1204010Presupuesto CASERIO DE CUSHPIORCO001Subpresupuesto MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA Precio S/. Parcial S/.Item Descripción Und. Metrado MOVILIZACION DE EQUIPOS Y HERRAMIENTAS03.02 4,331.50 2,299.3082.56EXCAVACION DE ZANJA PARA CIMIENTOS CORRIDOS m303.02.01 27.85 650.76255.20NIVELACION INTERIOR Y APISONADO PARA PISO m203.02.02 2.55 1,381.4499.17ELIMINACION MANUAL DE MATERIAL EXCEDENTE m303.02.03 13.93 OBRAS DE CONCRETO SIMPLE03.03 46,344.06 19,937.3684.97CIMIENTOS CORRIDOS MEZCLA 1:8+30% PG m303.03.01 234.64 10,444.82394.74ENCOFRADO Y DESENCOFRADO NORMAL m203.03.02 26.46 6,034.4821.09SOBRE CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 25% PIEDRA MEDIANA m303.03.03 286.13 9,927.4031.39CONCRETO f'c=140 kg/cm2 EN VEREDAS m303.03.04 316.26 OBRAS DE CONCRETO ARMADO03.04 7,985.75 3,140.27118.68ENCOFRADO Y DESENCOFRADO NORMAL m203.04.01 26.46 2,398.468.64CONCRETO f'c=140 kg/cm2 EN LAVADERO m303.04.02 277.60 2,447.02575.77ACERO fy=4,200 kg/cm2 EN LAVADERO kg03.04.03 4.25 ALBAÑILERIA03.05 69,058.40 69,058.401,166.33MURO DE LADRILLO ASENTADO DE SOGA (CARAVISTA) m203.05.01 59.21 REVOQUES, ENLUCIDOS Y MOLDADURAS03.06 19,264.72 19,264.72712.98TARRAJEO MUROS DE INTERIORES Y EXTERIORES m203.06.01 27.02 PISOS Y PAVIMENTOS03.07 3,674.26 3,674.26189.20PISO DE CEMENTO PULIDO Y BRUÑADO E=4" m203.07.01 19.42 CARPINTERIA DE MADERA03.08 18,573.42 16,581.6686.00PUERTA DE MADERA CONTRAPLACADA 0.60 X 2.00 und03.08.01 192.81 1,991.7686.00MARCO PARA VENTANA 0.90 X 0.30, LISTON DE 1 1/2" x 1 1/2" und03.08.02 23.16 COBERTURAS03.09 29,592.80 3,310.14258.00LISTONES DE MADERA DE 3"X2"X2.40M und03.09.01 12.83 4,802.24344.00CORREAS DE MADERA DE 2"X2"X2.80M und03.09.02 13.96 21,480.42692.47COBERTURA DE PLANCHA FIBRAFORTE 2.44 x 1.10 COLOR m203.09.03 31.02 CERRAJERIA03.10 2,147.42 1,044.90258.00BISAGRA DE 4" x 4" PESADA EN PUERTAS und03.10.01 4.05 555.5686.00CERROJO DE BRONCE MEDIANO und03.10.02 6.46 546.9686.00MANIJA DE BRONCE DE 4" PARA PUERTA pza03.10.03 6.36 INSTALACIONES SANITARIAS03.11 91,590.86 903.00172.00CODO PVC PARA DESAGUE 2" X 90° pza03.11.01 5.25 713.80172.00TEE PVC PARA DESAGUE Ø 2" pza03.11.02 4.15 5,278.6886.00CAJA DE REGISTRO.12" x 24 " DE DESAGUE und03.11.03 61.38 12,951.60344.00SALIDA DE DESAGUE EN PVC pto03.11.04 37.65 2,107.8686.00SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL DE 2" PARA VENTILACION m03.11.05 24.51 5,269.2286.00REGISTRO DE BRONCE 4" und03.11.06 61.27 11,226.44172.00SUMIDERO DE BRONCE 2" SUMINISTRO Y COLOCACION und03.11.07 65.27 10,870.40344.00SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto03.11.08 31.60 6,495.5886.00VALVULA DE COMPUERTA DE BRONCE 1/2" pza03.11.09 75.53 4,518.4486.00SUMINISTRO E INSTALACION DE LLAVE DE DUCHA Y DIFUSOR pza03.11.10 52.54 13,838.2686.00INODORO TANQUE BAJO COLOR BLANCO pza03.11.11 160.91 17,417.5886.00LAVATORIO COLOR BLANCO pza03.11.12 202.53 INSTALACIONES ELECTRICAS03.12 9,117.72 5,763.7286.00SALIDA PARA CENTRO DE LUZ pto03.12.01 67.02 1,818.90258.00TUBERIA PVC 20mm m03.12.02 7.05 1,535.1086.00CAJA DE PASO F°G° 4x4 1.5" und03.12.03 17.85 INSTALACION DE BIODIGESTOR03.13 114,982.05
  • 6. S10 Página 6 Presupuesto INSTALACION DEL SERVICIO DE AGUA POTABLE Y DEL SERVICIO SANITARIO DEL CASERIO CUSHPIORCO, DISTRITO DE AGALLPAMPA- LA LIBERTAD. 1204010Presupuesto CASERIO DE CUSHPIORCO001Subpresupuesto MUNICIPALIDAD DISTRITAL DE AGALLPAMPA 25/04/2016Costo alCliente Lugar LA LIBERTAD - OTUZCO - AGALLPAMPA Precio S/. Parcial S/.Item Descripción Und. Metrado 201.0373.10TRAZO Y REPLANTEO m203.13.01 2.75 3,242.58116.43CORTE MANUAL SUPERFICIAL EN TERRENO NORMAL PARA BIODIGESTOR m303.13.02 27.85 1,946.30139.72ELIMINACION MANUAL DE MATERIAL EXCEDENTE m303.13.03 13.93 919.6133.02EXCAVACION MASIVA PARA CAJA REGISTRO DE LODOS m303.13.04 27.85 2,024.556.04CONCRETO f'c=175 kg/cm2 SIN MEZCLADORA m303.13.05 335.19 4,202.20108.36MURO DE LADRILLO ASENTADO DE CANTO m203.13.06 38.78 6,413.0286.00ACCESORIOS CAJA DE LODO und03.13.07 74.57 96,032.7686.00SUMINISTRO E INSTALACION DE BIDIGESTOR DE 600 lts und03.13.08 1,116.66 INSTALACION DE ZANJAS DE PERCOLACION03.14 46,318.25 2,394.56870.75TRAZO Y REPLANTEO m203.14.01 2.75 13,849.74140.35COLOCACION DE MATERIAL DE RELLENO DE ZANJA DE PERCOLACION m303.14.02 98.68 21,225.661,634.00SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" PERFORADOS inc. Accesorios m03.14.03 12.99 4,656.61250.76EXCAVACION DE ZANJA PARA TUBERIA PVCSAL Y ZANJA DE PERCOLACION HASTA Df=0.70m m303.14.04 18.57 4,191.68300.91ELIMINACION MANUAL DE MATERIAL EXCEDENTE m303.14.05 13.93 TRANSPORTE DE MATERIALES04 149,031.83 47,797.13318,647.50FLETE TERRESTRE DE MATERIALES kg04.01 0.15 67,500.0045.00FLETE TERRESTRE AGREGADOS Y TUBERIA vje04.02 1,500.00 33,734.701.00TRANSPORTE DE MATERIALES EN ACEMILA glb04.03 33,734.70 EDUCACION SANITARIA Y CAPACITACION A LA JASS05 7,664.97 7,664.971.00EDUCACION SANITARIA Y CAPACITACION A LA JASS glb05.01 7,664.97 MITIGACION AMBIENTAL06 11,450.00 11,450.001.00MITIGACION DEL IMPACTO AMBIENTAL glb06.01 11,450.00 COSTO TOTAL 1,034,552.70 GASTOS GENERALES 10% 103,455.27 UTILIDAD 5% 51,727.64 -------------------- SUB TOTAL 1,189,735.61 IGV 18% 214,152.41 -------------------- ============= VALOR REFERENCIAL 1,403,888.02 SUPERVISION 70,194.40 ----------------------------- ============= PRESUPUESTO TOTAL 1,474,082.42 SON : UN MILLON CUATROCIENTOS SETENTICUATRO MIL OCHENTIDOS Y 42/100 NUEVOS SOLES