pjbelindo@gmail.com 8/26/10
to Wemeng
Mr. Loy.
When can i have addendum for the volume of work which is exceeded the number stated in my first contract.
Regards.
J.PURBA
PT EIN INDONESIA
john purba <pjbelindo@gmail.com> 8/16/11
to Kartini, Md
Dear, all.
Here's the completion report for you to really finalize the
settlement of PT EIN's payment.
The rest of related documents had been there with you to proceed.
Should you require any information, please feel free to contact me.
Jbp
2 Attachments
john purba <pjbelindo@gmail.com> 7/25/11
to Kartini
Hi, Kartini.
There is slightly change in number on my last summary.
I include here attachment for you to compare with the one you have with you.
Should you inquire further information, please be free to contact me.
Best Regards
J.PURBA
PT EIN LQ-206
PT EIN's PO
john purba <pjbelindo@gmail.com> 7/12/11
to Alan, nigel.womersley, elka.alexandro., mark.morris
Dear all
I wonder, how long would it take for contracting manager to get my PO done.
I need you to assist me to get my PO, for I have reinstatement of
LQ-206 piping works done completely.
Contracting Manager Mr. Mehadi told me to get in touch with him and
been trying to contact and SMS him several times this week, but no
answer at all, so please tell me what i have to do to get my papers
done.
I still have total Dia Inch 20121.83, or SGD 382,314.77 with out PO.
Total Dia Inch 2579.50, or SGD 49,010.50 with PO
Please see attachment!
Regards
J.PURBA
PT EIN LQ-206
john purba <pjbelindo@gmail.com> 6/9/11
to Selva, nigel.womersley, Alan
Hi Selva
Please spare your time to sign my progress ( S.I ) No-7, in order for
me to submit my VOR to get the P.O.
Michel told me yesterday that He has passed it to you.
Your best cooperation on this would be appreciated
Thanks
J. PURBA
PT EIN Project L-206
john purba <pjbelindo@gmail.com> 6/9/11
to elka.alexandro., Alan, nigel.womersley
Dear all.
Please instruct piping section head Mr. Selva to sign my No-7 S.I, in
other for me to submit VOR to get my P.O for piping job at LQ-206
your cooperation on this would be appreciated
Kind regards
J.PURBA
PT. EIN project L-206
PO
Syarial Daud <syarialdaud@yahoo.co.id> 5/17/11
to mehadi, lowryalan, nigel.womersley, me
Dear all.
Refer to the reports given to me by my partner Mr.Yusuf Purba said that PT EIN's PO submitted months ago haven't been signed till today.
In case there is a mistake on our document submitted to you you're welcome to notify us otherwise you may start sign our PO for we need to raise invoice.
Please be cooperated for we have done our duty and you should do yours.
Regards
PT EIN
General Manager
john purba <pjbelindo@gmail.com> 5/2/11
to Selva, nigel.womersley, MD
Hi, Selva.
I need these materials to do reinstatement of potable water system :
a) 1 1/2" x 1 1/4" PVC Red Bushing (sxs) sl sch 80 : 30 pcs
b) 1 1/4" x 1 1/4" PVC Brass Transition fitting (spg x nptf) : 30 pcs
c) 1/2" Coupling CPVC (sxs)-sl sch 80 : 20 pcs
Thank you for your cooperation
PT EIN
J. Purba.
Jbp
Click here to Reply, Reply to all, or Forward
Fitting
pjbelindo@gmail.com 4/21/11
to Selva, Capt, Husen
Hi,
how about the 1/2" cpvc/ pvc coupling for C-D-DECKS, when can we have them?
Due to C-DECK's level had been jacked up, we have to do some re-work on some of the lines that had been
installed.
Request for these materials has long been submitted.
Please follow up, so we can finish our job.
Thanks
PT EIN
J. Purba
Click here to Reply, Reply to all, or Forward
0.31 GB (2%) of 15 GB used
Manage
Terms - Privacy
Last account activity: 1 hour ago
Details
People (3)
nigel.womersley
Acquaintances
Show details
PO
john purba <pjbelindo@gmail.com> 4/14/11
to Alan, Md, mark.morris, MD
Dear all,
I have been asking Mr. Mehadi about my PO, for so many time but he
keeps saying that they're being handled in Singapore.
I include here attachment of submitted VORs:
VOR-3 on Feb,14-2011
VOR-4 on Feb, 29-2011
VOR-5 on April, 12-2011
Yesterday once again I went to see Mr. Mehadi, and he said that my PO
was not approved due to the price, SGD 19 / D.I.
Before I do what DDW-G calls an Additional Job, I took all the
revision drawing to Mr. Selva Kumaran on his first week on DDW-G to
let him count the volume of the additional job and issue the S.I
(site instruction) in other for PT EIN to commence, but he said " you
have to do the job first, and then I will sign the S.I"
To be 100% sure, I emailed Contracting Department to ask whether the
additional had the same price as stated on PT EIN's Contract, SGD, 21
/ D.I (81/GTI/EIN/09-2009).
The answer from contracting department Mr. Tai Qing was positive. "
your additional price will follow the original contract SGD 21 /D.I"
PT EIN then commenced the additional job.
PT EIN's first S.I signed by Mr. Reaz on Nov,18-2010 to get VOR
(variation order requesition), when contracting department started
showing its disagreement to PT EIN's claimed price and bargaining to
decrease from SGD 21 / D.I to SGD 19 / D.I for PVC pipe, but for
Carbon Steel remains the same SGD 21 / D.I.
After a while yesterday, the same dispute submerged again that DDW-G
contracting department still wanted PT EIN to cut more dollars on the
current price, in other to get its P.O signed. I don't know what's
going on within DDW-G's management, but this is absolutely not right,
and PT EIN disagree to lower the current price any longer.
It is April, 2011 now, and I Remember Mr. Alan said that Invoice
submitted from Dec, 5-2010, forward would be paid monthly but so far
within these four months, from two invoices submitted after
Dec,5-2010, ironically only one paid.
This email intended to you all to settle the above mentioned issues
and to reconsider what we have been through participating to execute
your project in good intention and please understand our position as
subcontractor, we have things to pay too.
PT EIN INDONESIA
J. PURBA
Manager
Jbp
3 Attachments

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

email conversation with DDWG Management

  • 1. pjbelindo@gmail.com 8/26/10 to Wemeng Mr. Loy. When can i have addendum for the volume of work which is exceeded the number stated in my first contract. Regards. J.PURBA PT EIN INDONESIA john purba <pjbelindo@gmail.com> 8/16/11 to Kartini, Md Dear, all. Here's the completion report for you to really finalize the settlement of PT EIN's payment. The rest of related documents had been there with you to proceed. Should you require any information, please feel free to contact me. Jbp 2 Attachments john purba <pjbelindo@gmail.com> 7/25/11 to Kartini Hi, Kartini. There is slightly change in number on my last summary. I include here attachment for you to compare with the one you have with you. Should you inquire further information, please be free to contact me. Best Regards J.PURBA PT EIN LQ-206 PT EIN's PO john purba <pjbelindo@gmail.com> 7/12/11 to Alan, nigel.womersley, elka.alexandro., mark.morris Dear all I wonder, how long would it take for contracting manager to get my PO done. I need you to assist me to get my PO, for I have reinstatement of LQ-206 piping works done completely. Contracting Manager Mr. Mehadi told me to get in touch with him and been trying to contact and SMS him several times this week, but no answer at all, so please tell me what i have to do to get my papers done. I still have total Dia Inch 20121.83, or SGD 382,314.77 with out PO. Total Dia Inch 2579.50, or SGD 49,010.50 with PO Please see attachment! Regards
  • 2. J.PURBA PT EIN LQ-206 john purba <pjbelindo@gmail.com> 6/9/11 to Selva, nigel.womersley, Alan Hi Selva Please spare your time to sign my progress ( S.I ) No-7, in order for me to submit my VOR to get the P.O. Michel told me yesterday that He has passed it to you. Your best cooperation on this would be appreciated Thanks J. PURBA PT EIN Project L-206 john purba <pjbelindo@gmail.com> 6/9/11 to elka.alexandro., Alan, nigel.womersley Dear all. Please instruct piping section head Mr. Selva to sign my No-7 S.I, in other for me to submit VOR to get my P.O for piping job at LQ-206 your cooperation on this would be appreciated Kind regards J.PURBA PT. EIN project L-206 PO Syarial Daud <syarialdaud@yahoo.co.id> 5/17/11 to mehadi, lowryalan, nigel.womersley, me Dear all. Refer to the reports given to me by my partner Mr.Yusuf Purba said that PT EIN's PO submitted months ago haven't been signed till today. In case there is a mistake on our document submitted to you you're welcome to notify us otherwise you may start sign our PO for we need to raise invoice. Please be cooperated for we have done our duty and you should do yours. Regards PT EIN General Manager john purba <pjbelindo@gmail.com> 5/2/11
  • 3. to Selva, nigel.womersley, MD Hi, Selva. I need these materials to do reinstatement of potable water system : a) 1 1/2" x 1 1/4" PVC Red Bushing (sxs) sl sch 80 : 30 pcs b) 1 1/4" x 1 1/4" PVC Brass Transition fitting (spg x nptf) : 30 pcs c) 1/2" Coupling CPVC (sxs)-sl sch 80 : 20 pcs Thank you for your cooperation PT EIN J. Purba. Jbp Click here to Reply, Reply to all, or Forward Fitting pjbelindo@gmail.com 4/21/11 to Selva, Capt, Husen Hi, how about the 1/2" cpvc/ pvc coupling for C-D-DECKS, when can we have them? Due to C-DECK's level had been jacked up, we have to do some re-work on some of the lines that had been installed. Request for these materials has long been submitted. Please follow up, so we can finish our job. Thanks PT EIN J. Purba Click here to Reply, Reply to all, or Forward 0.31 GB (2%) of 15 GB used Manage Terms - Privacy Last account activity: 1 hour ago Details People (3) nigel.womersley Acquaintances Show details PO john purba <pjbelindo@gmail.com> 4/14/11 to Alan, Md, mark.morris, MD Dear all, I have been asking Mr. Mehadi about my PO, for so many time but he keeps saying that they're being handled in Singapore. I include here attachment of submitted VORs: VOR-3 on Feb,14-2011 VOR-4 on Feb, 29-2011
  • 4. VOR-5 on April, 12-2011 Yesterday once again I went to see Mr. Mehadi, and he said that my PO was not approved due to the price, SGD 19 / D.I. Before I do what DDW-G calls an Additional Job, I took all the revision drawing to Mr. Selva Kumaran on his first week on DDW-G to let him count the volume of the additional job and issue the S.I (site instruction) in other for PT EIN to commence, but he said " you have to do the job first, and then I will sign the S.I" To be 100% sure, I emailed Contracting Department to ask whether the additional had the same price as stated on PT EIN's Contract, SGD, 21 / D.I (81/GTI/EIN/09-2009). The answer from contracting department Mr. Tai Qing was positive. " your additional price will follow the original contract SGD 21 /D.I" PT EIN then commenced the additional job. PT EIN's first S.I signed by Mr. Reaz on Nov,18-2010 to get VOR (variation order requesition), when contracting department started showing its disagreement to PT EIN's claimed price and bargaining to decrease from SGD 21 / D.I to SGD 19 / D.I for PVC pipe, but for Carbon Steel remains the same SGD 21 / D.I. After a while yesterday, the same dispute submerged again that DDW-G contracting department still wanted PT EIN to cut more dollars on the current price, in other to get its P.O signed. I don't know what's going on within DDW-G's management, but this is absolutely not right, and PT EIN disagree to lower the current price any longer. It is April, 2011 now, and I Remember Mr. Alan said that Invoice submitted from Dec, 5-2010, forward would be paid monthly but so far within these four months, from two invoices submitted after Dec,5-2010, ironically only one paid. This email intended to you all to settle the above mentioned issues and to reconsider what we have been through participating to execute your project in good intention and please understand our position as subcontractor, we have things to pay too. PT EIN INDONESIA J. PURBA Manager Jbp 3 Attachments