Basics of Pro-Active
    Risk Management
for Globalization Projects

  Vanessa Wilburn, PMP®

                             © 2011 IBM Corporation
Agenda


    Identification (breakout                             Planning (breakout
    activity)                                            activity)
    Analysis                                             Classic mistakes
    Prioritization                                       Trend watch




2           Risk Management for Globalization Projects             Vanessa Wilburn   © 2011 IBM Corporation
Identifying Project Risks
    Internal and external risks
     –Internal: Easier to mitigate
       • Requirements that change
       • Errors, omissions, poor estimates, poor communication, or
         misunderstandings
     –External: Hard to control
       • Political changes, market changes

    Ripple effects from a single risk
     –Late delivery, cost overruns, schedule shifts, or
      penalty payments



3        Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
G11N Project Risks

    Unplanned requirements
    Changing requirements
    Resource issues
    Cost overruns
    Acquisitions and mergers
    Vendor schedules


4         Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Name That Risk – Breakout Activity

1. Translation done by vendor done in country?
2. Translation done by vendor done anywhere by
   vendor?
3. Software G11N is done by product development
   team?
4. Software G11N is done by external vendor?



5       Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Risk Analysis Process

1. Identify risks
2. Prioritize risks
    – Qualitative methods determine likelihood and impact
      of risks.
    – Quantitative methods determine effect of risk and
      assign numerical ratings.




6         Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Risk Probability

    Low
    –The event has little chance of occurring.

    Medium
    –The event has some chance of occurring.

    High
    –The event is likely to occur.




7          Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Risk Impact

    Low
    –The event has little potential to disrupt the schedule,
     increase the cost, or degrade performance.

    Medium
    –The event has some potential to disrupt the schedule,
     increase the cost, or degrade performance.

    High
    –The event is likely to seriously disrupt the schedule,
     increase the cost, or degrade performance.

8          Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Risk Severity Matrix
Risk severity is a combination of the probability and the impact
of the risk.

                                                                Impact


                                                 Low            Medium    High
    Probability




                  High                           Medium         High      High
                  Medium                         Medium         High      High
                  Low                            Low            Medium    Medium




9                  Risk Management for Globalization Projects            Vanessa Wilburn   © 2011 IBM Corporation
Planning for Project Risks

     Risk mitigation
      –Determine if a risk event is too high, or if there will be serious
       consequences
      –Explore how to bring the risk into an “acceptable” range or
       avoidance
     Strategies for risks or threats
      –Avoid. Change the plan to eliminate the threat posed by an
        adverse risk, to isolate the project objectives from the risk’s
        impact, or to relax the objective that is in jeopardy, such as
        extending the schedule or reducing scope.
      –Transfer. Shift the negative impact of a threat, along with
        ownership of the response, to a third party. Gives another party
        responsibility; does not eliminate risk.
      –Mitigate. Reduce the probability and/or impact of an adverse
        risk event to an acceptable threshold.
10             Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Strategies for Positive Risks or Opportunities

     Exploit. Ensure that the opportunity is realized.
     Share. Allocate ownership to a third party who is
     best able to capture the opportunity for the benefit
     of the project.
     Enhance. Modifies the “size” of an opportunity by
     increasing probability and/or positive impacts.




11          Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Responding to Risks

     Risk plan as response to risks
     Corrective actions
      –Contingency plans
      –Workarounds for unplanned risks

     Preventative actions
      –Action that reduces the probability of negative
       consequences of risks

     Approved change requests

12           Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Planning Exercise – Breakout Activity




13    Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
G11N Project Risk Example 1

     You’ve been working with one vendor on several
     projects. They are always late in delivering your
     globalized product by as much as 6 weeks.
      –What is the probability and impact (risk severity) they
       will continue this pattern on the next project?
      –What can you do to plan for this occurrence?

     Write down your responses.



14           Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
G11N Project Risk Example 2

     Your G11N vendor has always supplied consistent
     resources – same people – on your projects,
     however, the next project will have new people
     involved.
     –How can you keep this from happening?
     –What can you do to ensure consistent quality with
      potentially new resources involved?

     Write down your responses.


15          Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
G11N Project Risk Example 3

     Your new project will add 6 more locales to your
     product’s existing 5 locales.
      –How do you determine that your vendor can handle this
       new increase demand?
      –What additional steps will you take to ensure delivery of
       these language additions?

     Write down your responses.




16           Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Classic Mistakes




17   Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Process Issues – General

     Lack of communication and understanding of the
     company business direction
     Expectation that budget and cost estimates remain static
     year to year, instead of shrinking due to today’s economic
     reality
     Not verifying the translation in country after it is complete
     or mostly complete
     Delivering too little or too much English text to translation
     company
      – Too much: Pay overtime to meet project schedules
      – Too little: Lose money on fix-priced contracts with translation group; create ill-
        will with translation company because they staffed for larger translation
18              Risk Management for Globalization Projects         Vanessa Wilburn   © 2011 IBM Corporation
Process Issues – Technical Education

     Erroneous perception that translation = multicultural support.
     Some issues are not understood as being software issues.
     Engineering teams frequently have no knowledge of the basic
     G11N requirements.
      –Example: Incorrect assumptions are made: a text string is
       always displayed from left to right.
     Engineering teams might use the wrong software development
     tools.
       –Software development tools might not have G11N capabilities.
       –Team doesn’t know that the G11N tools are available in their
        software development tools.
       –No framework in development environment to manage additional
        languages and new elements such as message catalogs.

19            Risk Management for Globalization Projects   Vanessa Wilburn   © 2011 IBM Corporation
Process Issues – People

     People: Structure of organization leads to conflicts.
      – Functional: Hierarchy is where each employee has one clear supervisor.
      – Projectized: Groups either report directly to the project manager or provide
        support services to the various projects.
      – Matrix: Structure is a blend of functional and projectized characteristics.
     Responsibilities are overlooked and thus are not assigned to an
     owner. Tasks and deliverables end up missing from the project.
     Intermediary (in-country) coordinator does not advise of labor
     disputes with translation vendor.
      – Example: Contract issues with translation vendor are not surfaced back to
        you, the project manager.
      – Example: Intermediary does not inform you that a translator plans to quit
        in the middle of the translation. (Lose consistency in translation when you
        switch to another translator, if a translator is even available).

20             Risk Management for Globalization Projects      Vanessa Wilburn   © 2011 IBM Corporation
Scope Issues

     PM underestimates amount to                             Product relies on other 3rd party
     translate.                                              software that is not globalized.
                                                              – Customer expects all aspects of
     PM overlooks aspects that require                          product to be globalized, not just
     multicultural support or translation                       “base product.”
     (for example, only books need
     translation; the online help gets                       Requirements definition: who wants
     forgotten).                                             what translated for which customer
                                                             and why
     Sizings assumptions are not                              – Team does not fully understand
     exposed.                                                   the requirement.
      – Does the word count include the                       – Ambiguous objectives lead to
        reused text?                                            differing solutions.
      – Does the word count exclude text
        that is in the file but doesn’t                      Team does not know who the
        appear on the screen?                                product is for. And nobody is asking.



21              Risk Management for Globalization Projects                    Vanessa Wilburn   © 2011 IBM Corporation
Schedule Issues

     Not accounting for                                     Delivering too late or too early
     intersections of national                               – Translation companies rely on
                                                               contractors; contractor schedules
     holidays and hard dates
                                                               are tightly controlled.
      – Where translation occurs, for
                                                             – Too early: You pay for contractors
        example Asian New Year
                                                               even though they have nothing to
      – Where English-language product
                                                               translate.
        is developed and managed
                                                             – Too late: Contractors no longer
     Not allowing enough time to                               available.
     correct mistakes from G11N
     testing
      – Translated product GUI labels
        won’t fit.
      – Product mishandles dates.


22             Risk Management for Globalization Projects                   Vanessa Wilburn   © 2011 IBM Corporation
Content-Specific Issues

     Terminology management                                   Help system not enabled for other
      – Lack of term management early or                      locales, such as right-to-left
        ever                                                  languages or searches with non-
      – Decentralized teams using multiple
        terms or product names for one thing                  English character sets
     Too small estimates for word                             Community-created content, such
     counts                                                   as comments
      – Writers’ inexperience with estimation                  – No translation or MT is insufficient
      – Scope creep                                            – Culturally-appropriate content
      – Lack of checkpoints to refine original                   nonexistent/inaccurate (users’
        estimates                                                expectation for a richer local site than
                                                                 “main” site)
     Tooling problems, such as:
      – Mismatches between authors’                           Collaboration translation (aka
        software version and translators’                     crowd sourcing)
        version                                                – Low quality due to poor language skills
      – Complex build/transform environments                     or technical knowledge
        for DITA > HTML                                        – Lack of translators interested in
                                                                 participating
     Insufficient time allotted for
     translation of screen captures                           Name yours!
     (time-consuming)
23               Risk Management for Globalization Projects                     Vanessa Wilburn   © 2011 IBM Corporation
Trend Watch, a Few Examples

     Social
      – ☺ Community-created content already translated and culturally appropriate!
      – Large volumes of content, faster translation times needed
     Mobile
      –     New technologies and delivery processes to learn, scope creep (we’re
          doing mobile now?!)
     Emerging markets
      – ☺ G11N organizations: growth area
      – New translators for potentially unusual markets, no translation memory for
        new language
     Today’s business reality: No resources, no budget, no time
     Improved machine translation
      – ☺ Machine translation starting to rival human translated information
      – Corollary to previous bullet: bean counters consider MT “good enough”

24                Risk Management for Globalization Projects    Vanessa Wilburn   © 2011 IBM Corporation
Thanks!

Vanessa Wilburn is a certified Project Management Professional (PMP) and senior
STC member with 16 years of technical communication and project management
experience. She has been a project lead, architect, editor, and writer on several
IBM products in the Software Group.

As part of a Localization Certification program, she teaches an online course,
Localization: Introduction to Project Management, at Austin Community College.
Previously, she was part of the marketing team, the developer/webmaster of the
company's Web site, writer, and instructional designer.




http://www.linkedin.com/pub/vanessa-wilburn/0/417/915



25           Risk Management for Globalization Projects     Vanessa Wilburn   © 2011 IBM Corporation

More Related Content

What's hot

P&msp2010 07 risk-and-change-management
P&msp2010 07 risk-and-change-managementP&msp2010 07 risk-and-change-management
P&msp2010 07 risk-and-change-managementEmanuele Della Valle
 
Hyatt.mark
Hyatt.markHyatt.mark
Hyatt.markNASAPMC
 
Risk management and IT technologies
Risk management and IT technologiesRisk management and IT technologies
Risk management and IT technologiesHadi Fadlallah
 
Michael.bay
Michael.bayMichael.bay
Michael.bayNASAPMC
 
Applying risk radar (v2)
Applying risk radar (v2)Applying risk radar (v2)
Applying risk radar (v2)Glen Alleman
 
Quantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalationQuantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalationKarl Davey
 
Probabilistic Cost, Schedule, and Risk management
Probabilistic Cost, Schedule, and Risk managementProbabilistic Cost, Schedule, and Risk management
Probabilistic Cost, Schedule, and Risk managementGlen Alleman
 
Sameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk managementSameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk managementSameer Mitter
 
Microsoft Power Point Simon Final
Microsoft Power Point   Simon FinalMicrosoft Power Point   Simon Final
Microsoft Power Point Simon Finalguesta09d518
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Increasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk ManagementIncreasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk ManagementGlen Alleman
 
Canga.m.wood.j
Canga.m.wood.jCanga.m.wood.j
Canga.m.wood.jNASAPMC
 
Software Engineering Risk Management Software Application
Software Engineering Risk Management   Software ApplicationSoftware Engineering Risk Management   Software Application
Software Engineering Risk Management Software Applicationguestfea9c55
 
Iwsm2014 defining technical risk in software development (vard antinyan)
Iwsm2014   defining technical risk in software development (vard antinyan)Iwsm2014   defining technical risk in software development (vard antinyan)
Iwsm2014 defining technical risk in software development (vard antinyan)Nesma
 
Liberty university busi 313 quiz 3 complete solutions correct answers slideshare
Liberty university busi 313 quiz 3 complete solutions correct answers slideshareLiberty university busi 313 quiz 3 complete solutions correct answers slideshare
Liberty university busi 313 quiz 3 complete solutions correct answers slideshareSong Love
 
Options based decisions processes
Options based decisions processesOptions based decisions processes
Options based decisions processesGlen Alleman
 
Managing Risk in Agile Development: It Isn’t Magic
Managing Risk in Agile Development: It Isn’t MagicManaging Risk in Agile Development: It Isn’t Magic
Managing Risk in Agile Development: It Isn’t MagicTechWell
 

What's hot (20)

P&msp2010 07 risk-and-change-management
P&msp2010 07 risk-and-change-managementP&msp2010 07 risk-and-change-management
P&msp2010 07 risk-and-change-management
 
Hyatt.mark
Hyatt.markHyatt.mark
Hyatt.mark
 
Risk management and IT technologies
Risk management and IT technologiesRisk management and IT technologies
Risk management and IT technologies
 
Michael.bay
Michael.bayMichael.bay
Michael.bay
 
Applying risk radar (v2)
Applying risk radar (v2)Applying risk radar (v2)
Applying risk radar (v2)
 
Quantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalationQuantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalation
 
Probabilistic Cost, Schedule, and Risk management
Probabilistic Cost, Schedule, and Risk managementProbabilistic Cost, Schedule, and Risk management
Probabilistic Cost, Schedule, and Risk management
 
Sameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk managementSameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk management
 
Microsoft Power Point Simon Final
Microsoft Power Point   Simon FinalMicrosoft Power Point   Simon Final
Microsoft Power Point Simon Final
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Increasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk ManagementIncreasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk Management
 
Canga.m.wood.j
Canga.m.wood.jCanga.m.wood.j
Canga.m.wood.j
 
Software Engineering Risk Management Software Application
Software Engineering Risk Management   Software ApplicationSoftware Engineering Risk Management   Software Application
Software Engineering Risk Management Software Application
 
Iwsm2014 defining technical risk in software development (vard antinyan)
Iwsm2014   defining technical risk in software development (vard antinyan)Iwsm2014   defining technical risk in software development (vard antinyan)
Iwsm2014 defining technical risk in software development (vard antinyan)
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
7 deadly sins of project management
7 deadly sins of project management7 deadly sins of project management
7 deadly sins of project management
 
Liberty university busi 313 quiz 3 complete solutions correct answers slideshare
Liberty university busi 313 quiz 3 complete solutions correct answers slideshareLiberty university busi 313 quiz 3 complete solutions correct answers slideshare
Liberty university busi 313 quiz 3 complete solutions correct answers slideshare
 
Options based decisions processes
Options based decisions processesOptions based decisions processes
Options based decisions processes
 
Effective Risk Mgmt Kylucas (C) 2009 All Rights Reserved
Effective Risk Mgmt Kylucas (C) 2009 All Rights ReservedEffective Risk Mgmt Kylucas (C) 2009 All Rights Reserved
Effective Risk Mgmt Kylucas (C) 2009 All Rights Reserved
 
Managing Risk in Agile Development: It Isn’t Magic
Managing Risk in Agile Development: It Isn’t MagicManaging Risk in Agile Development: It Isn’t Magic
Managing Risk in Agile Development: It Isn’t Magic
 

Similar to Risk Management Basics for Globalization Projects

Webinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and EffectivenessWebinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and EffectivenessInvensis Learning
 
Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011Sasha Lazarevic
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptxKamranKhan353531
 
PMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.pptPMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.pptDorraLamouchi1
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.pptavisha23
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.pptAyidAlmgati
 
Risk Analysis Workbook
Risk Analysis WorkbookRisk Analysis Workbook
Risk Analysis Workbookdmdk12
 
project_risk_mgmt_final 1.ppt
project_risk_mgmt_final 1.pptproject_risk_mgmt_final 1.ppt
project_risk_mgmt_final 1.pptBetshaTizazu2
 
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxRethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxInflectra
 
Agile-Risk-Management in Project Management
Agile-Risk-Management in Project ManagementAgile-Risk-Management in Project Management
Agile-Risk-Management in Project ManagementNajmul Hussain
 
Software risk analysis and management
Software risk analysis and managementSoftware risk analysis and management
Software risk analysis and managementONE BCG
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Managementcgautam
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk ManagementKelvin Fredson
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementNimat Khattak
 
Risk Management Presentation.pptx
Risk Management Presentation.pptxRisk Management Presentation.pptx
Risk Management Presentation.pptxPMIUKChapter
 

Similar to Risk Management Basics for Globalization Projects (20)

Webinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and EffectivenessWebinar - Building Team Efficiency and Effectiveness
Webinar - Building Team Efficiency and Effectiveness
 
Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
 
PMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.pptPMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.ppt
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.ppt
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.ppt
 
Risk Analysis Workbook
Risk Analysis WorkbookRisk Analysis Workbook
Risk Analysis Workbook
 
Risk guideline
Risk guidelineRisk guideline
Risk guideline
 
project_risk_mgmt_final 1.ppt
project_risk_mgmt_final 1.pptproject_risk_mgmt_final 1.ppt
project_risk_mgmt_final 1.ppt
 
Procept Risk Workshop 2007
Procept Risk Workshop 2007Procept Risk Workshop 2007
Procept Risk Workshop 2007
 
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxRethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
 
Agile-Risk-Management in Project Management
Agile-Risk-Management in Project ManagementAgile-Risk-Management in Project Management
Agile-Risk-Management in Project Management
 
Software risk analysis and management
Software risk analysis and managementSoftware risk analysis and management
Software risk analysis and management
 
Unit 7 risk
Unit 7 riskUnit 7 risk
Unit 7 risk
 
A Framework for Managing Project Risk
A Framework for Managing Project RiskA Framework for Managing Project Risk
A Framework for Managing Project Risk
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Risk Management Presentation.pptx
Risk Management Presentation.pptxRisk Management Presentation.pptx
Risk Management Presentation.pptx
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 

Recently uploaded

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 

Recently uploaded (20)

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Risk Management Basics for Globalization Projects

  • 1. Basics of Pro-Active Risk Management for Globalization Projects Vanessa Wilburn, PMP® © 2011 IBM Corporation
  • 2. Agenda Identification (breakout Planning (breakout activity) activity) Analysis Classic mistakes Prioritization Trend watch 2 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 3. Identifying Project Risks Internal and external risks –Internal: Easier to mitigate • Requirements that change • Errors, omissions, poor estimates, poor communication, or misunderstandings –External: Hard to control • Political changes, market changes Ripple effects from a single risk –Late delivery, cost overruns, schedule shifts, or penalty payments 3 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 4. G11N Project Risks Unplanned requirements Changing requirements Resource issues Cost overruns Acquisitions and mergers Vendor schedules 4 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 5. Name That Risk – Breakout Activity 1. Translation done by vendor done in country? 2. Translation done by vendor done anywhere by vendor? 3. Software G11N is done by product development team? 4. Software G11N is done by external vendor? 5 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 6. Risk Analysis Process 1. Identify risks 2. Prioritize risks – Qualitative methods determine likelihood and impact of risks. – Quantitative methods determine effect of risk and assign numerical ratings. 6 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 7. Risk Probability Low –The event has little chance of occurring. Medium –The event has some chance of occurring. High –The event is likely to occur. 7 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 8. Risk Impact Low –The event has little potential to disrupt the schedule, increase the cost, or degrade performance. Medium –The event has some potential to disrupt the schedule, increase the cost, or degrade performance. High –The event is likely to seriously disrupt the schedule, increase the cost, or degrade performance. 8 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 9. Risk Severity Matrix Risk severity is a combination of the probability and the impact of the risk. Impact Low Medium High Probability High Medium High High Medium Medium High High Low Low Medium Medium 9 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 10. Planning for Project Risks Risk mitigation –Determine if a risk event is too high, or if there will be serious consequences –Explore how to bring the risk into an “acceptable” range or avoidance Strategies for risks or threats –Avoid. Change the plan to eliminate the threat posed by an adverse risk, to isolate the project objectives from the risk’s impact, or to relax the objective that is in jeopardy, such as extending the schedule or reducing scope. –Transfer. Shift the negative impact of a threat, along with ownership of the response, to a third party. Gives another party responsibility; does not eliminate risk. –Mitigate. Reduce the probability and/or impact of an adverse risk event to an acceptable threshold. 10 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 11. Strategies for Positive Risks or Opportunities Exploit. Ensure that the opportunity is realized. Share. Allocate ownership to a third party who is best able to capture the opportunity for the benefit of the project. Enhance. Modifies the “size” of an opportunity by increasing probability and/or positive impacts. 11 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 12. Responding to Risks Risk plan as response to risks Corrective actions –Contingency plans –Workarounds for unplanned risks Preventative actions –Action that reduces the probability of negative consequences of risks Approved change requests 12 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 13. Planning Exercise – Breakout Activity 13 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 14. G11N Project Risk Example 1 You’ve been working with one vendor on several projects. They are always late in delivering your globalized product by as much as 6 weeks. –What is the probability and impact (risk severity) they will continue this pattern on the next project? –What can you do to plan for this occurrence? Write down your responses. 14 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 15. G11N Project Risk Example 2 Your G11N vendor has always supplied consistent resources – same people – on your projects, however, the next project will have new people involved. –How can you keep this from happening? –What can you do to ensure consistent quality with potentially new resources involved? Write down your responses. 15 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 16. G11N Project Risk Example 3 Your new project will add 6 more locales to your product’s existing 5 locales. –How do you determine that your vendor can handle this new increase demand? –What additional steps will you take to ensure delivery of these language additions? Write down your responses. 16 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 17. Classic Mistakes 17 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 18. Process Issues – General Lack of communication and understanding of the company business direction Expectation that budget and cost estimates remain static year to year, instead of shrinking due to today’s economic reality Not verifying the translation in country after it is complete or mostly complete Delivering too little or too much English text to translation company – Too much: Pay overtime to meet project schedules – Too little: Lose money on fix-priced contracts with translation group; create ill- will with translation company because they staffed for larger translation 18 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 19. Process Issues – Technical Education Erroneous perception that translation = multicultural support. Some issues are not understood as being software issues. Engineering teams frequently have no knowledge of the basic G11N requirements. –Example: Incorrect assumptions are made: a text string is always displayed from left to right. Engineering teams might use the wrong software development tools. –Software development tools might not have G11N capabilities. –Team doesn’t know that the G11N tools are available in their software development tools. –No framework in development environment to manage additional languages and new elements such as message catalogs. 19 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 20. Process Issues – People People: Structure of organization leads to conflicts. – Functional: Hierarchy is where each employee has one clear supervisor. – Projectized: Groups either report directly to the project manager or provide support services to the various projects. – Matrix: Structure is a blend of functional and projectized characteristics. Responsibilities are overlooked and thus are not assigned to an owner. Tasks and deliverables end up missing from the project. Intermediary (in-country) coordinator does not advise of labor disputes with translation vendor. – Example: Contract issues with translation vendor are not surfaced back to you, the project manager. – Example: Intermediary does not inform you that a translator plans to quit in the middle of the translation. (Lose consistency in translation when you switch to another translator, if a translator is even available). 20 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 21. Scope Issues PM underestimates amount to Product relies on other 3rd party translate. software that is not globalized. – Customer expects all aspects of PM overlooks aspects that require product to be globalized, not just multicultural support or translation “base product.” (for example, only books need translation; the online help gets Requirements definition: who wants forgotten). what translated for which customer and why Sizings assumptions are not – Team does not fully understand exposed. the requirement. – Does the word count include the – Ambiguous objectives lead to reused text? differing solutions. – Does the word count exclude text that is in the file but doesn’t Team does not know who the appear on the screen? product is for. And nobody is asking. 21 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 22. Schedule Issues Not accounting for Delivering too late or too early intersections of national – Translation companies rely on contractors; contractor schedules holidays and hard dates are tightly controlled. – Where translation occurs, for – Too early: You pay for contractors example Asian New Year even though they have nothing to – Where English-language product translate. is developed and managed – Too late: Contractors no longer Not allowing enough time to available. correct mistakes from G11N testing – Translated product GUI labels won’t fit. – Product mishandles dates. 22 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 23. Content-Specific Issues Terminology management Help system not enabled for other – Lack of term management early or locales, such as right-to-left ever languages or searches with non- – Decentralized teams using multiple terms or product names for one thing English character sets Too small estimates for word Community-created content, such counts as comments – Writers’ inexperience with estimation – No translation or MT is insufficient – Scope creep – Culturally-appropriate content – Lack of checkpoints to refine original nonexistent/inaccurate (users’ estimates expectation for a richer local site than “main” site) Tooling problems, such as: – Mismatches between authors’ Collaboration translation (aka software version and translators’ crowd sourcing) version – Low quality due to poor language skills – Complex build/transform environments or technical knowledge for DITA > HTML – Lack of translators interested in participating Insufficient time allotted for translation of screen captures Name yours! (time-consuming) 23 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 24. Trend Watch, a Few Examples Social – ☺ Community-created content already translated and culturally appropriate! – Large volumes of content, faster translation times needed Mobile – New technologies and delivery processes to learn, scope creep (we’re doing mobile now?!) Emerging markets – ☺ G11N organizations: growth area – New translators for potentially unusual markets, no translation memory for new language Today’s business reality: No resources, no budget, no time Improved machine translation – ☺ Machine translation starting to rival human translated information – Corollary to previous bullet: bean counters consider MT “good enough” 24 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation
  • 25. Thanks! Vanessa Wilburn is a certified Project Management Professional (PMP) and senior STC member with 16 years of technical communication and project management experience. She has been a project lead, architect, editor, and writer on several IBM products in the Software Group. As part of a Localization Certification program, she teaches an online course, Localization: Introduction to Project Management, at Austin Community College. Previously, she was part of the marketing team, the developer/webmaster of the company's Web site, writer, and instructional designer. http://www.linkedin.com/pub/vanessa-wilburn/0/417/915 25 Risk Management for Globalization Projects Vanessa Wilburn © 2011 IBM Corporation