FY2014 Utility Rates
Department of Public Works
Water and Sewer Divisions
WATER
EXPENDITURES
• Personnel
• Expenses
• Capital Outlay
• Indirect Costs
• Debt Service
FY2014 Water Budget
Personnel
21%
Expenses
21%
Capital Outlay
13%
Indirect Costs
10%
Debt Service
35%
Personnel
Expenses
Capital Outlay
Indirect Costs
Debt Service
FY2014 Staffing Levels
Non union management staff:
• .40 DPW Director – 1.00 position
• Water Superintendent – 1.00 position
• Administrative Assistant – 1.00 position
SEIU Local 888 (DPW Unit) staff:
• Working Foreman Grade 2 License – 1.00 position
• Maintenance Man/Operator – 3.00 positions
• Maintenance Man – 1.00 position
Water Indirect Costs
-
50,000
100,000
150,000
200,000
250,000
300,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Fiscal Year
Dollars
Water Debt Service
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Fiscal Year
Dollars
WATER REVENUES
• User Charges
• Betterments
• Water Liens
• Connection Fees
• Other Departmental Revenue
FY2014 Water Rate Calculation
FY2013 Rate = $45.97 per thousand cubic feet
FY2014 Proposed Budget + Indirect Costs $2,440,422
Less FY2014 Estimated Revenues:
Betterments 137,523
Water Liens 205,830
Connection Fees 23,783
Other Departmental Revenue 22,624 $ 389,760
Revenue Required From User Charges $2,050,662
FY2013 Total Water Consumption 44,139.21 thousand cubic feet
2,050,662/44,139.21 = 46.4589
46.4589/45.97 = 1.0106 = 1%
$45.97 x 1.01 = $46.43 per thousand cubic feet
Water Budget Analysis
1% rate increase
Proposed Budget
Personnel 509,754
Expenses 522,665
Capital Outlay 316,000
Debt Service 843,144
Total 2,191,563
Average single family bill would
increase from $101.13 to $102.14 per
quarter/$4.05 annually
Estimated Revenues
User Charges 2,049,370
Betterments 137,523
Water Liens 205,830
Connection Fees 23,783
Other Department Revenue 22,624
Subtotal 2,448,300
Less: Indirect Costs 248,859
Total 2,199,441
SEWER
EXPENDITURES
• Personnel
• Expenses
• Capital Outlay
• Indirect Costs
• Debt Service
FY2014 Sewer Budget
Personnel
22%
Expenses
34%
Capital Outlay
0%
Indirect Costs
10%
Debt Service
34%
Personnel
Expenses
Capital Outlay
Indirect Costs
Debt Service
FY2014 Staffing Levels
Non union management staff:
• .40 DPW Director – 1.00 position
• Sewer Superintendent – 1.00 position
• Chief of Maintenance – 1.00 position
• Chief Chemist – 1.00 position
• Administrative Assistant – 1.00 position
SEIU Local 888 (DPW Unit) staff:
• Senior Operator – 2.00 positions
• Grade 6 Operator – 1.00 position
• Maintenance – 2.00 positions
• Maintenance Mechanic – 2.00 positions
• Lab Tech – 1.00 position
• Chemist – 1.00 position
Sewer Indirect Costs
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Fiscal Year
Dollars
Sewer Debt Service
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
2,000,000
2,200,000
2,400,000
2,600,000
2,800,000
3,000,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Fiscal Year
Dollars
SEWER REVENUES
• User Charges
• Betterments
• Sewer Liens
• Connection Fees
• Dudley Operating Costs
• Dudley Debt Reimbursement
• Other Departmental Revenue
Town of Dudley
Debt Reimbursement
The Town of Dudley reimburses the Town of Webster for 17% of the annual
principal and interest payments relative to the following capital projects:
• WWTF Planning Project
FY2014 Debt = $138,743.76 @ 17% = $23,586.44
• WWTF Phase I Improvements Project
FY2014 Debt = $556,152.12 @ 17% = $93,209.62 (includes $1,336.24
credit for FY2013 overpayment)
• WWTF Phase II Improvements Project
FY2014 Debt = $230,811.99 @ 17% = $39,238.03
FY2014 Sewer Rate Calculation
No Debt Shift
FY2013 Rate = $72.87 per thousand cubic feet
FY2014 Proposed Budget + Indirect Costs $4,819,408
Less FY2014 Estimated Revenues:
Betterments 301,795
Sewer Liens 350,211
Connection Fees 36,000
Dudley Operating Costs 462,000
Dudley Debt Reimbursement 156,034
Other Departmental Revenue 104,761
Transfer from Retained Earnings 0 $1,410,801
Revenue Required From User Charges $3,408,607
FY2013 Total Water Consumption 44,139.21
FY2013 2nd
Meter Consumption 3.60
Total Sewer Consumption 44,135.61 thousand cubic feet
3,408,607/44,135.61 = 77.2303
77.2303/72.87 = 1.0598 = 6%
$72.87 x 1.06 = $77.24 per thousand cubic feet
Sewer Budget Analysis
6% rate increase from $72.87 to $77.24
Proposed Budget
Personnel 1,083,251
Expenses 1,627,800
Capital Outlay 0
Debt Service 1,647,145
Total 4,358,196
Average single family bill would
increase from $160.31 to $169.93
per quarter/$38.48 annually
Estimated Revenues
User Charges 3,409,132
Betterments 301,795
Sewer Liens 350,211
Connection Fees 36,000
Dudley Operating Costs 462,000
Dudley Debt Reimbursement 156,034
Other Department Revenue 104,761
Transfer from Retained Earnings 0
Subtotal 4,819,933
Less: Indirect Costs 461,212
Total 4,358,721
FY2014 Sewer Rate Calculation
$100,000 Debt Shift
FY2013 Rate = $72.87 per thousand cubic feet
FY2014 Proposed Budget + Indirect Costs $4,819,408
Less FY2014 Estimated Revenues:
Betterments 301,795
Sewer Liens 350,211
Connection Fees 36,000
Dudley Operating Costs 462,000
Dudley Debt Reimbursement 156,034
Other Departmental Revenue 104,761
Transfer from Retained Earnings 0
Transfer from General Fund 100,000 $1,510,801
Revenue Required From User Charges $3,308,607
FY2013 Total Water Consumption 44,139.21
FY2013 2nd
Meter Consumption 3.60
Total Sewer Consumption 44,135.61 thousand cubic feet
3,308,607/44,135.61 = 74.9645
74.9645/72.87 = 1.0287 = 3%
$72.87 x 1.0 = $75.06 per thousand cubic feet
Sewer Budget Analysis
3% rate increase from $72.87 to $75.06
Proposed Budget
Personnel 1,083,251
Expenses 1,627,800
Capital Outlay 0
Debt Service 1,647,145
Total 4,358,196
Average single family bill would
increase from $160.31 to $165.12
per quarter/$19.24 annually
Estimated Revenues
User Charges 3,312,647
Betterments 301,795
Sewer Liens 350,211
Connection Fees 36,000
Dudley Operating Costs 462,000
Dudley Debt Reimbursement 156,034
Other Departmental Revenue 104,761
Transfer from Retained Earnings 0
Transfer from General Fund 100,000
Subtotal 4,819,948
Less: Indirect Costs 461,212
Total 4,358,736
FY2014 Sewer Rate Calculation
$200,000 Debt Shift
FY2013 Rate = $72.87 per thousand cubic feet
FY2014 Proposed Budget + Indirect Costs $4,819,408
Less FY2014 Estimated Revenues:
Betterments 301,795
Sewer Liens 350,211
Connection Fees 36,000
Dudley Operating Costs 462,000
Dudley Debt Reimbursement 156,034
Other Departmental Revenue 104,761
Transfer from Retained Earnings 0
Transfer from General Fund 200,000 $1,610,801
Revenue Required From User Charges $3,208,607
FY2013 Total Water Consumption 44,139.21
FY2013 2nd
Meter Consumption 3.60
Total Sewer Consumption 44,135.61 thousand cubic feet
3,208,607/44,135.61 = 72.6988
72.6988/72.87 = .9976 = 0%
$72.87 x 1.00 = $72.87 per thousand cubic feet
Sewer Budget Analysis
0% rate increase
Proposed Budget
Personnel 1,083,251
Expenses 1,627,800
Capital Outlay 0
Debt Service 1,647,145
Total 4,358,196
Average single family bill would
remain $160.31 per quarter
Estimated Revenues
User Charges 3,216,162
Betterments 301,795
Sewer Liens 350,211
Connection Fees 36,000
Dudley Operating Costs 462,000
Dudley Debt Reimbursement 156,034
Other Departmental Revenue 104,761
Transfer from Retained Earnings 0
Transfer from General Fund 200,000
Subtotal 4,826,963
Less: Indirect Costs 461,212
Total 4,365,751
Thank you for your attention!

More Related Content

Similar to Fy2014 utility rates power point

2014 Proposed Budget
2014 Proposed Budget 2014 Proposed Budget
2014 Proposed Budget HRCA
 
2014 proposed budget options 2013-11-08 web version
2014 proposed budget   options 2013-11-08 web version2014 proposed budget   options 2013-11-08 web version
2014 proposed budget options 2013-11-08 web versionAmanda Arnce
 
Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyVictoriaColangelo
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
 
Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...
Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...
Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...Nat Rojanasathira
 
MiPCT Webinar 05/02/2012
MiPCT Webinar 05/02/2012MiPCT Webinar 05/02/2012
MiPCT Webinar 05/02/2012mednetone
 
Public outreach program overview city financial situation update for publi...
Public outreach program overview  city financial situation   update for publi...Public outreach program overview  city financial situation   update for publi...
Public outreach program overview city financial situation update for publi...TForsythe322
 
MiPCT Webinar 09/19/2012
MiPCT Webinar 09/19/2012MiPCT Webinar 09/19/2012
MiPCT Webinar 09/19/2012mednetone
 
Library borad 4 1-13
Library borad 4 1-13Library borad 4 1-13
Library borad 4 1-13Mike Dargan
 
Budgets-2015
Budgets-2015Budgets-2015
Budgets-2015AFRINIC
 
Fy 2015 16 proposed budget presentation
Fy 2015 16 proposed budget presentationFy 2015 16 proposed budget presentation
Fy 2015 16 proposed budget presentationRishi Kumar
 
Fy 2014 proposed budget presentation 10.21.13 v5
Fy 2014 proposed budget presentation 10.21.13 v5Fy 2014 proposed budget presentation 10.21.13 v5
Fy 2014 proposed budget presentation 10.21.13 v5cityofevanston
 
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions ManualFinancial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manualtuqykogod
 
Battle Ground Public Schools Levy Presentation February 25, 2013
Battle Ground Public Schools Levy Presentation February 25, 2013Battle Ground Public Schools Levy Presentation February 25, 2013
Battle Ground Public Schools Levy Presentation February 25, 2013scottmcd
 

Similar to Fy2014 utility rates power point (20)

2014 Proposed Budget
2014 Proposed Budget 2014 Proposed Budget
2014 Proposed Budget
 
2014 proposed budget options 2013-11-08 web version
2014 proposed budget   options 2013-11-08 web version2014 proposed budget   options 2013-11-08 web version
2014 proposed budget options 2013-11-08 web version
 
Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate Study
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation
 
FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)
 
Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...
Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...
Overview of the Town of Danville Proposed 2015/16 Operating Budget & Capita...
 
Shakopee 2016 Budget Presentation
Shakopee 2016 Budget PresentationShakopee 2016 Budget Presentation
Shakopee 2016 Budget Presentation
 
MiPCT Webinar 05/02/2012
MiPCT Webinar 05/02/2012MiPCT Webinar 05/02/2012
MiPCT Webinar 05/02/2012
 
Public outreach program overview city financial situation update for publi...
Public outreach program overview  city financial situation   update for publi...Public outreach program overview  city financial situation   update for publi...
Public outreach program overview city financial situation update for publi...
 
170724 Budget Workshop 1
170724 Budget Workshop 1170724 Budget Workshop 1
170724 Budget Workshop 1
 
FY18 Budget Workshop Day 1
FY18 Budget Workshop Day 1FY18 Budget Workshop Day 1
FY18 Budget Workshop Day 1
 
Sanitation Rate Studies
Sanitation Rate StudiesSanitation Rate Studies
Sanitation Rate Studies
 
Fourth Quarter 2015
Fourth Quarter 2015 Fourth Quarter 2015
Fourth Quarter 2015
 
MiPCT Webinar 09/19/2012
MiPCT Webinar 09/19/2012MiPCT Webinar 09/19/2012
MiPCT Webinar 09/19/2012
 
Library borad 4 1-13
Library borad 4 1-13Library borad 4 1-13
Library borad 4 1-13
 
Budgets-2015
Budgets-2015Budgets-2015
Budgets-2015
 
Fy 2015 16 proposed budget presentation
Fy 2015 16 proposed budget presentationFy 2015 16 proposed budget presentation
Fy 2015 16 proposed budget presentation
 
Fy 2014 proposed budget presentation 10.21.13 v5
Fy 2014 proposed budget presentation 10.21.13 v5Fy 2014 proposed budget presentation 10.21.13 v5
Fy 2014 proposed budget presentation 10.21.13 v5
 
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions ManualFinancial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
 
Battle Ground Public Schools Levy Presentation February 25, 2013
Battle Ground Public Schools Levy Presentation February 25, 2013Battle Ground Public Schools Levy Presentation February 25, 2013
Battle Ground Public Schools Levy Presentation February 25, 2013
 

Fy2014 utility rates power point

  • 1. FY2014 Utility Rates Department of Public Works Water and Sewer Divisions
  • 2. WATER EXPENDITURES • Personnel • Expenses • Capital Outlay • Indirect Costs • Debt Service
  • 3. FY2014 Water Budget Personnel 21% Expenses 21% Capital Outlay 13% Indirect Costs 10% Debt Service 35% Personnel Expenses Capital Outlay Indirect Costs Debt Service
  • 4. FY2014 Staffing Levels Non union management staff: • .40 DPW Director – 1.00 position • Water Superintendent – 1.00 position • Administrative Assistant – 1.00 position SEIU Local 888 (DPW Unit) staff: • Working Foreman Grade 2 License – 1.00 position • Maintenance Man/Operator – 3.00 positions • Maintenance Man – 1.00 position
  • 5. Water Indirect Costs - 50,000 100,000 150,000 200,000 250,000 300,000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Fiscal Year Dollars
  • 6. Water Debt Service - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Fiscal Year Dollars
  • 7. WATER REVENUES • User Charges • Betterments • Water Liens • Connection Fees • Other Departmental Revenue
  • 8. FY2014 Water Rate Calculation FY2013 Rate = $45.97 per thousand cubic feet FY2014 Proposed Budget + Indirect Costs $2,440,422 Less FY2014 Estimated Revenues: Betterments 137,523 Water Liens 205,830 Connection Fees 23,783 Other Departmental Revenue 22,624 $ 389,760 Revenue Required From User Charges $2,050,662 FY2013 Total Water Consumption 44,139.21 thousand cubic feet 2,050,662/44,139.21 = 46.4589 46.4589/45.97 = 1.0106 = 1% $45.97 x 1.01 = $46.43 per thousand cubic feet
  • 9. Water Budget Analysis 1% rate increase Proposed Budget Personnel 509,754 Expenses 522,665 Capital Outlay 316,000 Debt Service 843,144 Total 2,191,563 Average single family bill would increase from $101.13 to $102.14 per quarter/$4.05 annually Estimated Revenues User Charges 2,049,370 Betterments 137,523 Water Liens 205,830 Connection Fees 23,783 Other Department Revenue 22,624 Subtotal 2,448,300 Less: Indirect Costs 248,859 Total 2,199,441
  • 10. SEWER EXPENDITURES • Personnel • Expenses • Capital Outlay • Indirect Costs • Debt Service
  • 11. FY2014 Sewer Budget Personnel 22% Expenses 34% Capital Outlay 0% Indirect Costs 10% Debt Service 34% Personnel Expenses Capital Outlay Indirect Costs Debt Service
  • 12. FY2014 Staffing Levels Non union management staff: • .40 DPW Director – 1.00 position • Sewer Superintendent – 1.00 position • Chief of Maintenance – 1.00 position • Chief Chemist – 1.00 position • Administrative Assistant – 1.00 position SEIU Local 888 (DPW Unit) staff: • Senior Operator – 2.00 positions • Grade 6 Operator – 1.00 position • Maintenance – 2.00 positions • Maintenance Mechanic – 2.00 positions • Lab Tech – 1.00 position • Chemist – 1.00 position
  • 13. Sewer Indirect Costs - 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 500,000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Fiscal Year Dollars
  • 15. SEWER REVENUES • User Charges • Betterments • Sewer Liens • Connection Fees • Dudley Operating Costs • Dudley Debt Reimbursement • Other Departmental Revenue
  • 16. Town of Dudley Debt Reimbursement The Town of Dudley reimburses the Town of Webster for 17% of the annual principal and interest payments relative to the following capital projects: • WWTF Planning Project FY2014 Debt = $138,743.76 @ 17% = $23,586.44 • WWTF Phase I Improvements Project FY2014 Debt = $556,152.12 @ 17% = $93,209.62 (includes $1,336.24 credit for FY2013 overpayment) • WWTF Phase II Improvements Project FY2014 Debt = $230,811.99 @ 17% = $39,238.03
  • 17. FY2014 Sewer Rate Calculation No Debt Shift FY2013 Rate = $72.87 per thousand cubic feet FY2014 Proposed Budget + Indirect Costs $4,819,408 Less FY2014 Estimated Revenues: Betterments 301,795 Sewer Liens 350,211 Connection Fees 36,000 Dudley Operating Costs 462,000 Dudley Debt Reimbursement 156,034 Other Departmental Revenue 104,761 Transfer from Retained Earnings 0 $1,410,801 Revenue Required From User Charges $3,408,607 FY2013 Total Water Consumption 44,139.21 FY2013 2nd Meter Consumption 3.60 Total Sewer Consumption 44,135.61 thousand cubic feet 3,408,607/44,135.61 = 77.2303 77.2303/72.87 = 1.0598 = 6% $72.87 x 1.06 = $77.24 per thousand cubic feet
  • 18. Sewer Budget Analysis 6% rate increase from $72.87 to $77.24 Proposed Budget Personnel 1,083,251 Expenses 1,627,800 Capital Outlay 0 Debt Service 1,647,145 Total 4,358,196 Average single family bill would increase from $160.31 to $169.93 per quarter/$38.48 annually Estimated Revenues User Charges 3,409,132 Betterments 301,795 Sewer Liens 350,211 Connection Fees 36,000 Dudley Operating Costs 462,000 Dudley Debt Reimbursement 156,034 Other Department Revenue 104,761 Transfer from Retained Earnings 0 Subtotal 4,819,933 Less: Indirect Costs 461,212 Total 4,358,721
  • 19. FY2014 Sewer Rate Calculation $100,000 Debt Shift FY2013 Rate = $72.87 per thousand cubic feet FY2014 Proposed Budget + Indirect Costs $4,819,408 Less FY2014 Estimated Revenues: Betterments 301,795 Sewer Liens 350,211 Connection Fees 36,000 Dudley Operating Costs 462,000 Dudley Debt Reimbursement 156,034 Other Departmental Revenue 104,761 Transfer from Retained Earnings 0 Transfer from General Fund 100,000 $1,510,801 Revenue Required From User Charges $3,308,607 FY2013 Total Water Consumption 44,139.21 FY2013 2nd Meter Consumption 3.60 Total Sewer Consumption 44,135.61 thousand cubic feet 3,308,607/44,135.61 = 74.9645 74.9645/72.87 = 1.0287 = 3% $72.87 x 1.0 = $75.06 per thousand cubic feet
  • 20. Sewer Budget Analysis 3% rate increase from $72.87 to $75.06 Proposed Budget Personnel 1,083,251 Expenses 1,627,800 Capital Outlay 0 Debt Service 1,647,145 Total 4,358,196 Average single family bill would increase from $160.31 to $165.12 per quarter/$19.24 annually Estimated Revenues User Charges 3,312,647 Betterments 301,795 Sewer Liens 350,211 Connection Fees 36,000 Dudley Operating Costs 462,000 Dudley Debt Reimbursement 156,034 Other Departmental Revenue 104,761 Transfer from Retained Earnings 0 Transfer from General Fund 100,000 Subtotal 4,819,948 Less: Indirect Costs 461,212 Total 4,358,736
  • 21. FY2014 Sewer Rate Calculation $200,000 Debt Shift FY2013 Rate = $72.87 per thousand cubic feet FY2014 Proposed Budget + Indirect Costs $4,819,408 Less FY2014 Estimated Revenues: Betterments 301,795 Sewer Liens 350,211 Connection Fees 36,000 Dudley Operating Costs 462,000 Dudley Debt Reimbursement 156,034 Other Departmental Revenue 104,761 Transfer from Retained Earnings 0 Transfer from General Fund 200,000 $1,610,801 Revenue Required From User Charges $3,208,607 FY2013 Total Water Consumption 44,139.21 FY2013 2nd Meter Consumption 3.60 Total Sewer Consumption 44,135.61 thousand cubic feet 3,208,607/44,135.61 = 72.6988 72.6988/72.87 = .9976 = 0% $72.87 x 1.00 = $72.87 per thousand cubic feet
  • 22. Sewer Budget Analysis 0% rate increase Proposed Budget Personnel 1,083,251 Expenses 1,627,800 Capital Outlay 0 Debt Service 1,647,145 Total 4,358,196 Average single family bill would remain $160.31 per quarter Estimated Revenues User Charges 3,216,162 Betterments 301,795 Sewer Liens 350,211 Connection Fees 36,000 Dudley Operating Costs 462,000 Dudley Debt Reimbursement 156,034 Other Departmental Revenue 104,761 Transfer from Retained Earnings 0 Transfer from General Fund 200,000 Subtotal 4,826,963 Less: Indirect Costs 461,212 Total 4,365,751
  • 23. Thank you for your attention!