This document discusses the costs for a proposed unsaturated polyesters project. The total capital cost for the project would be Rs. 0.365 crores with Rs. 11.3 lacs specifically allocated for environmental pollution control measures. Annual recurring costs are estimated to be Rs. 3.05 lacs.