9. resourcing for single server farms
Component SharePoint 2010 SharePoint 2013
Processor 64 bit, 4 cores 64 bit, 4 cores
RAM Developer or 4 GB 8 GB
Evaluation
Single Server 8 GB 24 GB
Multi Server 8 GB 12 GB
Hard disk 80 GB for system drive
Maintain twice as much free space as
you have RAM for production
environments.
Minimum Requirements
10. resourcing for database servers
Compone Deployme SharePoint 2010 SharePoint 2013
nt nt Size
Processor Small 64 bit, 4 cores 64 bit, 4 cores
Medium 64 bit, 8 cores 64 bit, 8 cores
RAM Small 8 GB 8 GB
Medium 16 GB 16 GB
Hard Disk 80 GB for system drive
Hard disk is dependent on the size of the
SharePoint content
Minimum Requirements
14. the upgrade story
Upgrade Method SharePoint 2007 SharePoint 2010 SharePoint 2013
Database Attach
In-place Upgrade
Side by Side Upgrade
Microsoft recommends migrating to Claims
Authentication prior to upgrade
Remember to enable your Claims to Windows Token Service
SharePoint 2010 sites can be migrated into SharePoint
2013 and maintain the current UI and functionality
16. browser support
Browser Supported Not Supported
Internet Explorer 10
Internet Explorer 9
Internet Explorer 8
Internet Explorer 7
Internet Explorer 6
Google Chrome
Mozilla Firefox
Apple Safari