11
Mobility that Works for the Rail Industry
Case Studies
Amtrak
Washington Metropolitan Area Transit Authority (WMATA)
22
Agenda
•  WMATA Case Study
•  WMATA Application
•  Amtrak Case Study
•  Amtrak Application
•  Questions
Mobile Asset Management
Joe Grey
Director, Transit Asset Management
WMATA
Dan Wormald
Director, Product Delivery and Mobil...
About Metro
•  Metro Rail System
–  86 stations
–  106 miles of track
–  1,118 Rail Cars
–  589 Escalators
–  271 Elevator...
About Metro
•  Metro Bus
–  11,490 bus stops in Maryland, Virginia and
Washington DC
–  1,500 Buses
–  124,173,000 passeng...
Defining Asset Management
•  Asset	
  Management	
  is	
  a	
  strategic	
  and	
  systema0c	
  approach	
  to	
  
managin...
Asset Management Program
•  Began 2012
•  Approach
–  Strategic Team
•  The	
  AMP	
  Strategic	
  team	
  will	
  develop...
Asset Management Program
•  Mobile Proof of Concept Methodology
–  End User Requirements
–  Variety of Asset Classes
–  Va...
Software Selection
•  Operate	
  Connected	
  and	
  Disconnected	
  
Environments	
  
•  Maximo	
  Transporta;on	
  (Tr)	...
Hardware Selection
•  Requirements	
  
– Ruggedized	
  
– Opera;ng	
  System:	
  IOS/Android	
  
– Wifi	
  connec;vity	
  
...
Opportunities to Excel (Challenges)
•  Maximo	
  Usage	
  Differs	
  Across	
  Business	
  
•  Mobile	
  Technology	
  Cons...
Next Steps
•  Spread	
  the	
  Wealth	
  
•  Phased	
  Roll	
  Out	
  
•  GIS	
  
•  Inventory	
  
12	
  
WMATA Mobile WM Application
•  Overview	
  	
  
13	
  
– 14	
  
•  Work	
  Order	
  List	
  
•  Configura;ons	
  per	
  
Asset	
  Group	
  
•  Scan	
  Filter	
  
•  Includes	
  (...
– 15	
  
WO Status Change
•  Change	
  Status	
  
when	
  ready	
  to	
  
work	
  
•  WO	
  Status	
  
visibility	
  to	
 ...
– 16	
  
•  View	
  Work	
  
History	
  for	
  
Asset	
  
•  Easier	
  problem	
  
diagnosis	
  
•  More	
  informed	
  
m...
– 17	
  
View Attachments
•  Manuals	
  
•  Pictures	
  
•  Diagrams	
  
•  A`ach	
  Picture	
  
– 18	
  
•  View	
  
•  Edit	
  
•  Add	
  
Job Plan Tasks
– 19	
  
Meters / Measurements
•  Enter	
  
Measurements	
  
•  Evaluate	
  Limits	
  
•  View	
  
Measurement	
  
History...
– 20	
  
•  List	
  based	
  on	
  
Asset	
  Group	
  
•  View	
  
Storeroom	
  &	
  
Quan;ty	
  
Available	
  
Actuals - ...
– 21	
  
•  View	
  Exis;ng	
  
Labor	
  
•  Add	
  Labor	
  to	
  
Task	
  
Actuals - Labor
– 22	
  
•  Select	
  Mul;ple	
  
Labor	
  Records	
  
•  Mul;ple	
  
Search	
  Op;ons	
  
– Name	
  
– ID	
  
– Superviso...
– 23	
  
•  Failure	
  
•  Problem	
  
•  Cause	
  	
  
•  Remedy	
  
•  Failure	
  Remark	
  
Failure Reporting
– 24	
  
•  Scan	
  in/scan	
  
out	
  
Asset Move/Swap
– 25	
  
•  Report	
  Asset	
  
Condi;on	
  
– From	
  WO	
  or	
  
Asset	
  Tab	
  
Asset Condition
– 26	
  
WO Status Change - WCOMP
•  Work	
  Complete	
  
•  Enforce	
  Business	
  
Rules	
  
– Labor	
  
– Failure	
  Re...
– 27	
  
Create Follow-up / Child WO
•  Verify	
  Asset	
  
hierarchy	
  
•  Capture	
  
addi;onal	
  CM	
  
work	
  
– 28	
  
Asset Tab
•  Mul;ple	
  Search	
  
– Descrip;on	
  
– Asset	
  #	
  
– Asset	
  Tag	
  
– Scan	
  
– 29	
  
Asset - Details
•  Editable	
  Name	
  
Plate	
  Data	
  
•  Signature	
  
Security	
  
Controlled	
  
– 30	
  
Asset - Specifications
•  View	
  /	
  Edit	
  Asset	
  
Specs	
  
31
Mobility at Amtrak: Making it Work
Chester Schmitt
Director, Engineering/IT Business Liaison Office
Amtrak
Dan Wormald
...
32
Amtrak by the Numbers
•  21,000 Route Miles of Track
•  46 US States plus District of Columbia
•  3 Canadian Provinces
...
33
Mobility is a necessity
Distributed
Workforce
Needs
Mobility
IT as the
Customer
Maintenance
as the
Customer
Engineering...
34
Case Study: New York Penn Station
•  Challenge:
–  >100 turnouts
– 21 tracks, 1,200 trains, 4 tunnels
– Serves > 600,00...
35
Challenge: Zero Defects Program
Condition
Assessments
every 6
months
Inspectors
Record Track
Conditions
Work Orders
Wor...
36
Mobility Needs: Different for each user group
•  Usable
•  Familiar process
•  Device can be put in pocketMaintenance
•...
3737
Pilot: Mobile Informer
•  Production Pilot to be used at New York’s Penn Station
–  Zero Defect Project
•  Quick deve...
38
Application Overview
39
Login
40
Show All Work Orders and Sort Work Orders
41
Get Work Order Details or Create New Work Order
42
Problems and Remedies
43
Causes and Attachments
44
Asset Navigation
4545
Questions and Contacts
•  Amtrak
Chester Schmitt
Director, Engineering/IT Business Liaison Office
Chester.Schmitt@amt...
46
What is Mobile Informer?
A development platform enabling
the rapid development and
operation of mobile applications
47
•  Improves productivity and data collection to enable
strategic decision making
•  Increases user adoption
•  Takes a ...
Upcoming SlideShare
Loading in …5
×

WMATA and Amtrak Discuss Maximo Mobile Success

827 views
553 views

Published on

The Maximo European Rail Summit occurred on June 4, 2014. This presentation shows how Amtrak and WMATA are using next generation Interloc's Mobile Informer for Maximo to ensure successful Maximo mobility for their field workers.

Published in: Mobile, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
827
On SlideShare
0
From Embeds
0
Number of Embeds
17
Actions
Shares
0
Downloads
30
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

WMATA and Amtrak Discuss Maximo Mobile Success

  1. 1. 11 Mobility that Works for the Rail Industry Case Studies Amtrak Washington Metropolitan Area Transit Authority (WMATA)
  2. 2. 22 Agenda •  WMATA Case Study •  WMATA Application •  Amtrak Case Study •  Amtrak Application •  Questions
  3. 3. Mobile Asset Management Joe Grey Director, Transit Asset Management WMATA Dan Wormald Director, Product Delivery and Mobile Solutions Interloc Solutions Greg Heape Mobility Solutions Specialist Interloc Solutions Washington Metropolitan Area Transit Authority
  4. 4. About Metro •  Metro Rail System –  86 stations –  106 miles of track –  1,118 Rail Cars –  589 Escalators –  271 Elevators –  217,052,000 passenger trips (2011) 4  
  5. 5. About Metro •  Metro Bus –  11,490 bus stops in Maryland, Virginia and Washington DC –  1,500 Buses –  124,173,000 passenger trips (2011) •  Metro Access –  600 Vehicles –  6000 Passenger trips daily 5  
  6. 6. Defining Asset Management •  Asset  Management  is  a  strategic  and  systema0c  approach  to   managing  physical  assets.  It  focuses  on  business  and  engineering   processes  for  resource  alloca0on  and  u0liza0on,  with  the  objec0ve   of  be?er  decision  making  based  upon  quality  informa3on  and  well   defined  objec0ves.                                            -­‐  Na0onal  Transit  Ins0tute  2011   6  
  7. 7. Asset Management Program •  Began 2012 •  Approach –  Strategic Team •  The  AMP  Strategic  team  will  develop  a  framework,  processes   and  guidelines  to  support  the  implementa3on  of  asset   management  management  system.   –  Tactical Team •  The  AMP  tac3cal  team  is  focused  on  delivering  a  mobile  asset   management  solu3on,  which  is  integrated  with  EAM  system,   to  obtain  asset  condi3on,  asset  nameplate,  work  order  and   performance  data.   7  
  8. 8. Asset Management Program •  Mobile Proof of Concept Methodology –  End User Requirements –  Variety of Asset Classes –  Variety of Environments 8  
  9. 9. Software Selection •  Operate  Connected  and  Disconnected   Environments   •  Maximo  Transporta;on  (Tr)  and  Asset   Configura;on  Manager  (ACM)   •  No  Intermediate  Server   •  Intui;ve  User  Interface     9  
  10. 10. Hardware Selection •  Requirements   – Ruggedized   – Opera;ng  System:  IOS/Android   – Wifi  connec;vity   – Ethernet  connec;vity   – Support  barcode  scanning   – Mobile  Device  Manager  Compa;ble       10  
  11. 11. Opportunities to Excel (Challenges) •  Maximo  Usage  Differs  Across  Business   •  Mobile  Technology  Constantly  Changing   •  Compe;ng  Ini;a;ves   •  Connec;vity  Op;ons   11  
  12. 12. Next Steps •  Spread  the  Wealth   •  Phased  Roll  Out   •  GIS   •  Inventory   12  
  13. 13. WMATA Mobile WM Application •  Overview     13  
  14. 14. – 14   •  Work  Order  List   •  Configura;ons  per   Asset  Group   •  Scan  Filter   •  Includes  (Tr)     – Component  Code   – Condi;on  Repor;ng     WO List Screen
  15. 15. – 15   WO Status Change •  Change  Status   when  ready  to   work   •  WO  Status   visibility  to   Supervisor  
  16. 16. – 16   •  View  Work   History  for   Asset   •  Easier  problem   diagnosis   •  More  informed   maintenance   decision   WO Work History
  17. 17. – 17   View Attachments •  Manuals   •  Pictures   •  Diagrams   •  A`ach  Picture  
  18. 18. – 18   •  View   •  Edit   •  Add   Job Plan Tasks
  19. 19. – 19   Meters / Measurements •  Enter   Measurements   •  Evaluate  Limits   •  View   Measurement   History  
  20. 20. – 20   •  List  based  on   Asset  Group   •  View   Storeroom  &   Quan;ty   Available   Actuals - Materials
  21. 21. – 21   •  View  Exis;ng   Labor   •  Add  Labor  to   Task   Actuals - Labor
  22. 22. – 22   •  Select  Mul;ple   Labor  Records   •  Mul;ple   Search  Op;ons   – Name   – ID   – Supervisor   Actuals - Labor
  23. 23. – 23   •  Failure   •  Problem   •  Cause     •  Remedy   •  Failure  Remark   Failure Reporting
  24. 24. – 24   •  Scan  in/scan   out   Asset Move/Swap
  25. 25. – 25   •  Report  Asset   Condi;on   – From  WO  or   Asset  Tab   Asset Condition
  26. 26. – 26   WO Status Change - WCOMP •  Work  Complete   •  Enforce  Business   Rules   – Labor   – Failure  Repor;ng   •  WO  Status   visibility  to   Supervisor  
  27. 27. – 27   Create Follow-up / Child WO •  Verify  Asset   hierarchy   •  Capture   addi;onal  CM   work  
  28. 28. – 28   Asset Tab •  Mul;ple  Search   – Descrip;on   – Asset  #   – Asset  Tag   – Scan  
  29. 29. – 29   Asset - Details •  Editable  Name   Plate  Data   •  Signature   Security   Controlled  
  30. 30. – 30   Asset - Specifications •  View  /  Edit  Asset   Specs  
  31. 31. 31 Mobility at Amtrak: Making it Work Chester Schmitt Director, Engineering/IT Business Liaison Office Amtrak Dan Wormald Director, Product Delivery and Mobile Solutions Interloc Solutions
  32. 32. 32 Amtrak by the Numbers •  21,000 Route Miles of Track •  46 US States plus District of Columbia •  3 Canadian Provinces •  > 300 Trains Operating Daily •  > 650,000 Passengers
  33. 33. 33 Mobility is a necessity Distributed Workforce Needs Mobility IT as the Customer Maintenance as the Customer Engineering as the Customer
  34. 34. 34 Case Study: New York Penn Station •  Challenge: –  >100 turnouts – 21 tracks, 1,200 trains, 4 tunnels – Serves > 600,000 passengers per day •  Goal: – Keep trains moving
  35. 35. 35 Challenge: Zero Defects Program Condition Assessments every 6 months Inspectors Record Track Conditions Work Orders Worked On New Work Orders Reported REPORTS IN REALTIME
  36. 36. 36 Mobility Needs: Different for each user group •  Usable •  Familiar process •  Device can be put in pocketMaintenance •  Fast development •  Simplicity •  Better platforms •  No middleware Information Technology •  Seamless synchronization •  Fast provisioning of device (15,000 records processed in less than 30 seconds) •  Responsiveness from Information Technology Engineering
  37. 37. 3737 Pilot: Mobile Informer •  Production Pilot to be used at New York’s Penn Station –  Zero Defect Project •  Quick development – 4 weeks including requirements, development, testing, deploying •  Android phones (can fit in pocket) •  Intuitive / Native application •  No middleware •  Fast performance •  Simplicity meeting business needs •  Operates connected/disconnected
  38. 38. 38 Application Overview
  39. 39. 39 Login
  40. 40. 40 Show All Work Orders and Sort Work Orders
  41. 41. 41 Get Work Order Details or Create New Work Order
  42. 42. 42 Problems and Remedies
  43. 43. 43 Causes and Attachments
  44. 44. 44 Asset Navigation
  45. 45. 4545 Questions and Contacts •  Amtrak Chester Schmitt Director, Engineering/IT Business Liaison Office Chester.Schmitt@amtrak.com •  WMATA Joe Grey Director, Transit Asset Management jgrey@wmata.com •  Interloc Solutions Dan Wormald Director, Product Delivery and Mobile Solutions danw@interlocsolutions.com Greg Heape Mobile Solutions Specialist gheape@interlocsolutions.com
  46. 46. 46 What is Mobile Informer? A development platform enabling the rapid development and operation of mobile applications
  47. 47. 47 •  Improves productivity and data collection to enable strategic decision making •  Increases user adoption •  Takes a holistic approach to usability •  Provides simplicity for the end user •  Simple administration •  Integrated infrastructure Truly Successful Mobility for Maximo

×