SlideShare a Scribd company logo
1 of 47
Download to read offline
11
Mobility that Works for the Rail Industry
Case Studies
Amtrak
Washington Metropolitan Area Transit Authority (WMATA)
22
Agenda
•  WMATA Case Study
•  WMATA Application
•  Amtrak Case Study
•  Amtrak Application
•  Questions
Mobile Asset Management
Joe Grey
Director, Transit Asset Management
WMATA
Dan Wormald
Director, Product Delivery and Mobile Solutions
Interloc Solutions
Greg Heape
Mobility Solutions Specialist
Interloc Solutions
Washington Metropolitan Area Transit Authority
About Metro
•  Metro Rail System
–  86 stations
–  106 miles of track
–  1,118 Rail Cars
–  589 Escalators
–  271 Elevators
–  217,052,000 passenger trips
(2011)
4	
  
About Metro
•  Metro Bus
–  11,490 bus stops in Maryland, Virginia and
Washington DC
–  1,500 Buses
–  124,173,000 passenger trips (2011)
•  Metro Access
–  600 Vehicles
–  6000 Passenger trips daily
5	
  
Defining Asset Management
•  Asset	
  Management	
  is	
  a	
  strategic	
  and	
  systema0c	
  approach	
  to	
  
managing	
  physical	
  assets.	
  It	
  focuses	
  on	
  business	
  and	
  engineering	
  
processes	
  for	
  resource	
  alloca0on	
  and	
  u0liza0on,	
  with	
  the	
  objec0ve	
  
of	
  be?er	
  decision	
  making	
  based	
  upon	
  quality	
  informa3on	
  and	
  well	
  
defined	
  objec0ves.	
   	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   	
   	
   	
  	
  
	
  	
  	
  	
  	
  -­‐	
  Na0onal	
  Transit	
  Ins0tute	
  2011	
  
6	
  
Asset Management Program
•  Began 2012
•  Approach
–  Strategic Team
•  The	
  AMP	
  Strategic	
  team	
  will	
  develop	
  a	
  framework,	
  processes	
  
and	
  guidelines	
  to	
  support	
  the	
  implementa3on	
  of	
  asset	
  
management	
  management	
  system.	
  
–  Tactical Team
•  The	
  AMP	
  tac3cal	
  team	
  is	
  focused	
  on	
  delivering	
  a	
  mobile	
  asset	
  
management	
  solu3on,	
  which	
  is	
  integrated	
  with	
  EAM	
  system,	
  
to	
  obtain	
  asset	
  condi3on,	
  asset	
  nameplate,	
  work	
  order	
  and	
  
performance	
  data.	
  
7	
  
Asset Management Program
•  Mobile Proof of Concept Methodology
–  End User Requirements
–  Variety of Asset Classes
–  Variety of Environments
8	
  
Software Selection
•  Operate	
  Connected	
  and	
  Disconnected	
  
Environments	
  
•  Maximo	
  Transporta;on	
  (Tr)	
  and	
  Asset	
  
Configura;on	
  Manager	
  (ACM)	
  
•  No	
  Intermediate	
  Server	
  
•  Intui;ve	
  User	
  Interface	
  
	
  
9	
  
Hardware Selection
•  Requirements	
  
– Ruggedized	
  
– Opera;ng	
  System:	
  IOS/Android	
  
– Wifi	
  connec;vity	
  
– Ethernet	
  connec;vity	
  
– Support	
  barcode	
  scanning	
  
– Mobile	
  Device	
  Manager	
  Compa;ble	
  	
  
	
  
10	
  
Opportunities to Excel (Challenges)
•  Maximo	
  Usage	
  Differs	
  Across	
  Business	
  
•  Mobile	
  Technology	
  Constantly	
  Changing	
  
•  Compe;ng	
  Ini;a;ves	
  
•  Connec;vity	
  Op;ons	
  
11	
  
Next Steps
•  Spread	
  the	
  Wealth	
  
•  Phased	
  Roll	
  Out	
  
•  GIS	
  
•  Inventory	
  
12	
  
WMATA Mobile WM Application
•  Overview	
  	
  
13	
  
– 14	
  
•  Work	
  Order	
  List	
  
•  Configura;ons	
  per	
  
Asset	
  Group	
  
•  Scan	
  Filter	
  
•  Includes	
  (Tr)	
  	
  
– Component	
  Code	
  
– Condi;on	
  Repor;ng	
  
	
  
WO List Screen
– 15	
  
WO Status Change
•  Change	
  Status	
  
when	
  ready	
  to	
  
work	
  
•  WO	
  Status	
  
visibility	
  to	
  
Supervisor	
  
– 16	
  
•  View	
  Work	
  
History	
  for	
  
Asset	
  
•  Easier	
  problem	
  
diagnosis	
  
•  More	
  informed	
  
maintenance	
  
decision	
  
WO Work History
– 17	
  
View Attachments
•  Manuals	
  
•  Pictures	
  
•  Diagrams	
  
•  A`ach	
  Picture	
  
– 18	
  
•  View	
  
•  Edit	
  
•  Add	
  
Job Plan Tasks
– 19	
  
Meters / Measurements
•  Enter	
  
Measurements	
  
•  Evaluate	
  Limits	
  
•  View	
  
Measurement	
  
History	
  
– 20	
  
•  List	
  based	
  on	
  
Asset	
  Group	
  
•  View	
  
Storeroom	
  &	
  
Quan;ty	
  
Available	
  
Actuals - Materials
– 21	
  
•  View	
  Exis;ng	
  
Labor	
  
•  Add	
  Labor	
  to	
  
Task	
  
Actuals - Labor
– 22	
  
•  Select	
  Mul;ple	
  
Labor	
  Records	
  
•  Mul;ple	
  
Search	
  Op;ons	
  
– Name	
  
– ID	
  
– Supervisor	
  
Actuals - Labor
– 23	
  
•  Failure	
  
•  Problem	
  
•  Cause	
  	
  
•  Remedy	
  
•  Failure	
  Remark	
  
Failure Reporting
– 24	
  
•  Scan	
  in/scan	
  
out	
  
Asset Move/Swap
– 25	
  
•  Report	
  Asset	
  
Condi;on	
  
– From	
  WO	
  or	
  
Asset	
  Tab	
  
Asset Condition
– 26	
  
WO Status Change - WCOMP
•  Work	
  Complete	
  
•  Enforce	
  Business	
  
Rules	
  
– Labor	
  
– Failure	
  Repor;ng	
  
•  WO	
  Status	
  
visibility	
  to	
  
Supervisor	
  
– 27	
  
Create Follow-up / Child WO
•  Verify	
  Asset	
  
hierarchy	
  
•  Capture	
  
addi;onal	
  CM	
  
work	
  
– 28	
  
Asset Tab
•  Mul;ple	
  Search	
  
– Descrip;on	
  
– Asset	
  #	
  
– Asset	
  Tag	
  
– Scan	
  
– 29	
  
Asset - Details
•  Editable	
  Name	
  
Plate	
  Data	
  
•  Signature	
  
Security	
  
Controlled	
  
– 30	
  
Asset - Specifications
•  View	
  /	
  Edit	
  Asset	
  
Specs	
  
31
Mobility at Amtrak: Making it Work
Chester Schmitt
Director, Engineering/IT Business Liaison Office
Amtrak
Dan Wormald
Director, Product Delivery and Mobile Solutions
Interloc Solutions
32
Amtrak by the Numbers
•  21,000 Route Miles of Track
•  46 US States plus District of Columbia
•  3 Canadian Provinces
•  > 300 Trains Operating Daily
•  > 650,000 Passengers
33
Mobility is a necessity
Distributed
Workforce
Needs
Mobility
IT as the
Customer
Maintenance
as the
Customer
Engineering
as the
Customer
34
Case Study: New York Penn Station
•  Challenge:
–  >100 turnouts
– 21 tracks, 1,200 trains, 4 tunnels
– Serves > 600,000 passengers per day
•  Goal:
– Keep trains moving
35
Challenge: Zero Defects Program
Condition
Assessments
every 6
months
Inspectors
Record Track
Conditions
Work Orders
Worked On
New Work
Orders
Reported
REPORTS IN REALTIME
36
Mobility Needs: Different for each user group
•  Usable
•  Familiar process
•  Device can be put in pocketMaintenance
•  Fast development
•  Simplicity
•  Better platforms
•  No middleware
Information
Technology
•  Seamless synchronization
•  Fast provisioning of device (15,000 records
processed in less than 30 seconds)
•  Responsiveness from Information Technology
Engineering
3737
Pilot: Mobile Informer
•  Production Pilot to be used at New York’s Penn Station
–  Zero Defect Project
•  Quick development
– 4 weeks including requirements, development, testing,
deploying
•  Android phones (can fit in pocket)
•  Intuitive / Native application
•  No middleware
•  Fast performance
•  Simplicity meeting business needs
•  Operates connected/disconnected
38
Application Overview
39
Login
40
Show All Work Orders and Sort Work Orders
41
Get Work Order Details or Create New Work Order
42
Problems and Remedies
43
Causes and Attachments
44
Asset Navigation
4545
Questions and Contacts
•  Amtrak
Chester Schmitt
Director, Engineering/IT Business Liaison Office
Chester.Schmitt@amtrak.com
•  WMATA
Joe Grey
Director, Transit Asset Management
jgrey@wmata.com
•  Interloc Solutions
Dan Wormald
Director, Product Delivery and Mobile Solutions
danw@interlocsolutions.com
Greg Heape
Mobile Solutions Specialist
gheape@interlocsolutions.com
46
What is Mobile Informer?
A development platform enabling
the rapid development and
operation of mobile applications
47
•  Improves productivity and data collection to enable
strategic decision making
•  Increases user adoption
•  Takes a holistic approach to usability
•  Provides simplicity for the end user
•  Simple administration
•  Integrated infrastructure
Truly Successful Mobility for Maximo

More Related Content

Similar to WMATA and Amtrak Discuss Maximo Mobile Success

JOHN L. RACKAUSKAS-2Betsy
JOHN L. RACKAUSKAS-2BetsyJOHN L. RACKAUSKAS-2Betsy
JOHN L. RACKAUSKAS-2Betsy
John Rackauskas
 
Axcess overview v6
Axcess overview v6Axcess overview v6
Axcess overview v6
Mike Putich
 
Axcess overview v6
Axcess overview v6Axcess overview v6
Axcess overview v6
Mike Putich
 
Consulting Projects in Sunbend Computer Services Corporation
Consulting Projects in Sunbend Computer Services CorporationConsulting Projects in Sunbend Computer Services Corporation
Consulting Projects in Sunbend Computer Services Corporation
Gregory Bogenschutz, PMP, CSM
 
Enbridge & Calpine: Using Smart Devices to Make Maximo Field Work Easy
Enbridge & Calpine: Using Smart Devices to Make Maximo Field Work EasyEnbridge & Calpine: Using Smart Devices to Make Maximo Field Work Easy
Enbridge & Calpine: Using Smart Devices to Make Maximo Field Work Easy
Stacey Miller
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
bayu162365
 
360 facility
360 facility360 facility
360 facility
qjopera
 
MSI Value Proposition v2.2 (4-2-15)
MSI Value Proposition v2.2 (4-2-15)MSI Value Proposition v2.2 (4-2-15)
MSI Value Proposition v2.2 (4-2-15)
Joe Passafiume
 
Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...
Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...
Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...
Databricks
 

Similar to WMATA and Amtrak Discuss Maximo Mobile Success (20)

TESCO Meter Manager and Field Client Overview
TESCO Meter Manager and Field Client OverviewTESCO Meter Manager and Field Client Overview
TESCO Meter Manager and Field Client Overview
 
How komatsu is driving operational efficiencies using io t and machine learni...
How komatsu is driving operational efficiencies using io t and machine learni...How komatsu is driving operational efficiencies using io t and machine learni...
How komatsu is driving operational efficiencies using io t and machine learni...
 
Daniel Irwin - Crossrail: Future-Proofing Railway Asset Management
Daniel Irwin - Crossrail: Future-Proofing Railway Asset ManagementDaniel Irwin - Crossrail: Future-Proofing Railway Asset Management
Daniel Irwin - Crossrail: Future-Proofing Railway Asset Management
 
Assessing New Databases– Translytical Use Cases
Assessing New Databases– Translytical Use CasesAssessing New Databases– Translytical Use Cases
Assessing New Databases– Translytical Use Cases
 
JOHN L. RACKAUSKAS-2Betsy
JOHN L. RACKAUSKAS-2BetsyJOHN L. RACKAUSKAS-2Betsy
JOHN L. RACKAUSKAS-2Betsy
 
Axcess overview v6
Axcess overview v6Axcess overview v6
Axcess overview v6
 
Axcess overview v6
Axcess overview v6Axcess overview v6
Axcess overview v6
 
Mobile QoS Management using Complex Event Processing
Mobile QoS Management using Complex Event ProcessingMobile QoS Management using Complex Event Processing
Mobile QoS Management using Complex Event Processing
 
Consulting Projects in Sunbend Computer Services Corporation
Consulting Projects in Sunbend Computer Services CorporationConsulting Projects in Sunbend Computer Services Corporation
Consulting Projects in Sunbend Computer Services Corporation
 
Business Process Quality at Citrix
Business Process Quality at CitrixBusiness Process Quality at Citrix
Business Process Quality at Citrix
 
Incremental Queries and Transformations for Engineering Critical Systems
Incremental Queries and Transformations for Engineering Critical SystemsIncremental Queries and Transformations for Engineering Critical Systems
Incremental Queries and Transformations for Engineering Critical Systems
 
Enbridge & Calpine: Using Smart Devices to Make Maximo Field Work Easy
Enbridge & Calpine: Using Smart Devices to Make Maximo Field Work EasyEnbridge & Calpine: Using Smart Devices to Make Maximo Field Work Easy
Enbridge & Calpine: Using Smart Devices to Make Maximo Field Work Easy
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
 
Esri UC 2017 Water Meeting - How Central San Became a GIS-Centric Water Resou...
Esri UC 2017 Water Meeting - How Central San Became a GIS-Centric Water Resou...Esri UC 2017 Water Meeting - How Central San Became a GIS-Centric Water Resou...
Esri UC 2017 Water Meeting - How Central San Became a GIS-Centric Water Resou...
 
TESCO Meter Manager Overview
TESCO Meter Manager OverviewTESCO Meter Manager Overview
TESCO Meter Manager Overview
 
Verifying and Validating Requirements
Verifying and Validating RequirementsVerifying and Validating Requirements
Verifying and Validating Requirements
 
360 facility
360 facility360 facility
360 facility
 
MSI Value Proposition v2.2 (4-2-15)
MSI Value Proposition v2.2 (4-2-15)MSI Value Proposition v2.2 (4-2-15)
MSI Value Proposition v2.2 (4-2-15)
 
20171019 data migration (rk)
20171019 data migration (rk)20171019 data migration (rk)
20171019 data migration (rk)
 
Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...
Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...
Operationalizing Machine Learning—Managing Provenance from Raw Data to Predic...
 

WMATA and Amtrak Discuss Maximo Mobile Success

  • 1. 11 Mobility that Works for the Rail Industry Case Studies Amtrak Washington Metropolitan Area Transit Authority (WMATA)
  • 2. 22 Agenda •  WMATA Case Study •  WMATA Application •  Amtrak Case Study •  Amtrak Application •  Questions
  • 3. Mobile Asset Management Joe Grey Director, Transit Asset Management WMATA Dan Wormald Director, Product Delivery and Mobile Solutions Interloc Solutions Greg Heape Mobility Solutions Specialist Interloc Solutions Washington Metropolitan Area Transit Authority
  • 4. About Metro •  Metro Rail System –  86 stations –  106 miles of track –  1,118 Rail Cars –  589 Escalators –  271 Elevators –  217,052,000 passenger trips (2011) 4  
  • 5. About Metro •  Metro Bus –  11,490 bus stops in Maryland, Virginia and Washington DC –  1,500 Buses –  124,173,000 passenger trips (2011) •  Metro Access –  600 Vehicles –  6000 Passenger trips daily 5  
  • 6. Defining Asset Management •  Asset  Management  is  a  strategic  and  systema0c  approach  to   managing  physical  assets.  It  focuses  on  business  and  engineering   processes  for  resource  alloca0on  and  u0liza0on,  with  the  objec0ve   of  be?er  decision  making  based  upon  quality  informa3on  and  well   defined  objec0ves.                                            -­‐  Na0onal  Transit  Ins0tute  2011   6  
  • 7. Asset Management Program •  Began 2012 •  Approach –  Strategic Team •  The  AMP  Strategic  team  will  develop  a  framework,  processes   and  guidelines  to  support  the  implementa3on  of  asset   management  management  system.   –  Tactical Team •  The  AMP  tac3cal  team  is  focused  on  delivering  a  mobile  asset   management  solu3on,  which  is  integrated  with  EAM  system,   to  obtain  asset  condi3on,  asset  nameplate,  work  order  and   performance  data.   7  
  • 8. Asset Management Program •  Mobile Proof of Concept Methodology –  End User Requirements –  Variety of Asset Classes –  Variety of Environments 8  
  • 9. Software Selection •  Operate  Connected  and  Disconnected   Environments   •  Maximo  Transporta;on  (Tr)  and  Asset   Configura;on  Manager  (ACM)   •  No  Intermediate  Server   •  Intui;ve  User  Interface     9  
  • 10. Hardware Selection •  Requirements   – Ruggedized   – Opera;ng  System:  IOS/Android   – Wifi  connec;vity   – Ethernet  connec;vity   – Support  barcode  scanning   – Mobile  Device  Manager  Compa;ble       10  
  • 11. Opportunities to Excel (Challenges) •  Maximo  Usage  Differs  Across  Business   •  Mobile  Technology  Constantly  Changing   •  Compe;ng  Ini;a;ves   •  Connec;vity  Op;ons   11  
  • 12. Next Steps •  Spread  the  Wealth   •  Phased  Roll  Out   •  GIS   •  Inventory   12  
  • 13. WMATA Mobile WM Application •  Overview     13  
  • 14. – 14   •  Work  Order  List   •  Configura;ons  per   Asset  Group   •  Scan  Filter   •  Includes  (Tr)     – Component  Code   – Condi;on  Repor;ng     WO List Screen
  • 15. – 15   WO Status Change •  Change  Status   when  ready  to   work   •  WO  Status   visibility  to   Supervisor  
  • 16. – 16   •  View  Work   History  for   Asset   •  Easier  problem   diagnosis   •  More  informed   maintenance   decision   WO Work History
  • 17. – 17   View Attachments •  Manuals   •  Pictures   •  Diagrams   •  A`ach  Picture  
  • 18. – 18   •  View   •  Edit   •  Add   Job Plan Tasks
  • 19. – 19   Meters / Measurements •  Enter   Measurements   •  Evaluate  Limits   •  View   Measurement   History  
  • 20. – 20   •  List  based  on   Asset  Group   •  View   Storeroom  &   Quan;ty   Available   Actuals - Materials
  • 21. – 21   •  View  Exis;ng   Labor   •  Add  Labor  to   Task   Actuals - Labor
  • 22. – 22   •  Select  Mul;ple   Labor  Records   •  Mul;ple   Search  Op;ons   – Name   – ID   – Supervisor   Actuals - Labor
  • 23. – 23   •  Failure   •  Problem   •  Cause     •  Remedy   •  Failure  Remark   Failure Reporting
  • 24. – 24   •  Scan  in/scan   out   Asset Move/Swap
  • 25. – 25   •  Report  Asset   Condi;on   – From  WO  or   Asset  Tab   Asset Condition
  • 26. – 26   WO Status Change - WCOMP •  Work  Complete   •  Enforce  Business   Rules   – Labor   – Failure  Repor;ng   •  WO  Status   visibility  to   Supervisor  
  • 27. – 27   Create Follow-up / Child WO •  Verify  Asset   hierarchy   •  Capture   addi;onal  CM   work  
  • 28. – 28   Asset Tab •  Mul;ple  Search   – Descrip;on   – Asset  #   – Asset  Tag   – Scan  
  • 29. – 29   Asset - Details •  Editable  Name   Plate  Data   •  Signature   Security   Controlled  
  • 30. – 30   Asset - Specifications •  View  /  Edit  Asset   Specs  
  • 31. 31 Mobility at Amtrak: Making it Work Chester Schmitt Director, Engineering/IT Business Liaison Office Amtrak Dan Wormald Director, Product Delivery and Mobile Solutions Interloc Solutions
  • 32. 32 Amtrak by the Numbers •  21,000 Route Miles of Track •  46 US States plus District of Columbia •  3 Canadian Provinces •  > 300 Trains Operating Daily •  > 650,000 Passengers
  • 33. 33 Mobility is a necessity Distributed Workforce Needs Mobility IT as the Customer Maintenance as the Customer Engineering as the Customer
  • 34. 34 Case Study: New York Penn Station •  Challenge: –  >100 turnouts – 21 tracks, 1,200 trains, 4 tunnels – Serves > 600,000 passengers per day •  Goal: – Keep trains moving
  • 35. 35 Challenge: Zero Defects Program Condition Assessments every 6 months Inspectors Record Track Conditions Work Orders Worked On New Work Orders Reported REPORTS IN REALTIME
  • 36. 36 Mobility Needs: Different for each user group •  Usable •  Familiar process •  Device can be put in pocketMaintenance •  Fast development •  Simplicity •  Better platforms •  No middleware Information Technology •  Seamless synchronization •  Fast provisioning of device (15,000 records processed in less than 30 seconds) •  Responsiveness from Information Technology Engineering
  • 37. 3737 Pilot: Mobile Informer •  Production Pilot to be used at New York’s Penn Station –  Zero Defect Project •  Quick development – 4 weeks including requirements, development, testing, deploying •  Android phones (can fit in pocket) •  Intuitive / Native application •  No middleware •  Fast performance •  Simplicity meeting business needs •  Operates connected/disconnected
  • 40. 40 Show All Work Orders and Sort Work Orders
  • 41. 41 Get Work Order Details or Create New Work Order
  • 45. 4545 Questions and Contacts •  Amtrak Chester Schmitt Director, Engineering/IT Business Liaison Office Chester.Schmitt@amtrak.com •  WMATA Joe Grey Director, Transit Asset Management jgrey@wmata.com •  Interloc Solutions Dan Wormald Director, Product Delivery and Mobile Solutions danw@interlocsolutions.com Greg Heape Mobile Solutions Specialist gheape@interlocsolutions.com
  • 46. 46 What is Mobile Informer? A development platform enabling the rapid development and operation of mobile applications
  • 47. 47 •  Improves productivity and data collection to enable strategic decision making •  Increases user adoption •  Takes a holistic approach to usability •  Provides simplicity for the end user •  Simple administration •  Integrated infrastructure Truly Successful Mobility for Maximo