Chapter 1 - “Know Where You Are”
At the end of the course, you will be able to:
 Define business process redesign
 Describe the nine dimensions of BPR
 Discuss the benefits of BPR
 Identify and describe the situations in which BPR becomes necessary
 Describe the warning signs of trouble that indicate the need for
reengineering
 Identify and describe the critical success factors for BPR projects
2
 Reengineering business processes means tossing aside existing
process and starting over.
3
Business Process Reengineering is defined as;
“the fundamental rethinking and radical redesign of business processes to
achieve dramatic improvements in critical contemporary measures of
performance such as costs, quality and speed”.
(Hammer and Champy, 1993)
***Business process re-engineering is also known as business process redesign,
business transformation, or business process change management.
4
 Fundamental
Fundamental implies that everything – every assumption, every
reason, every activity – is challenged by asking why it should be
continued. The implication is nothing should be accepted as
scared. Over time, practices that were once required become
obsolete and need to be removed.
 Radical
Do not try to improve the existing situation,
invent(create/design) completely new ways of
accomplishing(complete/achieve) work.
5
 Dramatic
Do not use business process redesign to obtain marginal (small
slight) improvements, aim at order-of-magnitude improvements
(ten times). If the marginal gains – 5 to 10 percent – are the goal,
then continuous improvement is a more appropriate path than
reengineering.
 Process
Focus on the business processes instead of organizational
structures.
6
A business process may be defined as
“a set of logically related tasks performed to achieve a
defined business outcome” (Davenport, 1990)
OR
“activities that takes one or more kinds of input and create
an output that is of value to customer”
(Hammer and Champy, 1993)
OR
“a set of business events that together enable the
creation and delivery of an organization’s products or
services to its customers”
(Gelinas et. al, 2004) 7
Reengineering takes time, larger project takes even more time.
Reengineering requires process, organization and technology changes. Reengineering
also requires infrastructure changes and cultural transformation).
- Once the “radical” changes takes place, they must continuously improve the process,
practices in the business operation to prevent future deterioration and ensure
preventive maintenance.
8
Design Implementation
Continuous Process
Improvement
Time
Figure 1.1: The Business Reengineering Continuum
9
Process
Structure
Technology
Structure
Organization
Structure
Reward
Structure
Measurement
Systems
Organizational
Culture
Political
Power
Management
Methods
Individual Belief
Systems
Physical Technical Layer
Infrastructure Layer
Value Layer
More concrete
easiest to change
More difficult to
change less
concrete
Figure 1.2: The Dimensions of Business Reengineering
1.0 The Physical /Technical Dimensions are what people can easily see and
do. Include;
a. Process structure consists of the business processes, outcomes, policies,
practices and procedures that support the processes. (process structure is what, when
and how work is performed)
Process can be triggered by internal events, timing cycles, or external stimuli.
Some processes originate by designs, others may emerge informally to meet real or perceived organizational needs
(that is why we need business process reengineering).
There are undocumented, inconsistently applied and personality dependent processes.
No single organization has the same processes
Process produce business outcomes.
Its true purpose is to produce a “quality” outcome in a timely and predictable manner.
10
11
Dimensions of Business
Reengineering
b. Technology structure which consists of the automated
communications, networking, and computer systems used
to support the process structure.
The sensible (rational/reasonable) application of technology
depends on the competent integration of technology with
work processes.
c. Organization structure defines who performs, manages,
and is accountable for each business process.
When process and organization structures are out of
alignments, there are gaps in accountability.
2.0 The Infrastructure Dimensions refers to interpretation
of policies and procedures which heavily influences how
the physical/technical dimensions on a day-to-day basis.
If the physical/technical dimensions change, the
infrastructure must also change because they reinforce
desired performance operational behavior.
a. Reward structure regulates behavior. Rewards
may be formal or informal, financial or recognition
based. Ideally, well-designed jobs provide a work
environment that is rewarding in and of itself.
12
Dimensions of Business
Reengineering
b. Measurement systems define the feedback that provide
information on process performance.
- enables people to improve process performance;
- must deliver appropriate information;
- should uncover the need for change;
- should be made available directly and simultaneously (at once)
to process performers and managers
13
Dimensions of Business
Reengineering
c. Management methods consist of the practices and techniques
used to supervise, develop, and support the people who perform the
business processes.
It is one of the most neglected (ignored) in reengineering because it
is seen as outside the project scope.
Managers and supervisors must understand and learn how to
support the new environment so as to gain benefits from the
reengineering process.
14
Dimensions of Business
Reengineering
3.0 The Value Dimensions define the organization’s culture and
drive behavior. Leadership and improvement philosophies must
emerge from these dimensions.
a. Organizational culture consists of the unspoken,
collective rules and beliefs of the organization.
It can be discerned (perceive/see) through the
organization’s language, symbols, myths (legends) and
rituals (ceremony).
It defines what is important to the organization more
forcefully than any memo from the CEO.
Changing embedded corporate value is perhaps the
most powerful form of change.
15
Dimensions of Business
Reengineering
b. Political power refers to individual who manipulate and shape the
actions and behaviors of others.
Both formal and informal leaders use power to promulgate
(broadcast) and reinforce power.
Formal authority – acquired through the position held in the
organization.
Personal power – acquired through expertise, knowledge, or
connections.
16
Dimensions of Business
Reengineering
17
c. Individual belief systems are the attitudes and mental models
that individuals apply to themselves, those they work with, and
the work itself.
Examples of mental models: Impatience, skepticisms,
openness, control, rigidity, and flexibility
Aligning the value dimensions to support the reengineered
organization requires organization executives to demonstrate
leadership.
Dimensions of Business
Reengineering
1. Increase the organization’s ability to customize products and
services while retaining mass-production economics.
2. Increase customer satisfaction with products and services so they
prefer your products and services over those of your competitors.
3. Make it easy and pleasant (enjoyable) for customers to do business
with your organizations.
4. Break organizational boundaries, bringing customers into the
information channels through communication, networking, and
computer technologies.
18
19
BENEFIT of REENGGINEERING
5. Decrease response time to customers, eliminate errors and
complaints, and reduce product and service development and
manufacturing cycle time.
6. Process more customer requests and higher volume from each
customer, and deliver “value-driven” prices to customers without
reducing profitability.
7. Improve the quality of work life and individual capabilities for
contribution so that people experience ownership of their work
and of customers and see their contributions to the organizations.
8. Improve the sharing and utilization of organization knowledge so
the organization does not become/remain dependent on the
expertise of a few people.
20
THE NEED FOR REENGINEERING
WARNING SIGNS OF TROUBLE
1. The explosion of chaos and bureaucracy: Organizations’ work
processes were not designed BUT they evolved out of the chaos of
doing business. Processes become habitualized. From veteran to
new staff without realising it was a mistake
(e.g. a team of headquarters accountants visiting a field billing office found clerks misapplying
account codes to expense vouchers. The team asked a clerk why? She replied: “Listen, I’ve
been doing this job for 20 years, and you are not going to tell me I’m doing it wrong”.)
2. Thinking of customers: Too many companies design processes based
on the assumption that they know what’s best for customers, thus,
organization becomes inflexible, driving frustrated customers to
competitors or regulatory commissions. Employees who take the
initiatives to help customer would be penalised for bypassing official
procedures.
3. Automation of existing bureaucracy: computerization reinforced
bureaucracy rather that breaking through it.
(changing paper documents to electronic document, BUT company only duplicates existing
processes, thus, maintaining both paper and electronic forms of data. E.g. an insurance
company’s claims department, automation created paper printouts to replace handwritten claim
files, but paper continued to move from one desk to another as the claim was processed).
4. Bottlenecks and disconnects in critical cross-functional
processes. Each unit operates as if it has no relationship to the
other units.
(Each unit is part of the manufacturing stream, but they each operates in costly and cumbersome
processes preparing work for processing, resolving problems and errors, tracking the work in
progress, thru, creating duplicate and inaccurate data. E.g. large automobile manufacturing
company – each division reentered information about incoming work into its own systems, and
sent paper with the outgoing work. Each department did not check with each other on what is
going on in the manufacturing process).
21
THE NEED FOR REENGINEERING
22
THE NEED FOR REENGINEERING
WARNING SIGNS OF TROUBLE
5. Elusiveness of accountability: Most organizations are
structured by function (eg. Sales, manufacturing, etc.) but
essential business process (eg. Customer service and support)
cut across the functions. This makes it difficult, if not impossible,
to establish accountability for a complete business process.
(e.g. in a manufacturing firm, the subprocesses, each assigned to different group. If any plans
or budgets were late, inaccurate, or incomplete, customers’ programs could not be updated in
time to avoid invoicing errors and deductions. As a result, in 5-years time, the number of
changes in plans and budgets increased from 10 – 57%, and the process deteriorated from
lack of management, measurement and accountability.
6. Chaos of downsizing: It leaves survivors demoralized, the work
environment inadequately staffed, and people with inadequate
skills performing the work, and tasks can no longer be processed
within their current configuration. (e.g. a large government organization
downsized its headquarters by 40%. 1 staff was left to take up a responsibility for 4 person, he
has to work 16 hours a day and before long, demanded to transfer to another location.
7. The turmoil of integration and merger: This creates work processes
that often duplicate or conflict with each other. (e.g. Purchase of 4
companies gave the new company 4 different sets of policies, procedures and formula
options for processing customer orders. In a 5-year period, over $80 million would be
wasted supporting these overlapping redundant operations. Integrating the customer’s
order management process will create massive difficulties as 3 of the 4 companies. Field
work loads tripled, errors increased 50%, and over 100 additional clerical people were
hired to prepare inputs and correct errors.
23
THE NEED FOR REENGINEERING
Possible findings
1.0 Lack of a “big picture” concept and poor
communication
2.0 Inattention to detail
3.0 Designer arrogance and customer exclusion
4.0 Focus on correction, not error prevention
5.0 Measurement problems
6.0 Focus only on external customers
24
DIAGNOSIS OF PROCESSES OF SUSPECT
PRODUCTS AND SERVICES
Street-smart business reengineers know that it is critical to create a business case because “it
creates massive discomfort with status quo”.
The initial business case must sell executives on the VALUE OF THE CHANGE.
- must show that “the cost of NOT changing is too high”.
- Street smart business reengineers don’t ask people to put up with inconvenient and
stressful changes without good reason. They makes two points:
1. The necessity for change.
Use quantitative data that translates “what everybody already knows”
into facts and numbers
2. The alternative to change.
Use hard and soft data to paint a picture of the future if the
organization doesn’t change
25
CREATING A BUSINESS CASE
3. Once the facts are on the table, reengineers advocates must get
commitments to:
- Frame the projects so it is fully defined and understood
- Create a reengineered vision of the business, its values, and
goals
- Build a detailed process redesign of the business operations
- Plan the implementation
- Conduct a proof of concept (if needed)
(**once this has been laid out, reengineer advocate can ask for the “big
bucks” for implementation)
26
CREATING A BUSINESS CASE
To have a successful BR, requires a strategy that incorporates these CSF:
1. A business focus – a focus on all dimensions. Success
depends on integrating all three – process, technology, and
organization, plus supporting that integration with new
infrastructure and values.
2. A methodology and project approach – requires discipline
and structure; methodology must be systematic and fact
focused; must articulate how to secure finding, manage
power struggles, and sell the new ideas.
3. Time - BR takes time. Executives must be able to stick with
the program.
27
CRITICAL SUCCESS FACTORS FOR BR
PROJECTS
28
CRITICAL SUCCESS FACTORS FOR BR
PROJECTS
4. Partnership participation – BR is accomplished only as a
result of efforts by people from all over the organization.
Requires flexible and trained teams.
5. Visible, active leadership. This is the most important of all
the critical success factors. Requires long-term commitment
to BR – in terms of dollars, people and executive visibility.
(leaders must be careful not to use negative reinforcement,
positive reinforcement is much more effective).
**Executive leaders and middle managers must:
(1) enable people to step back and evaluate how the work is done, this may mean
changing work priorities,
(2) resist the temptation to silence dissident voices,
(3) simplify problem solving
(4) remove barriers and obstacles to peformance,
(5) reward and encourage ideas
(6) allow people to have fun at work.
 BR begins the process of transforming a dysfunctional
organization into a learning, productive, quality-focused,
customer driven organization.
 BR must be customer driven.
 Quality is defined in terms of added value, cost sensitivity,
responsiveness, and functionality.
 BR must enable people to handle more change successfully.
29
CRITICAL SUCCESS FACTORS FOR BR
PROJECTS

More Related Content

Similar to bpr-chapter1-concept-and-principle-know-where-you-are3.ppt

BUSINESS PROCESS RE-ENGINEERING (BPR)
BUSINESS PROCESS RE-ENGINEERING (BPR)BUSINESS PROCESS RE-ENGINEERING (BPR)
BUSINESS PROCESS RE-ENGINEERING (BPR)smclasses
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusIshwar Bulbule
 
Chapter 2 ext- business-process-reengineering.pptx
Chapter 2 ext- business-process-reengineering.pptxChapter 2 ext- business-process-reengineering.pptx
Chapter 2 ext- business-process-reengineering.pptxdevelvin404
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Parth Shukla
 
The 5 types of business transformation
The 5 types of business transformationThe 5 types of business transformation
The 5 types of business transformationSameerShaik43
 
Fail safe BPR.ppt
Fail safe BPR.pptFail safe BPR.ppt
Fail safe BPR.pptRenuLamba8
 
BPR slides by Tosin Adeyeye.pdf
BPR slides by Tosin Adeyeye.pdfBPR slides by Tosin Adeyeye.pdf
BPR slides by Tosin Adeyeye.pdfOluwatosinAdeyeye1
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringDAVIS THOMAS
 
Six sigma-and-supply-chain
Six sigma-and-supply-chainSix sigma-and-supply-chain
Six sigma-and-supply-chainStephen Depoe
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringAniket Verma
 
Intro process-centric-organizations
Intro process-centric-organizationsIntro process-centric-organizations
Intro process-centric-organizationsStephen Depoe
 
Ten Best Practices for Restructuringthe Organization RONALD .docx
Ten Best Practices for Restructuringthe Organization RONALD .docxTen Best Practices for Restructuringthe Organization RONALD .docx
Ten Best Practices for Restructuringthe Organization RONALD .docxbradburgess22840
 
Business Process Reengineering:A consolidated approach to different models
Business Process Reengineering:A consolidated approach to different modelsBusiness Process Reengineering:A consolidated approach to different models
Business Process Reengineering:A consolidated approach to different modelsSindhu Dasu
 
Business Management techniques and importance
Business Management techniques and importanceBusiness Management techniques and importance
Business Management techniques and importanceALISHBAAZAM3
 
Business process reengineering vs kaizen
Business process reengineering vs kaizenBusiness process reengineering vs kaizen
Business process reengineering vs kaizenKhawaja Naveed
 
Process improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsProcess improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsGeorge Dunn
 

Similar to bpr-chapter1-concept-and-principle-know-where-you-are3.ppt (20)

Rpb chapter 1
Rpb   chapter 1Rpb   chapter 1
Rpb chapter 1
 
BUSINESS PROCESS RE-ENGINEERING (BPR)
BUSINESS PROCESS RE-ENGINEERING (BPR)BUSINESS PROCESS RE-ENGINEERING (BPR)
BUSINESS PROCESS RE-ENGINEERING (BPR)
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University Syllabus
 
Chapter 2 ext- business-process-reengineering.pptx
Chapter 2 ext- business-process-reengineering.pptxChapter 2 ext- business-process-reengineering.pptx
Chapter 2 ext- business-process-reengineering.pptx
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)
 
The 5 types of business transformation
The 5 types of business transformationThe 5 types of business transformation
The 5 types of business transformation
 
Fail safe BPR.ppt
Fail safe BPR.pptFail safe BPR.ppt
Fail safe BPR.ppt
 
BPR slides by Tosin Adeyeye.pdf
BPR slides by Tosin Adeyeye.pdfBPR slides by Tosin Adeyeye.pdf
BPR slides by Tosin Adeyeye.pdf
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Mis ppt
Mis pptMis ppt
Mis ppt
 
Six sigma-and-supply-chain
Six sigma-and-supply-chainSix sigma-and-supply-chain
Six sigma-and-supply-chain
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Intro process-centric-organizations
Intro process-centric-organizationsIntro process-centric-organizations
Intro process-centric-organizations
 
450 bpr
450 bpr450 bpr
450 bpr
 
Ten Best Practices for Restructuringthe Organization RONALD .docx
Ten Best Practices for Restructuringthe Organization RONALD .docxTen Best Practices for Restructuringthe Organization RONALD .docx
Ten Best Practices for Restructuringthe Organization RONALD .docx
 
Business Process Reengineering:A consolidated approach to different models
Business Process Reengineering:A consolidated approach to different modelsBusiness Process Reengineering:A consolidated approach to different models
Business Process Reengineering:A consolidated approach to different models
 
Business Management techniques and importance
Business Management techniques and importanceBusiness Management techniques and importance
Business Management techniques and importance
 
Business process reengineering vs kaizen
Business process reengineering vs kaizenBusiness process reengineering vs kaizen
Business process reengineering vs kaizen
 
Process improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsProcess improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law Firms
 

More from GentaSahuri2

1. Introduction to Business Process Analysys
1. Introduction to Business Process Analysys1. Introduction to Business Process Analysys
1. Introduction to Business Process AnalysysGentaSahuri2
 
using looping in basic programming for beginners
using looping in basic programming for beginnersusing looping in basic programming for beginners
using looping in basic programming for beginnersGentaSahuri2
 
Media_807202_smxx.pptx
Media_807202_smxx.pptxMedia_807202_smxx.pptx
Media_807202_smxx.pptxGentaSahuri2
 
Chapter 8 - Software Testing.ppt
Chapter 8 - Software Testing.pptChapter 8 - Software Testing.ppt
Chapter 8 - Software Testing.pptGentaSahuri2
 
BI MicrosoftMDM - Frank Olav Estensen.ppt
BI MicrosoftMDM - Frank Olav Estensen.pptBI MicrosoftMDM - Frank Olav Estensen.ppt
BI MicrosoftMDM - Frank Olav Estensen.pptGentaSahuri2
 
Week3-Bill of Material.pptx
Week3-Bill of Material.pptxWeek3-Bill of Material.pptx
Week3-Bill of Material.pptxGentaSahuri2
 
Teaching demo.pptx
Teaching demo.pptxTeaching demo.pptx
Teaching demo.pptxGentaSahuri2
 
3 PU ERP - MRP.pptx
3 PU ERP - MRP.pptx3 PU ERP - MRP.pptx
3 PU ERP - MRP.pptxGentaSahuri2
 

More from GentaSahuri2 (10)

1. Introduction to Business Process Analysys
1. Introduction to Business Process Analysys1. Introduction to Business Process Analysys
1. Introduction to Business Process Analysys
 
using looping in basic programming for beginners
using looping in basic programming for beginnersusing looping in basic programming for beginners
using looping in basic programming for beginners
 
Media_807202_smxx.pptx
Media_807202_smxx.pptxMedia_807202_smxx.pptx
Media_807202_smxx.pptx
 
Chapter 8 - Software Testing.ppt
Chapter 8 - Software Testing.pptChapter 8 - Software Testing.ppt
Chapter 8 - Software Testing.ppt
 
BI MicrosoftMDM - Frank Olav Estensen.ppt
BI MicrosoftMDM - Frank Olav Estensen.pptBI MicrosoftMDM - Frank Olav Estensen.ppt
BI MicrosoftMDM - Frank Olav Estensen.ppt
 
Week3-Bill of Material.pptx
Week3-Bill of Material.pptxWeek3-Bill of Material.pptx
Week3-Bill of Material.pptx
 
Teaching demo.pptx
Teaching demo.pptxTeaching demo.pptx
Teaching demo.pptx
 
Sylabus MRP.pptx
Sylabus MRP.pptxSylabus MRP.pptx
Sylabus MRP.pptx
 
Empathys Map.pptx
Empathys Map.pptxEmpathys Map.pptx
Empathys Map.pptx
 
3 PU ERP - MRP.pptx
3 PU ERP - MRP.pptx3 PU ERP - MRP.pptx
3 PU ERP - MRP.pptx
 

Recently uploaded

Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio managementJunaidKhan750825
 

Recently uploaded (20)

Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio management
 

bpr-chapter1-concept-and-principle-know-where-you-are3.ppt

  • 1. 1 Chapter 1 - “Know Where You Are”
  • 2. At the end of the course, you will be able to:  Define business process redesign  Describe the nine dimensions of BPR  Discuss the benefits of BPR  Identify and describe the situations in which BPR becomes necessary  Describe the warning signs of trouble that indicate the need for reengineering  Identify and describe the critical success factors for BPR projects 2
  • 3.  Reengineering business processes means tossing aside existing process and starting over. 3 Business Process Reengineering is defined as; “the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical contemporary measures of performance such as costs, quality and speed”. (Hammer and Champy, 1993) ***Business process re-engineering is also known as business process redesign, business transformation, or business process change management.
  • 4. 4
  • 5.  Fundamental Fundamental implies that everything – every assumption, every reason, every activity – is challenged by asking why it should be continued. The implication is nothing should be accepted as scared. Over time, practices that were once required become obsolete and need to be removed.  Radical Do not try to improve the existing situation, invent(create/design) completely new ways of accomplishing(complete/achieve) work. 5
  • 6.  Dramatic Do not use business process redesign to obtain marginal (small slight) improvements, aim at order-of-magnitude improvements (ten times). If the marginal gains – 5 to 10 percent – are the goal, then continuous improvement is a more appropriate path than reengineering.  Process Focus on the business processes instead of organizational structures. 6
  • 7. A business process may be defined as “a set of logically related tasks performed to achieve a defined business outcome” (Davenport, 1990) OR “activities that takes one or more kinds of input and create an output that is of value to customer” (Hammer and Champy, 1993) OR “a set of business events that together enable the creation and delivery of an organization’s products or services to its customers” (Gelinas et. al, 2004) 7
  • 8. Reengineering takes time, larger project takes even more time. Reengineering requires process, organization and technology changes. Reengineering also requires infrastructure changes and cultural transformation). - Once the “radical” changes takes place, they must continuously improve the process, practices in the business operation to prevent future deterioration and ensure preventive maintenance. 8 Design Implementation Continuous Process Improvement Time Figure 1.1: The Business Reengineering Continuum
  • 9. 9 Process Structure Technology Structure Organization Structure Reward Structure Measurement Systems Organizational Culture Political Power Management Methods Individual Belief Systems Physical Technical Layer Infrastructure Layer Value Layer More concrete easiest to change More difficult to change less concrete Figure 1.2: The Dimensions of Business Reengineering
  • 10. 1.0 The Physical /Technical Dimensions are what people can easily see and do. Include; a. Process structure consists of the business processes, outcomes, policies, practices and procedures that support the processes. (process structure is what, when and how work is performed) Process can be triggered by internal events, timing cycles, or external stimuli. Some processes originate by designs, others may emerge informally to meet real or perceived organizational needs (that is why we need business process reengineering). There are undocumented, inconsistently applied and personality dependent processes. No single organization has the same processes Process produce business outcomes. Its true purpose is to produce a “quality” outcome in a timely and predictable manner. 10
  • 11. 11 Dimensions of Business Reengineering b. Technology structure which consists of the automated communications, networking, and computer systems used to support the process structure. The sensible (rational/reasonable) application of technology depends on the competent integration of technology with work processes. c. Organization structure defines who performs, manages, and is accountable for each business process. When process and organization structures are out of alignments, there are gaps in accountability.
  • 12. 2.0 The Infrastructure Dimensions refers to interpretation of policies and procedures which heavily influences how the physical/technical dimensions on a day-to-day basis. If the physical/technical dimensions change, the infrastructure must also change because they reinforce desired performance operational behavior. a. Reward structure regulates behavior. Rewards may be formal or informal, financial or recognition based. Ideally, well-designed jobs provide a work environment that is rewarding in and of itself. 12 Dimensions of Business Reengineering
  • 13. b. Measurement systems define the feedback that provide information on process performance. - enables people to improve process performance; - must deliver appropriate information; - should uncover the need for change; - should be made available directly and simultaneously (at once) to process performers and managers 13 Dimensions of Business Reengineering
  • 14. c. Management methods consist of the practices and techniques used to supervise, develop, and support the people who perform the business processes. It is one of the most neglected (ignored) in reengineering because it is seen as outside the project scope. Managers and supervisors must understand and learn how to support the new environment so as to gain benefits from the reengineering process. 14 Dimensions of Business Reengineering
  • 15. 3.0 The Value Dimensions define the organization’s culture and drive behavior. Leadership and improvement philosophies must emerge from these dimensions. a. Organizational culture consists of the unspoken, collective rules and beliefs of the organization. It can be discerned (perceive/see) through the organization’s language, symbols, myths (legends) and rituals (ceremony). It defines what is important to the organization more forcefully than any memo from the CEO. Changing embedded corporate value is perhaps the most powerful form of change. 15 Dimensions of Business Reengineering
  • 16. b. Political power refers to individual who manipulate and shape the actions and behaviors of others. Both formal and informal leaders use power to promulgate (broadcast) and reinforce power. Formal authority – acquired through the position held in the organization. Personal power – acquired through expertise, knowledge, or connections. 16 Dimensions of Business Reengineering
  • 17. 17 c. Individual belief systems are the attitudes and mental models that individuals apply to themselves, those they work with, and the work itself. Examples of mental models: Impatience, skepticisms, openness, control, rigidity, and flexibility Aligning the value dimensions to support the reengineered organization requires organization executives to demonstrate leadership. Dimensions of Business Reengineering
  • 18. 1. Increase the organization’s ability to customize products and services while retaining mass-production economics. 2. Increase customer satisfaction with products and services so they prefer your products and services over those of your competitors. 3. Make it easy and pleasant (enjoyable) for customers to do business with your organizations. 4. Break organizational boundaries, bringing customers into the information channels through communication, networking, and computer technologies. 18
  • 19. 19 BENEFIT of REENGGINEERING 5. Decrease response time to customers, eliminate errors and complaints, and reduce product and service development and manufacturing cycle time. 6. Process more customer requests and higher volume from each customer, and deliver “value-driven” prices to customers without reducing profitability. 7. Improve the quality of work life and individual capabilities for contribution so that people experience ownership of their work and of customers and see their contributions to the organizations. 8. Improve the sharing and utilization of organization knowledge so the organization does not become/remain dependent on the expertise of a few people.
  • 20. 20 THE NEED FOR REENGINEERING WARNING SIGNS OF TROUBLE 1. The explosion of chaos and bureaucracy: Organizations’ work processes were not designed BUT they evolved out of the chaos of doing business. Processes become habitualized. From veteran to new staff without realising it was a mistake (e.g. a team of headquarters accountants visiting a field billing office found clerks misapplying account codes to expense vouchers. The team asked a clerk why? She replied: “Listen, I’ve been doing this job for 20 years, and you are not going to tell me I’m doing it wrong”.) 2. Thinking of customers: Too many companies design processes based on the assumption that they know what’s best for customers, thus, organization becomes inflexible, driving frustrated customers to competitors or regulatory commissions. Employees who take the initiatives to help customer would be penalised for bypassing official procedures.
  • 21. 3. Automation of existing bureaucracy: computerization reinforced bureaucracy rather that breaking through it. (changing paper documents to electronic document, BUT company only duplicates existing processes, thus, maintaining both paper and electronic forms of data. E.g. an insurance company’s claims department, automation created paper printouts to replace handwritten claim files, but paper continued to move from one desk to another as the claim was processed). 4. Bottlenecks and disconnects in critical cross-functional processes. Each unit operates as if it has no relationship to the other units. (Each unit is part of the manufacturing stream, but they each operates in costly and cumbersome processes preparing work for processing, resolving problems and errors, tracking the work in progress, thru, creating duplicate and inaccurate data. E.g. large automobile manufacturing company – each division reentered information about incoming work into its own systems, and sent paper with the outgoing work. Each department did not check with each other on what is going on in the manufacturing process). 21 THE NEED FOR REENGINEERING
  • 22. 22 THE NEED FOR REENGINEERING WARNING SIGNS OF TROUBLE 5. Elusiveness of accountability: Most organizations are structured by function (eg. Sales, manufacturing, etc.) but essential business process (eg. Customer service and support) cut across the functions. This makes it difficult, if not impossible, to establish accountability for a complete business process. (e.g. in a manufacturing firm, the subprocesses, each assigned to different group. If any plans or budgets were late, inaccurate, or incomplete, customers’ programs could not be updated in time to avoid invoicing errors and deductions. As a result, in 5-years time, the number of changes in plans and budgets increased from 10 – 57%, and the process deteriorated from lack of management, measurement and accountability. 6. Chaos of downsizing: It leaves survivors demoralized, the work environment inadequately staffed, and people with inadequate skills performing the work, and tasks can no longer be processed within their current configuration. (e.g. a large government organization downsized its headquarters by 40%. 1 staff was left to take up a responsibility for 4 person, he has to work 16 hours a day and before long, demanded to transfer to another location.
  • 23. 7. The turmoil of integration and merger: This creates work processes that often duplicate or conflict with each other. (e.g. Purchase of 4 companies gave the new company 4 different sets of policies, procedures and formula options for processing customer orders. In a 5-year period, over $80 million would be wasted supporting these overlapping redundant operations. Integrating the customer’s order management process will create massive difficulties as 3 of the 4 companies. Field work loads tripled, errors increased 50%, and over 100 additional clerical people were hired to prepare inputs and correct errors. 23 THE NEED FOR REENGINEERING
  • 24. Possible findings 1.0 Lack of a “big picture” concept and poor communication 2.0 Inattention to detail 3.0 Designer arrogance and customer exclusion 4.0 Focus on correction, not error prevention 5.0 Measurement problems 6.0 Focus only on external customers 24 DIAGNOSIS OF PROCESSES OF SUSPECT PRODUCTS AND SERVICES
  • 25. Street-smart business reengineers know that it is critical to create a business case because “it creates massive discomfort with status quo”. The initial business case must sell executives on the VALUE OF THE CHANGE. - must show that “the cost of NOT changing is too high”. - Street smart business reengineers don’t ask people to put up with inconvenient and stressful changes without good reason. They makes two points: 1. The necessity for change. Use quantitative data that translates “what everybody already knows” into facts and numbers 2. The alternative to change. Use hard and soft data to paint a picture of the future if the organization doesn’t change 25 CREATING A BUSINESS CASE
  • 26. 3. Once the facts are on the table, reengineers advocates must get commitments to: - Frame the projects so it is fully defined and understood - Create a reengineered vision of the business, its values, and goals - Build a detailed process redesign of the business operations - Plan the implementation - Conduct a proof of concept (if needed) (**once this has been laid out, reengineer advocate can ask for the “big bucks” for implementation) 26 CREATING A BUSINESS CASE
  • 27. To have a successful BR, requires a strategy that incorporates these CSF: 1. A business focus – a focus on all dimensions. Success depends on integrating all three – process, technology, and organization, plus supporting that integration with new infrastructure and values. 2. A methodology and project approach – requires discipline and structure; methodology must be systematic and fact focused; must articulate how to secure finding, manage power struggles, and sell the new ideas. 3. Time - BR takes time. Executives must be able to stick with the program. 27 CRITICAL SUCCESS FACTORS FOR BR PROJECTS
  • 28. 28 CRITICAL SUCCESS FACTORS FOR BR PROJECTS 4. Partnership participation – BR is accomplished only as a result of efforts by people from all over the organization. Requires flexible and trained teams. 5. Visible, active leadership. This is the most important of all the critical success factors. Requires long-term commitment to BR – in terms of dollars, people and executive visibility. (leaders must be careful not to use negative reinforcement, positive reinforcement is much more effective). **Executive leaders and middle managers must: (1) enable people to step back and evaluate how the work is done, this may mean changing work priorities, (2) resist the temptation to silence dissident voices, (3) simplify problem solving (4) remove barriers and obstacles to peformance, (5) reward and encourage ideas (6) allow people to have fun at work.
  • 29.  BR begins the process of transforming a dysfunctional organization into a learning, productive, quality-focused, customer driven organization.  BR must be customer driven.  Quality is defined in terms of added value, cost sensitivity, responsiveness, and functionality.  BR must enable people to handle more change successfully. 29 CRITICAL SUCCESS FACTORS FOR BR PROJECTS