SlideShare a Scribd company logo
1 of 32
Download to read offline
Building the Next Major Iron Ore
Mine in the Labrador Trough
Corporate Presentation
January, 2012




                               FSE: P02
FORWARD-LOOKING STATEMENTS

Certain information contained herein regarding Champion Minerals Inc., including
management’s assessment of future plans and operations, may constitute forward-looking
statements under applicable securities law and necessarily involve risks, including but not
limited to risks associated with mining exploration, operating costs, production costs, volatility
of share prices, currency fluctuations, imprecision of resource and reserve estimates,
environmental risks and ability to access sufficient capital from internal and external sources.

As a consequence, actual results may differ materially from those anticipated in any forward
looking statements. Plans, intentions or expectations disclosed in any forward-looking
statements or information should not be read as guarantees of future results or events, and will
not necessarily be accurate indications of whether or when or by which such results or events
will be achieved.

Except as required by law, Champion Minerals Inc., expressly disclaims any intention and
undertakes no obligation to update any forward looking statements or information as conditions
change.

The historical mineral resources mentioned are strictly historical in nature and are non-
compliant to National Instrument 43-101 mineral resources and mineral reserves standards,
and should therefore not be relied upon. A qualified person has not done sufficient work to
upgrade or classify the historical mineral resources as current National Instrument NI-43-101
compliant.

                                                                                                     2
About Champion Minerals
Advanced iron ore exploration and development projects located in
Canada’s principal iron ore district, the Labrador Trough

Fermont Projects (710 km2)
 Over 17 projects in the Fermont Quebec mining camp
 The flagship Fire Lake North Project is currently in feasibility stage
 Over 2.2 Billion tonnes of NI 43-101 compliant iron ore resources
  hosted in 3 projects in close proximity to one another
 Champion Minerals holds an 82.5% direct interest, 3% NSR (C$3
  million to buyback 1% of NSR)*
 Fermont neighours are ArcelorMittal and Cliffs Resources
Attikamagen (310 km2)
 Champion Minerals holds a
  100% interest
 Century Iron Mines Corp. has
  option to earn up to a 60% interest
  in the property by spending
  C$13 million by May 2014**


                         •   Fancamp Exploration Ltd. holds remaining 17.5% interest; CHM can earn an
                             additional 2.5% interest upon completing a bankable feasibility study.

                         ** Announced investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M)
                                                                                                    3
Quebec’s Next Major Iron Ore Mine
Fire Lake North (FLN) Development Project
     Nov. 21 2011 PEA indicates ability to produce 8.7 million tonnes of
      concentrate per annum for the first 25 years of a 40-year mine life  the first
      five years will average approximately 10 million tonnes of concentrate per annum
     Net Present Value of $4 billion at a discounted cash flow rate of 8% with an
      Internal Rate of Return of 41.5% and a payback period of 2.3 years
     FLN Mineral Resource Estimate (Oct. 2011): 1.06 billion tonnes
       − Measured and Indicated Resources of 400.1 million tonnes grading 30.6%
           total iron
       − Inferred Resources of 661.2 million tonnes grading 27.7% total iron
Established Iron Ore District
     Canada’s produces 44 mtpy of iron ore concentrate in the southern end of the
      Labrador Trough  this is expected to grow to 200 mtpy over the next 10 years if
      all proposed development projects are realized.
     Established rail, power and port infrastructure
       -    Quebec’s Plan Nord: $80 billion investment over the next 25 years in
            northern Quebec for various projects including infrastructure projects
       -    Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012
       -    Initiative for world-class port facilities underway
Proven Team
     Strengthened advisory board and board of directors includes former Consolidated
      Thompson Iron Mines management and officers




                                                                                         4
Capital Structure
 Share Data and Cash Position as of December 31, 2011.
                               Shares Outstanding     88.0 million
                                          Warrants    6.9 million @ C$1.50
                                                      (450,000 @ C$1.15 expiring 04/2012
                                                      2.7 million @ C$1.50 expiring 04/2012
                                                      2.9 million @ C$1.50 expiring 10/2012, of which 75%
                                                      are owned by insiders and advisors.)
                                           Options    12.5 million @ C$1.04
                   Fully Diluted Shares Outstanding   107.6 million
                              Market Capitalization   C$114.4 million
                       (based on $1.30 share price)
                                     Cash Position    C$16.5 million
                        Fully Diluted Cash Position   C$41.0 million
                           Management Ownership       ~ 8%
                                 Analyst Coverage     Canaccord Genuity
                                                      Fraser Mackenzie
                                                      Haywood Securities
                                                      Jennings Capital
                                                      Macquarie Capital Markets
                                                      Paradigm Capital
                                                      RBC Capital Markets
                                                      Salman Partners
                                                      Stifel Nicolaus

                                                                                                            5
Experienced Management Team
Over 200 years of combined exploration and mine operations experience

Board of Directors                           Management Team
Tom Larsen                                   Tom Larsen
Chairman                                     President and CEO
Alexander Horvath, P.Eng.                    Alexander Horvath, P.Eng.
Director                                     Executive Vice President, Exploration
Jean Depatie, P.Geo.                         Martin Bourgoin, P. Geo.
Director                                     Executive Vice President, Operations
Ashwath Mehra                                Jeff Hussey, P.Geo.
Director                                     Executive Vice President, Development
Donald A. Sheldon, LLB., P.Eng.              Bruce Mitton, P.Geo.
Director                                     Vice President, Exploration
Paul Ankcorn                                 Jean-Luc Chouinard, P.Eng.
Director                                     Director of Projects
Francis Sauve                                Miles Nagamatsu, CA
Director                                     Chief Financial Officer
Joseph S. C. Chan                            Jorge Estepa
Director                                     Vice President, Secretary-Treasurer
Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board
Advisory Board: Richard Quesnel, Mick McMullen, and Doug Bache
Project Finance Advisor: Marc Duchesne                                               6
Why invest in Champion Minerals?
                    Favourable Operating              Champion Minerals’
                        Environment                  Competitive Advantage
                •   Established iron ore         •     Fermont: 17 iron ore
                    mining district  the              (710 km2) brownfield
                    Labrador Trough                    projects
                •   Favourable tax               •     Feasibility Stage Fire
                    environment                        Lake North Surface
                    (40% tax rebate on                 Deposits contain
                    exploration expenditures)          coarse grained
                •   Access to low-cost power           specular hematite 
                    and close to rail and port    Easier to liberate
                    infrastructure                Deleterious elements
                •   Quebec`s Plan Nord            are below industry
                    $80 billion over the next      specifications limits
                    25 years
                                                 •     Experienced team of
                •   Quebec is known to be a            project developers and
                    world class area to                mine builders
                    develop mines
                                                 •     Upside Potential for
                •   Unprecedented Iron Ore             Growth
                    Price Range and Forecast
                                                 •     Several De-Risking
                •   Skilled Labor Work Force           Initiatives Underway

                                                                                7
Attikamagen




                                                         Rail Infrastructure

                                              Quebec North Shore & Labrador
                                              Railway (“QNS&L”)
                                     High
                                    Voltage    QNS&L links to Sept-Iles and Pointe Noire
                                    Power
                                     Lines     Bloom Lake and QNS&L railways are
                     Cluster 1                  considered common carriers
   Cluster 2                                   Common carriers allocate capacity on a
                                                first-come, first-serve basis
Cluster 3      Fermont                         Fire Lake North PEA Base Case connection
                                                to Bloom Lake railway requires 94 km of rail
                                                – includes turnaround loop and sidings
                    Cartier
                                  QNS&L        Participation in a private multi user rail
                    Private
                                   Rail         solution as an alternative transportation /
                                 Common         haulage option is also under study
                    Rail
                                  Carrier
                                              Cartier Railway: Linked to Port-Cartier
                                               Privately owned by ArcelorMittal
                               Three Ports/
                                Stockpile      Adjacent to the west of Fire Lake North Proj.
                                Locations
                   St Lawrence Seaway
                                                                                              8
Multi-User Port Infrastructure
 Expanding to Meet Demand
Port of Sept-Iles
 RTZ-IOC shipping facility
Pointe Noire
 50Mtpy Multi User Port Project to be
  announced; Phase 2 Planning….                   Sept-Iles

 Cliffs Natural Resources shipping
  facility
                                                Pointe Noire
 New multi-user port to be expanded
  in two phases: phase one expansion
  of 40-50 Mtpy and phase two
  expansion of 100 Mtpy
Port-Cartier
 ArcelorMittal shipping facility
 $2.1B expansion is underway and                              China Max ship capacity 300kt
  will include concentrator expansion
  with port and rail infrastructure
  upgrades
 Located 62 km west of Sept-Iles
                                         Courtesy of the Port de Sept Isles
                                                                                               9
                                                                                                   9
Development: Fire Lake North Project
             Oil Can Project 6 km
           from FLN Concentrator
Fire Lake North Project
Growth through Development
                  PEA indicates ability to produce 8.7 million tonnes of concentrate per
                   annum for the first 25 years of a 40-year mine life  the first five years will
                   average almost 10 million tonnes of concentrate per annum
                  Net Present Value of $4 billion at a discounted cash flow rate of 8% with an
                   Internal Rate of Return of 41.5% and a capital payback period of 2.3 years.
                Recent mineral resource update
                 announced (October 6, 2011)
               −   Measured and Indicated Resources
                   of 400.1 million tonnes grading
                   30.6% total iron
               −   Inferred Resources of 661.2 million
                   tonnes grading 27.7% total iron
                Metallurgy indicates coarse liberation
                 grind size similar to RTZ/IOC
                 and ArcelorMittal operations nearby
                Feasibility Study underway; Several
                 project studies initiated in 2011




                                                  See www.championminerals.com for reports maps and assays 12
Fire Lake North - Metallurgy
 Deposits are coarser grained; at -24 to -28 mesh the SiO2 content is low (3-4%) ;
  SPI tests indicate a relatively soft ore; 2nd Phase of tests underway
 Gravity separation is the typical beneficiation technique in the Fermont mining
  camp; magnetic separation is not included in the current mill design
 Deposits of quartz specularite iron ore are typical of the Fermont area
    − Coarse liberation grind size (600-850 microns / 20 to 28 mesh) ; product will
      be sold as sinter fines ; 80% of the global iron ore market seeks this product
    − Low deleterious elemental levels will help to secure market share




    High Grade - Coarse Specular Hematite         Typical Quartz-Specular
                                               Hematite-Magnetite Mineralization    13
Fire Lake North Development Project




                                      14
Fire Lake North Development Project




                                      15
Fire Lake North Development Project
    November 2011 Preliminary Economic Assessment Update – Highlights

     Key Results                                                                     Pre-Tax Basis
     Internal Rate of Return (IRR) (8% Discount Rate)                                    41.5%
     Undiscounted Cash Flow                                                           US$10.9B
     Net Present Value @ 5% Discounted Cash Flow                                       US$5.6B
     Net Present Value @ 8% Discounted Cash Flow                                       US$4.0B

    Based upon the following Discounted Cash Flow
     Net Present Value @ 10% assumptions:                                              US$3.2B

     Payback Period (8% Discount Rate)                                                 2.3 Years

   Capital Costs:        US$1,368 million (includes rail and port infrastructure)
   Operating Costs:      US$51.01 per tonne (average 25 years);
                          US$39.46 per tonne (average years 1 to 5)
   Price assumptions:    US$115 per tonne of concentrate at 65% Fe
   Mine-Life:            40 years (average of 8.7 million tonnes/year for the first 25 years)
   Exchange rate:        $1.00 USD to $1.00 CDN
   Total Resources(1):   400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources)
                          661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)
   In Pit Resources      921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade
                                                                                                      16
Fire Lake North Project
Preliminary Economic Assessment Study

OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE)
                COST PARAMETERS                         AVERAGE 25 YEARS   AVERAGE YEARS 1 TO 5
Mining                                                       22.56                12.13
Concentrating, crushing and processing                       4.52                 3.97
Site infrastructure, sales and general administration        4.40                 3.39
Environmental tailings and management                        0.29                 0.26
Rail transport                                               15.52                16.14
Port facilities                                              3.72                 3.57
                                                Total        51.01                39.46
 Equipment Lease Cost (not included in above total)          1.67                 5.17

CAPITAL EXPENDITURES (US$ MILLIONS)
                                 COST CENTRES                                      $ MILLIONS
Pre-stripping of open pit areas                                                      97.5
Concentrator and site infrastructure including loadout facilities                    682.3
Railway (62km distance and 94km total including turnaround loop and sidings)         228.8
Port Facilities: Railcar unloading, stacker/reclaimer, conveyors                     96.8
Environmental and Tailings Management                                                27.9
Other Pre Production Costs                                                           34.0
                                                                      Sub-total      1,167
                                                                   Contingency        201
                                                                          Total      1,368        17
Fire Lake North Project Schedule
     Development, Construction, and Production
                                     2011        2012        2013        2014        2015
                                 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Diamond Drilling

Scoping Study

Feasibility Study

Environmental / Social Studies

Community Consultation

Permitting

Construction

Production




                                                                                          18
Oil Can Project
Exploration Upside

 First three drill holes of 8,000 metres planned program intersected magnetite-
  hematite iron formation from 191 metres to 402 metres in length
 Drill hole OC11-02 intersected 401.5 metres grading 30.7% Total Iron including
  a 213.5 metres interval grading 33.1% Total Iron

        TABLE 1 – SELECTED* COMPOSITE ASSAY                                         RESULTS (HOLES OC11-01 to OC11-03)
 HOLE-ID HOLE LENGTH AZIMUTH        DIP                                              FROM        TO    INTERVAL** GRADE***
                metres    degrees degrees                                            metres    metres    metres     Total Fe%
 OC11-01          396        260     -45                                             185.42    376.31    190.89        30.6
 OC11-02          594        310     -45                                             188.53    590.03    401.50        30.7
 including                                                                           246.86    460.40    213.54        33.1
 OC11-03          372        250     -45                                             40.58     264.60    224.02        28.1
 including                                                                           76.58     216.58    140.00        30.0
* Selected Composite Assay Resultsare stated only for results recently received. The Selected Composites are not necessarily representative of the average grade
or thickness of the mineral zones or potential resource.
** Intervals are down-hole lengths and not true widths of the mineral zones.
*** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis.




                                                                                                                                                               19
Oil Can Project
Exploration Upside


 Four drill holes completed on the South Zone at Oil Can were drilled on
  sections spaced approximately 400 metres (m) apart, along the estimated
  1,300 m strike length of a crescent-shaped magnetic anomaly
 2011 drill program completed at Oil Can ; Mineral Resource Estimate Q1 2012

            TABLE 2 - SELECTED* COMPOSITE ASSAY RESULTS (HOLES OC11-04 to OC11-08)
  HOLE-ID            HOLE LENGTH                AZIMUTH               DIP              FROM                   TO             INTERVAL**           GRADE***
                           metres                degrees           degrees            metres               metres               metres            Total Fe%
South Zone
 OC11-05                   545.00                   020               -45             241.56               545.00               303.44                34.7
 including                                                                            407.24               538.00               130.76                36.5
 OC11-07                   370.67                   250               -45              83.82               281.00               197.18                26.8
 including                                                                             83.82               229.36               145.54                28.1
 OC11-08                   616.00                   180               -50              67.00               612.73               545.73                33.7
 Including                                                                             67.00               509.34               442.34                36.4
North Zone
 OC11-04                   543.00                   360               -45       Assay results pending
 OC11-06                   520.00                   290               -45       Assay results pending

Selected Composite Assay Results are stated only for results recently received. The Selected Composites are not necessarily representative of the average grade
or thickness of the mineral zones or potential resource.
** Intervals are down-hole lengths and not true widths of the mineral zones.
*** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis.
                                                                                                                                                                  20
Moire Lake Project
Exploration Upside

                                     •   2011: 10,400m drill program completed
  Arcelor Mittal Property Boundary




                                     •   Mineral Resource Estimate Q1 2012
                                     •   Drill results include: 503 metres
                                         grading 31% total iron (LM11-12)
                                     •   Potential to significantly increase
                                         Historical Resource: 101 million tonnes
                                         grading 31% iron




• Kilometric Synform with
  Hematite and Magnetite
  outcrops at surface
                                                       500
• Adjacent to the East of                              meters
  ArcelorMittal Mont Wright Mine
• 10 km from QNS&L Railway

                                                                              21
Fermont Project Resource Base
Current NI 43-101 Compliant Resources


                                    Over 2.2 Billion Tonnes of
                             NI 43-101 Compliant Iron Ore Resources


                1000                                                 947
                    900                                                           Measured
                    800                                                           and
                                                                                  Indicated
                    700                              661                          (M&I)

                    600
                    500
                                               400
                    400
                    300
                                  215
                    200
                    100
                     0
   Project                   Bellechasse        Fire Lake North      Harvey Tuttle

   Location                Quebec, Canada       Quebec, Canada      Quebec, Canada
   Grade                        28.7%             30.6% (M&I)           23.2%
                                                27.7% (Inferred)
   Mineralization             Magnetite        Specular Hematite      Magnetite
   Historical             91 Mt @ 30.0% Iron   41 Mt @ 31.0% iron          n/a
   Resources

   * 15 % cut-off grade
                                                                                      22
Milestones

Fire Lake North Definition Drilling          Ongoing
Updated PEA on Fire Lake North              Completed
Initial NI 43-101 Mineral Resource
                                             Q1 2012
Estimate for Moire Lake Project
O’Keefe Purdy Drill Results Remaining        Q1 2012
Initial NI 43-101 Mineral Resource
Estimate for Oil Can Project                 Q1 2012
(adjacent to Fire Lake North Project)
Metallurgical results at Fire Lake North,
                                            Q1-Q2 2012
Moire Lake, and Oil Can Projects
Fire Lake North Feasibility Study            Q3 2012
Fire Lake North Construction Start           Q4 2013
Fire Lake North Production                    2015




                                                         23
Why Invest in
Champion Minerals?

 Fire Lake North NPV: $4 Billion @ 8% DCF & adjacent Oil Can
 17 Brownfield Projects (710 km2) near 5 operating mines
 Experienced Management Team: Developers & Mine Builders
 Good cash position  Favourable tax environment
 Quebec`s Plan Nord: $80 billion over 25 years
 Access to low-cost power and close to rail and port
 Multi User Port is planned ; Trans-Shipping is an option
 Several Railway options are under study
 Iron Price Range and Forecasts is Unprecedented
 Upside Potential of Adjacent Fermont Projects & Attikamagen
 Several De-Risking Initiatives Underway for Fire Lake North
 Project

                                                               24
Exploration Projects

                           Fire Lake North
                          Exploration Camp




 Coarse Grained
Specular Hematite
O’Keefe Purdy Project
Exploration Upside




  2 km




         o November 30, 2011 Press Release; O’Keefe NW Occurrence:
            Drill hole OP11-06 intersected 124 metres of specular hematite-rich iron
            formation grading 34.1% Total Iron; including 109 m grading 37% FeT.
         o Drill Hole OP11-08, located 200m away intersected 155.6 m grading
            29.7% FeT including an 87.4 m interval grading 37.1% FeT.

                                                                                       26
Advanced Exploration
Bellechasse Project                                Harvey Tuttle Project
                                                      NI 43-101 Inferred Resource Estimate:
 NI 43-101 Inferred Resource Estimate: 215Mt @
                                                       717Mt @ 25% iron; magnetite rich
  29% Iron; Magnetite Rich iron formation
 Historical Resources increased from 91Mt            Intersected multiple significant iron formation
  remaining upside potential.                          intervals in 2010 drill program

 Adjacent to Hwy 389; 10km from Fire Lake North      Total of 13,165m of drilling completed

 Synform Geometry is good for Open Pit               Less than 50% of the kilometric scale
                                                       magnetic anomalies have been tested
                                                      Metallurgical tests underway
                                                      Located 25 km NW of Fire Lake North
                                                      Within conveying distance from Fire Lake
                                                       North planned concentrator (20-30km)




                                                                                                         27
Labrador Trough Annual Production
Iron Ore Production Upside

             Company                              Current Annual        Projected
                                                   Production        Annual Forecast
 IOC/RTZ                                                   17 mtpy      26 mtpy1
 ArcelorMittal                                             13 mtpy      24 mtpy2
 Cliffs Natural Resources                                  12 mtpy       28 mtpy
 (Wuhan)
 Labrador Iron Mines                                       2 mtpy        5 mtpy
 Adriana Resources (Wuhan)                                   0           50 mtpy
 New Millennium (Tata)                                       0           27 mtpy
 Century Iron Mines (Wuhan)                                  0          ~20 mtpy
 Champion Minerals                                           0          ~18 mtpy
 Alderon Iron Ore Corp.                                      0           ~8 mtpy
 Total current and forecasted                                44        ~ 200 mtpy
 production
  1.   Possibility of expanding production up to 50 mtpy
  2.   Possibility of expanding production to 50 mtpy
                                                                                       28
Global Steel Production Shows
    Continued Demand for Iron Ore
1,600,000



1,400,000                       China’s CAGR* is 9.88% over
                               the last 30 years vs. 2.30% for
1,200,000
                                total global steel production
                                   over the same period.
1,000,000
                                                                                 China

 800,000
                                                                                 Japan

 600,000                                                                         Rest of the
                                                                                 World

 400,000



 200,000



       -
            1980           1985             1990   1995     2000   2005   2010

  Source: World Steel Association website
  * Compound annual growth rate
                                                                                           29
Thank You




            30




                 30
Iron Ore Types

Coarse Grained Specular Hematite




                                         Direct Shipping Ore




Coarse Grained Specular Hematite         Magnetite Rich Taconite   31
Fermont Iron
 Ore District
  (“FIOD”)




                32

More Related Content

What's hot

Champion august 31, 2012 with cn
Champion august 31, 2012 with cnChampion august 31, 2012 with cn
Champion august 31, 2012 with cnshosein2011
 
English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012shosein2011
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011shosein2011
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012shosein2011
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 enshosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25thshosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012shosein2011
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011shosein2011
 
05 29-12 maypresentation-updated
05 29-12 maypresentation-updated05 29-12 maypresentation-updated
05 29-12 maypresentation-updatedJennieg
 
05 24-12 maypresentation-updated
05 24-12 maypresentation-updated05 24-12 maypresentation-updated
05 24-12 maypresentation-updatedJennieg
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011shosein2011
 
Investor Presentation - September 2014
Investor Presentation - September 2014Investor Presentation - September 2014
Investor Presentation - September 2014Sagegold
 
1640 phillip bruce
1640 phillip bruce1640 phillip bruce
1640 phillip bruceSymposium
 

What's hot (19)

Champion august 31, 2012 with cn
Champion august 31, 2012 with cnChampion august 31, 2012 with cn
Champion august 31, 2012 with cn
 
English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 en
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011
 
05 29-12 maypresentation-updated
05 29-12 maypresentation-updated05 29-12 maypresentation-updated
05 29-12 maypresentation-updated
 
05 24-12 maypresentation-updated
05 24-12 maypresentation-updated05 24-12 maypresentation-updated
05 24-12 maypresentation-updated
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
 
Investor Presentation - September 2014
Investor Presentation - September 2014Investor Presentation - September 2014
Investor Presentation - September 2014
 
1640 phillip bruce
1640 phillip bruce1640 phillip bruce
1640 phillip bruce
 
April 2012
April 2012April 2012
April 2012
 

Similar to Champion Minerals Corporate Presentation Jan 16th 2012

Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012shosein2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011shosein2011
 
Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011shosein2011
 
Champion Minerals Corporate Presentation October 13 2011
Champion Minerals  Corporate Presentation October 13 2011Champion Minerals  Corporate Presentation October 13 2011
Champion Minerals Corporate Presentation October 13 2011shosein2011
 
Iron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationIron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationajstocks
 
Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting ajstocks
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011Crocodile Gold
 
25 04 12 reservoir minerals_v01_si (2)
25 04 12 reservoir minerals_v01_si  (2)25 04 12 reservoir minerals_v01_si  (2)
25 04 12 reservoir minerals_v01_si (2)reservoirminerals
 
Arianne Resources (TSX-V:DAN) Corporate Presentation
Arianne Resources (TSX-V:DAN) Corporate PresentationArianne Resources (TSX-V:DAN) Corporate Presentation
Arianne Resources (TSX-V:DAN) Corporate Presentationtsxvdan
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationCompany Spotlight
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Symposium
 
Hudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate PresentationHudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate Presentationtuer
 
Solitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor PresentationSolitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor PresentationCompany Spotlight
 
June 2010 HGC Corporate Presentation
June 2010 HGC Corporate PresentationJune 2010 HGC Corporate Presentation
June 2010 HGC Corporate PresentationAdnet Communications
 

Similar to Champion Minerals Corporate Presentation Jan 16th 2012 (17)

Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
 
Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011
 
Champion Minerals Corporate Presentation October 13 2011
Champion Minerals  Corporate Presentation October 13 2011Champion Minerals  Corporate Presentation October 13 2011
Champion Minerals Corporate Presentation October 13 2011
 
Iron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationIron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentation
 
Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting
 
Presentation: Critical Elements (May 2011)
Presentation: Critical Elements (May 2011)Presentation: Critical Elements (May 2011)
Presentation: Critical Elements (May 2011)
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011
 
25 04 12 reservoir minerals_v01_si (2)
25 04 12 reservoir minerals_v01_si  (2)25 04 12 reservoir minerals_v01_si  (2)
25 04 12 reservoir minerals_v01_si (2)
 
Arianne Resources (TSX-V:DAN) Corporate Presentation
Arianne Resources (TSX-V:DAN) Corporate PresentationArianne Resources (TSX-V:DAN) Corporate Presentation
Arianne Resources (TSX-V:DAN) Corporate Presentation
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 
Hudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate PresentationHudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate Presentation
 
Solitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor PresentationSolitario Exploration & Royalty Investor Presentation
Solitario Exploration & Royalty Investor Presentation
 
June 2010 HGC Corporate Presentation
June 2010 HGC Corporate PresentationJune 2010 HGC Corporate Presentation
June 2010 HGC Corporate Presentation
 

More from shosein2011

Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012shosein2011
 
Fr champion iron mines november 2012
Fr champion iron mines november 2012Fr champion iron mines november 2012
Fr champion iron mines november 2012shosein2011
 
German champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxGerman champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxshosein2011
 
12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]shosein2011
 
12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012shosein2011
 
August1 chinesecp
August1 chinesecpAugust1 chinesecp
August1 chinesecpshosein2011
 
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - ChineseChampion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - Chineseshosein2011
 

More from shosein2011 (17)

Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012
 
Fr champion iron mines november 2012
Fr champion iron mines november 2012Fr champion iron mines november 2012
Fr champion iron mines november 2012
 
German champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxGerman champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsx
 
12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]
 
12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Aug1chmcpc
Aug1chmcpcAug1chmcpc
Aug1chmcpc
 
Aug1chmcpc
Aug1chmcpcAug1chmcpc
Aug1chmcpc
 
Aug1chmcpg
Aug1chmcpgAug1chmcpg
Aug1chmcpg
 
August1 chinesecp
August1 chinesecpAugust1 chinesecp
August1 chinesecp
 
August1germancp
August1germancpAugust1germancp
August1germancp
 
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - ChineseChampion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦anilsa9823
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 

Champion Minerals Corporate Presentation Jan 16th 2012

  • 1. Building the Next Major Iron Ore Mine in the Labrador Trough Corporate Presentation January, 2012 FSE: P02
  • 2. FORWARD-LOOKING STATEMENTS Certain information contained herein regarding Champion Minerals Inc., including management’s assessment of future plans and operations, may constitute forward-looking statements under applicable securities law and necessarily involve risks, including but not limited to risks associated with mining exploration, operating costs, production costs, volatility of share prices, currency fluctuations, imprecision of resource and reserve estimates, environmental risks and ability to access sufficient capital from internal and external sources. As a consequence, actual results may differ materially from those anticipated in any forward looking statements. Plans, intentions or expectations disclosed in any forward-looking statements or information should not be read as guarantees of future results or events, and will not necessarily be accurate indications of whether or when or by which such results or events will be achieved. Except as required by law, Champion Minerals Inc., expressly disclaims any intention and undertakes no obligation to update any forward looking statements or information as conditions change. The historical mineral resources mentioned are strictly historical in nature and are non- compliant to National Instrument 43-101 mineral resources and mineral reserves standards, and should therefore not be relied upon. A qualified person has not done sufficient work to upgrade or classify the historical mineral resources as current National Instrument NI-43-101 compliant. 2
  • 3. About Champion Minerals Advanced iron ore exploration and development projects located in Canada’s principal iron ore district, the Labrador Trough Fermont Projects (710 km2)  Over 17 projects in the Fermont Quebec mining camp  The flagship Fire Lake North Project is currently in feasibility stage  Over 2.2 Billion tonnes of NI 43-101 compliant iron ore resources hosted in 3 projects in close proximity to one another  Champion Minerals holds an 82.5% direct interest, 3% NSR (C$3 million to buyback 1% of NSR)*  Fermont neighours are ArcelorMittal and Cliffs Resources Attikamagen (310 km2)  Champion Minerals holds a 100% interest  Century Iron Mines Corp. has option to earn up to a 60% interest in the property by spending C$13 million by May 2014** • Fancamp Exploration Ltd. holds remaining 17.5% interest; CHM can earn an additional 2.5% interest upon completing a bankable feasibility study. ** Announced investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M) 3
  • 4. Quebec’s Next Major Iron Ore Mine Fire Lake North (FLN) Development Project  Nov. 21 2011 PEA indicates ability to produce 8.7 million tonnes of concentrate per annum for the first 25 years of a 40-year mine life  the first five years will average approximately 10 million tonnes of concentrate per annum  Net Present Value of $4 billion at a discounted cash flow rate of 8% with an Internal Rate of Return of 41.5% and a payback period of 2.3 years  FLN Mineral Resource Estimate (Oct. 2011): 1.06 billion tonnes − Measured and Indicated Resources of 400.1 million tonnes grading 30.6% total iron − Inferred Resources of 661.2 million tonnes grading 27.7% total iron Established Iron Ore District  Canada’s produces 44 mtpy of iron ore concentrate in the southern end of the Labrador Trough  this is expected to grow to 200 mtpy over the next 10 years if all proposed development projects are realized.  Established rail, power and port infrastructure - Quebec’s Plan Nord: $80 billion investment over the next 25 years in northern Quebec for various projects including infrastructure projects - Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012 - Initiative for world-class port facilities underway Proven Team  Strengthened advisory board and board of directors includes former Consolidated Thompson Iron Mines management and officers 4
  • 5. Capital Structure Share Data and Cash Position as of December 31, 2011. Shares Outstanding 88.0 million Warrants 6.9 million @ C$1.50 (450,000 @ C$1.15 expiring 04/2012 2.7 million @ C$1.50 expiring 04/2012 2.9 million @ C$1.50 expiring 10/2012, of which 75% are owned by insiders and advisors.) Options 12.5 million @ C$1.04 Fully Diluted Shares Outstanding 107.6 million Market Capitalization C$114.4 million (based on $1.30 share price) Cash Position C$16.5 million Fully Diluted Cash Position C$41.0 million Management Ownership ~ 8% Analyst Coverage Canaccord Genuity Fraser Mackenzie Haywood Securities Jennings Capital Macquarie Capital Markets Paradigm Capital RBC Capital Markets Salman Partners Stifel Nicolaus 5
  • 6. Experienced Management Team Over 200 years of combined exploration and mine operations experience Board of Directors Management Team Tom Larsen Tom Larsen Chairman President and CEO Alexander Horvath, P.Eng. Alexander Horvath, P.Eng. Director Executive Vice President, Exploration Jean Depatie, P.Geo. Martin Bourgoin, P. Geo. Director Executive Vice President, Operations Ashwath Mehra Jeff Hussey, P.Geo. Director Executive Vice President, Development Donald A. Sheldon, LLB., P.Eng. Bruce Mitton, P.Geo. Director Vice President, Exploration Paul Ankcorn Jean-Luc Chouinard, P.Eng. Director Director of Projects Francis Sauve Miles Nagamatsu, CA Director Chief Financial Officer Joseph S. C. Chan Jorge Estepa Director Vice President, Secretary-Treasurer Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board Advisory Board: Richard Quesnel, Mick McMullen, and Doug Bache Project Finance Advisor: Marc Duchesne 6
  • 7. Why invest in Champion Minerals? Favourable Operating Champion Minerals’ Environment Competitive Advantage • Established iron ore • Fermont: 17 iron ore mining district  the (710 km2) brownfield Labrador Trough projects • Favourable tax • Feasibility Stage Fire environment Lake North Surface (40% tax rebate on Deposits contain exploration expenditures) coarse grained • Access to low-cost power specular hematite  and close to rail and port  Easier to liberate infrastructure  Deleterious elements • Quebec`s Plan Nord  are below industry $80 billion over the next specifications limits 25 years • Experienced team of • Quebec is known to be a project developers and world class area to mine builders develop mines • Upside Potential for • Unprecedented Iron Ore Growth Price Range and Forecast • Several De-Risking • Skilled Labor Work Force Initiatives Underway 7
  • 8. Attikamagen Rail Infrastructure Quebec North Shore & Labrador Railway (“QNS&L”) High Voltage  QNS&L links to Sept-Iles and Pointe Noire Power Lines  Bloom Lake and QNS&L railways are Cluster 1 considered common carriers Cluster 2  Common carriers allocate capacity on a first-come, first-serve basis Cluster 3 Fermont  Fire Lake North PEA Base Case connection to Bloom Lake railway requires 94 km of rail – includes turnaround loop and sidings Cartier QNS&L  Participation in a private multi user rail Private Rail solution as an alternative transportation / Common haulage option is also under study Rail Carrier Cartier Railway: Linked to Port-Cartier  Privately owned by ArcelorMittal Three Ports/ Stockpile  Adjacent to the west of Fire Lake North Proj. Locations St Lawrence Seaway 8
  • 9. Multi-User Port Infrastructure Expanding to Meet Demand Port of Sept-Iles  RTZ-IOC shipping facility Pointe Noire  50Mtpy Multi User Port Project to be announced; Phase 2 Planning…. Sept-Iles  Cliffs Natural Resources shipping facility Pointe Noire  New multi-user port to be expanded in two phases: phase one expansion of 40-50 Mtpy and phase two expansion of 100 Mtpy Port-Cartier  ArcelorMittal shipping facility  $2.1B expansion is underway and China Max ship capacity 300kt will include concentrator expansion with port and rail infrastructure upgrades  Located 62 km west of Sept-Iles Courtesy of the Port de Sept Isles 9 9
  • 10. Development: Fire Lake North Project Oil Can Project 6 km from FLN Concentrator
  • 11.
  • 12. Fire Lake North Project Growth through Development  PEA indicates ability to produce 8.7 million tonnes of concentrate per annum for the first 25 years of a 40-year mine life  the first five years will average almost 10 million tonnes of concentrate per annum  Net Present Value of $4 billion at a discounted cash flow rate of 8% with an Internal Rate of Return of 41.5% and a capital payback period of 2.3 years.  Recent mineral resource update announced (October 6, 2011) − Measured and Indicated Resources of 400.1 million tonnes grading 30.6% total iron − Inferred Resources of 661.2 million tonnes grading 27.7% total iron  Metallurgy indicates coarse liberation grind size similar to RTZ/IOC and ArcelorMittal operations nearby  Feasibility Study underway; Several project studies initiated in 2011 See www.championminerals.com for reports maps and assays 12
  • 13. Fire Lake North - Metallurgy  Deposits are coarser grained; at -24 to -28 mesh the SiO2 content is low (3-4%) ; SPI tests indicate a relatively soft ore; 2nd Phase of tests underway  Gravity separation is the typical beneficiation technique in the Fermont mining camp; magnetic separation is not included in the current mill design  Deposits of quartz specularite iron ore are typical of the Fermont area − Coarse liberation grind size (600-850 microns / 20 to 28 mesh) ; product will be sold as sinter fines ; 80% of the global iron ore market seeks this product − Low deleterious elemental levels will help to secure market share High Grade - Coarse Specular Hematite Typical Quartz-Specular Hematite-Magnetite Mineralization 13
  • 14. Fire Lake North Development Project 14
  • 15. Fire Lake North Development Project 15
  • 16. Fire Lake North Development Project November 2011 Preliminary Economic Assessment Update – Highlights Key Results Pre-Tax Basis Internal Rate of Return (IRR) (8% Discount Rate) 41.5% Undiscounted Cash Flow US$10.9B Net Present Value @ 5% Discounted Cash Flow US$5.6B Net Present Value @ 8% Discounted Cash Flow US$4.0B Based upon the following Discounted Cash Flow Net Present Value @ 10% assumptions: US$3.2B Payback Period (8% Discount Rate) 2.3 Years  Capital Costs: US$1,368 million (includes rail and port infrastructure)  Operating Costs: US$51.01 per tonne (average 25 years); US$39.46 per tonne (average years 1 to 5)  Price assumptions: US$115 per tonne of concentrate at 65% Fe  Mine-Life: 40 years (average of 8.7 million tonnes/year for the first 25 years)  Exchange rate: $1.00 USD to $1.00 CDN  Total Resources(1): 400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources) 661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)  In Pit Resources 921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade 16
  • 17. Fire Lake North Project Preliminary Economic Assessment Study OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE) COST PARAMETERS AVERAGE 25 YEARS AVERAGE YEARS 1 TO 5 Mining 22.56 12.13 Concentrating, crushing and processing 4.52 3.97 Site infrastructure, sales and general administration 4.40 3.39 Environmental tailings and management 0.29 0.26 Rail transport 15.52 16.14 Port facilities 3.72 3.57 Total 51.01 39.46 Equipment Lease Cost (not included in above total) 1.67 5.17 CAPITAL EXPENDITURES (US$ MILLIONS) COST CENTRES $ MILLIONS Pre-stripping of open pit areas 97.5 Concentrator and site infrastructure including loadout facilities 682.3 Railway (62km distance and 94km total including turnaround loop and sidings) 228.8 Port Facilities: Railcar unloading, stacker/reclaimer, conveyors 96.8 Environmental and Tailings Management 27.9 Other Pre Production Costs 34.0 Sub-total 1,167 Contingency 201 Total 1,368 17
  • 18. Fire Lake North Project Schedule Development, Construction, and Production 2011 2012 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Diamond Drilling Scoping Study Feasibility Study Environmental / Social Studies Community Consultation Permitting Construction Production 18
  • 19. Oil Can Project Exploration Upside  First three drill holes of 8,000 metres planned program intersected magnetite- hematite iron formation from 191 metres to 402 metres in length  Drill hole OC11-02 intersected 401.5 metres grading 30.7% Total Iron including a 213.5 metres interval grading 33.1% Total Iron TABLE 1 – SELECTED* COMPOSITE ASSAY RESULTS (HOLES OC11-01 to OC11-03) HOLE-ID HOLE LENGTH AZIMUTH DIP FROM TO INTERVAL** GRADE*** metres degrees degrees metres metres metres Total Fe% OC11-01 396 260 -45 185.42 376.31 190.89 30.6 OC11-02 594 310 -45 188.53 590.03 401.50 30.7 including 246.86 460.40 213.54 33.1 OC11-03 372 250 -45 40.58 264.60 224.02 28.1 including 76.58 216.58 140.00 30.0 * Selected Composite Assay Resultsare stated only for results recently received. The Selected Composites are not necessarily representative of the average grade or thickness of the mineral zones or potential resource. ** Intervals are down-hole lengths and not true widths of the mineral zones. *** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis. 19
  • 20. Oil Can Project Exploration Upside  Four drill holes completed on the South Zone at Oil Can were drilled on sections spaced approximately 400 metres (m) apart, along the estimated 1,300 m strike length of a crescent-shaped magnetic anomaly  2011 drill program completed at Oil Can ; Mineral Resource Estimate Q1 2012 TABLE 2 - SELECTED* COMPOSITE ASSAY RESULTS (HOLES OC11-04 to OC11-08) HOLE-ID HOLE LENGTH AZIMUTH DIP FROM TO INTERVAL** GRADE*** metres degrees degrees metres metres metres Total Fe% South Zone OC11-05 545.00 020 -45 241.56 545.00 303.44 34.7 including 407.24 538.00 130.76 36.5 OC11-07 370.67 250 -45 83.82 281.00 197.18 26.8 including 83.82 229.36 145.54 28.1 OC11-08 616.00 180 -50 67.00 612.73 545.73 33.7 Including 67.00 509.34 442.34 36.4 North Zone OC11-04 543.00 360 -45 Assay results pending OC11-06 520.00 290 -45 Assay results pending Selected Composite Assay Results are stated only for results recently received. The Selected Composites are not necessarily representative of the average grade or thickness of the mineral zones or potential resource. ** Intervals are down-hole lengths and not true widths of the mineral zones. *** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis. 20
  • 21. Moire Lake Project Exploration Upside • 2011: 10,400m drill program completed Arcelor Mittal Property Boundary • Mineral Resource Estimate Q1 2012 • Drill results include: 503 metres grading 31% total iron (LM11-12) • Potential to significantly increase Historical Resource: 101 million tonnes grading 31% iron • Kilometric Synform with Hematite and Magnetite outcrops at surface 500 • Adjacent to the East of meters ArcelorMittal Mont Wright Mine • 10 km from QNS&L Railway 21
  • 22. Fermont Project Resource Base Current NI 43-101 Compliant Resources Over 2.2 Billion Tonnes of NI 43-101 Compliant Iron Ore Resources 1000 947 900 Measured 800 and Indicated 700 661 (M&I) 600 500 400 400 300 215 200 100 0 Project Bellechasse Fire Lake North Harvey Tuttle Location Quebec, Canada Quebec, Canada Quebec, Canada Grade 28.7% 30.6% (M&I) 23.2% 27.7% (Inferred) Mineralization Magnetite Specular Hematite Magnetite Historical 91 Mt @ 30.0% Iron 41 Mt @ 31.0% iron n/a Resources * 15 % cut-off grade 22
  • 23. Milestones Fire Lake North Definition Drilling Ongoing Updated PEA on Fire Lake North Completed Initial NI 43-101 Mineral Resource Q1 2012 Estimate for Moire Lake Project O’Keefe Purdy Drill Results Remaining Q1 2012 Initial NI 43-101 Mineral Resource Estimate for Oil Can Project Q1 2012 (adjacent to Fire Lake North Project) Metallurgical results at Fire Lake North, Q1-Q2 2012 Moire Lake, and Oil Can Projects Fire Lake North Feasibility Study Q3 2012 Fire Lake North Construction Start Q4 2013 Fire Lake North Production 2015 23
  • 24. Why Invest in Champion Minerals? Fire Lake North NPV: $4 Billion @ 8% DCF & adjacent Oil Can 17 Brownfield Projects (710 km2) near 5 operating mines Experienced Management Team: Developers & Mine Builders Good cash position  Favourable tax environment Quebec`s Plan Nord: $80 billion over 25 years Access to low-cost power and close to rail and port Multi User Port is planned ; Trans-Shipping is an option Several Railway options are under study Iron Price Range and Forecasts is Unprecedented Upside Potential of Adjacent Fermont Projects & Attikamagen Several De-Risking Initiatives Underway for Fire Lake North Project 24
  • 25. Exploration Projects Fire Lake North Exploration Camp Coarse Grained Specular Hematite
  • 26. O’Keefe Purdy Project Exploration Upside 2 km o November 30, 2011 Press Release; O’Keefe NW Occurrence: Drill hole OP11-06 intersected 124 metres of specular hematite-rich iron formation grading 34.1% Total Iron; including 109 m grading 37% FeT. o Drill Hole OP11-08, located 200m away intersected 155.6 m grading 29.7% FeT including an 87.4 m interval grading 37.1% FeT. 26
  • 27. Advanced Exploration Bellechasse Project Harvey Tuttle Project  NI 43-101 Inferred Resource Estimate:  NI 43-101 Inferred Resource Estimate: 215Mt @ 717Mt @ 25% iron; magnetite rich 29% Iron; Magnetite Rich iron formation  Historical Resources increased from 91Mt  Intersected multiple significant iron formation remaining upside potential. intervals in 2010 drill program  Adjacent to Hwy 389; 10km from Fire Lake North  Total of 13,165m of drilling completed  Synform Geometry is good for Open Pit  Less than 50% of the kilometric scale magnetic anomalies have been tested  Metallurgical tests underway  Located 25 km NW of Fire Lake North  Within conveying distance from Fire Lake North planned concentrator (20-30km) 27
  • 28. Labrador Trough Annual Production Iron Ore Production Upside Company Current Annual Projected Production Annual Forecast IOC/RTZ 17 mtpy 26 mtpy1 ArcelorMittal 13 mtpy 24 mtpy2 Cliffs Natural Resources 12 mtpy 28 mtpy (Wuhan) Labrador Iron Mines 2 mtpy 5 mtpy Adriana Resources (Wuhan) 0 50 mtpy New Millennium (Tata) 0 27 mtpy Century Iron Mines (Wuhan) 0 ~20 mtpy Champion Minerals 0 ~18 mtpy Alderon Iron Ore Corp. 0 ~8 mtpy Total current and forecasted 44 ~ 200 mtpy production 1. Possibility of expanding production up to 50 mtpy 2. Possibility of expanding production to 50 mtpy 28
  • 29. Global Steel Production Shows Continued Demand for Iron Ore 1,600,000 1,400,000 China’s CAGR* is 9.88% over the last 30 years vs. 2.30% for 1,200,000 total global steel production over the same period. 1,000,000 China 800,000 Japan 600,000 Rest of the World 400,000 200,000 - 1980 1985 1990 1995 2000 2005 2010 Source: World Steel Association website * Compound annual growth rate 29
  • 30. Thank You 30 30
  • 31. Iron Ore Types Coarse Grained Specular Hematite Direct Shipping Ore Coarse Grained Specular Hematite Magnetite Rich Taconite 31
  • 32. Fermont Iron Ore District (“FIOD”) 32