SlideShare a Scribd company logo
1 of 2
Download to read offline
Six Sigma in Action




                                      BMW Program


                                        Thomas Henning
                                        Program Manager
                                        8/19/02

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                                      IMAC Process
Customer Profile – 3,000 seat Auto Manufacturing company                           Defect
                                                                                                     Before

                                                                                   10.8%         (Sigma = 3.4)
Business Problem & Impact
Installs Moves Adds and Changes process not affording consistent asset
tracking. Inconsistent database and time waited tracking down missing
equipment.

Measure & Analyze                                                                          Success
Data Collection: Installs Moves Adds and Changes completed and                              89.2%
entered into asset management data base
The existing process sigma was 3.4
Root Causes: 1. Technician did not think a blank field was critical.
2. IMAC request process not being followed by BMW customer.
3. Lack of Technician Experience/Training.
                                                                                                     After
Improve & Control                                                                Defects
Use the operational definitions to provide training to the technical staff on                    (Sigma = 3.9)
                                                                                   1%
how to properly complete the IMAC form. Set policy in place measuring
each employee on form completeness. Service Delivery Leader will
monitor employee conformity to this policy.

Results/Benefits                                                                      Success
Improved employee process knowledge and IMAC form accuracy.                             99%
Resulting in asset data base improvements which in turn save indirect
and direct dollars.




                                      A savings of US$6,048 in 2003!

More Related Content

More from Steven Bonacorsi

St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study PromappSteven Bonacorsi
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilSteven Bonacorsi
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI GlobalSteven Bonacorsi
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonaldsSteven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis EnergySteven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study PromappSteven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case StudySteven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans OlexSteven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma TemplatesSteven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studiesSteven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 

More from Steven Bonacorsi (20)

St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 

Bmw Imac Form Completeness Six Sigma Case Study

  • 1. Six Sigma in Action BMW Program Thomas Henning Program Manager 8/19/02 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action IMAC Process Customer Profile – 3,000 seat Auto Manufacturing company Defect Before 10.8% (Sigma = 3.4) Business Problem & Impact Installs Moves Adds and Changes process not affording consistent asset tracking. Inconsistent database and time waited tracking down missing equipment. Measure & Analyze Success Data Collection: Installs Moves Adds and Changes completed and 89.2% entered into asset management data base The existing process sigma was 3.4 Root Causes: 1. Technician did not think a blank field was critical. 2. IMAC request process not being followed by BMW customer. 3. Lack of Technician Experience/Training. After Improve & Control Defects Use the operational definitions to provide training to the technical staff on (Sigma = 3.9) 1% how to properly complete the IMAC form. Set policy in place measuring each employee on form completeness. Service Delivery Leader will monitor employee conformity to this policy. Results/Benefits Success Improved employee process knowledge and IMAC form accuracy. 99% Resulting in asset data base improvements which in turn save indirect and direct dollars. A savings of US$6,048 in 2003!