1. RIPE NCC Update
Axel Pawlik
Managing Director
RIPE NCC | Moscow | May 2014
2. Over 10,000 RIPE NCC Members RIPE NCC Update 2
ENOG 7 - May 2014
10,309
Source: https://labs.ripe.net/statistics
3. Annual Report 2013 RIPE NCC Update
• Operational Highlights (end 2013):
– Strong growth: 1,139 additional members in 2013
– 1,896 /22 IPv4 allocations and 1,724 IPv6 allocations
– IPv6 allocation take up is > 66% of membership
– 6,400 PI contractual relations processed (2007-01)
– 20% of our members have their resources certified
– Almost 5,000 active RIPE Atlas probes
– 1 Million RIPEstat users (up from 122,000 in 2012)
ENOG 7 - May 2014
3
4. Annual Report 2013 RIPE NCC Update
• Financial Overview
-Operational expenses were 3% lower than budget
-Staff numbers are steady (3% lower than budget)
-Reserves level remains at around one year’s operational
expenses
-Cost per member still falling (6% lower than 2012)
ENOG 7 - May 2014
4
5. Health of the RIPE NCC RIPE NCC Update
• Continually striving to keep the organisation:
– Stable, Secure and Resilient
– Useful to our members
• RIPE Database: Improved documentation and
release processes
• Assisted Registry Check (ARC) initiated
• Replacing and improving internal systems
• Resiliency project initiated (site in Sweden)
• Corporate governance documents in check
ENOG 7 - May 2014
5
6. Increased Risk for Hijacks RIPE NCC Update
• IPv4 addresses are becoming more valuable
• Criminals try very sophisticated methods to obtain
control over unused address blocks
- Faking registration and identity papers
- Faking entire websites and domains
!
• RIPE NCC has to do more thorough checks
- Unfortunately, it can take extra time to process requests
- Please cooperate by supplying the required documents
ENOG 7 - May 2014
6
7. Help Us Protect Your Resources RIPE NCC Update
• Hijacks often target address blocks with outdated
contact details
• Make sure your contact persons and company
details are up-to-date
- Check the LIR Portal and update contact information
- Verify all entries in RIPE Database
- Process any changes right away
• RIPE NCC relies on this information to validate any
requested changes
- Contact us if you need assistance updating your details
ENOG 7 - May 2014
7
8. IPv6 RIPEness Amongst Members RIPE NCC Update 8
10,309 Members
ENOG 7 - May 2014
21%
14%
30%
9% 26%
No IPv6 1 star 2 star 3 star 4 star
9. IPv6 RIPEness Russian Federation RIPE NCC Update 9
ENOG 7 - May 2014
16%
13%
10%
22%
39%
No IPv6 1 star 2 star 3 star 4 star
1,145 Members
10. IPv6 RIPEness Over Time (RU) RIPE NCC Update 10
100%
75%
50%
25%
0%
Jan 2011
Apr 2011
ENOG 7 - May 2014
Jul 2011
Oct 2011
Jan 2012
Apr 2012
Jul 2012
Oct 2012
Jan 2013
Apr 2013
Jul 2013
Oct 2013
Jan 2014
Apr 2014
No IPv6 1 star 2 stars 3 stars 4 stars
11. IPv6 RIPEness CIS Region (relative) RIPE NCC Update 11
100%
75%
50%
25%
0%
AM AZ BY GE KZ KG MD RU TJ TM UA UZ
ENOG 7 - May 2014
No IPv6 1 star 2 stars 3 stars 4 stars
12. More Improvements RIPE NCC Update
• Investigating supporting more languages
- Provide translations of key documents and information
• More contact with membership
- Small-scale events such as dinners and lunch meetings
• Advancing capacity building
- Introducing two-day technical IPv6 training
- Improving E-learning platform and courses
- IPv6 Roadshow material rewritten
• Collecting input on website improvements
ENOG 7 - May 2014
12
13. RIPE NCC General Meeting RIPE NCC Update
• GM held in Warsaw during RIPE 68 on 14 May
• 2015 Charging Scheme was adopted
- €1,600 per annum (€150 down on 2014 fee)
• Adoption of implementation process of RIPE NCC
services to Legacy Resource Holders
• RIPE NCC Executive Board elections
- three vacant seats filled by Maria Häll, Salam Yamout &
Christian Kaufmann
ENOG 7 - May 2014
13
14. Our Regional Presence RIPE NCC Update
• The RIPE NCC Survey 2013 results indicated that
you wanted us to be more present in all regions
• We have increased the number of regional meetings
- SEE 4 in 2015 - Belgrade
- Kazakhstan and Iran 2014, Georgia 2015
• Expanding Dubai office
- Two new Arab employees hired
• We already have one staff member based in
Moscow
- Interviewing for second staff member
ENOG 7 - May 2014
14