Your SlideShare is downloading. ×
Block wallscanir sample_grouted_cell_report
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Block wallscanir sample_grouted_cell_report

217
views

Published on

Published in: Art & Photos, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
217
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. THERMOGRAPHIC REPORT # Sample Retail Store Sample Grouted Cell Report Your Town, USA October 4, 2009 Authorized Service Contractor Down Column Line _________ Solid S lid areas are light-colored. li ht l d From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Qualitative Infrared  Description_____________________________________________________________________ Thermographic Survey Thermographic Survey of Masonry Walls Sample Retail Store Sample Retail Store October 3, 2009 Prepared for: p f Preferred Client Example Construction  Contractors
  • 2. THERMOGRAPHIC REPORT # Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 Down Column Line _________ Solid S lid areas are li ht l light-colored. d From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ October 5, 2009 Mr. Preferred Client E Example C l Construction C t t t ti Contractors 123 Sample Street Your Town, USA PROJECT: Sample Retail Store Your Town, USA. Dear Mr. Client: Herein, please find the report from the qualitative infrared (IR) thermographic survey of masonry walls at the new facilities of Sample Retail Store in Your Town, USA. The building was inspected on October 4, 2009. The IR thermographer was Greg Stockton. We imaged all masonry walls from the outside and inside of the building. Matching IR and visual images are included. We marked the faults with white arrows directly on the IR images of the walls where we found misplaced, misaligned or missing grouted cells. The following pages show p , g gg gp g areas where at least one problem exist. Grouted cells and all other solid areas are displayed in the infrared images as ‘light warm’, so solid cells are lighter than empty cells. The chemical reaction from recent pours show as hot in the IR imagery. This report consists of a printed copy of this file, and a CD-ROM All files are contained on the file CD ROM. CD-ROM, including a PDF with all thermographs taken -so we leave the final analysis of the walls to your structural engineers. Please let me know if I can be of assistance to you by calling 888-SCAN-4-IR . We appreciate your business and enjoyed working with your company. Sincerely, Sincerely Certified Infrared Thermographer #3583 Member of BlockWallScanIR™ Authorized Service Contractor
  • 3. THERMOGRAPHIC REPORT # Sample Retail Store Your Town, USA Understanding Building Infrared Imagery Authorized Service Contractor October 4, 2009 General Solid S lid areas are light-colored. Down Column Line is often a grayscale picture whose scales (or shades of gray) Infrared imagery _________ li ht l d From Column _____ to _____ temperature and emissivity (oppositeGrouted cells 48” O.C. represent the differences in of reflectivity) of Structural Grouting Schedule objects in the image. As a general rule, objects in the image that are lighter in color are Description_____________________________________________________________________ warmer, and darker objects are cooler. No object in the images is detected via visible light wavelengths (400-700 nanometers) rather, only from infrared wavelengths in the 3000-5000 or 8000-14000 nanometers range. Lights and other relatively hot objects are very evident, b t as a result of th i h t id t but lt f their heat…not li ht emissions. t light i i Procedure When an image is taken with an infrared camera, it is often recorded onto videotape and/or digitally saved to an on-board storage device. The image may be then modified in a number of ways to enhance its value to the end user. In the case of the printouts p provided in this report, the building images were digitized, saved and converted to p g g g JPEG images, then adjusted for color, contrast and brightness before being scaled and placed in this file. The file was then printed on photographic paper by using a photo quality ink-jet printer. After sunset, wall areas that contain grout are a different color because the heat (from daylight sunshine and the resulting thermal change) radiates from these areas longer than those areas with empty or insulated cells When the building structure cools down cells. down, we scanned the walls in an organized method with a sensitive infrared camera to detect the sources of heat and record them for later analysis. Since we can “see” all areas with more mass (filled cells) we can immediately determine if there is grout missing. When structural deficiencies were found, we made a matching visual image with a digital photographic camera for reference. For more information on this testing method, please visit our web site... www.BlockWallScanIR.com KEY TO ARROWS Vertical Reinforcement Fault Horizontal Reinforcement Fault
  • 4. THERMOGRAPHIC REPORT # Sample Retail Store ATTACHMENT A - DRAWING Your Town, USA Authorized Service Contractor October 4, 2009 11 10 14 Down Column Line _________ Solid S lid areas are light-colored. li ht l d From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ 8 7 12 13 9 15 16 17 6 20 18 19 3 4 5 1 2 DIRECTION OF SURVEY Outside Inside NOTE: Other structural wall details have been deleted from this sample.
  • 5. THERMOGRAPHIC REPORT # 1 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 1 Down Column Line _________ Solid S lid areas are light-colored. li ht l d J.30 H.24 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 6. THERMOGRAPHIC REPORT # 2 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 2 Down Column Line _________ Solid S lid areas are light-colored. li ht l d D C.16 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 7. THERMOGRAPHIC REPORT # 3 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 C.16 C 16 Down Column Line _________ Solid S lid areas are light-colored. li ht l d 1 From Column _____ to _____ 2 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 8. THERMOGRAPHIC REPORT # 4 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 2 Down Column Line _________ Solid S lid areas are light-colored. li ht l d C From Column _____ to _____B Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 9. THERMOGRAPHIC REPORT # 5 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 2 Down Column Line _________ Solid S lid areas are light-colored. li ht l d B From Column _____ to _____A Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 10. THERMOGRAPHIC REPORT # 6 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 A Down Column Line _________ Solid S lid areas are light-colored. li ht l d 5 From Column _____ to _____6 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 11. THERMOGRAPHIC REPORT # 7 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 9 Down Column Line _________ Solid S lid areas are light-colored. li ht l d A.40 B.10 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 12. THERMOGRAPHIC REPORT # 8 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 9 Down Column Line _________ Solid S lid areas are light-colored. li ht l d C C.29 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 13. THERMOGRAPHIC REPORT # 9 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 C.29 C 29 Down Column Line _________ Solid S lid areas are light-colored. li ht l d 9.22 From Column _____ to _____10 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 14. THERMOGRAPHIC REPORT # 10 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 10 Down Column Line _________ Solid S lid areas are light-colored. li ht l d C.29 D.23 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 15. THERMOGRAPHIC REPORT # 11 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 10 Down Column Line _________ Solid S lid areas are light-colored. li ht l d H J.05 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 16. THERMOGRAPHIC REPORT # 12 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 K Down Column Line _________ Solid S lid areas are light-colored. li ht l d 10 9.30 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 17. THERMOGRAPHIC REPORT # 13 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 K Down Column Line _________ Solid S lid areas are light-colored. li ht l d 9.30 From Column _____ to _____ 9 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 18. THERMOGRAPHIC REPORT # 14 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 9 Down Column Line _________ Solid S lid areas are light-colored. li ht l d K From Column _____ to _____ L Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 19. THERMOGRAPHIC REPORT # 15 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 L Down Column Line _________ Solid S lid areas are light-colored. li ht l d 9 From Column _____ to _____8 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 20. THERMOGRAPHIC REPORT # 16 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 L Down Column Line _________ Solid S lid areas are light-colored. li ht l d 8 From Column _____ to _____7 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 21. THERMOGRAPHIC REPORT # 17 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 L Down Column Line _________ Solid S lid areas are light-colored. li ht l d 7 6 From Column _____ to _____ Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Bond Beams not poured, on Wall L, from 7 to 4. Photo taken afternoon on June 19th
  • 22. THERMOGRAPHIC REPORT # 18 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 L Down Column Line _________ Solid S lid areas are light-colored. li ht l d 3 From Column _____ to _____ 2 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.
  • 23. THERMOGRAPHIC REPORT # 19 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 J.30 J 30 Down Column Line _________ Solid S lid areas are light-colored. li ht l d 2 From Column _____ to _____ 1 Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated. Photo taken afternoon on June 19th Not poured yet when IR taken
  • 24. THERMOGRAPHIC REPORT # 20 Sample Retail Store Your Town, USA Authorized Service Contractor October 4, 2009 2 Down Column Line _________ Solid S lid areas are light-colored. li ht l d H From Column _____ to _____ J Grouted cells 48” O.C. Structural Grouting Schedule Description_____________________________________________________________________ Grouted cells as indicated.