1. THERMOGRAPHIC REPORT #
Sample Retail Store
Sample Grouted Cell Report
Your Town, USA
October 4, 2009
Authorized Service Contractor
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Qualitative Infrared
Description_____________________________________________________________________
Thermographic Survey
Thermographic Survey
of Masonry Walls
Sample Retail Store
Sample Retail Store
October 3, 2009
Prepared for:
p f
Preferred Client
Example Construction
Contractors
2. THERMOGRAPHIC REPORT #
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
Down Column Line _________ Solid
S lid areas are li ht l
light-colored.
d
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
October 5, 2009
Mr. Preferred Client
E
Example C
l Construction C t t
t ti Contractors
123 Sample Street
Your Town, USA PROJECT: Sample Retail Store
Your Town, USA.
Dear Mr. Client:
Herein, please find the report from the qualitative infrared (IR) thermographic survey of masonry
walls at the new facilities of Sample Retail Store in Your Town, USA.
The building was inspected on October 4, 2009. The IR thermographer was Greg Stockton.
We imaged all masonry walls from the outside and inside of the building. Matching IR and visual
images are included. We marked the faults with white arrows directly on the IR images of the
walls where we found misplaced, misaligned or missing grouted cells. The following pages show
p , g gg gp g
areas where at least one problem exist.
Grouted cells and all other solid areas are displayed in the infrared images as ‘light warm’, so
solid cells are lighter than empty cells. The chemical reaction from recent pours show as hot in
the IR imagery.
This report consists of a printed copy of this file, and a CD-ROM All files are contained on the
file CD ROM.
CD-ROM, including a PDF with all thermographs taken -so we leave the final analysis of the
walls to your structural engineers.
Please let me know if I can be of assistance to you by calling 888-SCAN-4-IR . We appreciate
your business and enjoyed working with your company.
Sincerely,
Sincerely
Certified Infrared Thermographer #3583
Member of BlockWallScanIR™
Authorized Service Contractor
3. THERMOGRAPHIC REPORT #
Sample Retail Store
Your Town, USA Understanding Building Infrared Imagery
Authorized Service Contractor
October 4, 2009
General
Solid
S lid areas are light-colored.
Down Column Line is often a grayscale picture whose scales (or shades of gray)
Infrared imagery _________ li ht l d
From Column _____ to _____ temperature and emissivity (oppositeGrouted cells 48” O.C.
represent the differences in of reflectivity) of
Structural Grouting Schedule
objects in the image. As a general rule, objects in the image that are lighter in color are
Description_____________________________________________________________________
warmer, and darker objects are cooler. No object in the images is detected via visible
light wavelengths (400-700 nanometers) rather, only from infrared wavelengths in the
3000-5000 or 8000-14000 nanometers range. Lights and other relatively hot objects
are very evident, b t as a result of th i h t
id t but lt f their heat…not li ht emissions.
t light i i
Procedure
When an image is taken with an infrared camera, it is often recorded onto videotape
and/or digitally saved to an on-board storage device. The image may be then modified
in a number of ways to enhance its value to the end user. In the case of the printouts
p
provided in this report, the building images were digitized, saved and converted to
p g g g
JPEG images, then adjusted for color, contrast and brightness before being scaled and
placed in this file. The file was then printed on photographic paper by using a photo
quality ink-jet printer.
After sunset, wall areas that contain grout are a different color because the heat (from
daylight sunshine and the resulting thermal change) radiates from these areas longer
than those areas with empty or insulated cells When the building structure cools down
cells. down,
we scanned the walls in an organized method with a sensitive infrared camera to detect
the sources of heat and record them for later analysis. Since we can “see” all areas
with more mass (filled cells) we can immediately determine if there is grout missing.
When structural deficiencies were found, we made a matching visual image with a
digital photographic camera for reference.
For more information on this testing method, please visit our web site...
www.BlockWallScanIR.com
KEY TO ARROWS
Vertical Reinforcement Fault
Horizontal Reinforcement Fault
4. THERMOGRAPHIC REPORT #
Sample Retail Store
ATTACHMENT A - DRAWING
Your Town, USA Authorized Service Contractor
October 4, 2009
11 10
14
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
8 7
12
13 9
15
16
17
6
20
18
19 3
4 5
1 2
DIRECTION OF SURVEY
Outside
Inside
NOTE: Other structural wall details
have been deleted from this sample.
5. THERMOGRAPHIC REPORT # 1
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
1
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
J.30 H.24
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
6. THERMOGRAPHIC REPORT # 2
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
2
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
D C.16
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
7. THERMOGRAPHIC REPORT # 3
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
C.16
C 16
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
1
From Column _____ to _____ 2 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
8. THERMOGRAPHIC REPORT # 4
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
2
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
C
From Column _____ to _____B Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
9. THERMOGRAPHIC REPORT # 5
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
2
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
B
From Column _____ to _____A Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
10. THERMOGRAPHIC REPORT # 6
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
A
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
5
From Column _____ to _____6 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
11. THERMOGRAPHIC REPORT # 7
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
9
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
A.40 B.10
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
12. THERMOGRAPHIC REPORT # 8
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
9
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
C C.29
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
13. THERMOGRAPHIC REPORT # 9
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
C.29
C 29
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
9.22
From Column _____ to _____10 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
14. THERMOGRAPHIC REPORT # 10
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
10
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
C.29 D.23
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
15. THERMOGRAPHIC REPORT # 11
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
10
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
H J.05
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
16. THERMOGRAPHIC REPORT # 12
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
K
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
10 9.30
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
17. THERMOGRAPHIC REPORT # 13
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
K
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
9.30
From Column _____ to _____ 9 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
18. THERMOGRAPHIC REPORT # 14
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
9
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
K
From Column _____ to _____ L Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
19. THERMOGRAPHIC REPORT # 15
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
L
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
9
From Column _____ to _____8 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
20. THERMOGRAPHIC REPORT # 16
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
L
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
8
From Column _____ to _____7 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
21. THERMOGRAPHIC REPORT # 17
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
L
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
7 6
From Column _____ to _____ Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Bond Beams not poured, on Wall L, from 7 to 4.
Photo taken afternoon on June 19th
22. THERMOGRAPHIC REPORT # 18
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
L
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
3
From Column _____ to _____ 2 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
23. THERMOGRAPHIC REPORT # 19
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
J.30
J 30
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
2
From Column _____ to _____ 1 Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.
Photo taken afternoon on June 19th
Not poured yet when IR taken
24. THERMOGRAPHIC REPORT # 20
Sample Retail Store
Your Town, USA Authorized Service Contractor
October 4, 2009
2
Down Column Line _________ Solid
S lid areas are light-colored.
li ht l d
H
From Column _____ to _____ J Grouted cells 48” O.C.
Structural Grouting Schedule
Description_____________________________________________________________________
Grouted cells as indicated.