The document proposes fire evacuation signs for different floors and room types in a hotel, including:
- Floors 4 to 12 for deluxe rooms
- Floors 14, 16, 17 for junior suites
- Floors 28 & 29 for executive suites
- Floor 36 for a diplomatic 1 bedroom suite
- Floor 37 for a diplomatic 2 bedroom suite
1. PROPOSED FIRE EVACUATION SIGN
FLOOR - 4 TO 12
DELUXE ROOMS
01
Creative & Technical Head’s Approval Designer’s Approval Project Coordinator’s Approval
Sign / Date Juni Escriba James/Anthony Sign/Date Jerry Pingul Sign/Date Mr. Michael Dy
Warning Requested Date: Date Printed: Company: Enquiry No.:
These drawings are not to be scaled. All details in
these drawings must be checked by actual size 27 September 2011 29 October 2011 ASPIRE LOGISTICS GSE11-07-1226
prior to start proceeding in production. All
drawings and specifications are the property of
Gulf Crafts Company and not to be used, Scaling: Revision No.: 06 Project Title: Coordinator:
reproduces nor revised without written
permission from the author. All previous issues Not to Scale Date : 29 October 2011 TORCH HOTEL Mr. Michael Dy
2. PROPOSED FIRE EVACUATION SIGN
FLOOR - 14, 16, 17
JUNIOR SUITES
02
Creative & Technical Head’s Approval Designer’s Approval Project Coordinator’s Approval
Sign / Date Juni Escriba James/Anthony Sign/Date Jerry Pingul Sign/Date Mr. Michael Dy
Warning Requested Date: Date Printed: Company: Enquiry No.:
These drawings are not to be scaled. All details in
these drawings must be checked by actual size 27 September 2011 29 October 2011 ASPIRE LOGISTICS GSE11-07-1226
prior to start proceeding in production. All
drawings and specifications are the property of
Gulf Crafts Company and not to be used, Scaling: Revision No.: 06 Project Title: Coordinator:
reproduces nor revised without written
permission from the author. All previous issues Not to Scale Date : 29 October 2011 TORCH HOTEL Mr. Michael Dy
3. PROPOSED FIRE EVACUATION SIGN
FLOOR - 28 & 29
EXECUTIVE SUITE
03
Creative & Technical Head’s Approval Designer’s Approval Project Coordinator’s Approval
Sign / Date Juni Escriba James/Anthony Sign/Date Jerry Pingul Sign/Date Mr. Michael Dy
Warning Requested Date: Date Printed: Company: Enquiry No.:
These drawings are not to be scaled. All details in
these drawings must be checked by actual size 27 September 2011 29 October 2011 ASPIRE LOGISTICS GSE11-07-1226
prior to start proceeding in production. All
drawings and specifications are the property of
Gulf Crafts Company and not to be used, Scaling: Revision No.: 06 Project Title: Coordinator:
reproduces nor revised without written
permission from the author. All previous issues Not to Scale Date : 29 October 2011 TORCH HOTEL Mr. Michael Dy
4. PROPOSED FIRE EVACUATION SIGN
FLOOR - 36
DIPLOMATIC 1 BEDROOM SUITE
04
Creative & Technical Head’s Approval Designer’s Approval Project Coordinator’s Approval
Sign / Date Juni Escriba James/Anthony Sign/Date Jerry Pingul Sign/Date Mr. Michael Dy
Warning Requested Date: Date Printed: Company: Enquiry No.:
These drawings are not to be scaled. All details in
these drawings must be checked by actual size 27 September 2011 29 October 2011 ASPIRE LOGISTICS GSE11-07-1226
prior to start proceeding in production. All
drawings and specifications are the property of
Gulf Crafts Company and not to be used, Scaling: Revision No.: 06 Project Title: Coordinator:
reproduces nor revised without written
permission from the author. All previous issues Not to Scale Date : 29 October 2011 TORCH HOTEL Mr. Michael Dy
5. PROPOSED FIRE EVACUATION SIGN
FLOOR - 37
DIPLOMATIC 2 BEDROOM SUITE
05
Creative & Technical Head’s Approval Designer’s Approval Project Coordinator’s Approval
Sign / Date Juni Escriba James/Anthony Sign/Date Jerry Pingul Sign/Date Mr. Michael Dy
Warning Requested Date: Date Printed: Company: Enquiry No.:
These drawings are not to be scaled. All details in
these drawings must be checked by actual size 27 September 2011 29 October 2011 ASPIRE LOGISTICS GSE11-07-1226
prior to start proceeding in production. All
drawings and specifications are the property of
Gulf Crafts Company and not to be used, Scaling: Revision No.: 06 Project Title: Coordinator:
reproduces nor revised without written
permission from the author. All previous issues Not to Scale Date : 29 October 2011 TORCH HOTEL Mr. Michael Dy