1. HB977 Presented by Geo-Technology Associates, Inc. Geotechnical and Environmental Consultants April 23, 2010 Maryland’s New Mandatory Hazardous Substance Release Reporting Requirements
2.
3. 45-day review period Typically 2+ months After a 30-day review period 75-day review period 30-day review period VCP Overview Typically 9+ Months Typically 4-6 Months RAP Implementation (time period varies considerably) Pre-Application Meeting Submit Application Perform Additional Studies Submit Proposed Response Action Plan (RAP), Hold Public Meeting Acceptance Into VCP Submit Revised RAP Certificate of Completion No Further Requirements Determination (NFRD)
21. Case Study Manufacturing Trouble Old Dump Closed USTs with residual contamination Contaminated soil along rail spur Site-wide, low-level groundwater contamination