                               Project Cargo Risk Management
Even in difficult economic times, the development of oil and gas terminals, offshore installations, mineral
export and processing terminals, port development and Greenfield projects continue apace. The modules
and specialist components for these projects are typically manufactured vast geographical distances away
from project sites and need to be shipped to site as project cargo.
It is important that these high value, often very heavy, oversized
and damage susceptible project cargoes arrive at their destination
on time and undamaged. This allows the end user to realise on
time and on budget project execution. There are a number of
stakeholders involved in such specialised project shipments,
including: the end user, main contractor, sub-contractors, freight
forwarder, insurance broker, lead cargo insurer and cargo
surveyors. With a lack of training and investment in expertise
over preceding years, we find that even amongst established
marine contractors, there is an ever increasing lack of marine
expertise available or involved in the shipment of these high value
project cargoes. It should be a key consideration for any party
engaged in the shipment of high value project cargoes that
specialist, independent marine personnel or insurer’s in-house
experts are engaged early on in the project schedule to ensure
that the end user and insurers interests are protected. The risk
during transit is most prevalent when an item is being lifted,
moved or shipped in an open seaway. There is a need for all
                                                                       Discharge from ship to SPMT’s on a barge
involved in a project to be aware of this and then to lower the risk
to a reasonable ALARP (As Low As Reasonably Possible) level
without incurring unacceptable cost.


Methods of loss prevention and control
There are at least three methods of carrying out loss control for a project. They are:

1. Survey ‘cradle to grave’ i.e. everything from the project planning phases, to the manufacturing facilities,
   the packaging and preparation phase, during the land and sea logistics and all the way until the arrival at
   final destination and even installation.
2. Insurer to review the list of items to be shipped and with the help of his appointed specialised experts
   choose which items to survey, when and where.
3. Insurer to provide a one page ‘Risk Control Notification’ (RCN) to the client, so that for notifiable
   shipments a RCN is completed and sent to the loss control specialist.

I will address the third option as I believe that this is the most cost effective and pro-active method of
approach. It is also the approach that I adopted during my nine years as a major cargo insurers in-house loss
control specialist.
Set up of contracts
                                                      Initially the client will decide on which main contractor
                                                      will carry out the work, normally on an EPIC basis
                                                      (Engineering, Procurement, Installation &
                                                      Commissioning). The main contractor will usually sub-
                                                      contract with specialist companies that are required for
                                                      the project execution, which will include the insurance
                                                      broker. The broker will be requested to acquire the
                                                      best quote for either cargo cover or cargo & DSU (Delay
                                                      in Start Up) cover. The insurer who offers the best
                                                      quote is normally accepted as the lead insurer. The lead
                                                      insurer will then use his in house loss control specialist
                                                      or contract in an independent loss control specialist.

     Nakika platform on board MIGHTY SERVANT 1



Initial role of the loss control specialist
The loss control specialist will liaise with the broker and project team. Two issues will be addressed at this
stage. The first will be to arrange a ‘kick-off’ meeting at a mutually convenient location and for this meeting
to be held prior to any cargo being shipped. The second is to forward to the assured guidelines such as
‘Cargo Securing’ , ‘Cargo Marking’, ‘Towing’ and ‘Container Stuffing & Internal Securing’. I would encourage
the assured to use these guidelines, where appropriate, within their contracts. It will then ensure that all
parties are at least adhering to a reasonable standard during the
transportation of the cargo.

‘Kick-Off’ (KO) meeting
When a KO meeting has been arranged the loss control specialist
will typically chair the meeting. Normally a representative from the
main contractor and freight forwarder will be present. The agenda
for the meeting will be generic and sent out beforehand. It will
cover everything from the beginning of the project to the end of the
project i.e. all shipments of all shapes and sizes and not just the
items that are of interest to the insurer. Action points following the
KO meeting will be cleared out ASAP.

After the KO meeting a finalised RCN will be sent to the assured so
that the loss control specialist can be notified of relevant shipments.
Upon receipt of a completed RCN, these will be received
intermittently throughout the project, the loss control specialist will
carry out one of three options:

1. Appoint a surveyor at some, or a number of points, during the        960 mt vacuum column being discharged
   transport.
2. Ask further questions about the transportation.
3. Respond to the sender advising that no surveyor will be appointed (after reading a good method
   statement, knowing the port and knowing the vessels’ working arrangement this is sometimes carried
   out as a surveyor would add minimal added value).
Success
Ideally for a project to succeed I would like to see the following:

1.   Clear and concise insurance policy wording which includes action to be taken by the assured if damage
     occurs.
2.   A ‘Kick Off’ meeting.
3.   An agreed RCN pro-forma.
4.   Guidelines and checklists to be used throughout.
5.   RCN’s to be used when there is a notifiable shipment
6.   Surveyors to be clearly instructed
7.   Close co-operation and good communication between all stakeholders.

Common problems
Apart from non-compliance with the above seven
points the more common problems during a project
tend to be:

1. Inadequate pre-planning of the shipment.
2. Adverse weather.
3. Lack of procedures.
4. Commercial bias by one or more stakeholders.
5. Crews and ‘specialist’ shippers with limited and
   minimal experience.
6. Breakdown of hardware.
7. Lack of control by the client.
8. Inexperienced or ineffective Warranty Surveyors.
                                                                       Crane hook on SSCV HERMOD; Mexico

Claims
During the following instances I have seen claims occur in the past:

1. Deck cargo either due to insufficient seafastening or inadequate packing (majority).
2. Under deck cargo due to insufficient seafastening and/or lack of dunnage.
3. Inadequate lifting appliances and associated slings.
4. Damage during the short movement of cargoes to and from the dock and ship side, typically from
   inadequate securing arrangements or overloading of and associated stability of the load on the trailer
   system.
5. Whilst being moved from the port to final destination due to poor ground stability and/or insufficient
   cargo securing.



In conclusion, engaging a loss control specialist, with extensive industry experience in the shipment of high
value project cargoes greatly minimises the logistical risks involved. The associated costs fade into
insignificance when set against material damages, delays and late execution (or even possible cancellation)
of a project.


Capt. John Carroll
M3 Marine Expertise Pte Ltd
john.c@m3marine.com.sg

More Related Content

What's hot

P & i clubs and claims related issues
P & i clubs and claims related issuesP & i clubs and claims related issues
P & i clubs and claims related issues
Thiruvali Shrinivaasan
 
P & I Presentation for Pandiman - Jan 2013
P & I Presentation for Pandiman - Jan 2013P & I Presentation for Pandiman - Jan 2013
P & I Presentation for Pandiman - Jan 2013
Manu Ofiaza
 

What's hot (9)

Insight into Ship Operations - Rahul Bhargav Academic Conference 2018
Insight into Ship Operations - Rahul Bhargav Academic Conference 2018Insight into Ship Operations - Rahul Bhargav Academic Conference 2018
Insight into Ship Operations - Rahul Bhargav Academic Conference 2018
 
C K SharCase Studies in Chartering & Operations - Converting Knowledge into M...
C K SharCase Studies in Chartering & Operations - Converting Knowledge into M...C K SharCase Studies in Chartering & Operations - Converting Knowledge into M...
C K SharCase Studies in Chartering & Operations - Converting Knowledge into M...
 
P & i clubs and claims related issues
P & i clubs and claims related issuesP & i clubs and claims related issues
P & i clubs and claims related issues
 
P & I Presentation for Pandiman - Jan 2013
P & I Presentation for Pandiman - Jan 2013P & I Presentation for Pandiman - Jan 2013
P & I Presentation for Pandiman - Jan 2013
 
Cargo insurance & surveying
Cargo insurance & surveyingCargo insurance & surveying
Cargo insurance & surveying
 
Legal Aspects of Charter Parties – Basic Issues
Legal Aspects of Charter Parties – Basic IssuesLegal Aspects of Charter Parties – Basic Issues
Legal Aspects of Charter Parties – Basic Issues
 
Critical review of CIF-FOB international trade terms
Critical review of CIF-FOB international trade termsCritical review of CIF-FOB international trade terms
Critical review of CIF-FOB international trade terms
 
Institute Cargo Clauses in Marine Insurance By SN panigrahi
Institute Cargo Clauses in Marine Insurance By SN panigrahiInstitute Cargo Clauses in Marine Insurance By SN panigrahi
Institute Cargo Clauses in Marine Insurance By SN panigrahi
 
Safe boating 051113
Safe boating 051113Safe boating 051113
Safe boating 051113
 

Similar to Project Cargo Risk Management

Final-Interview
Final-InterviewFinal-Interview
Final-Interview
Raya Peterson
 
31 michael bullock, renewable risk advisers
31   michael bullock, renewable risk advisers31   michael bullock, renewable risk advisers
31 michael bullock, renewable risk advisers
johannaparans
 
Transocean offshore operation 6
Transocean   offshore operation 6Transocean   offshore operation 6
Transocean offshore operation 6
Steffones K
 
Financiers Insurance Due Diligence 2008
Financiers Insurance Due Diligence 2008Financiers Insurance Due Diligence 2008
Financiers Insurance Due Diligence 2008
forsythn1978
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
John Ashton
 
AMCO Logistics Profile
AMCO Logistics ProfileAMCO Logistics Profile
AMCO Logistics Profile
Mustafa Hamdy
 
Unit 7 Assignment Group Assignment – Risk Analysis and Ident
Unit 7 Assignment Group Assignment – Risk Analysis and IdentUnit 7 Assignment Group Assignment – Risk Analysis and Ident
Unit 7 Assignment Group Assignment – Risk Analysis and Ident
corbing9ttj
 
Analysing Extreme Events
Analysing Extreme EventsAnalysing Extreme Events
Analysing Extreme Events
NavSyd
 
owner-controlled-insurance-programmes-ocips.pdf
owner-controlled-insurance-programmes-ocips.pdfowner-controlled-insurance-programmes-ocips.pdf
owner-controlled-insurance-programmes-ocips.pdf
avenkatram
 

Similar to Project Cargo Risk Management (20)

Marine Warranty Survey
Marine Warranty SurveyMarine Warranty Survey
Marine Warranty Survey
 
Final-Interview
Final-InterviewFinal-Interview
Final-Interview
 
31 michael bullock, renewable risk advisers
31   michael bullock, renewable risk advisers31   michael bullock, renewable risk advisers
31 michael bullock, renewable risk advisers
 
Upstream energy info sheet
Upstream energy info sheetUpstream energy info sheet
Upstream energy info sheet
 
Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)
 
Transocean offshore operation 6
Transocean   offshore operation 6Transocean   offshore operation 6
Transocean offshore operation 6
 
Chapter 6 (General takaful).pptx
Chapter 6 (General takaful).pptxChapter 6 (General takaful).pptx
Chapter 6 (General takaful).pptx
 
Financiers Insurance Due Diligence 2008
Financiers Insurance Due Diligence 2008Financiers Insurance Due Diligence 2008
Financiers Insurance Due Diligence 2008
 
article
articlearticle
article
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
AMCO Logistics Profile
AMCO Logistics ProfileAMCO Logistics Profile
AMCO Logistics Profile
 
Unit 7 Assignment Group Assignment – Risk Analysis and Ident
Unit 7 Assignment Group Assignment – Risk Analysis and IdentUnit 7 Assignment Group Assignment – Risk Analysis and Ident
Unit 7 Assignment Group Assignment – Risk Analysis and Ident
 
AJC Case Analysis
AJC Case AnalysisAJC Case Analysis
AJC Case Analysis
 
Contractor management sections 5 topics 8& 9
Contractor management sections 5 topics 8& 9Contractor management sections 5 topics 8& 9
Contractor management sections 5 topics 8& 9
 
Analysing Extreme Events
Analysing Extreme EventsAnalysing Extreme Events
Analysing Extreme Events
 
Presentation ESS
Presentation ESSPresentation ESS
Presentation ESS
 
Lorry Crane
Lorry CraneLorry Crane
Lorry Crane
 
owner-controlled-insurance-programmes-ocips.pdf
owner-controlled-insurance-programmes-ocips.pdfowner-controlled-insurance-programmes-ocips.pdf
owner-controlled-insurance-programmes-ocips.pdf
 
WEN_Issue27_GMS
WEN_Issue27_GMSWEN_Issue27_GMS
WEN_Issue27_GMS
 

More from M3 Marine Group

M3 Marine Group Marketing Presentation
M3 Marine Group Marketing PresentationM3 Marine Group Marketing Presentation
M3 Marine Group Marketing Presentation
M3 Marine Group
 
M3 Marine Group Capability Statement 2012
M3 Marine Group Capability Statement 2012M3 Marine Group Capability Statement 2012
M3 Marine Group Capability Statement 2012
M3 Marine Group
 
2nd International Conference on Technology & Operation of Offshore Support Ve...
2nd International Conference on Technology & Operation of Offshore Support Ve...2nd International Conference on Technology & Operation of Offshore Support Ve...
2nd International Conference on Technology & Operation of Offshore Support Ve...
M3 Marine Group
 
20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore
20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore
20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore
M3 Marine Group
 
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
M3 Marine Group
 
20101123 - SPS for IMCA - November 2010, Dubai
20101123 - SPS for IMCA - November 2010, Dubai20101123 - SPS for IMCA - November 2010, Dubai
20101123 - SPS for IMCA - November 2010, Dubai
M3 Marine Group
 
20100201 - SPS for IMCA - February 2010, Singapore
20100201 - SPS for IMCA - February 2010, Singapore20100201 - SPS for IMCA - February 2010, Singapore
20100201 - SPS for IMCA - February 2010, Singapore
M3 Marine Group
 
20070201 - Asian Workboat OSV Forum - February 2007, Singapore
20070201 - Asian Workboat OSV Forum - February 2007, Singapore20070201 - Asian Workboat OSV Forum - February 2007, Singapore
20070201 - Asian Workboat OSV Forum - February 2007, Singapore
M3 Marine Group
 

More from M3 Marine Group (10)

Development of the Commodity AHTS Market and introducing the 'Six Eighty’
Development of the Commodity AHTS Market and introducing the 'Six Eighty’Development of the Commodity AHTS Market and introducing the 'Six Eighty’
Development of the Commodity AHTS Market and introducing the 'Six Eighty’
 
M3 Marine Group Marketing Presentation
M3 Marine Group Marketing PresentationM3 Marine Group Marketing Presentation
M3 Marine Group Marketing Presentation
 
What does a shipbroker actually do?
What does a shipbroker actually do?What does a shipbroker actually do?
What does a shipbroker actually do?
 
M3 Marine Group Capability Statement 2012
M3 Marine Group Capability Statement 2012M3 Marine Group Capability Statement 2012
M3 Marine Group Capability Statement 2012
 
2nd International Conference on Technology & Operation of Offshore Support Ve...
2nd International Conference on Technology & Operation of Offshore Support Ve...2nd International Conference on Technology & Operation of Offshore Support Ve...
2nd International Conference on Technology & Operation of Offshore Support Ve...
 
20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore
20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore
20050901 - OSV Singapore: When does a boat die ? September 2005 - Singapore
 
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
 
20101123 - SPS for IMCA - November 2010, Dubai
20101123 - SPS for IMCA - November 2010, Dubai20101123 - SPS for IMCA - November 2010, Dubai
20101123 - SPS for IMCA - November 2010, Dubai
 
20100201 - SPS for IMCA - February 2010, Singapore
20100201 - SPS for IMCA - February 2010, Singapore20100201 - SPS for IMCA - February 2010, Singapore
20100201 - SPS for IMCA - February 2010, Singapore
 
20070201 - Asian Workboat OSV Forum - February 2007, Singapore
20070201 - Asian Workboat OSV Forum - February 2007, Singapore20070201 - Asian Workboat OSV Forum - February 2007, Singapore
20070201 - Asian Workboat OSV Forum - February 2007, Singapore
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 

Recently uploaded (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

Project Cargo Risk Management

  • 1. M3 Marine Expertise Pte Ltd GST and Co. Reg No. 201001640W 1 Commonwealth Lane #06-21 ONE Commonwealth Singapore 149544 Tel: +65 6327 4606 Fax: +65 6221 4606 Email: expert@m3marine.com.sg Web: www.m3marine.com.sg Project Cargo Risk Management Even in difficult economic times, the development of oil and gas terminals, offshore installations, mineral export and processing terminals, port development and Greenfield projects continue apace. The modules and specialist components for these projects are typically manufactured vast geographical distances away from project sites and need to be shipped to site as project cargo. It is important that these high value, often very heavy, oversized and damage susceptible project cargoes arrive at their destination on time and undamaged. This allows the end user to realise on time and on budget project execution. There are a number of stakeholders involved in such specialised project shipments, including: the end user, main contractor, sub-contractors, freight forwarder, insurance broker, lead cargo insurer and cargo surveyors. With a lack of training and investment in expertise over preceding years, we find that even amongst established marine contractors, there is an ever increasing lack of marine expertise available or involved in the shipment of these high value project cargoes. It should be a key consideration for any party engaged in the shipment of high value project cargoes that specialist, independent marine personnel or insurer’s in-house experts are engaged early on in the project schedule to ensure that the end user and insurers interests are protected. The risk during transit is most prevalent when an item is being lifted, moved or shipped in an open seaway. There is a need for all Discharge from ship to SPMT’s on a barge involved in a project to be aware of this and then to lower the risk to a reasonable ALARP (As Low As Reasonably Possible) level without incurring unacceptable cost. Methods of loss prevention and control There are at least three methods of carrying out loss control for a project. They are: 1. Survey ‘cradle to grave’ i.e. everything from the project planning phases, to the manufacturing facilities, the packaging and preparation phase, during the land and sea logistics and all the way until the arrival at final destination and even installation. 2. Insurer to review the list of items to be shipped and with the help of his appointed specialised experts choose which items to survey, when and where. 3. Insurer to provide a one page ‘Risk Control Notification’ (RCN) to the client, so that for notifiable shipments a RCN is completed and sent to the loss control specialist. I will address the third option as I believe that this is the most cost effective and pro-active method of approach. It is also the approach that I adopted during my nine years as a major cargo insurers in-house loss control specialist.
  • 2. Set up of contracts Initially the client will decide on which main contractor will carry out the work, normally on an EPIC basis (Engineering, Procurement, Installation & Commissioning). The main contractor will usually sub- contract with specialist companies that are required for the project execution, which will include the insurance broker. The broker will be requested to acquire the best quote for either cargo cover or cargo & DSU (Delay in Start Up) cover. The insurer who offers the best quote is normally accepted as the lead insurer. The lead insurer will then use his in house loss control specialist or contract in an independent loss control specialist. Nakika platform on board MIGHTY SERVANT 1 Initial role of the loss control specialist The loss control specialist will liaise with the broker and project team. Two issues will be addressed at this stage. The first will be to arrange a ‘kick-off’ meeting at a mutually convenient location and for this meeting to be held prior to any cargo being shipped. The second is to forward to the assured guidelines such as ‘Cargo Securing’ , ‘Cargo Marking’, ‘Towing’ and ‘Container Stuffing & Internal Securing’. I would encourage the assured to use these guidelines, where appropriate, within their contracts. It will then ensure that all parties are at least adhering to a reasonable standard during the transportation of the cargo. ‘Kick-Off’ (KO) meeting When a KO meeting has been arranged the loss control specialist will typically chair the meeting. Normally a representative from the main contractor and freight forwarder will be present. The agenda for the meeting will be generic and sent out beforehand. It will cover everything from the beginning of the project to the end of the project i.e. all shipments of all shapes and sizes and not just the items that are of interest to the insurer. Action points following the KO meeting will be cleared out ASAP. After the KO meeting a finalised RCN will be sent to the assured so that the loss control specialist can be notified of relevant shipments. Upon receipt of a completed RCN, these will be received intermittently throughout the project, the loss control specialist will carry out one of three options: 1. Appoint a surveyor at some, or a number of points, during the 960 mt vacuum column being discharged transport. 2. Ask further questions about the transportation. 3. Respond to the sender advising that no surveyor will be appointed (after reading a good method statement, knowing the port and knowing the vessels’ working arrangement this is sometimes carried out as a surveyor would add minimal added value).
  • 3. Success Ideally for a project to succeed I would like to see the following: 1. Clear and concise insurance policy wording which includes action to be taken by the assured if damage occurs. 2. A ‘Kick Off’ meeting. 3. An agreed RCN pro-forma. 4. Guidelines and checklists to be used throughout. 5. RCN’s to be used when there is a notifiable shipment 6. Surveyors to be clearly instructed 7. Close co-operation and good communication between all stakeholders. Common problems Apart from non-compliance with the above seven points the more common problems during a project tend to be: 1. Inadequate pre-planning of the shipment. 2. Adverse weather. 3. Lack of procedures. 4. Commercial bias by one or more stakeholders. 5. Crews and ‘specialist’ shippers with limited and minimal experience. 6. Breakdown of hardware. 7. Lack of control by the client. 8. Inexperienced or ineffective Warranty Surveyors. Crane hook on SSCV HERMOD; Mexico Claims During the following instances I have seen claims occur in the past: 1. Deck cargo either due to insufficient seafastening or inadequate packing (majority). 2. Under deck cargo due to insufficient seafastening and/or lack of dunnage. 3. Inadequate lifting appliances and associated slings. 4. Damage during the short movement of cargoes to and from the dock and ship side, typically from inadequate securing arrangements or overloading of and associated stability of the load on the trailer system. 5. Whilst being moved from the port to final destination due to poor ground stability and/or insufficient cargo securing. In conclusion, engaging a loss control specialist, with extensive industry experience in the shipment of high value project cargoes greatly minimises the logistical risks involved. The associated costs fade into insignificance when set against material damages, delays and late execution (or even possible cancellation) of a project. Capt. John Carroll M3 Marine Expertise Pte Ltd john.c@m3marine.com.sg