SlideShare a Scribd company logo
1 of 1
Download to read offline
LEEDTM
PROJECTS                                                                                                                                                                                     STRATEGIES                                                                                                        LEEDTM INFO




   Beginning in 2000, the Office of Sustainable Design has sponsored numerous projects under their High Performance Building program, resulting in
   not only better buildings but also in a raised awareness within DDC, other City agencies and the professional community. Many of these projects
   have incorporated the LEED™ certification program of the US Green Building Council, which will now be required for many of DDC’s building con-
   struction projects under Local Law 86-2005. Below is a snapshot of the LEED credits anticipated by recent projects. They vary by building type, size,
   client group and environmental strategies adopted, but all share a commitment to energy efficiency, sustainable landscape practices, construction
   waste management and considered materials selection.




                    DDC Sustainable Design
                    Projects Seeking USGBC Certification




                                                                                                                                                                                                            Office of Emergency Management




                                                                                                                                                                                                                                                                                                                        % Projects Complying (8 Total)
                    LEEDTM Credits Anticipated* July 2006




                                                                                                                                   Brooklyn Children’s Museum




                                                                                                                                                                                                                                            Weeksville Heritage Center




                                                                                                                                                                                                                                                                           Glen Oaks Branch Library
                                                                                                        Queens Botanical Garden




                                                                                                                                                                Lion House Conversion




                                                                                                                                                                                        New Sunrise Yard




                                                                                                                                                                                                                                                                                                       Remsen Yard
*Includes “Yes” and “Likely” Credits

All Projects LEED NC2.1 Except Remsen Yard (NC2.2)


Sustainable Sites                                                                         Possible
                                                                                           Points
Prereq 1           Erosion & Sedimentation Control                                             Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Credit 1           Site Selection                                                               1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 2           Development Density                                                          1                                        1                                                                         1                                                            1                        1             50%
Credit 3           Brownfield Redevelopment                                                      1            1                                                                             1                       1                                                                                     1             50%
Credit 4.1         Alternative Transportation, Public Transportation Access                     1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 4.2         Alternative Transportation, Bicycle Storage & Changing Rooms                 1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 4.3         Alternative Transportation, Alternative Fuel Vehicles                        1            1                                                                                                     1                                                                                                   25%
Credit 4.4         Alternative Transportation, Parking Capacity and Carpooling                  1            1                                                       1                     1                       1                              1                                                      1             75%
Credit 5.1         Reduced Site Disturbance, Protect or Restore Open Space                      1            1                                                                                                                                    1                                                                    25%
Credit 5.2         Reduced Site Disturbance, Development Footprint                              1            1                                                       1                                                                            1                                                                    38%
Credit 6.1         Stormwater Management, Rate and Quantity                                     1            1                                                                             1                                                      1                                                                    38%
Credit 6.2         Stormwater Management, Treatment                                             1            1                                                                                                                                    1                                                                    25%
Credit 7.1         Landscape & Exterior Design to Reduce Heat Islands, Non-Roof                 1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 7.2         Landscape & Exterior Design to Reduce Heat Islands, Roof                     1            1                                                                             1                       1                                                            1                        1             63%
Credit 8           Light Pollution Reduction                                                    1            1                           1                           1                     1                       1                              1                             1                                      88%
                                                                              Subtotal         14       13                              6                           7                      9                10                              10                                  7                        8
Water Efficiency                                                                           Possible
                                                                                           Points
Credit 1.1         Water Efficient Landscaping, Reduce by 50%                                    1            1                           1                           1                     1                       1                              1                             1                                      88%
Credit 1.2         Water Efficient Landscaping, No Potable Use or No Irrigation                  1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 2           Innovative Wastewater Technologies                                           1            1                                                                                                                                                                                                         13%
Credit 3.1         Water Use Reduction, 20% Reduction                                           1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 3.2         Water Use Reduction, 30% Reduction                                           1            1                                                       1                                             1                              1                                                      1             63%
                                                                              Subtotal          5           5                           3                           4                      3                      4                              4                              3                        3
Energy & Atmosphere                                                                       Possible
                                                                                           Points
Prereq 1           Fundamental Building Systems Commissioning                                  Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Prereq 2           Minimum Energy Performance                                                  Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Prereq 3           CFC Reduction in HVAC&R Equipment                                           Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Credit 1.1         Optimize Energy Performance, 15% new / 5% renovation                         1            1                           1                           1                     1                                                      1                             1                        1             88%
Credit 1.2         Optimize Energy Performance, 20% / 10%                                       1            1                           1                           1                     1                                                      1                             1                        1             88%
Credit 1.3         Optimize Energy Performance, 25% / 15%                                       1            1                           1                           1                     1                                                      1                             1                        1             88%
Credit 1.4         Optimize Energy Performance, 30% / 20%                                       1            1                           1                           1                     1                                                                                                             1             63%
Credit 1.5         Optimize Energy Performance, 35% / 25%                                       1            1                           1                           1                     1                                                                                                             1             63%
Credit 1.6         Optimize Energy Performance, 40% / 30%                                       1            1                                                       1                     1                                                                                                                           38%
Credit 1.7         Optimize Energy Performance, 45% / 35%                                       1                                                                    1                     1                                                                                                                           25%
Credit 1.8         Optimize Energy Performance, 50% / 40%                                       1                                                                    1                     1                                                                                                                           25%
Credit 1.9         Optimize Energy Performance, 55% / 45%                                       1                                                                    1                     1                                                                                                                           25%
Credit 1.10        Optimize Energy Performance, 60% / 50%                                       1                                                                    1                     1                                                                                                                           25%
Credit 2.1         Renewable Energy, 5%                                                         1            1                           1                                                                                                                                                               1             38%
Credit 2.2         Renewable Energy, 10%                                                        1            1                                                                                                                                                                                           1             25%
Credit 2.3         Renewable Energy, 20%                                                        1                                                                                                                                                                                                        1             13%
Credit 3           Additional Commissioning                                                     1            1                           1                           1                     1                       1                              1                             1                                      88%
Credit 4           Ozone Depletion                                                              1                                                                                                                  1                              1                             1                                      38%
Credit 5           Measurement & Verification                                                    1                                        1                                                                                                                                                                             13%
Credit 6           Green Power                                                                  1            1                                                                                                                                                                                                         13%
                                                                              Subtotal         17       10                              8                       11                      11                        2                              5                              5                        8
Materials & Resources                                                                     Possible
                                                                                           Points
Prereq 1           Storage & Collection of Recyclables                                         Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Credit 1.1         Building Reuse, Maintain 75% of Existing Shell                               1                                                                                                                                                                                                                       0%
Credit 1.2         Building Reuse, Maintain 100% of Shell                                       1                                                                                                                                                                                                                       0%
Credit 1.3         Building Reuse, Maintain 100% Shell & 50% Non-Shell                          1                                                                                                                                                                                                                       0%
Credit 2.1         Construction Waste Management, Divert 50%                                    1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 2.2         Construction Waste Management, Divert 75%                                    1            1                           1                           1                     1                                                      1                             1                                      75%
Credit 3.1         Resource Reuse, Specify 5%                                                   1                                                                                                                                                                                                                       0%
Credit 3.2         Resource Reuse, Specify 10%                                                  1                                                                                                                                                                                                                       0%
Credit 4.1         Recycled Content, Specify 5% (post-consumer+½ post-industrial)               1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 4.2         Recycled Content, Specify 10% (post-consumer+½ post-industrial)              1            1                           1                           1                     1                       1                                                                                                   63%
Credit 5.1         Local/Regional Materials, 20% Manufactured Locally                           1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 5.2         Local/Regional Materials, of 20% Above, 50% Harvested Locally                1            1                           1                                                                                                        1                                                                    38%
Credit 6           Rapidly Renewable Materials                                                  1                                                                                                                                                                                                                       0%
Credit 7           Certified Wood                                                                1            1                                                       1                     1                       1                              1                                                      1             75%
                                                                              Subtotal         13           7                           6                           6                      6                      5                              6                              4                        4
Indoor Environmental Quality                                                              Possible
                                                                                           Points
Prereq 1           Minimum IAQ Performance                                                     Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Prereq 2           Environmental Tobacco Smoke (ETS) Control                                   Req.          Y                           Y                           Y                      Y                      Y                              Y                              Y                       Y
Credit 1           Carbon Dioxide (CO2 ) Monitoring                                             1            1                           1                           1                                             1                              1                             1                        1             88%
Credit 2           Ventilation Effectiveness                                                    1            1                           1                           1                                             1                              1                                                      1             75%
Credit 3.1         Construction IAQ Management Plan, During Construction                        1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 3.2         Construction IAQ Management Plan, Before Occupancy                           1            1                           1                           1                     1                                                      1                             1                        1             88%
Credit 4.1         Low-Emitting Materials, Adhesives & Sealants                                 1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 4.2         Low-Emitting Materials, Paints                                               1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 4.3         Low-Emitting Materials, Carpet                                               1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 4.4         Low-Emitting Materials, Composite Wood & Agrifiber                            1            1                           1                           1                     1                       1                                                            1                        1             88%
Credit 5           Indoor Chemical & Pollutant Source Control                                   1            1                           1                           1                     1                       1                              1                             1                        1             100%
Credit 6.1         Controllability of Systems                                                   1            1                                                                             1                                                      1                                                      1             50%
Credit 6.2         Controllability of Systems                                                   1            1                                                                                                                                    1                                                      1             38%
Credit 7.1         Thermal Comfort, Design (Comply with ASHRAE 55-1992)                         1            1                                                       1                     1                                                      1                             1                                      63%
Credit 7.2         Thermal Comfort, Verification (Permanent Monitoring System)                   1                                                                    1                                                                                                          1                                      25%
Credit 8.1         Daylight & Views, Daylight 75% of Spaces                                     1            1                                                       1                     1                                                      1                                                      1             63%
Credit 8.2         Daylight & Views, Views for 90% of Spaces                                    1            1                                                                             1                                                      1                                                      1             50%
                                                                              Subtotal         15       14                              9                       12                      11                        8                         13                             10                          13
Innovation & Design Process                                                               Possible
                                                                                           Points
Credit 1.1 - 1.4   Innovation in Design                                                         4        4A                          2B                          4C                      2D                   3E                              3F                            2G                                         63%
Credit 2           LEED™ Accredited Professional                                                1            1                           1                           1                     1                       1                              1                             1                        1             100%
                                                                              Subtotal          5           5                           3                           5                      3                      4                              4                              3                        1
Project Totals (“Yes” & “Likely” Credits Only)                                                 69       54                         35                           45                      43                  33                              42                             32                          37
Certified 26-32 points    Silver 33-38 points     Gold 39-51 points     Platinum 52-69 points          Platinum                    Silver                        Gold                    Gold               Silver                           Gold                         Certified                     Silver



                   A Innovation in Design: Queens Botanical Garden
                       Stormwater Capture & Combined Sewer Water Collection
                       Composting Program
                       Exemplary Performance, Water Use Reduction
                       Interpretive Educational Display

                   B Innovation in Design: Brooklyn Children’s Museum
                       Education/Outreach
                       Green Housekeeping

                   C Innovation in Design: Lion House Conversion
                       Stormwater Management
                       Green Housekeeping
                       Exemplary Performance, Water Use Reduction
                       Optimization of Process Water Use

                   D Innovation in Design: New Sunrise Yard
                       Ultra Low Sulfur Diesel Construction Vehicles
                       Elimination of Full Spray-On Fireproofing

                   E Innovation in Design: Office of Emergency Management
                       Education/Outreach
                       Green Operation & Maintenance w/ Integrated Pest Management
                       Water Reduction (Waterless Urinals)

                   F Innovation in Design: Weeksville Heritage Center
                       Interpretive Educational Display
                       100% Stormwater Capture
                       Water Use Reduction 40%

                   G Innovation in Design: Glen Oaks Branch Library
                       Education/Outreach
                       Green Housekeeping

More Related Content

What's hot

JAKARTA Multi Purpose Deep Tunnel
JAKARTA Multi Purpose Deep TunnelJAKARTA Multi Purpose Deep Tunnel
JAKARTA Multi Purpose Deep TunnelElisa Sutanudjaja
 
Leed 2009 new constru chk list
Leed 2009 new constru chk listLeed 2009 new constru chk list
Leed 2009 new constru chk listJ C
 
Impact Assessment of the Approach of ‘Passing On The Gift’
Impact Assessment of the Approach of ‘Passing On The Gift’Impact Assessment of the Approach of ‘Passing On The Gift’
Impact Assessment of the Approach of ‘Passing On The Gift’copppldsecretariat
 
Presentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management BusinessPresentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management Businessve-finance
 
DPS Leed Practice Area Brochure
DPS Leed Practice Area BrochureDPS Leed Practice Area Brochure
DPS Leed Practice Area Brochureannmarie1964
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Presentation kuwait 24.05.12
Presentation kuwait 24.05.12Presentation kuwait 24.05.12
Presentation kuwait 24.05.12greenbuilding
 
Disaster Recovery Presentation
Disaster Recovery PresentationDisaster Recovery Presentation
Disaster Recovery PresentationTimSchaefer
 
Brochure 2009 0416
Brochure 2009 0416Brochure 2009 0416
Brochure 2009 0416Berneche2
 

What's hot (13)

JAKARTA Multi Purpose Deep Tunnel
JAKARTA Multi Purpose Deep TunnelJAKARTA Multi Purpose Deep Tunnel
JAKARTA Multi Purpose Deep Tunnel
 
Leed 2009 new constru chk list
Leed 2009 new constru chk listLeed 2009 new constru chk list
Leed 2009 new constru chk list
 
Prenn projecr
Prenn projecrPrenn projecr
Prenn projecr
 
GREEN BUILDINGS
GREEN BUILDINGSGREEN BUILDINGS
GREEN BUILDINGS
 
Impact Assessment of the Approach of ‘Passing On The Gift’
Impact Assessment of the Approach of ‘Passing On The Gift’Impact Assessment of the Approach of ‘Passing On The Gift’
Impact Assessment of the Approach of ‘Passing On The Gift’
 
Presentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management BusinessPresentation and outlook of the Waste Management Business
Presentation and outlook of the Waste Management Business
 
Alma Balonon-Rosen, Enterprise Community Partners and Darien Crimmin, WinnDev...
Alma Balonon-Rosen, Enterprise Community Partners and Darien Crimmin, WinnDev...Alma Balonon-Rosen, Enterprise Community Partners and Darien Crimmin, WinnDev...
Alma Balonon-Rosen, Enterprise Community Partners and Darien Crimmin, WinnDev...
 
DPS Leed Practice Area Brochure
DPS Leed Practice Area BrochureDPS Leed Practice Area Brochure
DPS Leed Practice Area Brochure
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Presentation kuwait 24.05.12
Presentation kuwait 24.05.12Presentation kuwait 24.05.12
Presentation kuwait 24.05.12
 
Disaster Recovery Presentation
Disaster Recovery PresentationDisaster Recovery Presentation
Disaster Recovery Presentation
 
Analyzing water treatment start-ups
Analyzing water treatment start-upsAnalyzing water treatment start-ups
Analyzing water treatment start-ups
 
Brochure 2009 0416
Brochure 2009 0416Brochure 2009 0416
Brochure 2009 0416
 

Viewers also liked

Virtual education
Virtual educationVirtual education
Virtual educationanrowley
 
Atlantic terrace project leed gold
Atlantic terrace project leed goldAtlantic terrace project leed gold
Atlantic terrace project leed goldjpetr0s
 
Brooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-PrinciplesBrooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-Principlesjpetr0s
 
Pspd fall2010 course_schedule
Pspd fall2010 course_schedulePspd fall2010 course_schedule
Pspd fall2010 course_schedulejpetr0s
 
Pspd newsletter spring_2010
Pspd newsletter spring_2010Pspd newsletter spring_2010
Pspd newsletter spring_2010jpetr0s
 
Stillwell Avenue Train Station
Stillwell Avenue Train StationStillwell Avenue Train Station
Stillwell Avenue Train Stationjpetr0s
 

Viewers also liked (7)

Virtual education
Virtual educationVirtual education
Virtual education
 
Atlantic terrace project leed gold
Atlantic terrace project leed goldAtlantic terrace project leed gold
Atlantic terrace project leed gold
 
Brooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-PrinciplesBrooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-Principles
 
Pspd fall2010 course_schedule
Pspd fall2010 course_schedulePspd fall2010 course_schedule
Pspd fall2010 course_schedule
 
My first quiz!
My first quiz!My first quiz!
My first quiz!
 
Pspd newsletter spring_2010
Pspd newsletter spring_2010Pspd newsletter spring_2010
Pspd newsletter spring_2010
 
Stillwell Avenue Train Station
Stillwell Avenue Train StationStillwell Avenue Train Station
Stillwell Avenue Train Station
 

More from jpetr0s

Time Signatures
Time SignaturesTime Signatures
Time Signaturesjpetr0s
 
CF Drum Corp drumbook
CF Drum Corp drumbookCF Drum Corp drumbook
CF Drum Corp drumbookjpetr0s
 
New 08 development map bklyn navy yard
New 08 development map bklyn navy yardNew 08 development map bklyn navy yard
New 08 development map bklyn navy yardjpetr0s
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910jpetr0s
 
Ice Stone LEED USGBC
Ice Stone LEED USGBCIce Stone LEED USGBC
Ice Stone LEED USGBCjpetr0s
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Studyjpetr0s
 
Prattfolio spring 2010
Prattfolio spring 2010Prattfolio spring 2010
Prattfolio spring 2010jpetr0s
 
USGBC Green Building Research
USGBC  Green Building ResearchUSGBC  Green Building Research
USGBC Green Building Researchjpetr0s
 
LEED for Homes
LEED for HomesLEED for Homes
LEED for Homesjpetr0s
 
Remsen Yard Project
Remsen Yard ProjectRemsen Yard Project
Remsen Yard Projectjpetr0s
 
Nyc green training_inventory
Nyc green training_inventoryNyc green training_inventory
Nyc green training_inventoryjpetr0s
 
K+c projects letter_may2010
K+c projects letter_may2010K+c projects letter_may2010
K+c projects letter_may2010jpetr0s
 
Green map icons_v3_2pages
Green map icons_v3_2pagesGreen map icons_v3_2pages
Green map icons_v3_2pagesjpetr0s
 
Green map icons_v3_deficons
Green map icons_v3_deficonsGreen map icons_v3_deficons
Green map icons_v3_deficonsjpetr0s
 
Bushwick park project
Bushwick park projectBushwick park project
Bushwick park projectjpetr0s
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910jpetr0s
 
Bgi visionfor piers7-12
Bgi visionfor piers7-12Bgi visionfor piers7-12
Bgi visionfor piers7-12jpetr0s
 
Atlantic terrace lotteryrules
Atlantic terrace  lotteryrulesAtlantic terrace  lotteryrules
Atlantic terrace lotteryrulesjpetr0s
 
Atlantic terrace project leed gold.pdf 2
Atlantic terrace project leed gold.pdf 2Atlantic terrace project leed gold.pdf 2
Atlantic terrace project leed gold.pdf 2jpetr0s
 
Aia fall10 brochure
Aia fall10 brochureAia fall10 brochure
Aia fall10 brochurejpetr0s
 

More from jpetr0s (20)

Time Signatures
Time SignaturesTime Signatures
Time Signatures
 
CF Drum Corp drumbook
CF Drum Corp drumbookCF Drum Corp drumbook
CF Drum Corp drumbook
 
New 08 development map bklyn navy yard
New 08 development map bklyn navy yardNew 08 development map bklyn navy yard
New 08 development map bklyn navy yard
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910
 
Ice Stone LEED USGBC
Ice Stone LEED USGBCIce Stone LEED USGBC
Ice Stone LEED USGBC
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Study
 
Prattfolio spring 2010
Prattfolio spring 2010Prattfolio spring 2010
Prattfolio spring 2010
 
USGBC Green Building Research
USGBC  Green Building ResearchUSGBC  Green Building Research
USGBC Green Building Research
 
LEED for Homes
LEED for HomesLEED for Homes
LEED for Homes
 
Remsen Yard Project
Remsen Yard ProjectRemsen Yard Project
Remsen Yard Project
 
Nyc green training_inventory
Nyc green training_inventoryNyc green training_inventory
Nyc green training_inventory
 
K+c projects letter_may2010
K+c projects letter_may2010K+c projects letter_may2010
K+c projects letter_may2010
 
Green map icons_v3_2pages
Green map icons_v3_2pagesGreen map icons_v3_2pages
Green map icons_v3_2pages
 
Green map icons_v3_deficons
Green map icons_v3_deficonsGreen map icons_v3_deficons
Green map icons_v3_deficons
 
Bushwick park project
Bushwick park projectBushwick park project
Bushwick park project
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910
 
Bgi visionfor piers7-12
Bgi visionfor piers7-12Bgi visionfor piers7-12
Bgi visionfor piers7-12
 
Atlantic terrace lotteryrules
Atlantic terrace  lotteryrulesAtlantic terrace  lotteryrules
Atlantic terrace lotteryrules
 
Atlantic terrace project leed gold.pdf 2
Atlantic terrace project leed gold.pdf 2Atlantic terrace project leed gold.pdf 2
Atlantic terrace project leed gold.pdf 2
 
Aia fall10 brochure
Aia fall10 brochureAia fall10 brochure
Aia fall10 brochure
 

LEED Sustainable Projects

  • 1. LEEDTM PROJECTS STRATEGIES LEEDTM INFO Beginning in 2000, the Office of Sustainable Design has sponsored numerous projects under their High Performance Building program, resulting in not only better buildings but also in a raised awareness within DDC, other City agencies and the professional community. Many of these projects have incorporated the LEED™ certification program of the US Green Building Council, which will now be required for many of DDC’s building con- struction projects under Local Law 86-2005. Below is a snapshot of the LEED credits anticipated by recent projects. They vary by building type, size, client group and environmental strategies adopted, but all share a commitment to energy efficiency, sustainable landscape practices, construction waste management and considered materials selection. DDC Sustainable Design Projects Seeking USGBC Certification Office of Emergency Management % Projects Complying (8 Total) LEEDTM Credits Anticipated* July 2006 Brooklyn Children’s Museum Weeksville Heritage Center Glen Oaks Branch Library Queens Botanical Garden Lion House Conversion New Sunrise Yard Remsen Yard *Includes “Yes” and “Likely” Credits All Projects LEED NC2.1 Except Remsen Yard (NC2.2) Sustainable Sites Possible Points Prereq 1 Erosion & Sedimentation Control Req. Y Y Y Y Y Y Y Y Credit 1 Site Selection 1 1 1 1 1 1 1 1 1 100% Credit 2 Development Density 1 1 1 1 1 50% Credit 3 Brownfield Redevelopment 1 1 1 1 1 50% Credit 4.1 Alternative Transportation, Public Transportation Access 1 1 1 1 1 1 1 1 1 100% Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 1 1 1 1 1 1 1 1 100% Credit 4.3 Alternative Transportation, Alternative Fuel Vehicles 1 1 1 25% Credit 4.4 Alternative Transportation, Parking Capacity and Carpooling 1 1 1 1 1 1 1 75% Credit 5.1 Reduced Site Disturbance, Protect or Restore Open Space 1 1 1 25% Credit 5.2 Reduced Site Disturbance, Development Footprint 1 1 1 1 38% Credit 6.1 Stormwater Management, Rate and Quantity 1 1 1 1 38% Credit 6.2 Stormwater Management, Treatment 1 1 1 25% Credit 7.1 Landscape & Exterior Design to Reduce Heat Islands, Non-Roof 1 1 1 1 1 1 1 1 1 100% Credit 7.2 Landscape & Exterior Design to Reduce Heat Islands, Roof 1 1 1 1 1 1 63% Credit 8 Light Pollution Reduction 1 1 1 1 1 1 1 1 88% Subtotal 14 13 6 7 9 10 10 7 8 Water Efficiency Possible Points Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1 1 1 1 1 1 1 1 88% Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1 1 1 1 1 1 1 1 1 100% Credit 2 Innovative Wastewater Technologies 1 1 13% Credit 3.1 Water Use Reduction, 20% Reduction 1 1 1 1 1 1 1 1 1 100% Credit 3.2 Water Use Reduction, 30% Reduction 1 1 1 1 1 1 63% Subtotal 5 5 3 4 3 4 4 3 3 Energy & Atmosphere Possible Points Prereq 1 Fundamental Building Systems Commissioning Req. Y Y Y Y Y Y Y Y Prereq 2 Minimum Energy Performance Req. Y Y Y Y Y Y Y Y Prereq 3 CFC Reduction in HVAC&R Equipment Req. Y Y Y Y Y Y Y Y Credit 1.1 Optimize Energy Performance, 15% new / 5% renovation 1 1 1 1 1 1 1 1 88% Credit 1.2 Optimize Energy Performance, 20% / 10% 1 1 1 1 1 1 1 1 88% Credit 1.3 Optimize Energy Performance, 25% / 15% 1 1 1 1 1 1 1 1 88% Credit 1.4 Optimize Energy Performance, 30% / 20% 1 1 1 1 1 1 63% Credit 1.5 Optimize Energy Performance, 35% / 25% 1 1 1 1 1 1 63% Credit 1.6 Optimize Energy Performance, 40% / 30% 1 1 1 1 38% Credit 1.7 Optimize Energy Performance, 45% / 35% 1 1 1 25% Credit 1.8 Optimize Energy Performance, 50% / 40% 1 1 1 25% Credit 1.9 Optimize Energy Performance, 55% / 45% 1 1 1 25% Credit 1.10 Optimize Energy Performance, 60% / 50% 1 1 1 25% Credit 2.1 Renewable Energy, 5% 1 1 1 1 38% Credit 2.2 Renewable Energy, 10% 1 1 1 25% Credit 2.3 Renewable Energy, 20% 1 1 13% Credit 3 Additional Commissioning 1 1 1 1 1 1 1 1 88% Credit 4 Ozone Depletion 1 1 1 1 38% Credit 5 Measurement & Verification 1 1 13% Credit 6 Green Power 1 1 13% Subtotal 17 10 8 11 11 2 5 5 8 Materials & Resources Possible Points Prereq 1 Storage & Collection of Recyclables Req. Y Y Y Y Y Y Y Y Credit 1.1 Building Reuse, Maintain 75% of Existing Shell 1 0% Credit 1.2 Building Reuse, Maintain 100% of Shell 1 0% Credit 1.3 Building Reuse, Maintain 100% Shell & 50% Non-Shell 1 0% Credit 2.1 Construction Waste Management, Divert 50% 1 1 1 1 1 1 1 1 1 100% Credit 2.2 Construction Waste Management, Divert 75% 1 1 1 1 1 1 1 75% Credit 3.1 Resource Reuse, Specify 5% 1 0% Credit 3.2 Resource Reuse, Specify 10% 1 0% Credit 4.1 Recycled Content, Specify 5% (post-consumer+½ post-industrial) 1 1 1 1 1 1 1 1 1 100% Credit 4.2 Recycled Content, Specify 10% (post-consumer+½ post-industrial) 1 1 1 1 1 1 63% Credit 5.1 Local/Regional Materials, 20% Manufactured Locally 1 1 1 1 1 1 1 1 1 100% Credit 5.2 Local/Regional Materials, of 20% Above, 50% Harvested Locally 1 1 1 1 38% Credit 6 Rapidly Renewable Materials 1 0% Credit 7 Certified Wood 1 1 1 1 1 1 1 75% Subtotal 13 7 6 6 6 5 6 4 4 Indoor Environmental Quality Possible Points Prereq 1 Minimum IAQ Performance Req. Y Y Y Y Y Y Y Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Req. Y Y Y Y Y Y Y Y Credit 1 Carbon Dioxide (CO2 ) Monitoring 1 1 1 1 1 1 1 1 88% Credit 2 Ventilation Effectiveness 1 1 1 1 1 1 1 75% Credit 3.1 Construction IAQ Management Plan, During Construction 1 1 1 1 1 1 1 1 1 100% Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 1 1 1 1 1 1 1 88% Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1 1 1 1 1 1 1 1 1 100% Credit 4.2 Low-Emitting Materials, Paints 1 1 1 1 1 1 1 1 1 100% Credit 4.3 Low-Emitting Materials, Carpet 1 1 1 1 1 1 1 1 1 100% Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber 1 1 1 1 1 1 1 1 88% Credit 5 Indoor Chemical & Pollutant Source Control 1 1 1 1 1 1 1 1 1 100% Credit 6.1 Controllability of Systems 1 1 1 1 1 50% Credit 6.2 Controllability of Systems 1 1 1 1 38% Credit 7.1 Thermal Comfort, Design (Comply with ASHRAE 55-1992) 1 1 1 1 1 1 63% Credit 7.2 Thermal Comfort, Verification (Permanent Monitoring System) 1 1 1 25% Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 1 1 1 1 1 63% Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 1 1 1 1 50% Subtotal 15 14 9 12 11 8 13 10 13 Innovation & Design Process Possible Points Credit 1.1 - 1.4 Innovation in Design 4 4A 2B 4C 2D 3E 3F 2G 63% Credit 2 LEED™ Accredited Professional 1 1 1 1 1 1 1 1 1 100% Subtotal 5 5 3 5 3 4 4 3 1 Project Totals (“Yes” & “Likely” Credits Only) 69 54 35 45 43 33 42 32 37 Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points Platinum Silver Gold Gold Silver Gold Certified Silver A Innovation in Design: Queens Botanical Garden Stormwater Capture & Combined Sewer Water Collection Composting Program Exemplary Performance, Water Use Reduction Interpretive Educational Display B Innovation in Design: Brooklyn Children’s Museum Education/Outreach Green Housekeeping C Innovation in Design: Lion House Conversion Stormwater Management Green Housekeeping Exemplary Performance, Water Use Reduction Optimization of Process Water Use D Innovation in Design: New Sunrise Yard Ultra Low Sulfur Diesel Construction Vehicles Elimination of Full Spray-On Fireproofing E Innovation in Design: Office of Emergency Management Education/Outreach Green Operation & Maintenance w/ Integrated Pest Management Water Reduction (Waterless Urinals) F Innovation in Design: Weeksville Heritage Center Interpretive Educational Display 100% Stormwater Capture Water Use Reduction 40% G Innovation in Design: Glen Oaks Branch Library Education/Outreach Green Housekeeping