Your SlideShare is downloading. ×
Mgmt404 week 7 i lab tracking project progress
Mgmt404 week 7 i lab tracking project progress
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Mgmt404 week 7 i lab tracking project progress

43

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
43
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. MGMT404 Week 7 iLab Tracking Project Progress PLEASE DOWNLOAD HEREProject Audit and Closure & International Projects - iLabiLab 7 of 7: Tracking Project ProgressNow that the baseline is set, project work can begin. We can use MS Project totrack our projects progress and compare it to our baseline. Comparing to thebaseline allows us to check our progress against the schedule and budget. Whennegative variances occur, we are either behind schedule or over budget, so weknow that corrective actions are necessary. In this weeks iLab, we will:General Comments about the Microsoft Project Exercises Compare baseline data to actual and scheduled data. View a network diagram.Overview the Earned Value calculations in MS Project.GuidelinesComplete Lesson 7. Print the Project Summary Report. Print the OverbudgetTasks Report. (Print on one page) Print the Earned Value Report.DeliverablesAll of the following deliverables are required (in a zip file) to receive full credit:Completed MyLab7_XXX.mpp Completed Review QuestionsPrintouts/Screenshots contained in Week_7_Printouts_XXX.docxWhen submitting required printouts (if you are not bringing them to class), take ascreenshot (in Windows <ALT><PrtScr>) of the report from the Print Previewpage and paste the screenshot to an MS Word Document. Make sure to crop thescreen to show only the report. After cropping, resize the image appropriately. Ifthe printout is on more than one page, paste each page individually.Save the Word document containing printouts as Week_7_Printouts_XXX.docx,and submit this file to the Week 7 iLabDropbox in a zip file along with theMyLab7_XXX.mpp file and the completed Review Questions at the end of Lesson7. Remember to replace "XXX" in all the file names with your initials, and ensurethat all of your files are clearly labeled.iLAB STEPS
  • 2. STEP 1: Download iLab InstructionsClick the links below to access this weeks iLab instructions. You may alsodownload both lessons from the MS Project Exercises category in Doc Sharing.MS Project Lesson7.docx(Review Questions to be completed and submitted forLesson 7 are located at the end of this document.)STEP 2: Complete the iLab AssignmentComplete the iLab assignment for Week 7 based on the Guidelines section andLesson document above.STEP 3: SubmitiLabDeliverables Create a folder called MGMT404_YourLastName_Lab7

×