Your SlideShare is downloading. ×
Mgmt404 week 3 i lab scheduling with resources
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Mgmt404 week 3 i lab scheduling with resources

61
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
61
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. MGMT404 Week 3 iLabScheduling with Resources PLEASE DOWNLOAD HEREProject Network and Risk Management - iLabiLab 3 of 7: Scheduling with ResourcesGeneral Comments about the Microsoft Project ExercisesIn this weeks iLab, we will use the different ways MS Project allows you to modifyresource assignments and how this can affect work completion. In doing so wewill:Change the task type settings to control how resources affect task assignments.Apply preset resource contours to change work value distribution. Work with taskinformation forms.GuidelinesComplete Lesson 3. Print the Project Summary Report. Print the Task UsageReport. Print the Resource Usage Report.DeliverablesAll of the following deliverables are required (in a zip file) to receive full credit:Completed MyLab3_XXX.mpp Completed Review QuestionsPrintouts/Screenshots contained in Week_3_Printouts_XXX.docxWhen submitting required printouts, if you are not bringing them to class, from thePrint Preview Page, take a screen shot (in Windows <ALT><PrtScr>) of thereport, and paste the screen shot to a MS Word Document. Make sure to crop thescreen to show only the report. After cropping, resize the image appropriately. Ifthe printout is on more than one page, paste each page individually.Save the Word document containing printouts as Week_3_Printouts_XXX.docx,and submit this file to the Week 3 iLabDropbox in a zip file along with theMyLab3_XXX.mpp file and the completed Review Questions at the end of Lesson3. Remember to replace "XXX" in the file names with your initials, and ensure thatall of your files are all clearly labeled, and include your initials in the file name.
  • 2. iLAB STEPSSTEP 1: Download iLab InstructionsClick the links below to access this weeks iLab instructions. You may alsodownload both lessons from the MS Project Exercises category in Doc Sharing.MS Project Lesson3.docx(Review Questions to be completed and submitted forLesson 3 are located at the end of this document.)STEP 2: Complete the iLab AssignmentComplete the iLab assignment for Week 3 based on the Guidelines section andLesson document above.STEP 3: SubmitiLabDeliverables Create a folder called MGMT404_YourLastName_Lab3