Agenda
• What is an Urban Trail?
• Accomplishments
• Active Projects
• Next Steps
What is an Urban Trail?
Goals	
  of	
  Urban	
  Trail	
  Program:	
  
1.  Provide	
  easy	
  access	
  to	
  both	
  transporta3on	
  and	
  recrea3on	
  users	
  from	
  all	
  
parts	
  of	
  the	
  City.	
  
2.  Connect	
  to	
  the	
  on-­‐street	
  bicycle	
  and	
  sidewalk	
  network	
  around	
  them.	
  
3.  Ensure	
  adequately	
  sized	
  to	
  accommodate	
  both	
  recrea3on	
  and	
  
transporta3on	
  uses.	
  
4.  Incorporate	
  trail	
  ameni=es	
  and	
  features	
  that	
  transform	
  from	
  a	
  paved	
  
surface	
  to	
  unique	
  greenways	
  that	
  reflect	
  the	
  City	
  around	
  them.	
  
5.  Provide	
  adequate	
  funding	
  and	
  resources	
  to	
  maintain	
  and	
  operate.	
  
6.  Ensure	
  that	
  all	
  are	
  context-­‐sensi=ve	
  and	
  environmentally	
  sustainable	
  as	
  
well	
  as	
  preserve	
  and	
  improve	
  upon	
  wildlife	
  habitat.	
  
Accomplishments
Tejano Walking Trail
•  5-mile trail includes sidewalks, streets
without sidewalks, and the Butler trail.
•  Designated National Recreational Trail
•  Highlights historical and cultural points
of interest.
•  Implements the East Cesar Chavez
Neighborhood Plan (1999).
Floyd	
  McGown	
  House	
  (Flickr,	
  	
  ‘10)	
  
Accomplishments
Tejano Walking Trail
•  65 wayfinding tiles installed on
sidewalks.
•  11 iZone signs installed near historical
and cultural markers.
Accomplishments
Southern Walnut Creek Trail Kiosks
•  3 kiosks purchased for wayfinding and informational purposes.
•  Installation to occur this winter at the Govalle Park Trailhead, the Austin Tennis
Center Trailhead, and the YMCA Trailhead.
Accomplishments
Southern Walnut Creek Trail Signs
•  13 Wayfinding Signs
•  16 Mile Marker Signs
•  Installation to occur this
winter.
•  Worked
interdepartmentally
(PDR, PWD, PARD,
APD, AFD, EMS) to
approve design.
•  Design will become
standard for future
urban trail wayfinding.
Accomplishments
Southern Walnut Creek & Austin
to Manor Trail Maintenance
•  Re-constructed
approximately 100 feet of
trail.
•  Repaired erosion and
stability issues at 5+ unique
locations.
•  Quickly constructed the
repairs with minimal closures
and phased construction for
weekend use
•  Preventative maintenance
work preemptively protected
trail from recent rains.
Accomplishments
Trail Counters
3 permanent counters (1
additional permanent
counter to be installed
December 2015)
1 temporary counter
Trail Counters
(3 counters combined):
27,432 trail users
since June 1
Average of 2,400 trail
users per day
58% pedestrian, 42%
cyclist usage
Permanent Counter Stats
Accomplishments
Temporary Counter Stats
Trail Counters
North Acres Bridge
North Acres Bridge
•  649 cyclists during 4
week period
•  Average of 34 trail
users per day
•  Manual counts
estimate ~69
students use the
bridge per day to get
to school.
Active Projects
Active Projects
Austin to Manor Trail Phase II
Status Developing 90%
Design
Length 2.7 Mile
Projected
Completion
Construction currently
unfunded.
Estimated
Total Project
Cost
Estimated construction
cost $6m
Active Projects
Country Club Creek Trail Phase I
Status Developing 90%
Design
Length 0.25 Mile
Projected
Completion
Summer 2016
Estimated
Total Project
Cost
Estimated construction
cost $415k
Looking northeast from Burleson Road. Existing
trail along electric transmission easement.
Active Projects
JJ Seabrook Greenbelt: Manor - MLK
Status Complete
Length 0.4 Mile
Projected
Completion
November 2015
Estimated
Total Project
Cost
$2.2m
Active Projects
Mopac Mobility Bridges
Status Construction
Length 1 Mile
Projected
Completion
Phase I - December 2015,
Phase II - March, 2016
Estimated
Total Project
Cost
$13 M
Active Projects
Northern Walnut Creek Trail Phase I
Status Construction
Length 3.6 Mile
Projected
Completion
Fall 2017
Estimated
Total Project
Cost
$10 M
Active Projects
Northern Walnut Creek Trail Phase II
Status Design
Length 1.6 Mile
Projected
Completion
Construction unfunded
Estimated
Total Project
Cost
Construction unfunded
Active Projects
Shoal Creek Trail: Gap Project
3rd to 5th Street
Status Construction
Length 0.12 Mile
Projected
Completion
January 2017
Estimated
Total Project
Cost
$6.8 M
Active Projects
Shoal Creek Trail: Preliminary
Engineering Report (5th - 15th)
Status PER
Length 0.8 Mile
Projected
Completion
PER completion winter
2016
Estimated
Total Project
Cost
$400,000 (for PER).
Construction cost
unknown
Active Projects
Shoal Creek Restoration Project:
15th to 24th Street
Status Construction
Length 0.75 Mile
Projected
Completion
February 2016
Estimated
Total Project
Cost
Trail-related costs:
$900,000
Active Projects
Upper Boggy Creek Trail: MLK
Station to 12th Street.
Status Design
Length 0.4 Mile
Projected
Completion December 2017
Estimated
Total Project
Cost
$2.2M
Active Projects
Violet Crown Trail: Phase 2
“North & South”
Status Design
Length 2.4 Miles
Projected
Completion
Summer 2017
Estimated
Total Project
Cost
$2.4 M
Active Projects
Violet Crown Trail: Phase 2
“Circle C Ranch Metro Park Veloway”
Status Design
Length 3 Miles
Projected
Completion
Winter 2016
Estimated Total
Project Cost
$2.8 M
Active Projects
Violet Crown Trail: Phase 2
Neighborhood Partnering Project
Status Design
Length 0.25 Miles
Projected
Completion
Spring 2016
Estimated Total
Project Cost
$250,000
Active Projects
YBC Trail: “Y” at Oak Hill to
Barton Creek
Status PER
Length Approx. 5 miles
Projected
Completion
Construction
Unfunded
Estimated
Total Project
Cost
$10 - 12M
Active Projects
CTRMA - Shared Use Paths
OPEN TO TRAFFIC Miles
Manor
Expressway
US 183 interchange to Parmer
Lane
5.6
UNDER CONSTRUCTION
MoPac Parmer Ln. to Loop 360 3
Bergstrom
Expressway
US 290 to SH 71 8
SH 71
Express
Bergstrom Expressway to
Onion Creek Greenway
4.5
UNDER STUDY
MoPac South Lacrosse Ave to Lady Bird Lake 9
Oak Hill
Parkway
US 290: MoPac - Circle Drive
SH 71: US 290 - Silvermine
5.3
1.2
183 North SH 45N to MoPac 7.6
Active Projects
Tier II Urban Trails Under Review
•  Lexington Park II: Urban Trails on Pearce
Lane (900 feet) and Ross Road (500 feet)
and connections to Travis County Barkley
Meadows Park.
•  Lennox Oaks: US 183 to Montopolis
Practice Fields (.4 mile)
•  The Grove at Shoal Creek: Shoal Creek
Trail: 45th to Ridgelea Drive (.4 mile)
Next Steps
Tejano Walking Trail
•  Kiosk boards to be installed at Comal
parking lot near Butler Trail
•  11 additional iZone signs to be
purchased and installed for a total of 22
identified sites.
•  Plaza Saltillo informational board to be
installed.
•  Continue to work with Sidewalk
Program to complete the sidewalk
network along the trail route.
Cesar	
  Chavez	
  Statue	
  at	
  Terrazas	
  Library	
  (Flickr,	
  	
  ‘10)	
  
Next Steps
Standard Details and Specifications
•  Work with Engineering Services Division
to create and launch new Urban Trail
specific Standard Details and
Specifications.
•  Continue participation with PWD/ATD
Transportation Criteria Manual revision to
include urban trails in volumes I and II.
Cesar	
  Chavez	
  Statue	
  at	
  Terrazas	
  Library	
  (Flickr,	
  	
  ‘10)	
  
Next Steps
Cesar	
  Chavez	
  Statue	
  at	
  Terrazas	
  Library	
  (Flickr,	
  	
  ‘10)	
  
Train DSD on Standards
Next Steps
Cesar	
  Chavez	
  Statue	
  at	
  Terrazas	
  Library	
  (Flickr,	
  	
  ‘10)	
  
Citywide MOU and
Maintenance Map
•  Identifies responsible parties for
various segments of all trails
within COA
•  Boulder, CO example
Next Steps
Cesar	
  Chavez	
  Statue	
  at	
  Terrazas	
  Library	
  (Flickr,	
  	
  ‘10)	
  
Build Urban
Trails Network
•  Continue working
interdepartmentally to
identify opportunities for
build-out.
•  Continue working with
community groups and
neighborhoods to identify
new trail connection
opportunities.
•  Prepare for future funding
opportunities (bond, grant,
foundation, etc.)
Nadia.Barrera@austintexas.gov
512-974-7142
CONTACT
2015
STATE OF THE
URBAN TRAILS
THANK YOU!

More Related Content

What's hot

What's hot (20)

Prs valley cow-20210312_v2
Prs valley cow-20210312_v2Prs valley cow-20210312_v2
Prs valley cow-20210312_v2
 
Hunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingHunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach Meeting
 
Our Future Valley - May 25, 2021 Committee of the Whole
Our Future Valley - May 25, 2021 Committee of the Whole Our Future Valley - May 25, 2021 Committee of the Whole
Our Future Valley - May 25, 2021 Committee of the Whole
 
Lost Creek Civic Organization General Meeting June 2, 2016
Lost Creek Civic Organization General Meeting June 2, 2016Lost Creek Civic Organization General Meeting June 2, 2016
Lost Creek Civic Organization General Meeting June 2, 2016
 
Lost Creek Civic Organization General Meeting 050516
Lost Creek Civic Organization General Meeting 050516Lost Creek Civic Organization General Meeting 050516
Lost Creek Civic Organization General Meeting 050516
 
Comprehensive Plan, UDO Annual Review
Comprehensive Plan, UDO Annual ReviewComprehensive Plan, UDO Annual Review
Comprehensive Plan, UDO Annual Review
 
Sturgeon Valley Phase 1 Growth Framework
Sturgeon Valley Phase 1 Growth FrameworkSturgeon Valley Phase 1 Growth Framework
Sturgeon Valley Phase 1 Growth Framework
 
Lebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationLebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting Presentation
 
Water and Wastewater System Master Plans
Water and Wastewater System Master PlansWater and Wastewater System Master Plans
Water and Wastewater System Master Plans
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
chamber breakfast brief
chamber breakfast briefchamber breakfast brief
chamber breakfast brief
 
Affordable Housing Development Request
Affordable Housing Development RequestAffordable Housing Development Request
Affordable Housing Development Request
 
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meetingTysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
 
OPDC second revised draft Local Plan consultation - Design & Environment
OPDC second revised draft Local Plan consultation - Design & EnvironmentOPDC second revised draft Local Plan consultation - Design & Environment
OPDC second revised draft Local Plan consultation - Design & Environment
 
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
 
Campbell River Community Meeting October 22, 2013
Campbell River Community Meeting October 22, 2013Campbell River Community Meeting October 22, 2013
Campbell River Community Meeting October 22, 2013
 
Pavement Standards
Pavement StandardsPavement Standards
Pavement Standards
 
Pavement Standards
Pavement StandardsPavement Standards
Pavement Standards
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
NIHP Comox Valley Community Information Meeting presentation Dec. 3, 2014
NIHP Comox Valley Community Information Meeting presentation Dec. 3, 2014NIHP Comox Valley Community Information Meeting presentation Dec. 3, 2014
NIHP Comox Valley Community Information Meeting presentation Dec. 3, 2014
 

Viewers also liked (7)

How to Have a Firewise Home
How to Have a Firewise HomeHow to Have a Firewise Home
How to Have a Firewise Home
 
Austin Land Development Code
Austin Land Development CodeAustin Land Development Code
Austin Land Development Code
 
APD's District Representative Presentation to LCCO
APD's District Representative Presentation to LCCOAPD's District Representative Presentation to LCCO
APD's District Representative Presentation to LCCO
 
Austin Resource Recovery
Austin Resource RecoveryAustin Resource Recovery
Austin Resource Recovery
 
The Politics of Land Use
The Politics of Land UseThe Politics of Land Use
The Politics of Land Use
 
Champions Track 3
Champions Track 3Champions Track 3
Champions Track 3
 
Travis County Transportation Plan: Creating Tomorrow's Choice's Today
Travis County Transportation Plan: Creating Tomorrow's Choice's TodayTravis County Transportation Plan: Creating Tomorrow's Choice's Today
Travis County Transportation Plan: Creating Tomorrow's Choice's Today
 

Similar to State of the Trails 2015

Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
Crosstown TO
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
Crosstown TO
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
Crosstown TO
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
Crosstown TO
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
Crosstown TO
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
Crosstown TO
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
Crosstown TO
 

Similar to State of the Trails 2015 (20)

Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Bridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentationBridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentation
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
GIS Clinic: Great Rivers Greenway
GIS Clinic: Great Rivers GreenwayGIS Clinic: Great Rivers Greenway
GIS Clinic: Great Rivers Greenway
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Four Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force PresentationFour Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force Presentation
 
2015 member meeting presentation
2015 member meeting presentation2015 member meeting presentation
2015 member meeting presentation
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
Wilshire heights-na hike-bike-trail-presentation-10-25-2016
Wilshire heights-na hike-bike-trail-presentation-10-25-2016Wilshire heights-na hike-bike-trail-presentation-10-25-2016
Wilshire heights-na hike-bike-trail-presentation-10-25-2016
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 

More from Paul Schumann

More from Paul Schumann (20)

Liberty, Freedom and Rights
Liberty, Freedom and RightsLiberty, Freedom and Rights
Liberty, Freedom and Rights
 
An Overview of CodeNext
An Overview of CodeNextAn Overview of CodeNext
An Overview of CodeNext
 
CodeNext v3 Resolution
CodeNext v3 ResolutionCodeNext v3 Resolution
CodeNext v3 Resolution
 
Lost Creek Blvd Proposed Speed Mitigation
Lost Creek Blvd Proposed Speed MitigationLost Creek Blvd Proposed Speed Mitigation
Lost Creek Blvd Proposed Speed Mitigation
 
Lost Creek Wildfire Adapted Community Plan
Lost Creek Wildfire Adapted Community PlanLost Creek Wildfire Adapted Community Plan
Lost Creek Wildfire Adapted Community Plan
 
LCCO General Meeting 010418
LCCO General Meeting 010418LCCO General Meeting 010418
LCCO General Meeting 010418
 
What Goes In?
What Goes In?What Goes In?
What Goes In?
 
Household Affordability Code Prescription
Household Affordability Code PrescriptionHousehold Affordability Code Prescription
Household Affordability Code Prescription
 
ALDC Transect Matrix (Draft_092515)
ALDC Transect Matrix (Draft_092515)ALDC Transect Matrix (Draft_092515)
ALDC Transect Matrix (Draft_092515)
 
A Tale of Two Cities (Austin and Seattle)
A Tale of Two Cities   (Austin and Seattle)A Tale of Two Cities   (Austin and Seattle)
A Tale of Two Cities (Austin and Seattle)
 
They Want Our Land
They Want Our LandThey Want Our Land
They Want Our Land
 
Fact Sheets on Fencing for Wildfire Mitigation
Fact Sheets on Fencing for Wildfire MitigationFact Sheets on Fencing for Wildfire Mitigation
Fact Sheets on Fencing for Wildfire Mitigation
 
Austin Resource Recovery: Lost Creek
Austin Resource Recovery: Lost CreekAustin Resource Recovery: Lost Creek
Austin Resource Recovery: Lost Creek
 
Future Of Austin's Transportation
Future Of Austin's TransportationFuture Of Austin's Transportation
Future Of Austin's Transportation
 
Wildfire Adapted Community Plan
Wildfire Adapted Community PlanWildfire Adapted Community Plan
Wildfire Adapted Community Plan
 
Lost Creek Wildfire Assessment
Lost Creek Wildfire AssessmentLost Creek Wildfire Assessment
Lost Creek Wildfire Assessment
 
Ready, Set, Go!
Ready, Set, Go!Ready, Set, Go!
Ready, Set, Go!
 
Be Embers Aware
Be Embers AwareBe Embers Aware
Be Embers Aware
 
Fire Resistant Materials
Fire Resistant MaterialsFire Resistant Materials
Fire Resistant Materials
 
Firewise Landscaping in Texas
Firewise Landscaping in TexasFirewise Landscaping in Texas
Firewise Landscaping in Texas
 

Recently uploaded

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 

State of the Trails 2015

  • 1. Accomplishments, Active Projects, and Next Steps 2015 STATE OF THE URBAN TRAILS
  • 2. Agenda • What is an Urban Trail? • Accomplishments • Active Projects • Next Steps
  • 3. What is an Urban Trail? Goals  of  Urban  Trail  Program:   1.  Provide  easy  access  to  both  transporta3on  and  recrea3on  users  from  all   parts  of  the  City.   2.  Connect  to  the  on-­‐street  bicycle  and  sidewalk  network  around  them.   3.  Ensure  adequately  sized  to  accommodate  both  recrea3on  and   transporta3on  uses.   4.  Incorporate  trail  ameni=es  and  features  that  transform  from  a  paved   surface  to  unique  greenways  that  reflect  the  City  around  them.   5.  Provide  adequate  funding  and  resources  to  maintain  and  operate.   6.  Ensure  that  all  are  context-­‐sensi=ve  and  environmentally  sustainable  as   well  as  preserve  and  improve  upon  wildlife  habitat.  
  • 4. Accomplishments Tejano Walking Trail •  5-mile trail includes sidewalks, streets without sidewalks, and the Butler trail. •  Designated National Recreational Trail •  Highlights historical and cultural points of interest. •  Implements the East Cesar Chavez Neighborhood Plan (1999). Floyd  McGown  House  (Flickr,    ‘10)  
  • 5. Accomplishments Tejano Walking Trail •  65 wayfinding tiles installed on sidewalks. •  11 iZone signs installed near historical and cultural markers.
  • 6. Accomplishments Southern Walnut Creek Trail Kiosks •  3 kiosks purchased for wayfinding and informational purposes. •  Installation to occur this winter at the Govalle Park Trailhead, the Austin Tennis Center Trailhead, and the YMCA Trailhead.
  • 7. Accomplishments Southern Walnut Creek Trail Signs •  13 Wayfinding Signs •  16 Mile Marker Signs •  Installation to occur this winter. •  Worked interdepartmentally (PDR, PWD, PARD, APD, AFD, EMS) to approve design. •  Design will become standard for future urban trail wayfinding.
  • 8. Accomplishments Southern Walnut Creek & Austin to Manor Trail Maintenance •  Re-constructed approximately 100 feet of trail. •  Repaired erosion and stability issues at 5+ unique locations. •  Quickly constructed the repairs with minimal closures and phased construction for weekend use •  Preventative maintenance work preemptively protected trail from recent rains.
  • 9. Accomplishments Trail Counters 3 permanent counters (1 additional permanent counter to be installed December 2015) 1 temporary counter Trail Counters (3 counters combined): 27,432 trail users since June 1 Average of 2,400 trail users per day 58% pedestrian, 42% cyclist usage Permanent Counter Stats
  • 10. Accomplishments Temporary Counter Stats Trail Counters North Acres Bridge North Acres Bridge •  649 cyclists during 4 week period •  Average of 34 trail users per day •  Manual counts estimate ~69 students use the bridge per day to get to school.
  • 12. Active Projects Austin to Manor Trail Phase II Status Developing 90% Design Length 2.7 Mile Projected Completion Construction currently unfunded. Estimated Total Project Cost Estimated construction cost $6m
  • 13. Active Projects Country Club Creek Trail Phase I Status Developing 90% Design Length 0.25 Mile Projected Completion Summer 2016 Estimated Total Project Cost Estimated construction cost $415k Looking northeast from Burleson Road. Existing trail along electric transmission easement.
  • 14. Active Projects JJ Seabrook Greenbelt: Manor - MLK Status Complete Length 0.4 Mile Projected Completion November 2015 Estimated Total Project Cost $2.2m
  • 15. Active Projects Mopac Mobility Bridges Status Construction Length 1 Mile Projected Completion Phase I - December 2015, Phase II - March, 2016 Estimated Total Project Cost $13 M
  • 16. Active Projects Northern Walnut Creek Trail Phase I Status Construction Length 3.6 Mile Projected Completion Fall 2017 Estimated Total Project Cost $10 M
  • 17. Active Projects Northern Walnut Creek Trail Phase II Status Design Length 1.6 Mile Projected Completion Construction unfunded Estimated Total Project Cost Construction unfunded
  • 18. Active Projects Shoal Creek Trail: Gap Project 3rd to 5th Street Status Construction Length 0.12 Mile Projected Completion January 2017 Estimated Total Project Cost $6.8 M
  • 19. Active Projects Shoal Creek Trail: Preliminary Engineering Report (5th - 15th) Status PER Length 0.8 Mile Projected Completion PER completion winter 2016 Estimated Total Project Cost $400,000 (for PER). Construction cost unknown
  • 20. Active Projects Shoal Creek Restoration Project: 15th to 24th Street Status Construction Length 0.75 Mile Projected Completion February 2016 Estimated Total Project Cost Trail-related costs: $900,000
  • 21. Active Projects Upper Boggy Creek Trail: MLK Station to 12th Street. Status Design Length 0.4 Mile Projected Completion December 2017 Estimated Total Project Cost $2.2M
  • 22.
  • 23. Active Projects Violet Crown Trail: Phase 2 “North & South” Status Design Length 2.4 Miles Projected Completion Summer 2017 Estimated Total Project Cost $2.4 M
  • 24. Active Projects Violet Crown Trail: Phase 2 “Circle C Ranch Metro Park Veloway” Status Design Length 3 Miles Projected Completion Winter 2016 Estimated Total Project Cost $2.8 M
  • 25. Active Projects Violet Crown Trail: Phase 2 Neighborhood Partnering Project Status Design Length 0.25 Miles Projected Completion Spring 2016 Estimated Total Project Cost $250,000
  • 26. Active Projects YBC Trail: “Y” at Oak Hill to Barton Creek Status PER Length Approx. 5 miles Projected Completion Construction Unfunded Estimated Total Project Cost $10 - 12M
  • 27. Active Projects CTRMA - Shared Use Paths OPEN TO TRAFFIC Miles Manor Expressway US 183 interchange to Parmer Lane 5.6 UNDER CONSTRUCTION MoPac Parmer Ln. to Loop 360 3 Bergstrom Expressway US 290 to SH 71 8 SH 71 Express Bergstrom Expressway to Onion Creek Greenway 4.5 UNDER STUDY MoPac South Lacrosse Ave to Lady Bird Lake 9 Oak Hill Parkway US 290: MoPac - Circle Drive SH 71: US 290 - Silvermine 5.3 1.2 183 North SH 45N to MoPac 7.6
  • 28. Active Projects Tier II Urban Trails Under Review •  Lexington Park II: Urban Trails on Pearce Lane (900 feet) and Ross Road (500 feet) and connections to Travis County Barkley Meadows Park. •  Lennox Oaks: US 183 to Montopolis Practice Fields (.4 mile) •  The Grove at Shoal Creek: Shoal Creek Trail: 45th to Ridgelea Drive (.4 mile)
  • 29. Next Steps Tejano Walking Trail •  Kiosk boards to be installed at Comal parking lot near Butler Trail •  11 additional iZone signs to be purchased and installed for a total of 22 identified sites. •  Plaza Saltillo informational board to be installed. •  Continue to work with Sidewalk Program to complete the sidewalk network along the trail route. Cesar  Chavez  Statue  at  Terrazas  Library  (Flickr,    ‘10)  
  • 30. Next Steps Standard Details and Specifications •  Work with Engineering Services Division to create and launch new Urban Trail specific Standard Details and Specifications. •  Continue participation with PWD/ATD Transportation Criteria Manual revision to include urban trails in volumes I and II. Cesar  Chavez  Statue  at  Terrazas  Library  (Flickr,    ‘10)  
  • 31. Next Steps Cesar  Chavez  Statue  at  Terrazas  Library  (Flickr,    ‘10)   Train DSD on Standards
  • 32. Next Steps Cesar  Chavez  Statue  at  Terrazas  Library  (Flickr,    ‘10)   Citywide MOU and Maintenance Map •  Identifies responsible parties for various segments of all trails within COA •  Boulder, CO example
  • 33. Next Steps Cesar  Chavez  Statue  at  Terrazas  Library  (Flickr,    ‘10)   Build Urban Trails Network •  Continue working interdepartmentally to identify opportunities for build-out. •  Continue working with community groups and neighborhoods to identify new trail connection opportunities. •  Prepare for future funding opportunities (bond, grant, foundation, etc.)