Code No: 07A60105 R07 Set No. 2
III B.Tech II Semester Examinations,December-January, 2011-2012
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Explain the following:
(a) administrative approval.
(b) Expenditure sanction.
(c) Technical sanction. [16]
2. List out duties and liabilities of the following:
(a) Owner.
(b) Engineer. [16]
3. Explain open specifications along with its advantages and disadvantages. [16]
4. Write unit of measurement for the following cases.
(a) Earth work in excavation.
(b) Clearing of shrubs, small trees.
(c) Earth work in filling.
(d) Surface dressing.
(e) Boulder work.
(f) Dressed stone work as in chajjas.
(g) Lime terracing on roof.
(h) Madras terrace roofing. [16]
5. (a) What do you mean by spacer bars in beams
(b) Explain the following along with neat sketches
i. Lap length
ii. End anchorage. [8+8]
6. Explain the following methods along with an example.
(a) Straight line method
(b) Declining balance method. [16]
7. (a) Describe the procedure for calculation of earthwork in hill road.
1
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 2
(b) Calculate the area of the side slopes of portion of a bank for a length of 200
meter the heights of banks at the two ends being 2.50m and 3.50m and the
ratio of the side slope is 2:1. If the side slopes are to be provided with 15cm
thick stone pitching, calculate the cost of pitching at the rate of Rs.150/- per
cu.m. [8+8]
8. Describe the procedure for the calculation of rate per unit cu.m of cement concrete
1:2:4 with stone ballast 40 mm. [16]
2
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 4
III B.Tech II Semester Examinations,December-January, 2011-2012
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Draw the tabular form for the calculation of earthwork with the following methods
(a) Mid - ordinate method and
(b) Prismoidal formula method. [16]
2. Enumerate different methods for estimating building works along with a suitable
example. [16]
3. Explain the following:
(a) Years purchase method.
(b) Sinking fund method. [16]
4. Write a short note on the following:
(a) Informal tender.
(b) Sale of tender papers.
(c) Unbalanced tender. [16]
5. Describe the procedure for the calculation of rate per unit cu.m of Half brick wall
(10cm thick partition wall) with 1:3 cement mortar. [16]
6. Give the detailed specifications of the following items of works.
(a) Reinforced cement concrete
(b) Damp proof course 2.5 cm. [8+8]
7. Explain the following general items of work involved in the estimation for a building
and its process calculation.
(a) Flooring for ground floor
(b) White washing or colour washing
(c) Cement or lime concrete in foundation
(d) Damp proof course. [16]
8. Prepare a schedule of bars for the RCC lintel shown in the figure 1 assuming bearing
of the lintel be 25 cm on walls at each side. Weight of 10mm diameter bar is 0.62
kg/m and 6 mm diameter bar is 0.22 kg/m. [16]
3
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLDFigure 1
* * * * * *
4
Code No: 07A60105 R07 Set No. 4
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 1
Figure 1:
III B.Tech II Semester Examinations,December-January, 2011-2012
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Describe the procedure for the calculation of rate per unit sq.m of the following
items
(a) 2.5 cm cement concrete floor 1:2:4
(b) 2.5 cm cement concrete floor 1:11/2 :4 . [16]
2. Give the detailed specifications of the following items of works.
(a) Steel doors and windows.
(b) Decorative waterproof cement coating. [8+8]
3. Explain the following general items of work involved in the estimation for a building
along with the process of calculations.
(a) Earthwork in excavation.
(b) Earthwork in filling.
(c) Brick flat soling.
4
(d) Cement concrete in foundation.
(e) Masonry work in foundation.
(f) Damp proof course.
(g) Masonry work in superstructure.
(h) 10 cm thick brickwork. [16]
4. Write a short note on the following:
(a) Opening of tenders
(b) Comparative statement of tenders
(c) Global tender. [16]
5. (a) What are the main functions of an abstract
(b) What is the data required for preparing detailed estimates. [8+8]
6. Explain the following methods along with an example.
(a) Straight line method
(b) Quantity survey method. [16]
7. Prepare a detailed estimate for earthwork for a portion of a road from the following
data.
5
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 1
Distance in m RL of ground RL of the formation
0 114.50 115.00
100 114.75
200 115.25
300 115.20 Upward gradient 1 in 200 up to 600 m
400 116.10
500 116.85
600 118.00
700 118.25
800 118.10
900 117.80
1000 117.75 Downward gradient 1 in 400
1100 117.90
1200 117.50
Formation width of road is 8 m, side slopes are 2:1 in banking and 11/2 :1 in cutting.
Draw L-section and cross sections. [16]
8. Prepare a schedule of bars for the RCC lintel shown in the figure 2 assuming bearing
of the lintel be 15 cm on walls at each side. Weight of 10mm diameter bar is 0.62
kg/m and 6 mm diameter bar is 0.22 kg/m. [16]
5
6
Figure 2
* * * * * *
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 3
Figure 2:
III B.Tech II Semester Examinations,December-January, 2011-2012
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. List and explain any eight general items of work involved in the estimation for a
building along with the process of calculations. [16]
2. Describe the step by step procedure for inviting of tender for design and construc-
tion. [16]
3. Give the detailed specifications of the following items of works.
(a) Reinforced brickwork.
(b) Plastering cement mortar. [8+8]
4. Draw reinforcement details along with curtailment lengths in the following slabs.
(a) Simply supported.
(b) Continuous over several spans. [8+8]
5. Describe the procedure for the calculation of rate per unit sq.m of 6 mm thickness
plastering, 12 mm plastering thickness and 20 mm plastering thickness. [16]
6
6. A building is situated by the side of a main road of Hyderabad city on a land of
600 sq.m. The built up portion in 22m × 17m. The building is first class type
and provided with water supply, sanitary and electric fittings, and the age of the
building is 30 years. Workout the valuation of the property. Assume plinth area
rate is Rs.200.00 and cost of land as Rs.6000 per sq.m. [16]
7. Estimate the cost of earthwork for apportion of road for 400m length from the fol-
lowing data. Formation width of the road is 9 meter. Side slopes are 2:1 in banking
2:1 in cutting. [16]
7
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 3
Station Distance in meter RL of ground RL of formation
25 1000 51.00 52
26 1040 50.90
27 1080 50.50
28 1120 50.80
29 1160 50.60
30 1200 50.70
31 1240 51.20 Downward gradient of 1 in 200
32 1280 51.40
33 1320 51.30
34 1360 51.00
35 1400 50.60
8. Prepare a preliminary estimate for a framed four storied office building having
a carpet area of 400 sq m for each floor. Assume areas occupied by corridor,
verandah, lavatories, staircase etc as 25% of built up area and that occupied by
walls and columns as 8.5% of the same. The following details may be sued for
estimation
(a) Built-up area rate for ground floor (excluding foundation) = Rs1,500/- per sq
m
(b) Built-up area rate for 1st and 2nd floor = Rs1,650/- per sq m
(c) Built-up area rate for 3rd floor = Rs1,800/- per sq m
(d) Extra for foundation = 20% of superstructure cost
(e) Extra for special architectural treatment = 1% of building cost
(f) Extra for water supply and sanitary = 7% of building cost
(g) Extra for electrical installation = 8% of building cost
(h) Extra for work charge establishment = 10% of overall cost
(i) Extra for other source = 5% of building cost. [16]
7
8
www.jntuworld.com
www.jntuworld.com

More Related Content

Similar to 07 a60105 estimatingandcosting

0102 Building Planning And Construction Management
0102 Building Planning And Construction Management0102 Building Planning And Construction Management
0102 Building Planning And Construction Managementguestac67362
 
0102 Building Planning And Construction Management
0102 Building Planning And Construction Management0102 Building Planning And Construction Management
0102 Building Planning And Construction Managementguestd436758
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)Make Mannan
 
Etabs BY Subash Pathak
Etabs BY Subash PathakEtabs BY Subash Pathak
Etabs BY Subash PathakSubash Pathak
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Nafisa Nazneen Choudhury
 
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)Make Mannan
 
Mmup questionnaire 2
Mmup questionnaire 2Mmup questionnaire 2
Mmup questionnaire 2Omar Selim
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural designimaduddin91
 

Similar to 07 a60105 estimatingandcosting (20)

0102 Building Planning And Construction Management
0102 Building Planning And Construction Management0102 Building Planning And Construction Management
0102 Building Planning And Construction Management
 
0102 Building Planning And Construction Management
0102 Building Planning And Construction Management0102 Building Planning And Construction Management
0102 Building Planning And Construction Management
 
8th Semester (June; July-2015) Civil Engineering Question Paper
8th Semester (June; July-2015) Civil Engineering Question Paper8th Semester (June; July-2015) Civil Engineering Question Paper
8th Semester (June; July-2015) Civil Engineering Question Paper
 
6th Semester Civil Engineering Question Papers June/july 2018
6th Semester Civil Engineering Question Papers June/july 20186th Semester Civil Engineering Question Papers June/july 2018
6th Semester Civil Engineering Question Papers June/july 2018
 
7th Semester (July-2016) Civil Engineering Question Paper
7th Semester (July-2016) Civil Engineering Question Paper7th Semester (July-2016) Civil Engineering Question Paper
7th Semester (July-2016) Civil Engineering Question Paper
 
Blt4021
Blt4021Blt4021
Blt4021
 
C0343011020
C0343011020C0343011020
C0343011020
 
X10708 (me8692)
X10708 (me8692)X10708 (me8692)
X10708 (me8692)
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
 
Etabs BY Subash Pathak
Etabs BY Subash PathakEtabs BY Subash Pathak
Etabs BY Subash Pathak
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
5th Semester (July-2016) Civil Engineering Question Paper
5th Semester (July-2016) Civil Engineering Question Paper5th Semester (July-2016) Civil Engineering Question Paper
5th Semester (July-2016) Civil Engineering Question Paper
 
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
 
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
 
6th Semester (June; July-2015) Civil Engineering Question Paper
6th Semester (June; July-2015) Civil Engineering Question Paper6th Semester (June; July-2015) Civil Engineering Question Paper
6th Semester (June; July-2015) Civil Engineering Question Paper
 
Mmup questionnaire 2
Mmup questionnaire 2Mmup questionnaire 2
Mmup questionnaire 2
 
6th Semester (July-2016) Civil Engineering Question Paper
6th Semester (July-2016) Civil Engineering Question Paper6th Semester (July-2016) Civil Engineering Question Paper
6th Semester (July-2016) Civil Engineering Question Paper
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural design
 

More from imaduddin91

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplicationsimaduddin91
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringimaduddin91
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural designimaduddin91
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplicationsimaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineeringimaduddin91
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsimaduddin91
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringimaduddin91
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagementimaduddin91
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplicationsimaduddin91
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagementimaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineeringimaduddin91
 
Statistical metods
Statistical metodsStatistical metods
Statistical metodsimaduddin91
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference conceptsimaduddin91
 
Base 9.1 preparation guide
Base 9.1 preparation guideBase 9.1 preparation guide
Base 9.1 preparation guideimaduddin91
 
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)imaduddin91
 

More from imaduddin91 (20)

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplications
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineering
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural design
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplications
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineering
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
Statistical metods
Statistical metodsStatistical metods
Statistical metods
 
Sas cheat
Sas cheatSas cheat
Sas cheat
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference concepts
 
Base 9.1 preparation guide
Base 9.1 preparation guideBase 9.1 preparation guide
Base 9.1 preparation guide
 
Column design1
Column design1Column design1
Column design1
 
Chapter4
Chapter4Chapter4
Chapter4
 
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
 

07 a60105 estimatingandcosting

  • 1. JNTUW ORLD Code No: 07A60105 R07 Set No. 2 III B.Tech II Semester Examinations,December-January, 2011-2012 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. Explain the following: (a) administrative approval. (b) Expenditure sanction. (c) Technical sanction. [16] 2. List out duties and liabilities of the following: (a) Owner. (b) Engineer. [16] 3. Explain open specifications along with its advantages and disadvantages. [16] 4. Write unit of measurement for the following cases. (a) Earth work in excavation. (b) Clearing of shrubs, small trees. (c) Earth work in filling. (d) Surface dressing. (e) Boulder work. (f) Dressed stone work as in chajjas. (g) Lime terracing on roof. (h) Madras terrace roofing. [16] 5. (a) What do you mean by spacer bars in beams (b) Explain the following along with neat sketches i. Lap length ii. End anchorage. [8+8] 6. Explain the following methods along with an example. (a) Straight line method (b) Declining balance method. [16] 7. (a) Describe the procedure for calculation of earthwork in hill road. 1 www.jntuworld.com www.jntuworld.com
  • 2. JNTUW ORLD Code No: 07A60105 R07 Set No. 2 (b) Calculate the area of the side slopes of portion of a bank for a length of 200 meter the heights of banks at the two ends being 2.50m and 3.50m and the ratio of the side slope is 2:1. If the side slopes are to be provided with 15cm thick stone pitching, calculate the cost of pitching at the rate of Rs.150/- per cu.m. [8+8] 8. Describe the procedure for the calculation of rate per unit cu.m of cement concrete 1:2:4 with stone ballast 40 mm. [16] 2 www.jntuworld.com www.jntuworld.com
  • 3. JNTUW ORLD Code No: 07A60105 R07 Set No. 4 III B.Tech II Semester Examinations,December-January, 2011-2012 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. Draw the tabular form for the calculation of earthwork with the following methods (a) Mid - ordinate method and (b) Prismoidal formula method. [16] 2. Enumerate different methods for estimating building works along with a suitable example. [16] 3. Explain the following: (a) Years purchase method. (b) Sinking fund method. [16] 4. Write a short note on the following: (a) Informal tender. (b) Sale of tender papers. (c) Unbalanced tender. [16] 5. Describe the procedure for the calculation of rate per unit cu.m of Half brick wall (10cm thick partition wall) with 1:3 cement mortar. [16] 6. Give the detailed specifications of the following items of works. (a) Reinforced cement concrete (b) Damp proof course 2.5 cm. [8+8] 7. Explain the following general items of work involved in the estimation for a building and its process calculation. (a) Flooring for ground floor (b) White washing or colour washing (c) Cement or lime concrete in foundation (d) Damp proof course. [16] 8. Prepare a schedule of bars for the RCC lintel shown in the figure 1 assuming bearing of the lintel be 25 cm on walls at each side. Weight of 10mm diameter bar is 0.62 kg/m and 6 mm diameter bar is 0.22 kg/m. [16] 3 www.jntuworld.com www.jntuworld.com
  • 4. JNTUW ORLDFigure 1 * * * * * * 4 Code No: 07A60105 R07 Set No. 4 www.jntuworld.com www.jntuworld.com
  • 5. JNTUW ORLD Code No: 07A60105 R07 Set No. 1 Figure 1: III B.Tech II Semester Examinations,December-January, 2011-2012 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. Describe the procedure for the calculation of rate per unit sq.m of the following items (a) 2.5 cm cement concrete floor 1:2:4 (b) 2.5 cm cement concrete floor 1:11/2 :4 . [16] 2. Give the detailed specifications of the following items of works. (a) Steel doors and windows. (b) Decorative waterproof cement coating. [8+8] 3. Explain the following general items of work involved in the estimation for a building along with the process of calculations. (a) Earthwork in excavation. (b) Earthwork in filling. (c) Brick flat soling. 4 (d) Cement concrete in foundation. (e) Masonry work in foundation. (f) Damp proof course. (g) Masonry work in superstructure. (h) 10 cm thick brickwork. [16] 4. Write a short note on the following: (a) Opening of tenders (b) Comparative statement of tenders (c) Global tender. [16] 5. (a) What are the main functions of an abstract (b) What is the data required for preparing detailed estimates. [8+8] 6. Explain the following methods along with an example. (a) Straight line method (b) Quantity survey method. [16] 7. Prepare a detailed estimate for earthwork for a portion of a road from the following data. 5 www.jntuworld.com www.jntuworld.com
  • 6. JNTUW ORLD Code No: 07A60105 R07 Set No. 1 Distance in m RL of ground RL of the formation 0 114.50 115.00 100 114.75 200 115.25 300 115.20 Upward gradient 1 in 200 up to 600 m 400 116.10 500 116.85 600 118.00 700 118.25 800 118.10 900 117.80 1000 117.75 Downward gradient 1 in 400 1100 117.90 1200 117.50 Formation width of road is 8 m, side slopes are 2:1 in banking and 11/2 :1 in cutting. Draw L-section and cross sections. [16] 8. Prepare a schedule of bars for the RCC lintel shown in the figure 2 assuming bearing of the lintel be 15 cm on walls at each side. Weight of 10mm diameter bar is 0.62 kg/m and 6 mm diameter bar is 0.22 kg/m. [16] 5 6 Figure 2 * * * * * * www.jntuworld.com www.jntuworld.com
  • 7. JNTUW ORLD Code No: 07A60105 R07 Set No. 3 Figure 2: III B.Tech II Semester Examinations,December-January, 2011-2012 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. List and explain any eight general items of work involved in the estimation for a building along with the process of calculations. [16] 2. Describe the step by step procedure for inviting of tender for design and construc- tion. [16] 3. Give the detailed specifications of the following items of works. (a) Reinforced brickwork. (b) Plastering cement mortar. [8+8] 4. Draw reinforcement details along with curtailment lengths in the following slabs. (a) Simply supported. (b) Continuous over several spans. [8+8] 5. Describe the procedure for the calculation of rate per unit sq.m of 6 mm thickness plastering, 12 mm plastering thickness and 20 mm plastering thickness. [16] 6 6. A building is situated by the side of a main road of Hyderabad city on a land of 600 sq.m. The built up portion in 22m × 17m. The building is first class type and provided with water supply, sanitary and electric fittings, and the age of the building is 30 years. Workout the valuation of the property. Assume plinth area rate is Rs.200.00 and cost of land as Rs.6000 per sq.m. [16] 7. Estimate the cost of earthwork for apportion of road for 400m length from the fol- lowing data. Formation width of the road is 9 meter. Side slopes are 2:1 in banking 2:1 in cutting. [16] 7 www.jntuworld.com www.jntuworld.com
  • 8. JNTUW ORLD Code No: 07A60105 R07 Set No. 3 Station Distance in meter RL of ground RL of formation 25 1000 51.00 52 26 1040 50.90 27 1080 50.50 28 1120 50.80 29 1160 50.60 30 1200 50.70 31 1240 51.20 Downward gradient of 1 in 200 32 1280 51.40 33 1320 51.30 34 1360 51.00 35 1400 50.60 8. Prepare a preliminary estimate for a framed four storied office building having a carpet area of 400 sq m for each floor. Assume areas occupied by corridor, verandah, lavatories, staircase etc as 25% of built up area and that occupied by walls and columns as 8.5% of the same. The following details may be sued for estimation (a) Built-up area rate for ground floor (excluding foundation) = Rs1,500/- per sq m (b) Built-up area rate for 1st and 2nd floor = Rs1,650/- per sq m (c) Built-up area rate for 3rd floor = Rs1,800/- per sq m (d) Extra for foundation = 20% of superstructure cost (e) Extra for special architectural treatment = 1% of building cost (f) Extra for water supply and sanitary = 7% of building cost (g) Extra for electrical installation = 8% of building cost (h) Extra for work charge establishment = 10% of overall cost (i) Extra for other source = 5% of building cost. [16] 7 8 www.jntuworld.com www.jntuworld.com