3/22/2011 07:00 AM Unit  1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ  In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity Unknown  Unknown  Unknown  Not applicable due to outage plant status Containment integrity No information Damage suspected No information AC Power Substation connected  AC Power available – Load check is ongoing Not available Not available Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered (Stable) Around half of Fuel is uncovered  (Stable) Around half of Fuel is uncovered  (Stable) Not applicable due to outage plant status Pressure of RPV Stabilized Unreliable Readings Decreased CV Pressure Drywell Stable Stable Decreased Water injection to RPV Seawater  Seawater  Seawater  Water injection to CV No information No information No information Spent Fuel Pool Status No spraying reported Periodic spraying from outside Periodic spraying from outside Periodic spraying from outside
3/22/2011 07:00 AM Unit  5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Cold Shutdown RPV & RCS integrity Intact Intact Containment int. No damage expected No damage expected  AC Power Switched from emergency diesel  to off-site power Emergency diesel Off-site power being restored Building  No damage reported No damage reported Water level of RPV Above fuel  Above fuel  Pressure of RPV Decreased Decreased Containment Pressure No information No information Water injection to RPV Water injection as needed via the RHR system Water injection as needed via the RHR system Water injection to CV Not needed now Not needed now Spent Fuel Pool Status Cooling restored Cooling restored Severe condition Concern No immediate concern

More Related Content

More from International Atomic Energy Agency

Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)International Atomic Energy Agency
 
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...International Atomic Energy Agency
 

More from International Atomic Energy Agency (20)

Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 
Table summary of reactor unit status at 18-april 2011
Table  summary of reactor unit status at 18-april 2011Table  summary of reactor unit status at 18-april 2011
Table summary of reactor unit status at 18-april 2011
 
Table summary of reactor unit status at 15-april-1200 utc
Table   summary of reactor unit status at 15-april-1200 utcTable   summary of reactor unit status at 15-april-1200 utc
Table summary of reactor unit status at 15-april-1200 utc
 
Tc programme presentation UN audience
Tc programme presentation UN audienceTc programme presentation UN audience
Tc programme presentation UN audience
 
TC Programme Presentation Russian
TC Programme Presentation  RussianTC Programme Presentation  Russian
TC Programme Presentation Russian
 
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
 

IAEA Summary of Fukushima Daiichi Reactor Unit Status: 22 March 2011 @ 0700 UTC

  • 1. 3/22/2011 07:00 AM Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity Unknown Unknown Unknown Not applicable due to outage plant status Containment integrity No information Damage suspected No information AC Power Substation connected AC Power available – Load check is ongoing Not available Not available Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered (Stable) Around half of Fuel is uncovered (Stable) Around half of Fuel is uncovered (Stable) Not applicable due to outage plant status Pressure of RPV Stabilized Unreliable Readings Decreased CV Pressure Drywell Stable Stable Decreased Water injection to RPV Seawater Seawater Seawater Water injection to CV No information No information No information Spent Fuel Pool Status No spraying reported Periodic spraying from outside Periodic spraying from outside Periodic spraying from outside
  • 2. 3/22/2011 07:00 AM Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Cold Shutdown RPV & RCS integrity Intact Intact Containment int. No damage expected No damage expected AC Power Switched from emergency diesel to off-site power Emergency diesel Off-site power being restored Building No damage reported No damage reported Water level of RPV Above fuel Above fuel Pressure of RPV Decreased Decreased Containment Pressure No information No information Water injection to RPV Water injection as needed via the RHR system Water injection as needed via the RHR system Water injection to CV Not needed now Not needed now Spent Fuel Pool Status Cooling restored Cooling restored Severe condition Concern No immediate concern