SlideShare a Scribd company logo
04/18/2011 11:00 UTC Unit  1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ  In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but slowly decreasing RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation  – Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant status Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable  Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Fresh water injection by concrete pump truck
04/18/2011 11:00 UTC Unit  5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building  Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

More Related Content

What's hot

Effect Of Grid Disturbance On Plant Dynamics
Effect Of Grid Disturbance On Plant DynamicsEffect Of Grid Disturbance On Plant Dynamics
Effect Of Grid Disturbance On Plant Dynamics
divyadeepak77
 
POWER EECTRONICS BASIC COMPONENTS PART 2
POWER EECTRONICS BASIC COMPONENTS PART 2POWER EECTRONICS BASIC COMPONENTS PART 2
POWER EECTRONICS BASIC COMPONENTS PART 2
RanjitKumar Parmar
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines
Karol Bielecki
 
ADITEC04
ADITEC04ADITEC04
ADITEC04
Dimitra Muni
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
ConsultingSpecifyingEngineer
 
Week 12 13 14 pe 3231
Week 12   13    14  pe  3231Week 12   13    14  pe  3231
Week 12 13 14 pe 3231
Charlton Inao
 
AQUAFAN Engineering Principles
AQUAFAN Engineering PrinciplesAQUAFAN Engineering Principles
AQUAFAN Engineering Principles
Bertus Bolknak
 
Chernobyl Timeline
Chernobyl TimelineChernobyl Timeline
Chernobyl Timeline
smmiller166
 
Paralleling Switchgear
Paralleling SwitchgearParalleling Switchgear
Paralleling Switchgear
michaeljmack
 
Geomagnetic storms and power system
Geomagnetic storms and power systemGeomagnetic storms and power system
Geomagnetic storms and power system
Abhishek Anand
 
Low cost automatic water level control for domestic or industrial applicat...
Low cost  automatic water level control for domestic  or industrial  applicat...Low cost  automatic water level control for domestic  or industrial  applicat...
Low cost automatic water level control for domestic or industrial applicat...
Ahasan Ullah Hasan
 
Project listing
Project listingProject listing
Project listing
Kenneth Ilg
 
AQUAFAN Introduction - Watco Group
AQUAFAN Introduction - Watco GroupAQUAFAN Introduction - Watco Group
AQUAFAN Introduction - Watco Group
Bertus Bolknak
 
Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1
Richard Peck
 
Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...
Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...
Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...
AltafHussain381
 
RebeccaB_capacity report_presentation
RebeccaB_capacity report_presentationRebeccaB_capacity report_presentation
RebeccaB_capacity report_presentation
Rebecca Bisangwa
 
05 ropp sandia-epri_workshop_lrov_spod_05092016
05 ropp sandia-epri_workshop_lrov_spod_0509201605 ropp sandia-epri_workshop_lrov_spod_05092016
05 ropp sandia-epri_workshop_lrov_spod_05092016
Sandia National Laboratories: Energy & Climate: Renewables
 
Wireless Power Transmission
Wireless Power TransmissionWireless Power Transmission
Wireless Power Transmission
Yogesh Raju
 
Temperature controlled dc fan
Temperature controlled dc fanTemperature controlled dc fan
Temperature controlled dc fan
Shovon Das
 
DanOlaru-List of Documents
DanOlaru-List of DocumentsDanOlaru-List of Documents
DanOlaru-List of Documents
OLARU I. Dan
 

What's hot (20)

Effect Of Grid Disturbance On Plant Dynamics
Effect Of Grid Disturbance On Plant DynamicsEffect Of Grid Disturbance On Plant Dynamics
Effect Of Grid Disturbance On Plant Dynamics
 
POWER EECTRONICS BASIC COMPONENTS PART 2
POWER EECTRONICS BASIC COMPONENTS PART 2POWER EECTRONICS BASIC COMPONENTS PART 2
POWER EECTRONICS BASIC COMPONENTS PART 2
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines
 
ADITEC04
ADITEC04ADITEC04
ADITEC04
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
 
Week 12 13 14 pe 3231
Week 12   13    14  pe  3231Week 12   13    14  pe  3231
Week 12 13 14 pe 3231
 
AQUAFAN Engineering Principles
AQUAFAN Engineering PrinciplesAQUAFAN Engineering Principles
AQUAFAN Engineering Principles
 
Chernobyl Timeline
Chernobyl TimelineChernobyl Timeline
Chernobyl Timeline
 
Paralleling Switchgear
Paralleling SwitchgearParalleling Switchgear
Paralleling Switchgear
 
Geomagnetic storms and power system
Geomagnetic storms and power systemGeomagnetic storms and power system
Geomagnetic storms and power system
 
Low cost automatic water level control for domestic or industrial applicat...
Low cost  automatic water level control for domestic  or industrial  applicat...Low cost  automatic water level control for domestic  or industrial  applicat...
Low cost automatic water level control for domestic or industrial applicat...
 
Project listing
Project listingProject listing
Project listing
 
AQUAFAN Introduction - Watco Group
AQUAFAN Introduction - Watco GroupAQUAFAN Introduction - Watco Group
AQUAFAN Introduction - Watco Group
 
Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1
 
Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...
Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...
Temperature Controlled Dc fan Using op AMP..... And Also With Circuit diagram...
 
RebeccaB_capacity report_presentation
RebeccaB_capacity report_presentationRebeccaB_capacity report_presentation
RebeccaB_capacity report_presentation
 
05 ropp sandia-epri_workshop_lrov_spod_05092016
05 ropp sandia-epri_workshop_lrov_spod_0509201605 ropp sandia-epri_workshop_lrov_spod_05092016
05 ropp sandia-epri_workshop_lrov_spod_05092016
 
Wireless Power Transmission
Wireless Power TransmissionWireless Power Transmission
Wireless Power Transmission
 
Temperature controlled dc fan
Temperature controlled dc fanTemperature controlled dc fan
Temperature controlled dc fan
 
DanOlaru-List of Documents
DanOlaru-List of DocumentsDanOlaru-List of Documents
DanOlaru-List of Documents
 

Similar to Table summary of reactor unit status at 18-april 2011

Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
 Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:... Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
International Atomic Energy Agency
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
International Atomic Energy Agency
 
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
International Atomic Energy Agency
 
Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011
International Atomic Energy Agency
 
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
Sandia National Laboratories: Energy & Climate: Renewables
 
DC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfDC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdf
GautamChattopadhyay4
 
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Société Française d'Energie Nucléaire
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALI
Mahendra Magre
 
19. GM Energize.pptx
19. GM Energize.pptx19. GM Energize.pptx
19. GM Energize.pptx
ssuser56273f
 
Fukushima Daiichi Byu Presentation
Fukushima Daiichi Byu PresentationFukushima Daiichi Byu Presentation
Fukushima Daiichi Byu Presentation
Joe Miller
 
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdfOn Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
KhalidAyaz3
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
AmitKumar6931
 
Boiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPPBoiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPP
Md Asif Imrul
 
Nuclear fission
Nuclear fissionNuclear fission
Nuclear fission
Anu Ashokan
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
michaeljmack
 
Electric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantElectric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plant
Abdul Soomro
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
Navyasri Jiguru
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
Rajashekar Gurrala
 
18 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_16051018 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_160510
Sandia National Laboratories: Energy & Climate: Renewables
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
ajay kumar
 

Similar to Table summary of reactor unit status at 18-april 2011 (20)

Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
 Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:... Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
 
Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011
 
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
 
DC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfDC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdf
 
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALI
 
19. GM Energize.pptx
19. GM Energize.pptx19. GM Energize.pptx
19. GM Energize.pptx
 
Fukushima Daiichi Byu Presentation
Fukushima Daiichi Byu PresentationFukushima Daiichi Byu Presentation
Fukushima Daiichi Byu Presentation
 
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdfOn Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
Boiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPPBoiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPP
 
Nuclear fission
Nuclear fissionNuclear fission
Nuclear fission
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Electric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantElectric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plant
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
18 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_16051018 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_160510
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 

More from International Atomic Energy Agency

IAEA Bulletin September 2011
IAEA Bulletin September 2011IAEA Bulletin September 2011
IAEA Bulletin September 2011
International Atomic Energy Agency
 
The IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear SafetyThe IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear Safety
International Atomic Energy Agency
 
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
International Atomic Energy Agency
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
International Atomic Energy Agency
 
Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)
International Atomic Energy Agency
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
International Atomic Energy Agency
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
International Atomic Energy Agency
 
Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
International Atomic Energy Agency
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
International Atomic Energy Agency
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
International Atomic Energy Agency
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
International Atomic Energy Agency
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
International Atomic Energy Agency
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
International Atomic Energy Agency
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
International Atomic Energy Agency
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)International Atomic Energy Agency
 

More from International Atomic Energy Agency (20)

IAEA Bulletin September 2011
IAEA Bulletin September 2011IAEA Bulletin September 2011
IAEA Bulletin September 2011
 
The IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear SafetyThe IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear Safety
 
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
 
Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 

Table summary of reactor unit status at 18-april 2011

  • 1. 04/18/2011 11:00 UTC Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but slowly decreasing RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant status Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Fresh water injection by concrete pump truck
  • 2. 04/18/2011 11:00 UTC Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Editor's Notes

  1. 04/18/11 16:34
  2. 04/18/11 16:34