Mercer West: Open House (June 8, 2011)

740 views
723 views

Published on

The introductory presentation from the Mercer West Open House that was held at Seattle Center on June 8, 2011.

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
740
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Mercer West: Open House (June 8, 2011)

  1. 1. Project Overview<br />
  2. 2. 2<br />Completing the Vision for Two-Way Mercer St From I-5 to Elliott Ave W<br />WEST MERCER PLACE<br />TWO-WAY CONVERSION<br />MERCER UNDERPASS<br /><ul><li>Add a New Option for Freight From I-5 to Interbay
  3. 3. Connect the Uptown and S Lake Union Urban Centers
  4. 4. Enhance Transit Access
  5. 5. Create a Direct Connection From I-5 and SR 99 to Seattle Center, Uptown, Queen Anne, and Interbay
  6. 6. Improve Pedestrian and Bicycle Connection Across SR 99</li></li></ul><li>3<br />West Mercer Place<br />Construction begins Monday, June 13th.<br />No work on weekends<br />No work during morning or evening rush hours<br />Will be completed in 3-6 weeks.<br />
  7. 7. 4<br />Two-Way Conversion <br />(Fifth Ave N to Fifth Ave W)<br />Two Lanes in Each Direction on Mercer St (Fifth Ave N – Second Ave W)<br />One Lane Each Direction on Roy St (Fifth Ave N – Queen Anne Ave N)<br />Bike Lanes on Roy St<br />All Changes Within the Existing Street Right-of-Way<br />Project Coordination: Seattle Center, RapidRide<br />
  8. 8. 5<br />Widened Underpass at Aurora (conceptual)<br /><ul><li>Three Lanes in Each Direction
  9. 9. Median/Left-Turn Lane
  10. 10. Bicycle Path
  11. 11. 12-16’ Sidewalks
  12. 12. Project Coordination: WSDOT (Viaduct Replacement), Mercer East,The Gates Foundation, Lake to Bay Trail, Seattle Center</li></li></ul><li>6<br />Project Schedule<br />
  13. 13. 7<br />If you have any questions, please visit:<br />http://www.seattle.gov/transportation/mercer_west.htm<br />Or contact: <br />Eric Tweit<br />Mercer West Project Manager<br />mercerwest@seattle.gov<br />(206) 684-8834<br />QR code for the web site<br />

×