3. Content:
1.Introduction
2.Summary of main issues. Solution
3.Benefits for community.Benefits for students.
4.Where the Fresh Market can be constructed?
Photos fronm the site.
5.Site analysis. Site analysis plan. Benefits of the
site.
6.Zone Plan
7.Layout Plan
8.Circulation Plan
9.How to get a permitt to build Fresh Market within
Taylor’s University Lakeside?
10. The Conclusion
11. References list
4. Introduction:
According to the brief, our aim was to select a site and propose the building. Each
group got different type of areas, as for us we got commercial buildings.
The objectives for that project is improve our understanding of the building team,
their organization, duties, interrelations; awareness professional responsibilities.
We have to demonstrate the understanding of coherent working relations between
various industry players, ability to document, explanation and illustration
structures of organization involved in the construction industry.
5. Summary of main issues:
In the Plaza of Taylor’s campus there is no place to buy fresh fruits and
vegetables
Students that live in U- Residence have to go outside campus to get fruits
and vegetables, which is not convinient in terms of time and payment for
transportation
There is some students who adhere to a special diet ( more fresh fruits and
vegetables) for health reasons or other reasons, also students – vegetarians
are not able to acquire necessary products in easy way.
Also it is not convinient for students in terms of safety. Since a campus is
under security in 24 hours a day it is much better to provide all the amenities
for a comfortable staying in U-Residence.
Solution: Construction of the Fresh Market within Taylor’s University Lakeside
Campus.
6. Benefits for community:
1. Construction of the commercial area such as Fresh Market provides new
jobs for builders and for staff.
Benefits for students :
1. Students will allowed to buy some fresh vegetables and fruits that do not
have to prepared (Since there is rule about banning cooking inside of the U-
Residence apartments)
2. Students will not have to go outside Taylor’s University Lakeside Campus
to buy fresh vegetables and fruits
3. Not going outside to buy vegetables and fruits will save money for
transportation
4. Students who adhere to a special diet for health reasons or other reasons,
also students - vegetarians will appreciate the convenience of buying fruits
and vegetables in the fresh market.
5. A wide range of fruits and vegetables, that will satisfy any client.
6. Students will have easier way to have whole range of vitamins for better
assimilation of information received at the lectures.
7. Where the Fresh Market can be constructed?
There are some photos from the site that was chosen to construct commercial area
such as Fresh Market.
8. Site analysis:
The location of the site: Jalan Taylors, Subang Jaya, 47500 Subang Jaya,
Selangor, Malaysia. This particular site is located beside Coda Gallary and
carriageway.
Site plan:
9. Site analysis plan ( Includes sun path, north point)
Type of cover: Concreate
Topography: Flat
Other conditions: There is some concreate object to be demolished
10. Access to the site:
car parking
pedestrian walkway
Temporary parking infront of the Satrbucks
Average temperature in Subang Jaya:
Benefits of site:
Location of site within the Taylor’s Lakeside Plaza, which means that the
construction of the Fresh Market will be fully fit in terms of compatibility of
buildings around
Tha location of the site is close to U-Residense
Easy way to access (car parking, walkway, temporary parking infront of the
Satrbucks)
14. How to get a permitt to build Fresh Market within Taylor’s
University Lakeside?
1. To get a permision from Taylor’s University Lakeside authority
2. Submit and obtain Development Approval through OSC
3. Preapare plans such as:
Planing plan
Building plan
Enginereeng plan
Landscape plan
Water supply plan
Sewerage plan
Infrastructure communication plan
Fire safety plan
4. Obtain approvals such as:
Water approval
Sewerage approval
Fire Safety ( arch) Comment
Earthwork approval
Road and Drainage approval
Landscape approval
Street Lighting approval
MSMA and SPAH approvals ( Urban Storm Water Management and
Rainwater Harvesting system)
Building plan approval
Fire Safety ( M&E) approval
Or it also possible so fill the form on this site and submitt all necessary
documents online
http://jprb.dbkl.gov.my/Pentadbir/MuatTurunBorangOSC/MTBorang11.asp
15. The Conclusion:
While doing the report we found out a lot of interesting and important things
about construction industry, commercial buildings, which rooms have to be there,
planning and layout. Also, during writing the report we have consolidated our
knowledges about building planning and responsibilities of certain individuals in
the construction industry.
16. References list:
OSC 1 SUBMISSION (2014) GUIDELINES FOR APPLYING FOR OSC 1
http://jprb.dbkl.gov.my/Pentadbir/MuatTurunBorangOSC/MTBorang11.asp
Composition Improvement store layout and their relationship
http://radekkem.ru/sostav_pomeshenii_magazina_ih_planirovka.html