1. JOB ON TRAINING INDUSTRY
AT ADIKARYA SELOGIRI
WONOGIRI IN 2011
AMBAR MARIJAN
XII TP
2. MY ACTIVITIES
• Cutting the plate iron with length 100 cm
• Make thread of a screw with diameter 14 cm
• Drill the plate iron with diameter 19 cm,7 cm,13
cm and 22 cm
• Lathe the iron with diameter 19 cm become
diameter 14 cm
• Welding two the plate iron with length 15 cm
• Milling the plate iron agree with size
3. Cutting the plate iron with length
100 cm
• 2 people
• A half hour
• Size long less
4. Make thread of a screw with
diameter 14 cm
• 4 people
• Two days
• The
5. Drill the plate iron with diameter 19
cm,7 cm,13 cm and 22 cm
• 3 people
• One day
• The result is good and right size
6. Lathe the iron with diameter 19 cm
become diameter 14 cm
• 5 people
• Two days
• Turning pretty good result
7. Welding two the plate iron with
length 15 cm
• 4 people
• Two days
• Unsatisfactory welding result
8. Milling the plate iron agree with size
• 4 people
• Three days
• Size less than maximum
9. conclusion
After I job on training industry at Adikarya
selogiri wonogiri in 2011 here,I get a lot of
skill on iron lathe,drill steel plate,cut some
metal and of course here I also received a
lot of work experience machining
techniques.