Sequence of Presentation
• Background
• Year wise details of Rains
• Impact of the Rain
• Objectives
• Storm Water Drainage System
• Stream Discharging rain water directly in to the Sea
• Existing Situation
• Preparedness Measures
• Pre Rain Measures
• Identified low lying areas
• Geography of Nullah under KMC Responsibilities
• KMC Measures
• Measures during rains
• Post Rain Measures
• Functions performed by other Departments
• Emergency/Imortant Telephone Numbers
Karachi Rain Emergency Plan 2013
Background:
• Karachi is situated in the south of Sindh on the coast of
Arabian sea. By virtue of geographic location it tends to
have a relatively mild climate with low levels of average
precipitation (approximately 250 mm per annum)
• Heavy rainfall received in a relatively short span of time,
caused flash floods.
• Synchronization of the peak floods with high tide in the
sea.
Karachi City and surrounding cris-crossed by many
nallah which generally flow from the North East to South
West. These nallahs act as natural drains and carry
storm water from Kithar Range down till sea. The major
rivers in the area are Malir River in the East and Lyari
River in the West. Which further have their own small
tributaries (nallahs) falling in to them. During the floods
of 2013, a new central nallah (Wateen Wari Nullah).
Which originates from Kirthar Range, was identified
which cause flooding in Karachi. Based on the
experience of floods of 2013, it can be generally
concluded that the drainage of Karachi is dependent on
three Rivers/ nallahs. Which may cause flooding, due to
overflow. These are Malir River in the East, Wateen
Wari Nallah in the Middle and Lyari River in the West.
YEAR WISE DETAILS OF RAINS (In MM)
Year June July August September Total
2006 0 66.2 148.6 21.8 236.6
2007 110.3 41 250 0 401.3
2008 0 94 37.5 Trace 131.5
2009 3.6 159.9 44 68.9 276.4
2010 97.4 130.4 11.5 42.7 382
2011 0 7.7 60.1 213.3 281.1
IMPACT OF THE RAIN
• The traffic system cease to work
• Failure of electric power and other utility services
• Choked sewerage system causing difficulties to public,
and Katchi Abadies get submerged, resulting in epidemic
diseases like Gastroenteritis, Cholera, Malaria, Skin
Diseases and Conjunctivitis.
• Advertisement Boards/fall of trees – causing havoc and
loss of precious lives
• Contamination of drinking water
• Damage to Road infrastructure
OBJECTIVES
• In view of the previous experiences, it became imperative to
introduce updated Rain Emergency Plan with a systematic
approach for the safety of property and lives of Karachities and a
provision of better relief system to them
• To counter flood like situation in Lyari River, Malir River and Major
Nallahs like their link Nallahs during heavy rain fall
• For awareness information of concerned agencies/DMCs where
unauthorized settlement and inhabitants are this plan would help
and assets for them rescue and relief living in dangerous
environment of River Beds
• A coordinated/comprehensive/update Rain Emergency Plan is very
much needed to prevent and manage the pre, during and post rain
situation.
STORM WATER DRAINAGE SYSTEM
An overview of Storm Water Drainage System:
There are 13 major Nallahs running through out the city and most of
them discharging their affluent into the 2 major rivers i.e. Lyari and
Malir
Details of Nullahs:
• Soldier Bazar Nallah
• Farrier Nallah/Glass Tower Nallah
• Chakora Nallah
• Golden Town Nallah
• Korangi Nallah
• Picture Nallah
• Gujjar Nallah
• Orangi Nallah
• Zehri House Nallah/Manzoor Colony Nallah
• Monchko Nallah
Stream Discharging Rain Water Directly in Sea.
• Nehr-e-Khayyam
• Frere Nallah
• Pitcher Nallah
• Kalri Nallah
• Soldier Bazar Nallah
• Manzoor Colony Nallah
EXISTING SITUATION
• Most of the drains are:
- Heavily encroached and peoples are living un-
authorizedly on both sides of these Nallah
- Choked with silt and garbage
• Their water carrying capacity is at the minimum level
• Stagnation of rain water on road, lanes and streets due
to chockage and non cleaning of Nallahs, in case of rain
fall.
KARACHI DRAINAGE NETWORK
Storm water drains of Karachi have been converted into sewers over the
years and they lack the capacity to drain off rain water or any other runoff
water. Salient are as following :-
a. The drains, which are supported to remain dry through out the year,
have been turned into sewer conduits for the city.
b. A rise in the number of slums and squatter settlements built on the
banks of the drains have made the issue further complicated.
c. Almost all 13x large and over 250x small storm water drains have
been encroached and these encroachments have clogged the Storm
water drains.
d. Few pictures of various nallahs, drains and rivers and related
important information which may help in understanding the overall the
state of drainage system in the city as given below:-
1. Sungal Nallah (White House Area North East Karachi.
2. Encroachment of silt and Garbage.
3. Picher Nallah (Landhi Sector) Mixing of Sewerage Line and Garbage
4. Azim Pura Divisionary Nallah.
5. Vegetation and Wild Growth in Nallah.
MALIR RIVER
Malir River flows through eastern part of Karachi from North East to the South
West and falls into the Arabian Sea. Salient are as under:-
a. It has two many tributaries. Thuddo and Sukhan nallahs.
b. In the rainy season, this river experience heavy water flow.
c. It drains almost 35-40 % of flood water and the drainage of Eastern
region is dependent in this river.
d. Generally in previous year of floods, its surrounding populated areas did
not face any over flow because of its wide span and capacity.
e. Its banks have experienced growth of katchi Abadi and
encroachments at some places.
Tributaries (Major nullahs) Malir River are as under:-
a. MANZOOR COLONY NALLAH
1. It drains water from adjoining areas of Shahrah-e-Faisal, Manzoor
Colony, M Ali Jinnah Society and DHA.
2. It was able to drain the flood water from surrounding areas in 2013.
3. Gradually, its boundaries are being encroached which may result in
narrowing its span and causing overflow of flood water.
Tributaries (Major Nallahs) Malir River are as under:-
a. MANZOOR COLONY NALLAH
1. It drains water from adjoining areas of Shahrah-e-Faisal,
Manzoor Colony, M Ali Jinnah Society and DHA.
2. It was able to drain the flood water from surrounding areas
in 2013.
3. Gradually, its boundaries are being encroached which may
result in narrowing its span and causing overflow of flood
water.
b. KORANGI NALLAH
(1) It drains water from Korangi Industrial Area and surrounding
direct into the sea.
(2) Surrounding parts of this nallah are mostly flood free.
(3) This nallah has also been encroached
c. NEHR-E-KHAYYAM
(1) Drains water from Clifton and Defence areas and falls directly into
sea.
(2) This drainage also requires dredging/de-silting.
d. AZEEM PURA DIVERSIONARY NULLAH
(1) Capacity of nallah has diminished due to worst encroachment linkage to
sewerage lines and heavy silting.
(2) Its span was around 100ft once it was constructed presently it has
been reduced to 20ft (average).
(3) Purpose of the diversionary nallah is to drain water from Air Port
area and surroundings and deliver it to Malir Naddi.
(4) New construction of the same nallah are under progress. It will flow
underground in Azim Pura localities.
WATEEN WARI NALLAH AND ITS EXTENSION DOWN TILL MALIR
RIVER This nallah originates from Kirthar Range and passes through Saforan
Goth where it is named Soforan Nallah and then further southwards. Pahelwan
Goth Nallah and Jauher Nallah also joins in and it is then named as Chakora
Nallah which finally outfalls into Malir Rivers.
THE MAJOR LINKED IN WATEEN NALLAH ARE AS FOLLOWS:-
a. Phelwan Goth Nallah
(1) This nallah originates from race course Ground and has
enough area to take water load of its share.
(2) It drains water from Pehlwan Goth and surroundings.
(3) The nallah is also being encroached.
b. JAUHAR NALLAH
(1) This Nallah join the Pehalwan Goth Nallah near Gulistan-e-Jauhar
Colony Bridge.
(2) This Nallah needs parallel to Pehalwan Goth Nallah but passes
through Gulistan-e-Jauhar area.
(3) Because of Heavy encroachments water over flows and floods the area for
limited period.
(4) Pehalwan Goth Nalllah and Gulistan-e-Jauhar Nallah meet near the
colony bridge from this point onwards this Nallah is named Chakora Nallah which
ultimately drains water of both the Nallah to Malir Nadi.
c. SAFORAN NALLAH
(1) This nallah drains the water of Pehalwan Goth, Gulistan-e-Jauhar and Shah
Faisal Colony.
(2) Span of this nallah has reduced manifolds due to encroachments.
(3) Condition of vegetation and wild growth is also alarming.
(4) This nallah over flow during flood.
(5) There is no major flood threat but life of public comes to a standstill till
pumps/ drain out water from the roads to diversionary nallahs.
LYARI RIVER
Lyari River flows from North East to the center and drains into the Arabian Sea at
Manora Channel. The river is about 50 KM long. It carries the surface water/ run
off water into sea. Encroachment is also common phenomenon astride the river.
Its tributary nallahs are as under:-
a. SUNGAL NALLAH
(1) It drains rain water from Sohrab Goth, Bara Area and
surroundings.
(2) It had successfully drained water and surroundings were not
effected in 2013. However, span of this nallah has reduced
due to heavy encroachments.
b. PICHER NALLAH
(1) This nallah drains water from Jamila Street, Light House
area, Lee Market area, Khara Dar and Meetha Dar areas
and flows into sea.
(2) This nallah is totally sited, filled with garbage and sewerage
water and only a portion of real picher nullah is oval on
ground whereas rest of its portion has been encroached.
c. KALRI NALLAH
(1) It originates from Juna Masjid and drains water from Old City and Central
Karachi directly into the sea.
(2) Like Picher Nallah, this Nallah is also sited and full of garbage.
(3) Flow of water through this nallah seems impossible as it is covered till top with
Solid Waste etc.
(4) Encroachments along the banks are also alarming.
d. SOLDIER BAZAR NALLAH
(1) It drains water from areas of Guru Mandir, Patail Parah, Garden Police HQ
and surroundings (Central Karachi areas).
(2) It flows into sea near Boat Basin area.
(3) This nallah is also encroached at many places.
PREPAREDNESS MEASURES
a. Pre-rain measures
b. Measures during rain floods emergency
c. Post rain measures
PRE-RAIN MEASURES
The following actions are required:
• De-silting of storm water drains
• Repair, maintenance and procurement of dewatering pumps/
pumps.
• Repair of roads and filling of trenches
• Identification of troubled spots
• Activation of early warning system
• Prevent deaths due to wire snapping / electrocution
• Provision of Rescue Teams
• Evacuation to relief camps ear-marked in different education DCs
Schools and DMCs
• Prevention from infectious diseases/epidemics/fumigation long drive
with the coordination with DMCs
• Provision of first aid & medical facilities
• Cleaning of all chocked gratings alongside all main roads
by Technical Services Department, KMC.
• Cleaning/maintenance/provision of generators at all
under passes and especially
Gharibabad/Liaquatabad/Nazimabad/Clifton underpass
by Municipal Services Department, KMC.
IDENTIFIED LOW LYING AREAS
• Near Governor House
• Near Chief Minister House
• I.I. Chundrigar Road
• Shaheen Complex
• City Business Area
• Shahrah-e-Faisal:
a. Jinnah Bridge
b. Natha Khan
c. Nursery
d. FTC Flyover
e. Karsaz Link
f. Airport (Falak Naz)
• M.A Jinnah Road:
a. Gurumondir
b. Business Recorder Road.
• University Road:
a. Old Sabzi Mandi
b. Civic Center
c. NIPA Flyover
• Rashid Minhas Road
• Near Stadium Flyover
• Near Liaquatabad No. 10 Flyover
• Near Karimabad Flyover
• Near Nagan Chowrangi Flyover
• At-grade road of Banaras Flyover
• KDA Chowrangi (North Nazimabad)
Geography of Nallah under KMC Responsibility
NAME OF
NALLAH
LOCATION
Pitcher Nallah Start from Jamila Street and ends at Mauripure Road
passing through Lyari, Saddar and Keamari and dispose off
into the sea.
Jubilee Nallah Segment of different nallah i/c channel along pir Muhammad
Road, Bhund Muhallah Nallah and others
Kalri Nallah Start from Tannery Road and ends at Mauripure Road
passing through thickly populated areas of Lyari and
ultimately dispose off into the sea
Soldier Bazar Nalah Start from Gurumondir and ends at Jijrat Colony/Sultanabad
into sea via Doli Khata behind Holy Family Hospital, Jublee
Market, Aurangzeb Market, Urdu Bazar, Sindh Secretariat,
Shaheed Complex & PIDC
Ferer Nallah From Glass Tower to Nehr-e-Khayyam Clifton
Shahrah-e-
Quideen
Nallah
From society office to PECHS Block-6 upto
Mehmoodabad
Waris Shah
Nallah
Along Waris Shah Road PECHS Block-6
Mehmoodabad
Nallah
From Mehmoodabad to Manzoor Colony
KMC Measures
• The Administrator and Metropolitan Commissioner, KMC held
several meeting to review the arrangements made during rainfall
and to face any eventuality. Also held coordination meetings with
concern departments and stakeholders of other agencies in the City.
• The utility agencies i.e. KESC, SSGC, PTCL etc have been advised
to make necessary arrangements and set up emergency centers.
• Additional Relief Commissioner, PDMA and Met Office, shall be
ensured for management and updatation of early warning system.
• All DGs, Sr. Directors of KMC and Municipal Commissioners of
DMCs have been instructed to activate their control rooms round the
clock during Monsoon season.
Continued
• Pre-rain arrangements i.e. desilting of storm water drain started in April
2014 by Municipal Services Department, KMC and is still going on.
• A Special Monitoring and Coordination Cell to deal with rain emergency
has already been established in Administrator Secretariat which shall
remain operative round the clock.
• All newly constructed roads, underpasses and flyovers have been
provided with storm water drainage facility with stand by generators in
case of power failure.
• Rain Emergency Centers to be established in all DMCs
• Machinery available (working condition) with Municipal Services
Department, KMC:
a. Dump Trucks 85
b. Grab Cranes 09
c. Sludge Carriers 20
d. Wheel Loaders 10
e. Dewatering Pumps 15
MEASURES DURING RAINS:
• Deployment of staff, pumps and related machinery at Civic
Center and other specific vulnerable points with especial
emphasize on Shahrah-e-Faisal
• Establishment of control rooms at Municipal Services
Department, KMC at Civic Center.
• Activation of Emergency Response Center at Hawks
Bay/Mubarak Village.
• Establishment of control room at 16 Control Room and
1339 Complaint Center for public complaints.
• Cancellation of leave of all the Emergency Staff.
• Deployment of City Wardens at Vital Points
• Deployment of Urban Search and Rescue Team at KMC
Head Office, M.A Jinnah Road.
POST RAIN MEASURES
Health and Hygiene:
• Removal of stagnant water from Main Roads and other
locations
• Fumigation drive through out the city.
• Coordination with all DMCs with regards to removal of
accumulated garbage backlog.
• Removal of fallen trees, sign boards and bill boards.
• Filling of pot holes, repair of trenches.
• Public Education and awareness through print, electronic
and Rising Karachi Project.
ROLE OF OTHER DEPARTMENTS IN THE CITY
Karachi Water and Sewerage Board:
• Executive Engineer (Sewerage), KWSB shall be responsible to open the
chocked gutters/main holes/sewerage lines, keeping in view that the
stagnant / sewerage water may be drain out quickly. All the machinery
should be ready and standby to meet the emergency.
• All main holes should be covered, Ring Slabs & main hole covers may be
kept/provided at Emergency Centers to cover the main hole during the rain
emergency.
• All trenches, excavated by Sewerage Department may be filed before Rain
fall.
• One Representative of Sewerage Department may be deputed at Rain
Emergency Center to receive / forward and ensure to resolve the
complaints.
• Arrangements of stand by generators at Clifton and Jamilla Pumping
stations, in case of power failure
Continued
• Executive Engineer (Water) KWSB is responsible to repaired water
leakage to avoid water contamination. All trenches excavated may be
filled immediately before rain fall and during the rainy season.
• One representative of water department may be deputed at Rain
Emergency Center to receive / forward and ensure to resolve the
complaints.
K.E.S.C
• The Executive Engineer KESC will arrange the availability of KESC staff
to test out the feeble poles & Electric wires and should be replaced
without any further delay and also ensure immediate disconnection of
electricity either if any pole/wire fall down or electric shock passes the
poles.
• One representative of KESC may be deputed at Rain Emergency
Center to receive / forward and ensure to resolve the complaints.
• Special attention is required to ensure continuous electric supply in old
city area, to keep Clifton and Jamilla Pumping Station functioning.
Continued
Karachi Building Control Authority
• Deputy Controller of Buildings shall point out the dangerous buildings
and shall be responsible to vacate the buildings for which he may
seek help from the Area Police
Police Department:
• The Superintendent of Police of the Districts and Area SHOs shall
stand by/ red alert in the area to meet any emergency and also
provide the necessary information through to Landhi and other Law
Enforcing Agencies.
• The Superintendent of Police, especially Landhi shall keep vigilant
eye on flow of water in Malir River and will remain in close
coordination with the Superintendent of Police, Shah Faisal, in case
the stream flow up to alarming point the Causeway from Murtaza
Chowrangi to Jumma Goth Malir may be closed for traffic immediately
OBSERVATION FROM PRE FLOOD RECONNAISSANCE 2014
a. Karachi drainage system not only requires immediate attention but also require
physical measures for its cleanliness. Any efforts in the absence of master plan will be
futile exercise for overall drainage system of Karachi.
b. Capacity enhancement of present drainage system is required as
encroachments and lack of maintenance has reduced the designed capacity of
existing drainage system.
c. Most of the drains/nallahs require cleaning and removal of garbage.
d. Diversionary Nallahs have been planned however progress of construction is at
snail pace due to various issues like non availability of funds, be immediately resolved to
speed up the construction work.
e. Sewerage lines are being discharged in rain water drains resulting in
accumulation of silt and garbage.
f. Wild growth and vegetation needs to be removed for smooth flow of water in all
channels.
g. Continuous increase in the encroachments along drains/ nallahs must be
checked.
h. No flood risk mapping of Karachi exist which can help in better planning of the entire
flood fighting efforts.
RECOMMENDATIONS
a. Master plan for complete drainage system of Karachi should be
prepared and executed.
b. KMC/DMCs should be pro-active in preventing flood like situation due to
heavy rains by undertaking following:-
(1) Ensure removal of encroachment of drains/ natural drains.
(2) Construction of storm water drains and maintenance of existing
drainage system.
(3) Make a plan to absorb volunteers / NGO’s to create energy to fight
flood emergency. A well-coordinated flood relief/ rescue plan is required
incorporating all civil resources. Same should be rehearsed by
KMC/DMCs to coordinate the response of various agencies.
(4) Sewerage lines linked t drainage channels should be separated to
avoid silting and blockade of drains/ nallahs.
(5) KMC/DMCs should check encroachments astride the various nallahs
and drains and should also undertake dredging operation of these nallahs to
enhance their capacities.
Continued
c. Dewatering pumps/ equipments must be maintained before the onset of
monsoon season.
d. Flood risk mapping of Karachi should be done by PDMA.
e. Flood risk zoning and surface water management of all zones should be
undertaken.
ACTIVATION OF EMERGENCY CENTERS (CONTROL ROOMS)
Municipal Services Deptt, KMC 99230071 (Fax:99230068)
Complaint Center, KMC CCIS-1339
Complaint Center, Fire Brigade 99230060 (five lines)
Fire Head Quarter 99215007-8
Gulistan-e-Mustafa Fire Station 99246268-99246316
Landhi Fire Station 35015988-35015888
Lyari Fire Station 32527521-32528090
FOCAL PERSONS FOR CLEANING OF NALLAH
1 Mr. Noman Arshad Director, Machine
Pool Depot
0321-2384090
2 Mr. Ibrahim Baloch Chief Engineer/
Director, Storm
Water Drainage,
TS, KMC
0333-2746391
SOLID WASTE MANAGEMENT DEPARTMENT
Sr.# Name Designation Office Mobile
1 Mr. Sohail Ahmed Director 99231341 0336-2262250
2 Mr. Saleem Shaikh Addl: Director -do- 0300-2069050
3 Mr. Raees Siddiqui Deputy Director -do- 0300-2604554
4 Mr. M. Irshad Deputy Director -do- 0300-8238491
Important Telephone Numbers of Municipal Services Department, KMC (All Zones)
S# NAME SITE MOBILE
Incharge Mr. Azhar (South) Cell No. 0300-26291337
1 Safdar Shaheen Complex 0300-3553301
2 Mr. Asghar Marriot Hotel/ Glass Tower 0300-2329940
3 Mr. Asif (MPD) Tower/ Kharadar 0300-2693102
Incharge Mr. Anwer Baloch (East) Cell No.
4 Mr. Mehmood FTC 0341-2009172
0300-2624061
5 Mr. Asim CNG Petrol Pump 0300-9210519
6 Mr. Ajoon CNG Petrol Pump 0300-2242284
7 Mr. Niaz Uddin (MPD) CNG Petrol Pump 0346-2381098
Incharge Dr. Hamid Mustafa (Central & West) 0332-3371377
8 Mr. Sagheer Under Bypass & K.D.A Chowrangi 0321-9215955
IMPORTANT NUMBERS OF MACHINE POOL DEPOT
S. NO NAME OF OFFICER DESIGNATION PHONE NO
1 Mr. Noman Arshad Director 0321-2380490
2 Mr. Muhammad Azhar Dy: Director 0300-2629137
3 Mr. Aslam Dy: Director 0345-2208676
4 Mr. Anwer Baloch Asst Director 0300-2038682
5 Mr. Shahbaz Inspector 0345-2580499
6 Mr. Niaz Uddin Inspector 0346-2381098
7 Mr. Asif Khan Inspector 0300-2639106
8 Mr. Asfar Ali Inspector 0300-2329940
9 Mr. Zameen Khan Inspector 0300-2436653
10 Mr. Faraz Inspector 0344-2688714
11 Mr. Sagheer Ahmed Inspector 0321-9215959
IMPORTANT TELEPHONE NUMBERS OF MUNICIPAL PUBLIC HEALTH
S.NO NAME DESIGNATION TELEPHONE NO
1 Dr. Mansoor Shaikh Director, MPH 0300-2208362
2 Dr. Hamid Mustafa Dy: Director, MPH 0332-3371377
3 Anwer Malaria Supervisor 0300-2669097
4 Nazeer Malaria Supervisor 0344-2940261
5 Muhammad Zaman Malaria Supervisor 0345-2494717
6 Roshan Malaria Supervisor 0344-2677829
7 Asim Malaria Supervisor 0300-9210519
8 Muhammad Hanif Malaria Supervisor 0321-2536570
9 Ajoon Malaria Supervisor 0300-2242284
10 Shafiq Malaria Supervisor 0300-2202798
11 Malik Zaman Malaria Supervisor 0345-2736004
12 Waheed Malaria Supervisor 0312-2032699
13 Naeem Malaria Supervisor 0300-3628928
FIRE BRIGADE TELEPHONE NUMBERS
S# Name of Station Name of Officer Designation Cell No Office No
1 Head Quarter Ehtishamuddin
Saleem
Chief Fire Officer 0346-2371026
0345-8685330
99215652
99215002
2 Head Quarter Imtiaz Afzal Dy: Chief Fire
Officer
0301-2245266 99238921
3 Korangi Fire Station Ishtiaq Ahmed Station Officer 0333-2356516 99215007-8
4 Central Fire Station Wajahat Hussain Station Officer 0334-3076441 99260331-2
5 New Karachi Mazhar Rafi Station Officer 0344-2739588 36974020-30
6 Gulshan-e-Iqbal Khalid Hussain Station Officer 0300-2160392 99244490
7 Gulistan-e-Jauhar Buland Iqbal Station Officer 0300-9219441 34016255
34631918
8 Gulistan-e-Mustafa Arif Mansoori Station Officer 0333-2213146 99246316
99246268
9 Landhi Fakharuddin Station Officer 0345-2146273 35015888
35015988
10 Korangi Zafar Khan Station Officer 0300-9209902 3566260-1
11 Manzoor Colony Mubin Ahmed Station Officer 0333-2179171 35804097
S# Name of Station Name of Officer Designation Cell No Office No
12 Shah Faisal Colony Saeedullah Station Officer 0300-2354717 99239112
13 Saddar Tauheed ur Rehman Station Officer 0333-3028991 99215095-8
14 S.I.T.E. Tehseen Siddiqui Station Officer 0300-9242498 2562243-45
15 Orangi Aslam Sub Fire Officer 0321-9250142
0300-9250142
36651222
36650515
16 Bolton Nadeem Zehri Sub Fire Officer 0300-2218706 32562243-45
17 Baldia Murtaza Station Officer 0321-2888041 32810015
18 Lyari Zaheer Siddiqui Station Officer 0333-2182896 32528090
32527521
19 Truck Stand Abrar Sheikh Station Officer 0300-2179172 32353333
20 Malir Nisar Khalid Station Officer 0315-2617624 34112599
34504922
21 Gulshan-e-Maymar Humayon Sub Fire Officer 0300-2259819
22 Cattle Colony Javeed Hussain Station Officer 0322-2076149 34100491
23 Civic Center Abdul Nasir Station Officer 0344-2739588 99231808
24 ERC Mairaj Station Officer 0345-2263450
KARACHI WATER & SEWERAGE BOARD
RAIN EMERGENCY PLAN - 2014
DETAILING RELIEF MEASURES FOR RAINY SEASON, MAY- 2014
• In view of likely rains, the KW&SB has chalked out a Comprehensive Rain Emergency / Contingency Plan to
combat any situation in the face of up-coming monsoon season. This is in clear understanding of the fact that
the operation, maintenance and cleaning of storm water drains and nallahs is a function of the KMC who have
already undertaken the work of desalting and cleaning of storm water drains / nallahs with appreciation of
following points:
Basic Rationale
• The sewerage system of city is insufficient for the intake of rainwater of the city.
• The solid waste, debris and garbage of roads flow into the sewerage lines while running with rainwater during
rains which causes sewage blockades.
• With cognisance of these facts, KW&SB has made efforts for smooth maintenance of city’s sewerage system
as a precautionary measure and also provide maximum relief to general public by maximizing the efficiency of
its sewer cleaning system during rains.
• Other steps taken under Rain Emergency Plan are as follows: -
High Alert
• High alert is in place with instructions to all KW&SB engineers and personnel for fulltime preparedness of rain
emergencies.
• Special emphasis has been laid on upkeep and readiness of emergency fighting machinery and equipment
available at KW&SB.
Focal Person
• The Chief Engineer- Electrical & Mechanical (Sewerage) Mr. Zaheer Abbas Zaidi has been nominated as the
focal person for all rain emergency actions who will co-ordinate all KW&SB efforts in the matter.
• He will interact with all District CEs, CE (BT), CE (E&M) and all concerned and liaison with KMC and DMCs in
the city.
• The District CEs and Town SEs have been mobilized to ensure efficiency in all sewerage division within their
jurisdiction.
• They have streamlined all sewerage wings at all Towns level through respective EEs sewerage.
Focal Point
• The 1339 Complaints Centre / Customer Service Centre, Block-A at 9th Mile, Karsaz, Shahra-e-Faisal,
Karachi, has been made focal point for Rain Emergency Operations.
• Following steps may also be ensured to prevent rain related problems in the city:
• All physical resources (equipment, machinery etc) and personnel would be pooled and controlled from this
point. Communication facilities shall be kept in order and readily available for backup wherever required.
• The Central Machinery Pool and Central (Workshop Division), Karsaz, Central Pumping Station, PIDC Clifton
and Jamila Pumping Station, Lyari shall work in full capacity with backup support of standby generator and
fulltime availability of fuel during Rain emergency.
• All Sewer Cleaning / Jetting / Suction / Pumping Machines / Mobiles, Standby Generators and other
equipment shall be in field on 24-hours basis instead of only day shifts during rain emergency.
• In case of any crises machinery including generators and cranes shall be arranged on rent as an exigency
alternate.
• During Rain Emergency, the Complaint Centers shall be activated in the field offices of all District Chief
Engineers and Town Superintending Engineers to facilitate general public.
• Efficient Officials shall be deputed on these Centers for lodging / recording complaints of consumers in
person or on phone with proper reporting system on 24-hours basis.
• These officials shall work in shifts with clear instructions not to leave the duty until their reliever may report
during emergency period.
• Constant liaison may be maintained with the control room setup in the offices of Commissioner Karachi,
District Dy. Commissioners, KMC and ZMCs by all District Chief Engineers to mitigate the rain sufferings.
• All field staff will be on high alert with preparedness and round the clock area monitoring may be ensured to
check and addressed public complaints related to sewage overflow and congestion problems.
• Low lying areas of the city and Towns on the coastal belt including Keamari, Saddar, Korangi, Landhi, Bin
Qasim may be placed under special observations during rain emergency.
• List of complaint centers key personnel/facilitators included the appendices as listed.
Coordination & Liaison
• There will be a Coordination Committee headed by Managing Director, KW&SB and comprising of all KW&SB
Chief Engineers to review and manage rain emergency. It will meet on weekly basis or even earlier in
accordance with the situation.
• The KMC including the Administrator’s Secretariat shall be coordinated at appropriate level.
• All CEs, SEs and EEs will remain in contact with respective Town and UC Administrations constantly and
closely to meet any emergency and resolve the problems of people.
Public Awareness & Cooperation
• Citizens are being advised not to open the manhole covers to drain rainfall run-off into sewerage
pipelines, as it will chock & restrict sewer flow.
• Awareness messages are being propagated through print & electronic media and advertisement in the
news.
• Various NGOs and community circles have also been taken on board for public awareness through
seminars and meetings.
Patrolling & Monitoring
• Round the clock patrolling of the bulk transmission system, canal, syphons, conduits and other
installations in remote areas i.e. Dhabeji, Gharo, NEK pumping station & filter plants etc. would be
undertaken.
• Round the clock monitoring of sewerage pumping stations would be carried out to monitor
operational efficiency.
• Sour points where problems have been experienced as per previous records of rainy season in the
past have been identified to pay extra attention and prevent re-occurrence of problem.
Power Failure
• Immediate reporting of power failures & faults to KESC in respect of KW&SB installations is arranged,
so that water and sewerage pumping stations may function smoothly.
• Alternate arrangements of standby generators in case of power breakdown are also being made upto
possible extent.
Precautionary Measures
• Covering of manholes on main roads, streets and footpaths is given priority to avoid any accidents.
Fixing of missing / stolen manholes covers has been ensured.
• Complaints of open manholes are being taken up on top priority basis.
• Desilting / cleaning of sewerage lines in each town before rains is being carried out.
Review & Feedback
• Daily progress review would be done at Chief Engineer level regarding desilting of sewerage lines,
missing manholes covers etc.
RAIN EMERGENCY PLAN - 2014
MAY-2014
KARACHI WATER & SEWERAGE BOARD
KARACHI WATER AND SEWERAGE BOARD
TELEPHONE NUMBERS OF KEY PERSONNEL, KW&SB
SR. # DESIGNATION IMPORTANT NUMBERS
1 Mr. Qutubuddin Shaikh
Managing Director
99245154 / 99245155 / 99245156
Cell # 0300-2001344
2 Mr. Waqar Ahmed Hashmi
Principal Staff Officer
99245159
Cell # 0321-2049716
3 Mr. Tahseen Manzar
Director, Implementation/TRG
99245178
Cell # 0313-4948874/0302-2129020
4 Mr. Najm-e-Alam
DMD (TS)
99245146
Cell # 0321-8749091
5 Mr. Mashkoor ul Husnain
DMD (Planning)
99245136 / 0300-2313823
6 Mr. Najam-e-Alam
CE (B/T)
99245130
Cell: 0321-8749091
7 Mr. Iftikhar Ahmed Khan
CE (BT)
99231226
Cell # 0323-2739170
8 Mr. Anwar Saeed Khan
CE (WTM)
99245161
Cell # 0314-2005253
9 Mr. Zaheer Abbas
CE (Sewerage)
99245028
Cell # 0333-3156584
10 Mr. Asadullah Khan
DCE (E/M) - Water
99240803
Cell # 0300-2723545/0321-3789379
Continued
SR. # DESIGNATION IMPORTANT NUMBERS
11 Mr. Ghulam Qadir Abbas
CE (East)
99231221
Cell # 0333-3092418
12 Mr. Muhammad Arif
CE (Saddar & Jamshed)
99231221
Cell # 0300-2992627
13 Mr. Fahim Zaidi
CE (Central)
99230318
Cell # 0321-3782790
14 Mr. Ovais Malik
CE (West)
99230318
Cell # 0300-9269683
15 Mr. Imdad Hussain Magsi
CE (Malir)
Cell: 0321-2422897
16 Mr. Muhammad Usman Khaskhely
CE (Lyari & Keamari)
Cell: 0333-3642630
17 Mr. Noor Muhammad Chohan
CE (E/M)-Water
99240318
Cell: 0333-3629447
18 KW&SB – Central Complaint Center
KW&SB 1339-Incharge
99245138-99245139/99245140
19 Mr. Nazir Mateen
Director Public Relation
992450821
Cell # 0300-2889782
KWSB RAIN EMERGENCY
24-Hours Complaint Centers
1339-Complaints /Customer Service Center
Block-A, Karsaz
99245138-40
Head Office Complaint Center
Civic Center Annexe, Gulshan
99230317 /99230318 / 9923221
Rain Emergency Focal Person:
Engr. Syed Zaheer Abbas Zaidi
Chief Engineer – Electrical/Machanical (Sewerage)
Off: 99245028
Cell: 0333-3156584
List of KW&SB Rain Emergency Centers
ELECTRICAL & MECHANICAL WING
24-Hours Operation During Rain Emergency – 2014
KW&SB – 1339 - COMPLAINT CENTER
Block-A, 9th Mile – Karsaz, Shahra-e- Faisal, Karachi.
Tele # 99245138- 99245139 & 99245140
ELECTRICAL & MECHANICAL WING
SEWER CLEANING EQUIPMENT DIVISION/SUCTION –JETTING MACHINES
COMPLAINT OF POWER BREAKDOWN AT KW&SB INSTALLATIONS
Mr. Noor Muhammad Chohan
CE (E/M), Sewerage - KW&SB
Cell # 0333-3629447
Off # 9245027
Fax # 9245028
Res #
1 Mr. Mazhar
Executive Engineer
Cell # 0300-2189703
Off # 0323-2025306
2 Mr. Suhail Jaffri
AE (E/M)
Cell # 0322-2109383
1 Mr. Nadim Hadi Khan
EE (E/M)
Cell # 0333-2138721
Res # 36616999
TREATMENT PLANTS CIRCLE KEY PERSONNEL
SEWERAGE PUMPING CIRCLE KEY PERSONNEL
1 Mr. Manzoor KhatriSE – SPD Cell # 0301-2053281
Off # 9204336
2 Mr. Wasim ShaikhEx. Engineer – SPD-I
(Saddar Town-Sew)
Cell # 0333-3167848
Off # 9204342 Res # 5414112
3 Mr. Ajeet KumarEx. Engineer – SPD-II,
Lyari-Sew
Cell # 0323-2507106
1 Mr. Qaiser Ali
SE – TPs, Circle
Cell # 0333-3856343
Res # 4406920
2 Mr. Akhtar Sami
EE – TP-I
3 Mr. Jagdesh
EE – TP-II
Cell # 0333-3458338
Res #
4 Mr. Nadim Ahmed
EE – TP-III
Cell # 0300-2183653
Res # 9230372
INTRODUCTION
• Hyderabad Municipal Corporation is the 2ND
largest City of Sindh. It is also the largest business
city of Sindh after Karachi. The climate of Hyderabad is moderate.
• The total area of Hyderabad Municipal Corporation is about 14710 sq acres having population
of 1.8 Million. Hyderabad Municipal Corporation consists of 37 Union councils of Hyderabad
City and Latifabad.
• Every year, Hyderabad Municipal Corporation takes serious efforts to combat Flood / Rain and
there is no doubt that in the past when Rain Emergency was declared during the rainfall,
Hyderabad Municipal Corporation completed the task successfully.
• SOP for combating summer Flood / Rain of 2014 is prepared for taking preventive and
remedial measures in advance to avoid any unpleasant incidence during the Flood / Rain.
ZAHID HUSSAIN KHEMTIO
Municipal Commissioner
Hyderabad Municipal Corporation
Hyderabad
QAMAR-UD-DIN SHEIKH
ADMINISTRATOR
Hyderabad Municipal Corporation
Hyderabad
IMPORTANT PHONE NOS OF CONCERNED OFFICER / OFFICIALS / CENTRE INVOLVED FOR RESCUE
PROGRAME DURING MOON SOON SEASION IN HMC HYDERABAD 2014.
1. Administrator Phone No. 9210071 Mob. 0300-2627607
2. Municipal Commissioner Phone No. 9210193 Mob. 0300-3013110
3. Director Health Services Mob: 0300-3012952
4. Executive Engineer Mob: 0333-2609057
5. Assistant Executive Engineer (City) Mob: 0313-3221982
0321-9274090
6. Assistant Executive Engineer (Latifabad) Mob: 0333-2724745
0345-9199910
0321-3004927
7. Assistant Director Health Services (Latifabad) Mob: 0333-2759051
8. Assistant Director Health Services (City) Mob: 0315-8824072
9. (Chief Fire Officer) Mob: 0300-3017382
10. Market Fire Brigade Phone No. 2612211
11. Faqir ka Pir Fire Brigade Phone No. 2616975 (16)
12. Nashterabad Fire Brigade Phone No. 2616976 (16)
13. 139 Complaint Centre Mob. 0300-3038606
14. (Mechanical) Engineer Workshop Phone No. 2720058 Mob: 0321-3957702
The SOP for combating summer floods & Rains of 2014.
The Following low-lying areas have been identified in the action plain.
1. Liaquat Colony Ground UC # 10
2. Tando Mir Mehmood Graveyard UC # 14
3. Laloo Lashari Goth UC # 16
4. Khursheed Town UC # 16
5. Solangi Goth Hala Naka UC # 01
6. Mir Nabi Bux Town ( Noorani Basti) UC # 17-16
7. Hyder Shah UC # 19 Electric Pump
8. Mirza Para (Sikanderabad) UC # 20
9. Katchi Para UC # 20
10. Malka Nagar UC # 16
11. Sardar Colony UC # 17
12. Ehsanabad UC # 16
13. Fakir Ka Pir Fire Brigade # 07
14. Railway Colony UC # 09
15. Aliabad UC # 16
16. Hyder Chowk Qazi Qayoom Road UC # 09
During rain emergency the diesel pumps will be provided at low-lying areas on demand and as per need and
condition of rain water.
In order to meet any sort of emergency during the rainy / flood season, the following emergency centers
are established to receive and rectify the complaints of public of the respective areas:-
DETAIL OF EMERGENCY CENTRE
1. CITY:
Sr.# Location of Center Union Council # Name of In-Charge of Centre
1 Market Fire Station Phone # 261221 1 to 5
Rehmat CSI
(i) Ahmed Hussain I/C UC # 03
(ii) Aslam Rehmat I/C UC # 04
2
Inayatullah (Shaheed) Fire Brigade
(Fakir Ka Pir) 16 Phone # 2616975
6 to 9
Mr: Abdul Karim CSI
Mr: Mehsar Pailad Incharge UC # 08
Mr: Shahid Rajput Incharge UC # 08
Mr: Dileep Incharge UC # 09
3 Nazim Office (Firdous Colony UC # 11 10, 11, 16
Ilyas Qureshi CSI
Ramesh Mata din UC # 10
Papan Lakhmi UC # 11
Faqira Pamma UC # 16
4
Nazim Office (Bakra Mandi) UC # 12
Phone # 2636709
12 to 15
Ashraf Hussain Siddiqui CSI
Perdeep UC # 12
Mansha Masih Mucd: UC # 13
Budhan UC # 15
5
Nashterabad Fire Station Phulleli Pretabad
2616976
17 to 20
Complaint
Centre 139
Paretabad
Khalid Khursheed CSI
Abbas UC # 17
Amanwal Mucd: UC # 18
Rasheed UC # 19
Hanif UC # 20
6 139 Complaint Centre Main Office 2616939
139 /
UC #06
/ UC # 09
Amir Nagar Incharge 139
Iftikhar
Naeem Ahmed Incharge Nalla Gang
2. LATIFABAD
A. Workshop Qadam Gah Moula Ali
1. Mr: Asgher Sub-Engineer Incharge
2. Mr: Asgher Pump Incharge
3. Mr: Imran Mechanic
B. Workshop Hali Road Latifabad
1. Mr: Haseeb AEE Incharge
2. Jamil Ahmed Chief Inspector
3 Mr: Ahmed
4. Mr: Arif
5. Farhat
C. Office of Assistant Director Health Services Unit # 09
1. Mr: Habib-ul-allah Chief Inspector Incharge
2. Mr: Faiz Alam Sub-Engineer
3. Mr: Akber Clerk
4. Amjad Naib Qasid
The above said centers will work round the clock during rain / flood emergency
The details of Staff working on Permanent Electric Pumping Station (City)
Mr. Yousuf Sardar Incharge Electric Pumps Mobile No: 0345-3607987
SR. # PUMPING STATION
PUMP OPERATOR / PUMP
DRIVER
CONTACTS
1.
Bhatti Village Pumping Station
UC # 20
A: Noor Muhammad
B: Frances
C: Pervaiz
0331-3542374
2.
Pinyari Disposal Pumping Station
UC # 19
A: Aftab Hussain
B: Anwar Rahim
C: Arshad Saleem
Babo Din (G.O)
0345-3577991
0344-3613573
3.
Hyder Shah Pumping Station
UC # 19
A: Bahadur
B: Arif Masih
C: Ghualm Qadir
4.
Sultan Shah Pumping Station
UC # 16
A: Nasir Ali
B: Khadim Hussain
C: Abid Hussain
5.
Rishi Ghat Pumping Station
UC # 12
A: Muhammad Iqbal
B: Naveed
C: Muhammad Ahsan
0300-3066913
6.
Sattar Shah Pumping Station
UC # 02
A: Abdul Rasheed
B: Aslam Sharif
C: Arslan
0312-3575815
7.
Fakir Ka Pir Pumping Station
UC # 07 On any emergency
A: Umar Daraz 0315-5761878
DETAILS OF ELECTRIC PUMPING STATION WORKING PERMANENTLY
(CITY)
SR. # NAME OF PUMPING STATION hp TOTAL
1. Pinyari Disposal Pump 50 HP 02
2. Old Power Hose 50 HP 02
3. Rashi Ghatt 25 HP 01
4. Sultan Shah Colony 20 HP 01
5. Hyder Shah Colony 25 HP 01
6. Bhatti Village 50 HP and 40 HP 02
7. Sattar Shah 25 HP and 50 HP 02
8. Fakir Ka Pir 25 HP 01
LIST OF PERMANENT PUMPING STATIONS IN LATIFABAD
Sr.
#
Location of Pumping Stations
No. of
Pumps
In case of electric failure
alternate arrangement
Remarks
1.
Hali Road pumping station.
(i) 100 HP Electric Motor Pump
(ii) 50 HP Electric Motor Pump
(iii) 40 HP Electric Motor Pump
(iv) 30 HP Electric Motor Pump
2 No:
1 No:
1 No:
1 No:
Stand b Generator
250 KV
Working Condition
Working Condition
Working Condition
Under Repair
Under Repair
2.
American Quarters Pumping Station
(i) 30 HP Electric Motor Pump
(ii) 25 HP Electric Motor Pump
1 No:
1 No:
1. Stand by Generator
Under Repair
Working Condition
3.
Gul-shan-e-Hali Pumping Station
(i) 30 HP Electric Motor Pump
(ii) 10 HP Electric Motor Pump
1 No:
1 No:
1. Stand by Generator
Working Condition
Under Repair
Under Repair
4.
Visram Pumping Station
(i) 15 HP Electric Motor Pump
(ii) 7 HP Electric Motor Pump
1 No:
1 No:
1. Stand by Generator
Working Condition
Working Condition
Working Condition
5.
Hussainabad Pumping Station
(i) 50 HP Electric Motor Pump
(ii) 30 HP Electric Motor Pump
1 No:
1 No:
1. Stand by Generator
Working Condition
Under Repair
Working Condition
6.
Hazara Colony
(i) 15 HP Electric Motor Pump
1 No: Nil Working Condition
7.
Bhatti Goth Tandri Pumping Station.
(i) 15 HP Electric Motor Pump
1 No: 1. Stand by Generator
Working Condition
Working Condition
8.
Tando Yousuf Pumping Station
(i) 7.5 HP Electric Pump
1 No: 1. Stand by Generator
Under Repair
Working Condition
9.
Gujrati Para Pumping Station
(i) 10 HP Electric Motor Pump
1 No: 1. Stand by Generator
New working due to unstable voltage
Working Condition
THE DETAILS OF STAFF WORKING ON PERMANENT ELECTRIC
PUMPING STATION (LATIFABAD)
Gulshan-e-Hali Electric Pumping Station American Quarter Electric Pumping Station
S. No. Name Designation Shift S.No Name Designation Shift
1. Arshahd
Khan
Pump Driver A 1. Zia Pump Driver A
2. Guddo S.W A 2. Charanji S.W A
3. Ajaz Pump Driver B 3. Anwer Banta Pump Driver B
4. Aziz S.W B 4. Siraj S.W B
5. Anwer Masih Pump Driver C 5. Naeem Pump Driver C
6. Boota S.W C
Continued
Hussainabad Electric Pumping Station Visram Pori Electric Pumping Station
S. No. Name Designation Shift S.No Name Designation Shift
1. Taj Pump Driver A 1. Bashir Pump Driver A
2. Pawan Pump Drive B 2. Gopal SW A
3. Chand SW B 3.
Noor
Muhamm
ad
SW B
4. Barkat Pump Drive C
5. Sanjay SW C
Continued
Hussainabad Electric Pumping Station Visram Pori Electric Pumping Station
S. No. Name Designation Shift S.No Name Designation Shift
1. Nadeem Helper B 1. Thams Diesel Pump Driver Tando Yousuf
2. Ilyas SW A 2. Haroon Diesel Pump Driver Badin Chali
3. Tehseen Pump Driver B 3. Faisal Diesel Pump Driver Khaskheli Para
4. Akram SW B 4. Suleman Diesel Pump Driver Gujrati Para
5. Rafique Pump Driver C 5. Farhan Diesel Pump Driver Minority Graveyard
6. Mushtaq SW C 7. Ramzan Diesel Pump Driver Goth Aliabad UC # 05
7.
Babo
Gama SW A
Continued
DETAILS OF DIESEL PUMPING STATION WORKING
PERMANENTLY (CITY)
Hazara Colony Electric Pumping Station
S. No. Name Designation Shift
1. Arib Jamali Pump Driver A
2. Shoukat Pump Driver A
Hatti Goth Electric Pumping Station
S. No. Name Designation Shift
1. Aqleem Pump Driver A
S. # Name of Pumping station HP Total
1. New Aliabad 16 HP 01
2. Solangi Town 12 HP 01
3. Tando Mir Mehmood 16 HP 01
4. Paretabad (Zacha Khana) 16 HP 01
5. Mustafa Colony 16 HP 01
6. Gatta Ground 12 HP 01
DIESEL PUMPS AVAILABLE
Sr. # Pumps HP Total
Various
Sides
Available in
Workshop
1. Diesel Pumps 16 HP 13 04 09
2. Diesel Pumps 12 HP 03 02 01
3. Diesel Pumps 7 HP and 5 HP 03 ---- 03
4. Diesel Pumps 04 HP 02 ---- 02
5. Petrol Engine Pumps 7 HP 01 ---- 01
6. Petrol Engine 5 kv 02 ---- 02
7. Petrol Engine 2 kv 06 ---- 06
8. Diesel Mobile Engine 50 HP 01 ---- 01
9.
Electric Motor Pump Single
Face
5 HP 01 ---- 01
10.
Electric Motor Pump Three
Face
40 HP 01 ---- 01
11.
Electric Motor Pump Single
Face
15 HP 02 ---- 02
LIST OF PERMANENT DIESEL ENGINE PUMPS SITES, (LATIFABAD)
Sr. # Name of Pumping station HP Quantity Remarks
1. Khaskheli Goth 16 1 Nos Working Condition
2. Badin Challi 16 1 Nos Working Condition
3. Minority Graveyard Tando Yousuf 16 1 Nos Working Condition
4. Gujrati Para 16 1 Nos Working Condition
5. Goth Aliabad Unit No: 04 16 1 Nos Working Condition
6. Bhatti Goth 16 1 Nos Working Condition
RAIN NALLAS
In city area, there are two main rain Nallas which drain out sullage water from half of the city area.
One runs from universal book depot towards Makrani Para Maki Shah Passing through tulsidas road.
Other one runs from Sattar Shah Pumping Station towards old Power house pumping station Tando Mir
Mehmood. Both Nallas run by natural gravity towards their end points.
1st Nalla is covered by rooftop from universal book depot up to sultan hotel but in some places slabs are
kept over the holes. By removing these slabs through sanitary workers the excavator can disilt this nalla only to
those points.
From Sultan Hotel onwards the whole Nalla in open except some places which are encroached by
shopkeepers. Here it is difficult to disilt the nalla. This Nala from universal book depot upto Tulsidas Pumping
station is about 10 feet in width through out. From here it passes beneath the overhead bridge and turns into
small drain, approximately 3 feet in width, emerging from market and passes beside the railway colony carrying its
sullage water towards Makrani Para in a pit. From there it is lifted by HDA pumping stations of Barkat Bhai /
Makrani Para.
The work of Desilting of this Nalla is being carried out again and again except those areas which are fully
covered with rooftop.
This will cost much more and will cause problems for shopkeeper and public. If sufficient amount is
allocated to Hyderabad Municipal Corporation for this purpose, the target can be achieved easily.
Continued
Other Nalla which runs from Sattar Shah Pumping Station Liaquat Colony towards Tando Yousuf Railway
Crossing is divided into 3 parts for draining out the sullage water.
1st part runs from Cattle Piri Shahab Cinema towards Sattar Shah pumping Station and drain out the
sullage water of UC # 10, 11, 4 and 3.
2nd part runs from Chori Para Ilyasabad towards Rishi Ghat Pumping Staiton. Here Nalla which is 10 or
12 feet in width turns into 2 to 3 feet drain and runs from sweet shop towards Rishi Ghat Pumping Station. The
Disilting of Ilyasabad Nalla has been carried out while the drain will be desilted by deploying main power of Nalla
Gang to do the need full.
3rd part of rain water Nalla runs from Nishat Plaza towards Tando Yousuf Railway Crossing. From Nishat
Plaza upto sitara mosque, the above said nalla is fully covered with rooftop except some places where the slabs
are kept to disilt but the problem will not be solved until & unless the roof top on the nalla is removed. Here there
is Asia’s largest chori market and the shopkeepers & nearby residents throw all their waste material and garbage
in it. Keeping in view, all there difficulties the disilting of work has been carried out where there is access of
machine.
From sitara mosque near capital plaza upto faqir ka pir culvert the Nallas is encroached by nearby
residents who have built their houses on nalla. Here the access of machine to disilt in difficult but some places are
there to do the need full.
From faqir ka pir culvert upto guru nagar culvert the same situation is there but there are some places
open to disilt and the work of disilting has been carried out.
From guru nagar culvert upto tando yousuf railway crossing, complete disilting work has been carried out.
LIAQUAT COLONY NALLAS
In Rainy Session as the Liaquat Colony is low lying area so in heavy rain the water accumulate in that
area due to poor drainage system. The reason for that is the encroachment over the Nallas by the nearby
residents & shopkeepers. Other factor is that proper Disilting of these Nallas have not been carried out
previously.
The length of these Nallas is approximately 1KM each from both sides and lies in UC # 10 & UC # 11
respectfully.
UC # 10, Nallas runs from Sakhi Pir culvert towards Pathan Hotel and the Nalla is divided into two parts
1st part runs from Din Mohammad Milk Diary towards Sakhi Pir Culvert and other part runs from Firdous
Jamia Mosque to Pathan Hotel near mutton slaughter House. In between this Nalla is totally covered by
mosque, shopkeepers and a petrol pump.
UC # 11 Nalla runs from Sakhi Pir Culvert towards Mutton slaughter house separating the Nalla into two
parts. 1st parts runs from Modern Plaza towards Mutton Slaughter House and other runs from Modern Plaza
towards Sakhir Pir Culvert.
The following action will be taken before Moonson season to rectify the problem.
1. Disilting campaign will be launched immediately on both Nalla (work in progress).
2. Department of Encroachment will be taken into task to remove the encroachments where the problem
lies.
3. In the case of heavy rain Diesel pump will be installed at the both ends of Nallas to drain out the rain
water smoothly.
PROBLEMS:
1. Shortage of Pump Operators and Labour for loading and Shifting of Diesel pumps.
2. Vehicle for shifting and loading of Diesel Pump
3. Sanitary Staff Shortage
4. Accessories of Pumps (Electric / Diesel).
5. Non-availability of Movable generators which are required in case of Load Shedding.
6. 3 phase electric connection for electric pumps.
REQUIREMENTS:
1. At least 10 Electric Pump Operators, 40 Pump Operators for Diesel Pumps (Sub-Division City and
Latifabad)
2. Shahzoor Pickup 2 in number for City and Latifabad.
3. 100 sanitary staff for Disilting of Chamber of Pumping Stations (City and Latifabad)
4. Details of Accessories required.
Generators 5 in number
1 50kv + 2 Nos: 100kv for city Division
2 No: 50kv for Latifabad Division
5. 5000 sand bags in case of emergency.
6. Electric Connection.
RESPONSIBILITIES:
1. Sattar Shah Pumping Station
2. Haider Shah Pumping Station
3. HDA WASA will be responsible to install Generators at their permanent electric pumping stations for
proper functioning in case of any emergency / failure of Electricity.
1. Tulsi Das Pumping Station
2. Affandi Town
3. Peretabad PDI Rehman Town
4. PD-II, Hashmat Banu Town
5. Gujrati Para Near Tando Yousuf Railway Crossing
6. Unit No: 2 Pumping Station
7. Public School Pumping Station
8. LD4 Pumping Station
9. Unit No: 10, Pumping Station
10. Unit No: 9, Pumping Station
11. Disposal Unit No: 11, Pumping Station
12. Airport Road Pumping Station
13. Makrani Para Pumping Station
14. Barkat Bhai Town Pumping Station
15. Mir Khan Pumping Station Auto Bhan Road.
In case of any emergency
HESCO will be responsible
to provide 3 phase
connection
Kmc rain emergency plan 2014 final

More Related Content

What's hot

Water scarcity and water poverty index in Karachi megacity
Water scarcity and water poverty  index  in Karachi megacityWater scarcity and water poverty  index  in Karachi megacity
Water scarcity and water poverty index in Karachi megacitysyed Ijlal Ahmed waleed
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control Systemgrandestrategy
 
Hydrology Distribution of Water Cycle
Hydrology Distribution of Water CycleHydrology Distribution of Water Cycle
Hydrology Distribution of Water CycleShah Naseer
 
Environmental Law
Environmental LawEnvironmental Law
Environmental LawAsh Hassan
 
Catchment hydrology in botswana
Catchment hydrology in botswanaCatchment hydrology in botswana
Catchment hydrology in botswanapelontle pikati
 
Irrigation System of Pakistan
Irrigation System of PakistanIrrigation System of Pakistan
Irrigation System of PakistanFahad Amin
 
Irrigation system of pakistan
Irrigation system of pakistan Irrigation system of pakistan
Irrigation system of pakistan ShabnamHayat
 
Solapurcity 110320021741-phpapp01
Solapurcity 110320021741-phpapp01Solapurcity 110320021741-phpapp01
Solapurcity 110320021741-phpapp01Yogesh Patil
 
Irrigation System Of Pakistan
Irrigation System Of PakistanIrrigation System Of Pakistan
Irrigation System Of Pakistanwajeeh hassan
 
Introduction to Civil Engineering Design
Introduction to Civil Engineering DesignIntroduction to Civil Engineering Design
Introduction to Civil Engineering DesignVED Engineers Sdn. Bhd.
 

What's hot (18)

Drainage in New Orleans
Drainage in New OrleansDrainage in New Orleans
Drainage in New Orleans
 
Water scarcity and water poverty index in Karachi megacity
Water scarcity and water poverty  index  in Karachi megacityWater scarcity and water poverty  index  in Karachi megacity
Water scarcity and water poverty index in Karachi megacity
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control System
 
Hydrology Distribution of Water Cycle
Hydrology Distribution of Water CycleHydrology Distribution of Water Cycle
Hydrology Distribution of Water Cycle
 
Environmental Law
Environmental LawEnvironmental Law
Environmental Law
 
Catchment hydrology in botswana
Catchment hydrology in botswanaCatchment hydrology in botswana
Catchment hydrology in botswana
 
Irrigation System of Pakistan
Irrigation System of PakistanIrrigation System of Pakistan
Irrigation System of Pakistan
 
Water resources development in India
Water resources development in IndiaWater resources development in India
Water resources development in India
 
Current surface water resources of the Ganges coastal zone of Bangladesh
Current surface water resources of the Ganges coastal zone of BangladeshCurrent surface water resources of the Ganges coastal zone of Bangladesh
Current surface water resources of the Ganges coastal zone of Bangladesh
 
Non-renewable groundwater management in Saudi Arabia
Non-renewable groundwater management in Saudi ArabiaNon-renewable groundwater management in Saudi Arabia
Non-renewable groundwater management in Saudi Arabia
 
Hydrology 1
Hydrology 1Hydrology 1
Hydrology 1
 
Future projection of surface water resources of the Ganges coastal zone of Ba...
Future projection of surface water resources of the Ganges coastal zone of Ba...Future projection of surface water resources of the Ganges coastal zone of Ba...
Future projection of surface water resources of the Ganges coastal zone of Ba...
 
Water resources in the coastal zone of Bangladesh: constraints or opportuniti...
Water resources in the coastal zone of Bangladesh: constraints or opportuniti...Water resources in the coastal zone of Bangladesh: constraints or opportuniti...
Water resources in the coastal zone of Bangladesh: constraints or opportuniti...
 
Mithi river pollution pptx.
Mithi river pollution pptx.Mithi river pollution pptx.
Mithi river pollution pptx.
 
Irrigation system of pakistan
Irrigation system of pakistan Irrigation system of pakistan
Irrigation system of pakistan
 
Solapurcity 110320021741-phpapp01
Solapurcity 110320021741-phpapp01Solapurcity 110320021741-phpapp01
Solapurcity 110320021741-phpapp01
 
Irrigation System Of Pakistan
Irrigation System Of PakistanIrrigation System Of Pakistan
Irrigation System Of Pakistan
 
Introduction to Civil Engineering Design
Introduction to Civil Engineering DesignIntroduction to Civil Engineering Design
Introduction to Civil Engineering Design
 

Viewers also liked

Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...
Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...
Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...drkretov
 
Aba Service Presentation 11 2008
    Aba Service Presentation 11 2008     Aba Service Presentation 11 2008
Aba Service Presentation 11 2008 TKH
 
Tolomatic ICR Smart Actuator Product Presentation may 2009
Tolomatic ICR Smart Actuator Product Presentation may 2009Tolomatic ICR Smart Actuator Product Presentation may 2009
Tolomatic ICR Smart Actuator Product Presentation may 2009Electromate
 
Parque Natural Aiako Harria
Parque Natural Aiako HarriaParque Natural Aiako Harria
Parque Natural Aiako HarriaTrek2.0
 
Rabí moisés ben maimon
Rabí moisés ben maimonRabí moisés ben maimon
Rabí moisés ben maimonjrbellidomainar
 
Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014
Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014
Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014ifm electronic gmbh
 
New Markets for Your Crops
New Markets for Your CropsNew Markets for Your Crops
New Markets for Your CropsElisaMendelsohn
 
Indumentaria Inteligente
Indumentaria InteligenteIndumentaria Inteligente
Indumentaria InteligenteGonzalofabiani
 
Stadtjubiläum er2002-dokumentation
Stadtjubiläum er2002-dokumentationStadtjubiläum er2002-dokumentation
Stadtjubiläum er2002-dokumentationplvisit
 
El Hip Hop En Bogota Empieza A Partir De Los AñOs 80 Casi
El Hip Hop En Bogota Empieza A Partir De Los AñOs 80 CasiEl Hip Hop En Bogota Empieza A Partir De Los AñOs 80 Casi
El Hip Hop En Bogota Empieza A Partir De Los AñOs 80 Casi93010306963
 
Práctica extensometria probeta traccion
Práctica extensometria probeta traccionPráctica extensometria probeta traccion
Práctica extensometria probeta traccionUnai Galfarsoro
 

Viewers also liked (20)

Licitaciones
LicitacionesLicitaciones
Licitaciones
 
Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...
Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...
Dr. Kretov Kirill - Basic classification of corporate assets. Introduction to...
 
Aba Service Presentation 11 2008
    Aba Service Presentation 11 2008     Aba Service Presentation 11 2008
Aba Service Presentation 11 2008
 
Tolomatic ICR Smart Actuator Product Presentation may 2009
Tolomatic ICR Smart Actuator Product Presentation may 2009Tolomatic ICR Smart Actuator Product Presentation may 2009
Tolomatic ICR Smart Actuator Product Presentation may 2009
 
Power 14
Power 14Power 14
Power 14
 
Podpora pr vaší firmy
Podpora pr vaší firmyPodpora pr vaší firmy
Podpora pr vaší firmy
 
Parque Natural Aiako Harria
Parque Natural Aiako HarriaParque Natural Aiako Harria
Parque Natural Aiako Harria
 
Memoria 1
Memoria 1Memoria 1
Memoria 1
 
Rabí moisés ben maimon
Rabí moisés ben maimonRabí moisés ben maimon
Rabí moisés ben maimon
 
Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014
Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014
Ifm Automatisierungstechnik für die Lebensmittelindustrie Deutsch 2013-2014
 
New Markets for Your Crops
New Markets for Your CropsNew Markets for Your Crops
New Markets for Your Crops
 
Kanban infosystem
Kanban infosystem   Kanban infosystem
Kanban infosystem
 
Indumentaria Inteligente
Indumentaria InteligenteIndumentaria Inteligente
Indumentaria Inteligente
 
Portafolio
PortafolioPortafolio
Portafolio
 
Stadtjubiläum er2002-dokumentation
Stadtjubiläum er2002-dokumentationStadtjubiläum er2002-dokumentation
Stadtjubiläum er2002-dokumentation
 
Deber
DeberDeber
Deber
 
El Hip Hop En Bogota Empieza A Partir De Los AñOs 80 Casi
El Hip Hop En Bogota Empieza A Partir De Los AñOs 80 CasiEl Hip Hop En Bogota Empieza A Partir De Los AñOs 80 Casi
El Hip Hop En Bogota Empieza A Partir De Los AñOs 80 Casi
 
Diálogos 60
Diálogos 60Diálogos 60
Diálogos 60
 
Sejarah Internet
Sejarah InternetSejarah Internet
Sejarah Internet
 
Práctica extensometria probeta traccion
Práctica extensometria probeta traccionPráctica extensometria probeta traccion
Práctica extensometria probeta traccion
 

Similar to Kmc rain emergency plan 2014 final

All about godavari river
All about godavari riverAll about godavari river
All about godavari riverE Venkatesh
 
Flood project case study rk
Flood project case study rkFlood project case study rk
Flood project case study rkankitkalariya
 
CH-1 Introduction to River Hydraulics.pdf
CH-1 Introduction to River Hydraulics.pdfCH-1 Introduction to River Hydraulics.pdf
CH-1 Introduction to River Hydraulics.pdfDanielSolomon58
 
Rivers, floods and management
Rivers, floods and management Rivers, floods and management
Rivers, floods and management jamierjhill
 
Flood Happened In Mahad .pptx
Flood Happened In Mahad .pptxFlood Happened In Mahad .pptx
Flood Happened In Mahad .pptxTanviTipnis
 
Deltares sustainable development of 8 deltas
Deltares sustainable development of 8 deltasDeltares sustainable development of 8 deltas
Deltares sustainable development of 8 deltasMarcel Bruggers
 
2010 leh cloud bursting
2010 leh cloud bursting2010 leh cloud bursting
2010 leh cloud burstingManish Singh
 
K4 banjir
K4 banjirK4 banjir
K4 banjirUTHM
 
Paper 1 revision 29.5.13 bv
Paper 1 revision 29.5.13 bvPaper 1 revision 29.5.13 bv
Paper 1 revision 29.5.13 bvtudorgeog
 
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASURFLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASURHAFIZABDULHASEEB
 
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaKrishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaGlobal Risk Forum GRFDavos
 
Assessment of the 2015 Kaduna Flood.pptx
Assessment of the 2015 Kaduna Flood.pptxAssessment of the 2015 Kaduna Flood.pptx
Assessment of the 2015 Kaduna Flood.pptxDogara Bashir
 
Chapter 1: Introduction to River Hydraulics
Chapter 1: Introduction to River HydraulicsChapter 1: Introduction to River Hydraulics
Chapter 1: Introduction to River Hydraulicsgemedo gelgelu
 

Similar to Kmc rain emergency plan 2014 final (20)

All about godavari river
All about godavari riverAll about godavari river
All about godavari river
 
Flood project case study rk
Flood project case study rkFlood project case study rk
Flood project case study rk
 
CH-1 Introduction to River Hydraulics.pdf
CH-1 Introduction to River Hydraulics.pdfCH-1 Introduction to River Hydraulics.pdf
CH-1 Introduction to River Hydraulics.pdf
 
Rivers, floods and management
Rivers, floods and management Rivers, floods and management
Rivers, floods and management
 
Flood Happened In Mahad .pptx
Flood Happened In Mahad .pptxFlood Happened In Mahad .pptx
Flood Happened In Mahad .pptx
 
flood
 flood flood
flood
 
Deltares sustainable development of 8 deltas
Deltares sustainable development of 8 deltasDeltares sustainable development of 8 deltas
Deltares sustainable development of 8 deltas
 
2010 leh cloud bursting
2010 leh cloud bursting2010 leh cloud bursting
2010 leh cloud bursting
 
K4 banjir
K4 banjirK4 banjir
K4 banjir
 
Flood Management
Flood ManagementFlood Management
Flood Management
 
Paper 1 revision 29.5.13 bv
Paper 1 revision 29.5.13 bvPaper 1 revision 29.5.13 bv
Paper 1 revision 29.5.13 bv
 
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASURFLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
 
FLOOD CONTINGENCY PLAN 2011
FLOOD CONTINGENCY PLAN 2011FLOOD CONTINGENCY PLAN 2011
FLOOD CONTINGENCY PLAN 2011
 
FLOOD CONTINGENCY PLAN 2011
FLOOD CONTINGENCY PLAN 2011FLOOD CONTINGENCY PLAN 2011
FLOOD CONTINGENCY PLAN 2011
 
Floods
Floods Floods
Floods
 
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaKrishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
 
Floods of Somalia
Floods of SomaliaFloods of Somalia
Floods of Somalia
 
Emptying hussain sagar
Emptying hussain sagarEmptying hussain sagar
Emptying hussain sagar
 
Assessment of the 2015 Kaduna Flood.pptx
Assessment of the 2015 Kaduna Flood.pptxAssessment of the 2015 Kaduna Flood.pptx
Assessment of the 2015 Kaduna Flood.pptx
 
Chapter 1: Introduction to River Hydraulics
Chapter 1: Introduction to River HydraulicsChapter 1: Introduction to River Hydraulics
Chapter 1: Introduction to River Hydraulics
 

Recently uploaded

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...rajputriyana310
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
 

Kmc rain emergency plan 2014 final

  • 1.
  • 2. Sequence of Presentation • Background • Year wise details of Rains • Impact of the Rain • Objectives • Storm Water Drainage System • Stream Discharging rain water directly in to the Sea • Existing Situation • Preparedness Measures • Pre Rain Measures • Identified low lying areas • Geography of Nullah under KMC Responsibilities • KMC Measures • Measures during rains • Post Rain Measures • Functions performed by other Departments • Emergency/Imortant Telephone Numbers
  • 3. Karachi Rain Emergency Plan 2013 Background: • Karachi is situated in the south of Sindh on the coast of Arabian sea. By virtue of geographic location it tends to have a relatively mild climate with low levels of average precipitation (approximately 250 mm per annum) • Heavy rainfall received in a relatively short span of time, caused flash floods. • Synchronization of the peak floods with high tide in the sea.
  • 4. Karachi City and surrounding cris-crossed by many nallah which generally flow from the North East to South West. These nallahs act as natural drains and carry storm water from Kithar Range down till sea. The major rivers in the area are Malir River in the East and Lyari River in the West. Which further have their own small tributaries (nallahs) falling in to them. During the floods of 2013, a new central nallah (Wateen Wari Nullah). Which originates from Kirthar Range, was identified which cause flooding in Karachi. Based on the experience of floods of 2013, it can be generally concluded that the drainage of Karachi is dependent on three Rivers/ nallahs. Which may cause flooding, due to overflow. These are Malir River in the East, Wateen Wari Nallah in the Middle and Lyari River in the West.
  • 5. YEAR WISE DETAILS OF RAINS (In MM) Year June July August September Total 2006 0 66.2 148.6 21.8 236.6 2007 110.3 41 250 0 401.3 2008 0 94 37.5 Trace 131.5 2009 3.6 159.9 44 68.9 276.4 2010 97.4 130.4 11.5 42.7 382 2011 0 7.7 60.1 213.3 281.1
  • 6. IMPACT OF THE RAIN • The traffic system cease to work • Failure of electric power and other utility services • Choked sewerage system causing difficulties to public, and Katchi Abadies get submerged, resulting in epidemic diseases like Gastroenteritis, Cholera, Malaria, Skin Diseases and Conjunctivitis. • Advertisement Boards/fall of trees – causing havoc and loss of precious lives • Contamination of drinking water • Damage to Road infrastructure
  • 7. OBJECTIVES • In view of the previous experiences, it became imperative to introduce updated Rain Emergency Plan with a systematic approach for the safety of property and lives of Karachities and a provision of better relief system to them • To counter flood like situation in Lyari River, Malir River and Major Nallahs like their link Nallahs during heavy rain fall • For awareness information of concerned agencies/DMCs where unauthorized settlement and inhabitants are this plan would help and assets for them rescue and relief living in dangerous environment of River Beds • A coordinated/comprehensive/update Rain Emergency Plan is very much needed to prevent and manage the pre, during and post rain situation.
  • 8. STORM WATER DRAINAGE SYSTEM An overview of Storm Water Drainage System: There are 13 major Nallahs running through out the city and most of them discharging their affluent into the 2 major rivers i.e. Lyari and Malir Details of Nullahs: • Soldier Bazar Nallah • Farrier Nallah/Glass Tower Nallah • Chakora Nallah • Golden Town Nallah • Korangi Nallah • Picture Nallah • Gujjar Nallah • Orangi Nallah • Zehri House Nallah/Manzoor Colony Nallah • Monchko Nallah
  • 9. Stream Discharging Rain Water Directly in Sea. • Nehr-e-Khayyam • Frere Nallah • Pitcher Nallah • Kalri Nallah • Soldier Bazar Nallah • Manzoor Colony Nallah
  • 10. EXISTING SITUATION • Most of the drains are: - Heavily encroached and peoples are living un- authorizedly on both sides of these Nallah - Choked with silt and garbage • Their water carrying capacity is at the minimum level • Stagnation of rain water on road, lanes and streets due to chockage and non cleaning of Nallahs, in case of rain fall.
  • 11. KARACHI DRAINAGE NETWORK Storm water drains of Karachi have been converted into sewers over the years and they lack the capacity to drain off rain water or any other runoff water. Salient are as following :- a. The drains, which are supported to remain dry through out the year, have been turned into sewer conduits for the city. b. A rise in the number of slums and squatter settlements built on the banks of the drains have made the issue further complicated. c. Almost all 13x large and over 250x small storm water drains have been encroached and these encroachments have clogged the Storm water drains. d. Few pictures of various nallahs, drains and rivers and related important information which may help in understanding the overall the state of drainage system in the city as given below:- 1. Sungal Nallah (White House Area North East Karachi. 2. Encroachment of silt and Garbage. 3. Picher Nallah (Landhi Sector) Mixing of Sewerage Line and Garbage 4. Azim Pura Divisionary Nallah. 5. Vegetation and Wild Growth in Nallah.
  • 12. MALIR RIVER Malir River flows through eastern part of Karachi from North East to the South West and falls into the Arabian Sea. Salient are as under:- a. It has two many tributaries. Thuddo and Sukhan nallahs. b. In the rainy season, this river experience heavy water flow. c. It drains almost 35-40 % of flood water and the drainage of Eastern region is dependent in this river. d. Generally in previous year of floods, its surrounding populated areas did not face any over flow because of its wide span and capacity. e. Its banks have experienced growth of katchi Abadi and encroachments at some places. Tributaries (Major nullahs) Malir River are as under:- a. MANZOOR COLONY NALLAH 1. It drains water from adjoining areas of Shahrah-e-Faisal, Manzoor Colony, M Ali Jinnah Society and DHA. 2. It was able to drain the flood water from surrounding areas in 2013. 3. Gradually, its boundaries are being encroached which may result in narrowing its span and causing overflow of flood water.
  • 13. Tributaries (Major Nallahs) Malir River are as under:- a. MANZOOR COLONY NALLAH 1. It drains water from adjoining areas of Shahrah-e-Faisal, Manzoor Colony, M Ali Jinnah Society and DHA. 2. It was able to drain the flood water from surrounding areas in 2013. 3. Gradually, its boundaries are being encroached which may result in narrowing its span and causing overflow of flood water. b. KORANGI NALLAH (1) It drains water from Korangi Industrial Area and surrounding direct into the sea. (2) Surrounding parts of this nallah are mostly flood free. (3) This nallah has also been encroached
  • 14. c. NEHR-E-KHAYYAM (1) Drains water from Clifton and Defence areas and falls directly into sea. (2) This drainage also requires dredging/de-silting. d. AZEEM PURA DIVERSIONARY NULLAH (1) Capacity of nallah has diminished due to worst encroachment linkage to sewerage lines and heavy silting. (2) Its span was around 100ft once it was constructed presently it has been reduced to 20ft (average). (3) Purpose of the diversionary nallah is to drain water from Air Port area and surroundings and deliver it to Malir Naddi. (4) New construction of the same nallah are under progress. It will flow underground in Azim Pura localities.
  • 15. WATEEN WARI NALLAH AND ITS EXTENSION DOWN TILL MALIR RIVER This nallah originates from Kirthar Range and passes through Saforan Goth where it is named Soforan Nallah and then further southwards. Pahelwan Goth Nallah and Jauher Nallah also joins in and it is then named as Chakora Nallah which finally outfalls into Malir Rivers. THE MAJOR LINKED IN WATEEN NALLAH ARE AS FOLLOWS:- a. Phelwan Goth Nallah (1) This nallah originates from race course Ground and has enough area to take water load of its share. (2) It drains water from Pehlwan Goth and surroundings. (3) The nallah is also being encroached.
  • 16. b. JAUHAR NALLAH (1) This Nallah join the Pehalwan Goth Nallah near Gulistan-e-Jauhar Colony Bridge. (2) This Nallah needs parallel to Pehalwan Goth Nallah but passes through Gulistan-e-Jauhar area. (3) Because of Heavy encroachments water over flows and floods the area for limited period. (4) Pehalwan Goth Nalllah and Gulistan-e-Jauhar Nallah meet near the colony bridge from this point onwards this Nallah is named Chakora Nallah which ultimately drains water of both the Nallah to Malir Nadi. c. SAFORAN NALLAH (1) This nallah drains the water of Pehalwan Goth, Gulistan-e-Jauhar and Shah Faisal Colony. (2) Span of this nallah has reduced manifolds due to encroachments. (3) Condition of vegetation and wild growth is also alarming. (4) This nallah over flow during flood. (5) There is no major flood threat but life of public comes to a standstill till pumps/ drain out water from the roads to diversionary nallahs.
  • 17. LYARI RIVER Lyari River flows from North East to the center and drains into the Arabian Sea at Manora Channel. The river is about 50 KM long. It carries the surface water/ run off water into sea. Encroachment is also common phenomenon astride the river. Its tributary nallahs are as under:- a. SUNGAL NALLAH (1) It drains rain water from Sohrab Goth, Bara Area and surroundings. (2) It had successfully drained water and surroundings were not effected in 2013. However, span of this nallah has reduced due to heavy encroachments. b. PICHER NALLAH (1) This nallah drains water from Jamila Street, Light House area, Lee Market area, Khara Dar and Meetha Dar areas and flows into sea. (2) This nallah is totally sited, filled with garbage and sewerage water and only a portion of real picher nullah is oval on ground whereas rest of its portion has been encroached.
  • 18. c. KALRI NALLAH (1) It originates from Juna Masjid and drains water from Old City and Central Karachi directly into the sea. (2) Like Picher Nallah, this Nallah is also sited and full of garbage. (3) Flow of water through this nallah seems impossible as it is covered till top with Solid Waste etc. (4) Encroachments along the banks are also alarming. d. SOLDIER BAZAR NALLAH (1) It drains water from areas of Guru Mandir, Patail Parah, Garden Police HQ and surroundings (Central Karachi areas). (2) It flows into sea near Boat Basin area. (3) This nallah is also encroached at many places.
  • 19. PREPAREDNESS MEASURES a. Pre-rain measures b. Measures during rain floods emergency c. Post rain measures
  • 20. PRE-RAIN MEASURES The following actions are required: • De-silting of storm water drains • Repair, maintenance and procurement of dewatering pumps/ pumps. • Repair of roads and filling of trenches • Identification of troubled spots • Activation of early warning system • Prevent deaths due to wire snapping / electrocution • Provision of Rescue Teams • Evacuation to relief camps ear-marked in different education DCs Schools and DMCs • Prevention from infectious diseases/epidemics/fumigation long drive with the coordination with DMCs
  • 21. • Provision of first aid & medical facilities • Cleaning of all chocked gratings alongside all main roads by Technical Services Department, KMC. • Cleaning/maintenance/provision of generators at all under passes and especially Gharibabad/Liaquatabad/Nazimabad/Clifton underpass by Municipal Services Department, KMC.
  • 22. IDENTIFIED LOW LYING AREAS • Near Governor House • Near Chief Minister House • I.I. Chundrigar Road • Shaheen Complex • City Business Area • Shahrah-e-Faisal: a. Jinnah Bridge b. Natha Khan c. Nursery d. FTC Flyover e. Karsaz Link f. Airport (Falak Naz)
  • 23. • M.A Jinnah Road: a. Gurumondir b. Business Recorder Road. • University Road: a. Old Sabzi Mandi b. Civic Center c. NIPA Flyover • Rashid Minhas Road • Near Stadium Flyover • Near Liaquatabad No. 10 Flyover • Near Karimabad Flyover • Near Nagan Chowrangi Flyover • At-grade road of Banaras Flyover • KDA Chowrangi (North Nazimabad)
  • 24. Geography of Nallah under KMC Responsibility NAME OF NALLAH LOCATION Pitcher Nallah Start from Jamila Street and ends at Mauripure Road passing through Lyari, Saddar and Keamari and dispose off into the sea. Jubilee Nallah Segment of different nallah i/c channel along pir Muhammad Road, Bhund Muhallah Nallah and others Kalri Nallah Start from Tannery Road and ends at Mauripure Road passing through thickly populated areas of Lyari and ultimately dispose off into the sea Soldier Bazar Nalah Start from Gurumondir and ends at Jijrat Colony/Sultanabad into sea via Doli Khata behind Holy Family Hospital, Jublee Market, Aurangzeb Market, Urdu Bazar, Sindh Secretariat, Shaheed Complex & PIDC
  • 25. Ferer Nallah From Glass Tower to Nehr-e-Khayyam Clifton Shahrah-e- Quideen Nallah From society office to PECHS Block-6 upto Mehmoodabad Waris Shah Nallah Along Waris Shah Road PECHS Block-6 Mehmoodabad Nallah From Mehmoodabad to Manzoor Colony
  • 26. KMC Measures • The Administrator and Metropolitan Commissioner, KMC held several meeting to review the arrangements made during rainfall and to face any eventuality. Also held coordination meetings with concern departments and stakeholders of other agencies in the City. • The utility agencies i.e. KESC, SSGC, PTCL etc have been advised to make necessary arrangements and set up emergency centers. • Additional Relief Commissioner, PDMA and Met Office, shall be ensured for management and updatation of early warning system. • All DGs, Sr. Directors of KMC and Municipal Commissioners of DMCs have been instructed to activate their control rooms round the clock during Monsoon season. Continued
  • 27. • Pre-rain arrangements i.e. desilting of storm water drain started in April 2014 by Municipal Services Department, KMC and is still going on. • A Special Monitoring and Coordination Cell to deal with rain emergency has already been established in Administrator Secretariat which shall remain operative round the clock. • All newly constructed roads, underpasses and flyovers have been provided with storm water drainage facility with stand by generators in case of power failure. • Rain Emergency Centers to be established in all DMCs • Machinery available (working condition) with Municipal Services Department, KMC: a. Dump Trucks 85 b. Grab Cranes 09 c. Sludge Carriers 20 d. Wheel Loaders 10 e. Dewatering Pumps 15
  • 28. MEASURES DURING RAINS: • Deployment of staff, pumps and related machinery at Civic Center and other specific vulnerable points with especial emphasize on Shahrah-e-Faisal • Establishment of control rooms at Municipal Services Department, KMC at Civic Center. • Activation of Emergency Response Center at Hawks Bay/Mubarak Village. • Establishment of control room at 16 Control Room and 1339 Complaint Center for public complaints. • Cancellation of leave of all the Emergency Staff. • Deployment of City Wardens at Vital Points • Deployment of Urban Search and Rescue Team at KMC Head Office, M.A Jinnah Road.
  • 29. POST RAIN MEASURES Health and Hygiene: • Removal of stagnant water from Main Roads and other locations • Fumigation drive through out the city. • Coordination with all DMCs with regards to removal of accumulated garbage backlog. • Removal of fallen trees, sign boards and bill boards. • Filling of pot holes, repair of trenches. • Public Education and awareness through print, electronic and Rising Karachi Project.
  • 30. ROLE OF OTHER DEPARTMENTS IN THE CITY Karachi Water and Sewerage Board: • Executive Engineer (Sewerage), KWSB shall be responsible to open the chocked gutters/main holes/sewerage lines, keeping in view that the stagnant / sewerage water may be drain out quickly. All the machinery should be ready and standby to meet the emergency. • All main holes should be covered, Ring Slabs & main hole covers may be kept/provided at Emergency Centers to cover the main hole during the rain emergency. • All trenches, excavated by Sewerage Department may be filed before Rain fall. • One Representative of Sewerage Department may be deputed at Rain Emergency Center to receive / forward and ensure to resolve the complaints. • Arrangements of stand by generators at Clifton and Jamilla Pumping stations, in case of power failure Continued
  • 31. • Executive Engineer (Water) KWSB is responsible to repaired water leakage to avoid water contamination. All trenches excavated may be filled immediately before rain fall and during the rainy season. • One representative of water department may be deputed at Rain Emergency Center to receive / forward and ensure to resolve the complaints. K.E.S.C • The Executive Engineer KESC will arrange the availability of KESC staff to test out the feeble poles & Electric wires and should be replaced without any further delay and also ensure immediate disconnection of electricity either if any pole/wire fall down or electric shock passes the poles. • One representative of KESC may be deputed at Rain Emergency Center to receive / forward and ensure to resolve the complaints. • Special attention is required to ensure continuous electric supply in old city area, to keep Clifton and Jamilla Pumping Station functioning. Continued
  • 32. Karachi Building Control Authority • Deputy Controller of Buildings shall point out the dangerous buildings and shall be responsible to vacate the buildings for which he may seek help from the Area Police Police Department: • The Superintendent of Police of the Districts and Area SHOs shall stand by/ red alert in the area to meet any emergency and also provide the necessary information through to Landhi and other Law Enforcing Agencies. • The Superintendent of Police, especially Landhi shall keep vigilant eye on flow of water in Malir River and will remain in close coordination with the Superintendent of Police, Shah Faisal, in case the stream flow up to alarming point the Causeway from Murtaza Chowrangi to Jumma Goth Malir may be closed for traffic immediately
  • 33. OBSERVATION FROM PRE FLOOD RECONNAISSANCE 2014 a. Karachi drainage system not only requires immediate attention but also require physical measures for its cleanliness. Any efforts in the absence of master plan will be futile exercise for overall drainage system of Karachi. b. Capacity enhancement of present drainage system is required as encroachments and lack of maintenance has reduced the designed capacity of existing drainage system. c. Most of the drains/nallahs require cleaning and removal of garbage. d. Diversionary Nallahs have been planned however progress of construction is at snail pace due to various issues like non availability of funds, be immediately resolved to speed up the construction work. e. Sewerage lines are being discharged in rain water drains resulting in accumulation of silt and garbage. f. Wild growth and vegetation needs to be removed for smooth flow of water in all channels. g. Continuous increase in the encroachments along drains/ nallahs must be checked. h. No flood risk mapping of Karachi exist which can help in better planning of the entire flood fighting efforts.
  • 34. RECOMMENDATIONS a. Master plan for complete drainage system of Karachi should be prepared and executed. b. KMC/DMCs should be pro-active in preventing flood like situation due to heavy rains by undertaking following:- (1) Ensure removal of encroachment of drains/ natural drains. (2) Construction of storm water drains and maintenance of existing drainage system. (3) Make a plan to absorb volunteers / NGO’s to create energy to fight flood emergency. A well-coordinated flood relief/ rescue plan is required incorporating all civil resources. Same should be rehearsed by KMC/DMCs to coordinate the response of various agencies. (4) Sewerage lines linked t drainage channels should be separated to avoid silting and blockade of drains/ nallahs. (5) KMC/DMCs should check encroachments astride the various nallahs and drains and should also undertake dredging operation of these nallahs to enhance their capacities. Continued
  • 35. c. Dewatering pumps/ equipments must be maintained before the onset of monsoon season. d. Flood risk mapping of Karachi should be done by PDMA. e. Flood risk zoning and surface water management of all zones should be undertaken.
  • 36. ACTIVATION OF EMERGENCY CENTERS (CONTROL ROOMS) Municipal Services Deptt, KMC 99230071 (Fax:99230068) Complaint Center, KMC CCIS-1339 Complaint Center, Fire Brigade 99230060 (five lines) Fire Head Quarter 99215007-8 Gulistan-e-Mustafa Fire Station 99246268-99246316 Landhi Fire Station 35015988-35015888 Lyari Fire Station 32527521-32528090
  • 37. FOCAL PERSONS FOR CLEANING OF NALLAH 1 Mr. Noman Arshad Director, Machine Pool Depot 0321-2384090 2 Mr. Ibrahim Baloch Chief Engineer/ Director, Storm Water Drainage, TS, KMC 0333-2746391
  • 38. SOLID WASTE MANAGEMENT DEPARTMENT Sr.# Name Designation Office Mobile 1 Mr. Sohail Ahmed Director 99231341 0336-2262250 2 Mr. Saleem Shaikh Addl: Director -do- 0300-2069050 3 Mr. Raees Siddiqui Deputy Director -do- 0300-2604554 4 Mr. M. Irshad Deputy Director -do- 0300-8238491
  • 39. Important Telephone Numbers of Municipal Services Department, KMC (All Zones) S# NAME SITE MOBILE Incharge Mr. Azhar (South) Cell No. 0300-26291337 1 Safdar Shaheen Complex 0300-3553301 2 Mr. Asghar Marriot Hotel/ Glass Tower 0300-2329940 3 Mr. Asif (MPD) Tower/ Kharadar 0300-2693102 Incharge Mr. Anwer Baloch (East) Cell No. 4 Mr. Mehmood FTC 0341-2009172 0300-2624061 5 Mr. Asim CNG Petrol Pump 0300-9210519 6 Mr. Ajoon CNG Petrol Pump 0300-2242284 7 Mr. Niaz Uddin (MPD) CNG Petrol Pump 0346-2381098 Incharge Dr. Hamid Mustafa (Central & West) 0332-3371377 8 Mr. Sagheer Under Bypass & K.D.A Chowrangi 0321-9215955
  • 40. IMPORTANT NUMBERS OF MACHINE POOL DEPOT S. NO NAME OF OFFICER DESIGNATION PHONE NO 1 Mr. Noman Arshad Director 0321-2380490 2 Mr. Muhammad Azhar Dy: Director 0300-2629137 3 Mr. Aslam Dy: Director 0345-2208676 4 Mr. Anwer Baloch Asst Director 0300-2038682 5 Mr. Shahbaz Inspector 0345-2580499 6 Mr. Niaz Uddin Inspector 0346-2381098 7 Mr. Asif Khan Inspector 0300-2639106 8 Mr. Asfar Ali Inspector 0300-2329940 9 Mr. Zameen Khan Inspector 0300-2436653 10 Mr. Faraz Inspector 0344-2688714 11 Mr. Sagheer Ahmed Inspector 0321-9215959
  • 41. IMPORTANT TELEPHONE NUMBERS OF MUNICIPAL PUBLIC HEALTH S.NO NAME DESIGNATION TELEPHONE NO 1 Dr. Mansoor Shaikh Director, MPH 0300-2208362 2 Dr. Hamid Mustafa Dy: Director, MPH 0332-3371377 3 Anwer Malaria Supervisor 0300-2669097 4 Nazeer Malaria Supervisor 0344-2940261 5 Muhammad Zaman Malaria Supervisor 0345-2494717 6 Roshan Malaria Supervisor 0344-2677829 7 Asim Malaria Supervisor 0300-9210519 8 Muhammad Hanif Malaria Supervisor 0321-2536570 9 Ajoon Malaria Supervisor 0300-2242284 10 Shafiq Malaria Supervisor 0300-2202798 11 Malik Zaman Malaria Supervisor 0345-2736004 12 Waheed Malaria Supervisor 0312-2032699 13 Naeem Malaria Supervisor 0300-3628928
  • 42. FIRE BRIGADE TELEPHONE NUMBERS S# Name of Station Name of Officer Designation Cell No Office No 1 Head Quarter Ehtishamuddin Saleem Chief Fire Officer 0346-2371026 0345-8685330 99215652 99215002 2 Head Quarter Imtiaz Afzal Dy: Chief Fire Officer 0301-2245266 99238921 3 Korangi Fire Station Ishtiaq Ahmed Station Officer 0333-2356516 99215007-8 4 Central Fire Station Wajahat Hussain Station Officer 0334-3076441 99260331-2 5 New Karachi Mazhar Rafi Station Officer 0344-2739588 36974020-30 6 Gulshan-e-Iqbal Khalid Hussain Station Officer 0300-2160392 99244490 7 Gulistan-e-Jauhar Buland Iqbal Station Officer 0300-9219441 34016255 34631918 8 Gulistan-e-Mustafa Arif Mansoori Station Officer 0333-2213146 99246316 99246268 9 Landhi Fakharuddin Station Officer 0345-2146273 35015888 35015988 10 Korangi Zafar Khan Station Officer 0300-9209902 3566260-1 11 Manzoor Colony Mubin Ahmed Station Officer 0333-2179171 35804097
  • 43. S# Name of Station Name of Officer Designation Cell No Office No 12 Shah Faisal Colony Saeedullah Station Officer 0300-2354717 99239112 13 Saddar Tauheed ur Rehman Station Officer 0333-3028991 99215095-8 14 S.I.T.E. Tehseen Siddiqui Station Officer 0300-9242498 2562243-45 15 Orangi Aslam Sub Fire Officer 0321-9250142 0300-9250142 36651222 36650515 16 Bolton Nadeem Zehri Sub Fire Officer 0300-2218706 32562243-45 17 Baldia Murtaza Station Officer 0321-2888041 32810015 18 Lyari Zaheer Siddiqui Station Officer 0333-2182896 32528090 32527521 19 Truck Stand Abrar Sheikh Station Officer 0300-2179172 32353333 20 Malir Nisar Khalid Station Officer 0315-2617624 34112599 34504922 21 Gulshan-e-Maymar Humayon Sub Fire Officer 0300-2259819 22 Cattle Colony Javeed Hussain Station Officer 0322-2076149 34100491 23 Civic Center Abdul Nasir Station Officer 0344-2739588 99231808 24 ERC Mairaj Station Officer 0345-2263450
  • 44.
  • 45. KARACHI WATER & SEWERAGE BOARD RAIN EMERGENCY PLAN - 2014 DETAILING RELIEF MEASURES FOR RAINY SEASON, MAY- 2014 • In view of likely rains, the KW&SB has chalked out a Comprehensive Rain Emergency / Contingency Plan to combat any situation in the face of up-coming monsoon season. This is in clear understanding of the fact that the operation, maintenance and cleaning of storm water drains and nallahs is a function of the KMC who have already undertaken the work of desalting and cleaning of storm water drains / nallahs with appreciation of following points: Basic Rationale • The sewerage system of city is insufficient for the intake of rainwater of the city. • The solid waste, debris and garbage of roads flow into the sewerage lines while running with rainwater during rains which causes sewage blockades. • With cognisance of these facts, KW&SB has made efforts for smooth maintenance of city’s sewerage system as a precautionary measure and also provide maximum relief to general public by maximizing the efficiency of its sewer cleaning system during rains. • Other steps taken under Rain Emergency Plan are as follows: - High Alert • High alert is in place with instructions to all KW&SB engineers and personnel for fulltime preparedness of rain emergencies. • Special emphasis has been laid on upkeep and readiness of emergency fighting machinery and equipment available at KW&SB. Focal Person • The Chief Engineer- Electrical & Mechanical (Sewerage) Mr. Zaheer Abbas Zaidi has been nominated as the focal person for all rain emergency actions who will co-ordinate all KW&SB efforts in the matter. • He will interact with all District CEs, CE (BT), CE (E&M) and all concerned and liaison with KMC and DMCs in the city. • The District CEs and Town SEs have been mobilized to ensure efficiency in all sewerage division within their jurisdiction. • They have streamlined all sewerage wings at all Towns level through respective EEs sewerage.
  • 46. Focal Point • The 1339 Complaints Centre / Customer Service Centre, Block-A at 9th Mile, Karsaz, Shahra-e-Faisal, Karachi, has been made focal point for Rain Emergency Operations. • Following steps may also be ensured to prevent rain related problems in the city: • All physical resources (equipment, machinery etc) and personnel would be pooled and controlled from this point. Communication facilities shall be kept in order and readily available for backup wherever required. • The Central Machinery Pool and Central (Workshop Division), Karsaz, Central Pumping Station, PIDC Clifton and Jamila Pumping Station, Lyari shall work in full capacity with backup support of standby generator and fulltime availability of fuel during Rain emergency. • All Sewer Cleaning / Jetting / Suction / Pumping Machines / Mobiles, Standby Generators and other equipment shall be in field on 24-hours basis instead of only day shifts during rain emergency. • In case of any crises machinery including generators and cranes shall be arranged on rent as an exigency alternate. • During Rain Emergency, the Complaint Centers shall be activated in the field offices of all District Chief Engineers and Town Superintending Engineers to facilitate general public. • Efficient Officials shall be deputed on these Centers for lodging / recording complaints of consumers in person or on phone with proper reporting system on 24-hours basis. • These officials shall work in shifts with clear instructions not to leave the duty until their reliever may report during emergency period. • Constant liaison may be maintained with the control room setup in the offices of Commissioner Karachi, District Dy. Commissioners, KMC and ZMCs by all District Chief Engineers to mitigate the rain sufferings. • All field staff will be on high alert with preparedness and round the clock area monitoring may be ensured to check and addressed public complaints related to sewage overflow and congestion problems. • Low lying areas of the city and Towns on the coastal belt including Keamari, Saddar, Korangi, Landhi, Bin Qasim may be placed under special observations during rain emergency. • List of complaint centers key personnel/facilitators included the appendices as listed. Coordination & Liaison • There will be a Coordination Committee headed by Managing Director, KW&SB and comprising of all KW&SB Chief Engineers to review and manage rain emergency. It will meet on weekly basis or even earlier in accordance with the situation. • The KMC including the Administrator’s Secretariat shall be coordinated at appropriate level. • All CEs, SEs and EEs will remain in contact with respective Town and UC Administrations constantly and closely to meet any emergency and resolve the problems of people.
  • 47. Public Awareness & Cooperation • Citizens are being advised not to open the manhole covers to drain rainfall run-off into sewerage pipelines, as it will chock & restrict sewer flow. • Awareness messages are being propagated through print & electronic media and advertisement in the news. • Various NGOs and community circles have also been taken on board for public awareness through seminars and meetings. Patrolling & Monitoring • Round the clock patrolling of the bulk transmission system, canal, syphons, conduits and other installations in remote areas i.e. Dhabeji, Gharo, NEK pumping station & filter plants etc. would be undertaken. • Round the clock monitoring of sewerage pumping stations would be carried out to monitor operational efficiency. • Sour points where problems have been experienced as per previous records of rainy season in the past have been identified to pay extra attention and prevent re-occurrence of problem. Power Failure • Immediate reporting of power failures & faults to KESC in respect of KW&SB installations is arranged, so that water and sewerage pumping stations may function smoothly. • Alternate arrangements of standby generators in case of power breakdown are also being made upto possible extent. Precautionary Measures • Covering of manholes on main roads, streets and footpaths is given priority to avoid any accidents. Fixing of missing / stolen manholes covers has been ensured. • Complaints of open manholes are being taken up on top priority basis. • Desilting / cleaning of sewerage lines in each town before rains is being carried out. Review & Feedback • Daily progress review would be done at Chief Engineer level regarding desilting of sewerage lines, missing manholes covers etc.
  • 48. RAIN EMERGENCY PLAN - 2014 MAY-2014 KARACHI WATER & SEWERAGE BOARD
  • 49. KARACHI WATER AND SEWERAGE BOARD TELEPHONE NUMBERS OF KEY PERSONNEL, KW&SB SR. # DESIGNATION IMPORTANT NUMBERS 1 Mr. Qutubuddin Shaikh Managing Director 99245154 / 99245155 / 99245156 Cell # 0300-2001344 2 Mr. Waqar Ahmed Hashmi Principal Staff Officer 99245159 Cell # 0321-2049716 3 Mr. Tahseen Manzar Director, Implementation/TRG 99245178 Cell # 0313-4948874/0302-2129020 4 Mr. Najm-e-Alam DMD (TS) 99245146 Cell # 0321-8749091 5 Mr. Mashkoor ul Husnain DMD (Planning) 99245136 / 0300-2313823 6 Mr. Najam-e-Alam CE (B/T) 99245130 Cell: 0321-8749091 7 Mr. Iftikhar Ahmed Khan CE (BT) 99231226 Cell # 0323-2739170 8 Mr. Anwar Saeed Khan CE (WTM) 99245161 Cell # 0314-2005253 9 Mr. Zaheer Abbas CE (Sewerage) 99245028 Cell # 0333-3156584 10 Mr. Asadullah Khan DCE (E/M) - Water 99240803 Cell # 0300-2723545/0321-3789379 Continued
  • 50. SR. # DESIGNATION IMPORTANT NUMBERS 11 Mr. Ghulam Qadir Abbas CE (East) 99231221 Cell # 0333-3092418 12 Mr. Muhammad Arif CE (Saddar & Jamshed) 99231221 Cell # 0300-2992627 13 Mr. Fahim Zaidi CE (Central) 99230318 Cell # 0321-3782790 14 Mr. Ovais Malik CE (West) 99230318 Cell # 0300-9269683 15 Mr. Imdad Hussain Magsi CE (Malir) Cell: 0321-2422897 16 Mr. Muhammad Usman Khaskhely CE (Lyari & Keamari) Cell: 0333-3642630 17 Mr. Noor Muhammad Chohan CE (E/M)-Water 99240318 Cell: 0333-3629447 18 KW&SB – Central Complaint Center KW&SB 1339-Incharge 99245138-99245139/99245140 19 Mr. Nazir Mateen Director Public Relation 992450821 Cell # 0300-2889782
  • 51. KWSB RAIN EMERGENCY 24-Hours Complaint Centers 1339-Complaints /Customer Service Center Block-A, Karsaz 99245138-40 Head Office Complaint Center Civic Center Annexe, Gulshan 99230317 /99230318 / 9923221 Rain Emergency Focal Person: Engr. Syed Zaheer Abbas Zaidi Chief Engineer – Electrical/Machanical (Sewerage) Off: 99245028 Cell: 0333-3156584
  • 52. List of KW&SB Rain Emergency Centers ELECTRICAL & MECHANICAL WING 24-Hours Operation During Rain Emergency – 2014 KW&SB – 1339 - COMPLAINT CENTER Block-A, 9th Mile – Karsaz, Shahra-e- Faisal, Karachi. Tele # 99245138- 99245139 & 99245140 ELECTRICAL & MECHANICAL WING SEWER CLEANING EQUIPMENT DIVISION/SUCTION –JETTING MACHINES COMPLAINT OF POWER BREAKDOWN AT KW&SB INSTALLATIONS Mr. Noor Muhammad Chohan CE (E/M), Sewerage - KW&SB Cell # 0333-3629447 Off # 9245027 Fax # 9245028 Res # 1 Mr. Mazhar Executive Engineer Cell # 0300-2189703 Off # 0323-2025306 2 Mr. Suhail Jaffri AE (E/M) Cell # 0322-2109383 1 Mr. Nadim Hadi Khan EE (E/M) Cell # 0333-2138721 Res # 36616999
  • 53. TREATMENT PLANTS CIRCLE KEY PERSONNEL SEWERAGE PUMPING CIRCLE KEY PERSONNEL 1 Mr. Manzoor KhatriSE – SPD Cell # 0301-2053281 Off # 9204336 2 Mr. Wasim ShaikhEx. Engineer – SPD-I (Saddar Town-Sew) Cell # 0333-3167848 Off # 9204342 Res # 5414112 3 Mr. Ajeet KumarEx. Engineer – SPD-II, Lyari-Sew Cell # 0323-2507106 1 Mr. Qaiser Ali SE – TPs, Circle Cell # 0333-3856343 Res # 4406920 2 Mr. Akhtar Sami EE – TP-I 3 Mr. Jagdesh EE – TP-II Cell # 0333-3458338 Res # 4 Mr. Nadim Ahmed EE – TP-III Cell # 0300-2183653 Res # 9230372
  • 54.
  • 55.
  • 56. INTRODUCTION • Hyderabad Municipal Corporation is the 2ND largest City of Sindh. It is also the largest business city of Sindh after Karachi. The climate of Hyderabad is moderate. • The total area of Hyderabad Municipal Corporation is about 14710 sq acres having population of 1.8 Million. Hyderabad Municipal Corporation consists of 37 Union councils of Hyderabad City and Latifabad. • Every year, Hyderabad Municipal Corporation takes serious efforts to combat Flood / Rain and there is no doubt that in the past when Rain Emergency was declared during the rainfall, Hyderabad Municipal Corporation completed the task successfully. • SOP for combating summer Flood / Rain of 2014 is prepared for taking preventive and remedial measures in advance to avoid any unpleasant incidence during the Flood / Rain. ZAHID HUSSAIN KHEMTIO Municipal Commissioner Hyderabad Municipal Corporation Hyderabad QAMAR-UD-DIN SHEIKH ADMINISTRATOR Hyderabad Municipal Corporation Hyderabad
  • 57. IMPORTANT PHONE NOS OF CONCERNED OFFICER / OFFICIALS / CENTRE INVOLVED FOR RESCUE PROGRAME DURING MOON SOON SEASION IN HMC HYDERABAD 2014. 1. Administrator Phone No. 9210071 Mob. 0300-2627607 2. Municipal Commissioner Phone No. 9210193 Mob. 0300-3013110 3. Director Health Services Mob: 0300-3012952 4. Executive Engineer Mob: 0333-2609057 5. Assistant Executive Engineer (City) Mob: 0313-3221982 0321-9274090 6. Assistant Executive Engineer (Latifabad) Mob: 0333-2724745 0345-9199910 0321-3004927 7. Assistant Director Health Services (Latifabad) Mob: 0333-2759051 8. Assistant Director Health Services (City) Mob: 0315-8824072 9. (Chief Fire Officer) Mob: 0300-3017382 10. Market Fire Brigade Phone No. 2612211 11. Faqir ka Pir Fire Brigade Phone No. 2616975 (16) 12. Nashterabad Fire Brigade Phone No. 2616976 (16) 13. 139 Complaint Centre Mob. 0300-3038606 14. (Mechanical) Engineer Workshop Phone No. 2720058 Mob: 0321-3957702
  • 58. The SOP for combating summer floods & Rains of 2014. The Following low-lying areas have been identified in the action plain. 1. Liaquat Colony Ground UC # 10 2. Tando Mir Mehmood Graveyard UC # 14 3. Laloo Lashari Goth UC # 16 4. Khursheed Town UC # 16 5. Solangi Goth Hala Naka UC # 01 6. Mir Nabi Bux Town ( Noorani Basti) UC # 17-16 7. Hyder Shah UC # 19 Electric Pump 8. Mirza Para (Sikanderabad) UC # 20 9. Katchi Para UC # 20 10. Malka Nagar UC # 16 11. Sardar Colony UC # 17 12. Ehsanabad UC # 16 13. Fakir Ka Pir Fire Brigade # 07 14. Railway Colony UC # 09 15. Aliabad UC # 16 16. Hyder Chowk Qazi Qayoom Road UC # 09 During rain emergency the diesel pumps will be provided at low-lying areas on demand and as per need and condition of rain water.
  • 59. In order to meet any sort of emergency during the rainy / flood season, the following emergency centers are established to receive and rectify the complaints of public of the respective areas:- DETAIL OF EMERGENCY CENTRE 1. CITY: Sr.# Location of Center Union Council # Name of In-Charge of Centre 1 Market Fire Station Phone # 261221 1 to 5 Rehmat CSI (i) Ahmed Hussain I/C UC # 03 (ii) Aslam Rehmat I/C UC # 04 2 Inayatullah (Shaheed) Fire Brigade (Fakir Ka Pir) 16 Phone # 2616975 6 to 9 Mr: Abdul Karim CSI Mr: Mehsar Pailad Incharge UC # 08 Mr: Shahid Rajput Incharge UC # 08 Mr: Dileep Incharge UC # 09 3 Nazim Office (Firdous Colony UC # 11 10, 11, 16 Ilyas Qureshi CSI Ramesh Mata din UC # 10 Papan Lakhmi UC # 11 Faqira Pamma UC # 16 4 Nazim Office (Bakra Mandi) UC # 12 Phone # 2636709 12 to 15 Ashraf Hussain Siddiqui CSI Perdeep UC # 12 Mansha Masih Mucd: UC # 13 Budhan UC # 15 5 Nashterabad Fire Station Phulleli Pretabad 2616976 17 to 20 Complaint Centre 139 Paretabad Khalid Khursheed CSI Abbas UC # 17 Amanwal Mucd: UC # 18 Rasheed UC # 19 Hanif UC # 20 6 139 Complaint Centre Main Office 2616939 139 / UC #06 / UC # 09 Amir Nagar Incharge 139 Iftikhar Naeem Ahmed Incharge Nalla Gang
  • 60. 2. LATIFABAD A. Workshop Qadam Gah Moula Ali 1. Mr: Asgher Sub-Engineer Incharge 2. Mr: Asgher Pump Incharge 3. Mr: Imran Mechanic B. Workshop Hali Road Latifabad 1. Mr: Haseeb AEE Incharge 2. Jamil Ahmed Chief Inspector 3 Mr: Ahmed 4. Mr: Arif 5. Farhat C. Office of Assistant Director Health Services Unit # 09 1. Mr: Habib-ul-allah Chief Inspector Incharge 2. Mr: Faiz Alam Sub-Engineer 3. Mr: Akber Clerk 4. Amjad Naib Qasid The above said centers will work round the clock during rain / flood emergency
  • 61. The details of Staff working on Permanent Electric Pumping Station (City) Mr. Yousuf Sardar Incharge Electric Pumps Mobile No: 0345-3607987 SR. # PUMPING STATION PUMP OPERATOR / PUMP DRIVER CONTACTS 1. Bhatti Village Pumping Station UC # 20 A: Noor Muhammad B: Frances C: Pervaiz 0331-3542374 2. Pinyari Disposal Pumping Station UC # 19 A: Aftab Hussain B: Anwar Rahim C: Arshad Saleem Babo Din (G.O) 0345-3577991 0344-3613573 3. Hyder Shah Pumping Station UC # 19 A: Bahadur B: Arif Masih C: Ghualm Qadir 4. Sultan Shah Pumping Station UC # 16 A: Nasir Ali B: Khadim Hussain C: Abid Hussain 5. Rishi Ghat Pumping Station UC # 12 A: Muhammad Iqbal B: Naveed C: Muhammad Ahsan 0300-3066913 6. Sattar Shah Pumping Station UC # 02 A: Abdul Rasheed B: Aslam Sharif C: Arslan 0312-3575815 7. Fakir Ka Pir Pumping Station UC # 07 On any emergency A: Umar Daraz 0315-5761878
  • 62. DETAILS OF ELECTRIC PUMPING STATION WORKING PERMANENTLY (CITY) SR. # NAME OF PUMPING STATION hp TOTAL 1. Pinyari Disposal Pump 50 HP 02 2. Old Power Hose 50 HP 02 3. Rashi Ghatt 25 HP 01 4. Sultan Shah Colony 20 HP 01 5. Hyder Shah Colony 25 HP 01 6. Bhatti Village 50 HP and 40 HP 02 7. Sattar Shah 25 HP and 50 HP 02 8. Fakir Ka Pir 25 HP 01
  • 63. LIST OF PERMANENT PUMPING STATIONS IN LATIFABAD Sr. # Location of Pumping Stations No. of Pumps In case of electric failure alternate arrangement Remarks 1. Hali Road pumping station. (i) 100 HP Electric Motor Pump (ii) 50 HP Electric Motor Pump (iii) 40 HP Electric Motor Pump (iv) 30 HP Electric Motor Pump 2 No: 1 No: 1 No: 1 No: Stand b Generator 250 KV Working Condition Working Condition Working Condition Under Repair Under Repair 2. American Quarters Pumping Station (i) 30 HP Electric Motor Pump (ii) 25 HP Electric Motor Pump 1 No: 1 No: 1. Stand by Generator Under Repair Working Condition 3. Gul-shan-e-Hali Pumping Station (i) 30 HP Electric Motor Pump (ii) 10 HP Electric Motor Pump 1 No: 1 No: 1. Stand by Generator Working Condition Under Repair Under Repair 4. Visram Pumping Station (i) 15 HP Electric Motor Pump (ii) 7 HP Electric Motor Pump 1 No: 1 No: 1. Stand by Generator Working Condition Working Condition Working Condition 5. Hussainabad Pumping Station (i) 50 HP Electric Motor Pump (ii) 30 HP Electric Motor Pump 1 No: 1 No: 1. Stand by Generator Working Condition Under Repair Working Condition 6. Hazara Colony (i) 15 HP Electric Motor Pump 1 No: Nil Working Condition 7. Bhatti Goth Tandri Pumping Station. (i) 15 HP Electric Motor Pump 1 No: 1. Stand by Generator Working Condition Working Condition 8. Tando Yousuf Pumping Station (i) 7.5 HP Electric Pump 1 No: 1. Stand by Generator Under Repair Working Condition 9. Gujrati Para Pumping Station (i) 10 HP Electric Motor Pump 1 No: 1. Stand by Generator New working due to unstable voltage Working Condition
  • 64. THE DETAILS OF STAFF WORKING ON PERMANENT ELECTRIC PUMPING STATION (LATIFABAD) Gulshan-e-Hali Electric Pumping Station American Quarter Electric Pumping Station S. No. Name Designation Shift S.No Name Designation Shift 1. Arshahd Khan Pump Driver A 1. Zia Pump Driver A 2. Guddo S.W A 2. Charanji S.W A 3. Ajaz Pump Driver B 3. Anwer Banta Pump Driver B 4. Aziz S.W B 4. Siraj S.W B 5. Anwer Masih Pump Driver C 5. Naeem Pump Driver C 6. Boota S.W C Continued
  • 65. Hussainabad Electric Pumping Station Visram Pori Electric Pumping Station S. No. Name Designation Shift S.No Name Designation Shift 1. Taj Pump Driver A 1. Bashir Pump Driver A 2. Pawan Pump Drive B 2. Gopal SW A 3. Chand SW B 3. Noor Muhamm ad SW B 4. Barkat Pump Drive C 5. Sanjay SW C Continued
  • 66. Hussainabad Electric Pumping Station Visram Pori Electric Pumping Station S. No. Name Designation Shift S.No Name Designation Shift 1. Nadeem Helper B 1. Thams Diesel Pump Driver Tando Yousuf 2. Ilyas SW A 2. Haroon Diesel Pump Driver Badin Chali 3. Tehseen Pump Driver B 3. Faisal Diesel Pump Driver Khaskheli Para 4. Akram SW B 4. Suleman Diesel Pump Driver Gujrati Para 5. Rafique Pump Driver C 5. Farhan Diesel Pump Driver Minority Graveyard 6. Mushtaq SW C 7. Ramzan Diesel Pump Driver Goth Aliabad UC # 05 7. Babo Gama SW A Continued
  • 67. DETAILS OF DIESEL PUMPING STATION WORKING PERMANENTLY (CITY) Hazara Colony Electric Pumping Station S. No. Name Designation Shift 1. Arib Jamali Pump Driver A 2. Shoukat Pump Driver A Hatti Goth Electric Pumping Station S. No. Name Designation Shift 1. Aqleem Pump Driver A S. # Name of Pumping station HP Total 1. New Aliabad 16 HP 01 2. Solangi Town 12 HP 01 3. Tando Mir Mehmood 16 HP 01 4. Paretabad (Zacha Khana) 16 HP 01 5. Mustafa Colony 16 HP 01 6. Gatta Ground 12 HP 01
  • 68. DIESEL PUMPS AVAILABLE Sr. # Pumps HP Total Various Sides Available in Workshop 1. Diesel Pumps 16 HP 13 04 09 2. Diesel Pumps 12 HP 03 02 01 3. Diesel Pumps 7 HP and 5 HP 03 ---- 03 4. Diesel Pumps 04 HP 02 ---- 02 5. Petrol Engine Pumps 7 HP 01 ---- 01 6. Petrol Engine 5 kv 02 ---- 02 7. Petrol Engine 2 kv 06 ---- 06 8. Diesel Mobile Engine 50 HP 01 ---- 01 9. Electric Motor Pump Single Face 5 HP 01 ---- 01 10. Electric Motor Pump Three Face 40 HP 01 ---- 01 11. Electric Motor Pump Single Face 15 HP 02 ---- 02
  • 69. LIST OF PERMANENT DIESEL ENGINE PUMPS SITES, (LATIFABAD) Sr. # Name of Pumping station HP Quantity Remarks 1. Khaskheli Goth 16 1 Nos Working Condition 2. Badin Challi 16 1 Nos Working Condition 3. Minority Graveyard Tando Yousuf 16 1 Nos Working Condition 4. Gujrati Para 16 1 Nos Working Condition 5. Goth Aliabad Unit No: 04 16 1 Nos Working Condition 6. Bhatti Goth 16 1 Nos Working Condition
  • 70. RAIN NALLAS In city area, there are two main rain Nallas which drain out sullage water from half of the city area. One runs from universal book depot towards Makrani Para Maki Shah Passing through tulsidas road. Other one runs from Sattar Shah Pumping Station towards old Power house pumping station Tando Mir Mehmood. Both Nallas run by natural gravity towards their end points. 1st Nalla is covered by rooftop from universal book depot up to sultan hotel but in some places slabs are kept over the holes. By removing these slabs through sanitary workers the excavator can disilt this nalla only to those points. From Sultan Hotel onwards the whole Nalla in open except some places which are encroached by shopkeepers. Here it is difficult to disilt the nalla. This Nala from universal book depot upto Tulsidas Pumping station is about 10 feet in width through out. From here it passes beneath the overhead bridge and turns into small drain, approximately 3 feet in width, emerging from market and passes beside the railway colony carrying its sullage water towards Makrani Para in a pit. From there it is lifted by HDA pumping stations of Barkat Bhai / Makrani Para. The work of Desilting of this Nalla is being carried out again and again except those areas which are fully covered with rooftop. This will cost much more and will cause problems for shopkeeper and public. If sufficient amount is allocated to Hyderabad Municipal Corporation for this purpose, the target can be achieved easily. Continued
  • 71. Other Nalla which runs from Sattar Shah Pumping Station Liaquat Colony towards Tando Yousuf Railway Crossing is divided into 3 parts for draining out the sullage water. 1st part runs from Cattle Piri Shahab Cinema towards Sattar Shah pumping Station and drain out the sullage water of UC # 10, 11, 4 and 3. 2nd part runs from Chori Para Ilyasabad towards Rishi Ghat Pumping Staiton. Here Nalla which is 10 or 12 feet in width turns into 2 to 3 feet drain and runs from sweet shop towards Rishi Ghat Pumping Station. The Disilting of Ilyasabad Nalla has been carried out while the drain will be desilted by deploying main power of Nalla Gang to do the need full. 3rd part of rain water Nalla runs from Nishat Plaza towards Tando Yousuf Railway Crossing. From Nishat Plaza upto sitara mosque, the above said nalla is fully covered with rooftop except some places where the slabs are kept to disilt but the problem will not be solved until & unless the roof top on the nalla is removed. Here there is Asia’s largest chori market and the shopkeepers & nearby residents throw all their waste material and garbage in it. Keeping in view, all there difficulties the disilting of work has been carried out where there is access of machine. From sitara mosque near capital plaza upto faqir ka pir culvert the Nallas is encroached by nearby residents who have built their houses on nalla. Here the access of machine to disilt in difficult but some places are there to do the need full. From faqir ka pir culvert upto guru nagar culvert the same situation is there but there are some places open to disilt and the work of disilting has been carried out. From guru nagar culvert upto tando yousuf railway crossing, complete disilting work has been carried out.
  • 72. LIAQUAT COLONY NALLAS In Rainy Session as the Liaquat Colony is low lying area so in heavy rain the water accumulate in that area due to poor drainage system. The reason for that is the encroachment over the Nallas by the nearby residents & shopkeepers. Other factor is that proper Disilting of these Nallas have not been carried out previously. The length of these Nallas is approximately 1KM each from both sides and lies in UC # 10 & UC # 11 respectfully. UC # 10, Nallas runs from Sakhi Pir culvert towards Pathan Hotel and the Nalla is divided into two parts 1st part runs from Din Mohammad Milk Diary towards Sakhi Pir Culvert and other part runs from Firdous Jamia Mosque to Pathan Hotel near mutton slaughter House. In between this Nalla is totally covered by mosque, shopkeepers and a petrol pump. UC # 11 Nalla runs from Sakhi Pir Culvert towards Mutton slaughter house separating the Nalla into two parts. 1st parts runs from Modern Plaza towards Mutton Slaughter House and other runs from Modern Plaza towards Sakhir Pir Culvert. The following action will be taken before Moonson season to rectify the problem. 1. Disilting campaign will be launched immediately on both Nalla (work in progress). 2. Department of Encroachment will be taken into task to remove the encroachments where the problem lies. 3. In the case of heavy rain Diesel pump will be installed at the both ends of Nallas to drain out the rain water smoothly.
  • 73. PROBLEMS: 1. Shortage of Pump Operators and Labour for loading and Shifting of Diesel pumps. 2. Vehicle for shifting and loading of Diesel Pump 3. Sanitary Staff Shortage 4. Accessories of Pumps (Electric / Diesel). 5. Non-availability of Movable generators which are required in case of Load Shedding. 6. 3 phase electric connection for electric pumps. REQUIREMENTS: 1. At least 10 Electric Pump Operators, 40 Pump Operators for Diesel Pumps (Sub-Division City and Latifabad) 2. Shahzoor Pickup 2 in number for City and Latifabad. 3. 100 sanitary staff for Disilting of Chamber of Pumping Stations (City and Latifabad) 4. Details of Accessories required. Generators 5 in number 1 50kv + 2 Nos: 100kv for city Division 2 No: 50kv for Latifabad Division 5. 5000 sand bags in case of emergency. 6. Electric Connection.
  • 74. RESPONSIBILITIES: 1. Sattar Shah Pumping Station 2. Haider Shah Pumping Station 3. HDA WASA will be responsible to install Generators at their permanent electric pumping stations for proper functioning in case of any emergency / failure of Electricity. 1. Tulsi Das Pumping Station 2. Affandi Town 3. Peretabad PDI Rehman Town 4. PD-II, Hashmat Banu Town 5. Gujrati Para Near Tando Yousuf Railway Crossing 6. Unit No: 2 Pumping Station 7. Public School Pumping Station 8. LD4 Pumping Station 9. Unit No: 10, Pumping Station 10. Unit No: 9, Pumping Station 11. Disposal Unit No: 11, Pumping Station 12. Airport Road Pumping Station 13. Makrani Para Pumping Station 14. Barkat Bhai Town Pumping Station 15. Mir Khan Pumping Station Auto Bhan Road. In case of any emergency HESCO will be responsible to provide 3 phase connection