North–South Railway Project South Line
Project Brief for the Opportunity to Design, Build, Finance, Operate, and Maintain a Landmark Commuter
and Long–Haul Rail Asset in the Republic of the Philippines
THE NORTH–SOUTH RAILWAY PROJECT SOUTH LINE (“NSRP SOUTH LINE” OR THE “PROJECT”)
IS A KEYSTONE PROJECT OF THE PHILIPPINES’ DEPARTMENT OF TRANSPORTATION AND
COMMUNICATIONS (DOTC) AND PHILIPPINE NATIONAL RAILWAYS (PNR). THE PROJECT IS
INTENDED TO SERVE AS THE SOLE RAIL BACKBONE CONNECTING METRO MANILA TO
CURRENTLY UNDERSERVED AREAS IN SOUTHERN LUZON.
A compelling opportunity exists for a consortium of leading rail system developers and operators to:
 Provide a world-class passenger rail service, including infrastructure, signaling, and rolling stock, by
developing 56km commuter rail and 653km long-haul passenger rail services
 Capitalize on the Philippines’ economic and urban growth by providing critical connectivity infrastructure for
the country. The Philippines has been investment grade for over 2 years, with Moody’s further raising the
sovereign credit rating to Baa2 in December 2014
 Design, build, finance, operate, and maintain the largest public–private partnership (PPP) in the Philippines
to date. Over the last five years, the Philippines has been one of the most successful PPP markets in
Southeast Asia.
THE REPUBLIC OF THE PHILIPPINES
The Republic of the Philippines is an archipelago comprising more than 7,100 islands located in Southeastern
Asia. It has a total area of 300,000 km2
, with the two largest islands (Luzon and Mindanao) taking up over 66%
of the land area. With over 100 million people, the archipelago is the seventh most populated Asian country and
12th
most populated country in the world.
It is estimated that half of the country’s population resides on the island of Luzon, where the Project will be
located. Metro Manila, one end of the NSRP South Line, is the most populous of the twelve defined metropolitan
areas in the Philippines and the 11th most populous in the world. As of the 2007 census, it had a population of
11.5 million, comprising 13% of the national population.
The Philippine economy is the 39th
largest in the world, with an estimated 2014 gross domestic product (GDP) of
$290 billion. A newly industrialized country, the Philippine economy has been transitioning from one based upon
agriculture to an economy with more emphasis upon services and manufacturing. Of the country's total labor
force of around 41 million, the agricultural sector employs close to 32% of the labor force and accounts for 14%
of GDP. The industrial sector employs around 14% of the workforce and accounts for 30% of GDP.
On the political front, the Philippines is a pluralist democracy modeled on the United States of America, with an
executive presidency, a bicameral Congress and a Supreme Court that can rule on the constitutionality of
government actions. Elections took place in May 2010 for the posts of president and vice-president, the House
of Representatives and one-half of the Senate, at which time Benigno Aquino III was elected the 15th
president
of the Philippines.
The implementation of PPP projects is a cornerstone of the Aquino administration. Since its inception in 2010,
nine projects (valued at about $3 billion or 1% of GDP) have been awarded.
OVERVIEW OF THE PROJECT
The Government of Philippines’ (GoP) NSRP South Line aims to deliver a reliable, safe, and environment-
friendly transport service to currently underserved areas in southern Luzon and encourage more productive
activities. The Project is comprised of two components:
1. Long-Haul Passenger Rail Operations from Manila to Legaspi City in the Bicol Region, with extensions to
Batangas City and Matnog in Sorsogon (478km main line, with 175km for extensions)
2. Commuter Rail Operations from Manila to Calamba City in Laguna (56km)
GoP has recognized the potential of its rail network to reduce transport costs as well as improve the rail service.
However, PNR’s long haul commuter service from Tutuban to Legaspi has been discontinued since October
2012 due to concerns about the integrity in sections along the line.
PNR currently operates a 56 km commuter rail service operating daily from Tutuban to Calamba, Laguna,
though this has been recently suspended. PNR presently runs a daily commuter rail service along a 35 km route
from Naga to Sipocot.
Based on a feasibility study conducted by CPCS Transcom Limited (“CPCS”), construction of the Project,
including infrastructure costs, rolling stock, signaling, and other expenses is expected to cost approximately
Php170.7 billion (US$3.8 billion as of 18 May 2015). Presently, the transaction is structured using availability
payments although the concessionaire will additionally have access to farebox revenues. The concessionaire
will also have access to ancillary business, for example through advertising and commercial development at
station locations and right-of-way where allowed.
The Project was approved by the National Economic and Development Agency (NEDA) Board, chaired by
President Aquino, on 16 February 2015 and will be tendered under the Philippine BOT Law (Republic Act No.
6957, as amended by Republic Act No. 7718) and its Revised Implementing Rules and Regulations (2012).
DOTC and PNR are now seeking parties with historically proven expertise in large-scale rail project
development to provide feedback on the proposed transaction parameters.
This Project Brief does not constitute a solicitation of bids for any aspect of the Project. Solicitations of bids and
bidding guidelines shall be provided in the Instructions to Prospective Bidders.
Additional information on the Project may be found on websites of the DOTC (www.dotc.gov.ph) and the PPP
Center (www.ppp.gov.ph).
TRANSACTION PARAMETERS
Transaction is structured based on the following parameters:
 34 year concession period to be granted by DOTC and PNR as co-grantors, with 4-year construction period
and 30-year operations and maintenance (O&M) period;
 Concessionaire to design and construct the entire system, including provision and operation of the rolling
stock, with construction milestone payments from the Government;
 Availability payments to be provided by the Philippine government during the first 11 years of operations;
 Concessionaire will also operate and maintain the entire NSRP South Line; O&M supported through fare
box and other commercial revenues; and
 Bid parameter based on lowest total infrastructure fees (milestone payments during construction, availability
payments during operations).
Design approach for the commuter rail will be as follows:
 Double track the entire route from Tutuban in Manila to Calamba (the line will be a combination of viaduct,
elevated earth embankment and at-grade segments);
 Design speed of 75 kph
 Minimize the impact of road crossings at grade, and add pedestrian overpasses as required;
 Modernize and enlarge 19 stations, and depot facilities at Calamba;
 Electric multiple unit-based rolling stock comprised of around 14 8-car trains rising to 32 trains by 2044; and
 Electromechanical, signaling, communication, and automatic fare collection systems.
Design approach for the long-haul rail will be as follows:
 Rehabilitation and restoration of existing track structure for safe use at a design speed of 75 kph and
maximum permissible axle loads of 15 tons;
 Repair or replacement of over 420 bridges along alignment;
 Rehabilitation and development of estimated 15 stations and 3 depot sites along alignment;
 Development of new line extension from Legaspi to Matnog (approximately 117 km);
 Rehabilitation and restoration of line extension from Calamba to Batangas (approximately 58 km); and
 Diesel multiple unit based rolling stock comprised of around 6 8-car trains with additional spares.
Bidding consortia could comprise the following:
 International as well as local partners, subject to nationality requirements of the 1987 Constitution of the
Republic of the Philippines;
 Rail system construction companies;
 Rail system operators and rail franchisees;
 Rolling stock providers/Rolling stock operating companies; and/or
 Equity providers/strategic investors.
INVESTMENT HIGHLIGHTS
The Project has numerous benefits for a concessionaire:
Solid support from investment grade sovereign
 Because of the high profile nature of project, DOTC is providing significant support through milestone
payments during construction and availability payments during operation.
 The Philippines has held a stable investment grade rating for over 2 years from each of the three major rating
agencies. Moody’s further raised the sovereign credit rating by Baa2 in December 2014, the 21st positive
credit-rating action (including actual rating upgrade and improved outlook).
 Additional government support, for example grantors of concession will shoulder real property tax payments
for the project land of the core operations.
Landmark and high profile project connecting to major populated regions south of the National Capital
Region
 NSRP South Line is the only planned rail network connecting Metro Manila to the southern Provinces.
 As of May 2015, this will be the largest PPP project ever tendered by the GoP.
 NSRP was recently highlighted by the World Bank as one of 15 key projects for ASEAN connectivity.
Determined to be technically feasible by leading rail infrastructure advisor
 CPCS, a global leader in rail infrastructure project development and advisory services, conducted a detailed
feasibility study, which concluded that the technical specifications for the Project are feasible.
 Rail infrastructure already exists along most of the total system length, although significant rehabilitation will
be required. New rail infrastructure will be required for the Batangas branch and the Matnog extension.
 All proposed components are based on proven technology with substantial operations history.
Integration with current and future transport systems in Metro Manila
 The Project was developed with the intent to provide connectivity with Metro Manila’s existing urban rail
systems including LRT-1, LRT-2, MRT-3, and others.
 Planned projects, including the NSRP North Line, LRT-2 west extension, C5 Modern Bus Transit System,
and the Integrated Transport System – South Terminal (“ITS-South”) in Food Terminal Incorporated (FTI) in
Taguig City are expected to connect with NSRP South Line and provide increased reach within Metro Manila.
Strong demand projection for commuter and southern provincial rail service along this alignment
 316,000 trips per day forecast for the commuter rail in 2020; rising to 485,000 by 2030
 The CPCS long-haul passenger survey, conducted as part of feasibility study, indicates 66% of current
provincial bus passengers were at least moderately likely to switch to train at similar fare levels (50% for
private vehicle passengers).
-
5,000
10,000
15,000
20,000
25,000
2015
2017
2019
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
OneWayTripsPerDay
Projected Long Haul Passenger Demand
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
2015
2017
2019
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
OneWayTripsPerDay
Projected Commuter Passenger Demand
Positive demographic and economic growth prospects in rail coverage area
 Asian Development Bank (ADB), in its Asian Development Outlook 2015, forecasts Philippine GDP to grow
by 6.4% in 2015 and 6.3% in 2016. Strong fundamentals are driven by government expenditure, private
consumption, and investment
 South Luzon’s population is expected to grow by 1.5% per annum over the next 20 years, while the Manila
area is expected to grow by 1.0% over the same period
PNR is in possession of at-grade right of way from Tutuban to Legaspi
 PNR has operated the line from Manila to Legaspi for decades. Because NSRP South Line will be
implemented along this existing PNR alignment, at-grade right of way is available for the main line from
Manila to Legaspi, as well as extension to Batangas. Portions of the right of way for the Matnog extension
will still have to be acquired.
 Land acquisition and resettlement framework has been developed and will be funded by the GoP
 Philippines has long-standing laws in place for land acquisition and eminent domain
Strong track record of PPPs in the Philippines
 From just 11 projects in 2010, the Philippines now has 56 potential PPPs – 9 of which have already been
awarded, valued at ~US$3 billion or just over 1% of GDP
 The Philippines’ PPP Center has been consistently rated and awarded as one of the best central government
PPP units. It won the Gold Award for being the Best Central / Regional Government PPP Promoter by
Partnerships Bulletin 2014 and was recently awarded the 2014 Asia Pacific Grantor of the Year award by
Infrastructure Journal.
Strong multilateral support for the Project
 ADB and Development Bank of the Philippines (DBP), as transaction advisors, have been working with
DOTC and PNR with a view to bring a “bankable” structure to the market
 Transportation and regional connectivity are both key priorities in ADB’s country partnership strategy for the
Philippines
 DBP has been actively involved in the GoP PPP Program, having acted as transaction advisors in the
successful tenders of the LRT-1 Cavite Extension and the Ninoy Aquino International Airport (NAIA)
Expressway. DBP is currently advising DOTC for the tender of the LRT-2 O&M PPP and the Davao Sasa
Port projects.
 ADB brings significant expertise and experience on advising and financing large infrastructure projects in
emerging markets.
PROCESS AND TIMING
The international competitive public bidding for the Project will be conducted in accordance with the
procurement rules and procedures for public bidding set out in the Philippine BOT Law. Indicative schedule is as
follows:
2Q 2015 Release of Instructions to Prospective Bidders (ITPB) / Start of Pre-Qualification Phase
2Q 2015 Pre-Qualification Conference
3Q 2015 Qualification Documents Submission Date and Notice of Pre-Qualified Bidders
3Q 2015 Release of Bid Documents and draft Concession Agreement to Pre-Qualified Bidders,
3Q 2015 Pre-Bid Conference
1Q 2016 Bid Submission
1Q 2016 Notice of Award
CONTACT DETAILS
For any queries regarding the Project please contact ADB and DBP via email:
Srinivas Sampath / Pratish Halady
Office of Public–Private Partnership
Asian Development Bank
nsrp@adb.org
Jedd Carlo F. Ugay
Project Development Office
Department of Transport and Communications
jeddugay.dotc@gmail.com
Francis Nicolas Chua / Nigel Rillon
Investment Banking
Development Bank of the Philippines
fnmchua@dbp.ph / ngbrillon@dbp.ph
Frocks Roque
Project Development Service
Public–Private Partnership Center
fdmroque@ppp.gov.ph
IMPORTANT NOTICE AND DISCLAIMER
This document has been prepared by ADB and DBP in conjunction with DOTC and PNR strictly for information purposes only and has no binding force. It is intended to
assist prospective bidders and investors in their preliminary evaluation of the opportunity to participate in the North-South Railway Project – South Line, but is not
intended to provide a basis for any decision to participate or invest.
The information contained in this document is by its nature selective and indicative, and is not intended to be complete. Each prospective bidder and investor is
expected to make its own independent investigation and to obtain such independent advice as it may deem necessary or desirable in order to assess the opportunity
without reliance upon the information contained in this document, or GoP, DOTC,PNR, ADB or DBP. The information contained in this document is subject to change
without notice. None of GoP, DOTC, PNR, ADB or DBP bears any responsibility or duty of care to update, supplement or revise this document if any of the information
on which it is based changes or is found to be inaccurate.
This document has been issued for use by selected recipients and their advisors only and is confidential. It may not be reproduced or distributed in whole or in part, or
disclosed to third parties, without the prior written consent of ADB and DBP.
Nothing in this document is intended to constitute or create (i) an offer capable of acceptance or the basis of any contract or award that may be concluded in relation to
the Project, (ii) a legally binding relationship between any prospective bidder, investor or other recipient of this document (on the one hand) and GoP, DOTC, PNR, ADB
or DBP (on the other), or (iii) any other duty or obligation enforceable by any prospective bidder, investor or other recipient of this document against GoP, DOTC, PNR,
ADB or DBP. Nothing in this document is, or may be relied upon as, a promise, undertaking or representation as to the future performance or policies of the Project, or
should be considered as a recommendation by GoP, DOTC, PNR, ADB or DBP to participate in the opportunity or Project.
No undertakings, representations, or warranties (whether express or implied) are given or made by GoP, DOTC, PNR, ADB or DBP (or their respective members,
affiliates, advisors, employees or agents) in relation to this document or the information contained in it. No person has been authorised to give or make any
undertakings, representations, or warranties in any written or oral communications with respect to the opportunity or Project and, if given or made, such undertakings,
representations or warranties must not be relied upon.
GoP, DOTC, PNR, ADB and DBP (and their respective members, affiliates, advisors, employees or agents) shall have no liability for (i) any of the information contained
in this document (including, without limitation, any errors or omissions), or for any written or oral communications made in the course of any interested bidder’s or
investor’s assessment of the opportunity and Project or (ii) any damages, losses (including, without limitation, direct or consequential losses), costs or expenses
suffered or incurred by any prospective bidder, investor or other recipient of this document in acting on any of the information contained in this document, or otherwise in
connection with the opportunity or Project.

More Related Content

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Recently uploaded (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

NSRP South Line - Market Awareness Brochure

  • 1. North–South Railway Project South Line Project Brief for the Opportunity to Design, Build, Finance, Operate, and Maintain a Landmark Commuter and Long–Haul Rail Asset in the Republic of the Philippines THE NORTH–SOUTH RAILWAY PROJECT SOUTH LINE (“NSRP SOUTH LINE” OR THE “PROJECT”) IS A KEYSTONE PROJECT OF THE PHILIPPINES’ DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS (DOTC) AND PHILIPPINE NATIONAL RAILWAYS (PNR). THE PROJECT IS INTENDED TO SERVE AS THE SOLE RAIL BACKBONE CONNECTING METRO MANILA TO CURRENTLY UNDERSERVED AREAS IN SOUTHERN LUZON. A compelling opportunity exists for a consortium of leading rail system developers and operators to:  Provide a world-class passenger rail service, including infrastructure, signaling, and rolling stock, by developing 56km commuter rail and 653km long-haul passenger rail services  Capitalize on the Philippines’ economic and urban growth by providing critical connectivity infrastructure for the country. The Philippines has been investment grade for over 2 years, with Moody’s further raising the sovereign credit rating to Baa2 in December 2014  Design, build, finance, operate, and maintain the largest public–private partnership (PPP) in the Philippines to date. Over the last five years, the Philippines has been one of the most successful PPP markets in Southeast Asia.
  • 2. THE REPUBLIC OF THE PHILIPPINES The Republic of the Philippines is an archipelago comprising more than 7,100 islands located in Southeastern Asia. It has a total area of 300,000 km2 , with the two largest islands (Luzon and Mindanao) taking up over 66% of the land area. With over 100 million people, the archipelago is the seventh most populated Asian country and 12th most populated country in the world. It is estimated that half of the country’s population resides on the island of Luzon, where the Project will be located. Metro Manila, one end of the NSRP South Line, is the most populous of the twelve defined metropolitan areas in the Philippines and the 11th most populous in the world. As of the 2007 census, it had a population of 11.5 million, comprising 13% of the national population. The Philippine economy is the 39th largest in the world, with an estimated 2014 gross domestic product (GDP) of $290 billion. A newly industrialized country, the Philippine economy has been transitioning from one based upon agriculture to an economy with more emphasis upon services and manufacturing. Of the country's total labor force of around 41 million, the agricultural sector employs close to 32% of the labor force and accounts for 14% of GDP. The industrial sector employs around 14% of the workforce and accounts for 30% of GDP. On the political front, the Philippines is a pluralist democracy modeled on the United States of America, with an executive presidency, a bicameral Congress and a Supreme Court that can rule on the constitutionality of government actions. Elections took place in May 2010 for the posts of president and vice-president, the House of Representatives and one-half of the Senate, at which time Benigno Aquino III was elected the 15th president of the Philippines. The implementation of PPP projects is a cornerstone of the Aquino administration. Since its inception in 2010, nine projects (valued at about $3 billion or 1% of GDP) have been awarded. OVERVIEW OF THE PROJECT The Government of Philippines’ (GoP) NSRP South Line aims to deliver a reliable, safe, and environment- friendly transport service to currently underserved areas in southern Luzon and encourage more productive activities. The Project is comprised of two components: 1. Long-Haul Passenger Rail Operations from Manila to Legaspi City in the Bicol Region, with extensions to Batangas City and Matnog in Sorsogon (478km main line, with 175km for extensions) 2. Commuter Rail Operations from Manila to Calamba City in Laguna (56km) GoP has recognized the potential of its rail network to reduce transport costs as well as improve the rail service. However, PNR’s long haul commuter service from Tutuban to Legaspi has been discontinued since October 2012 due to concerns about the integrity in sections along the line. PNR currently operates a 56 km commuter rail service operating daily from Tutuban to Calamba, Laguna, though this has been recently suspended. PNR presently runs a daily commuter rail service along a 35 km route from Naga to Sipocot. Based on a feasibility study conducted by CPCS Transcom Limited (“CPCS”), construction of the Project, including infrastructure costs, rolling stock, signaling, and other expenses is expected to cost approximately Php170.7 billion (US$3.8 billion as of 18 May 2015). Presently, the transaction is structured using availability payments although the concessionaire will additionally have access to farebox revenues. The concessionaire will also have access to ancillary business, for example through advertising and commercial development at station locations and right-of-way where allowed. The Project was approved by the National Economic and Development Agency (NEDA) Board, chaired by President Aquino, on 16 February 2015 and will be tendered under the Philippine BOT Law (Republic Act No. 6957, as amended by Republic Act No. 7718) and its Revised Implementing Rules and Regulations (2012).
  • 3. DOTC and PNR are now seeking parties with historically proven expertise in large-scale rail project development to provide feedback on the proposed transaction parameters. This Project Brief does not constitute a solicitation of bids for any aspect of the Project. Solicitations of bids and bidding guidelines shall be provided in the Instructions to Prospective Bidders. Additional information on the Project may be found on websites of the DOTC (www.dotc.gov.ph) and the PPP Center (www.ppp.gov.ph). TRANSACTION PARAMETERS Transaction is structured based on the following parameters:  34 year concession period to be granted by DOTC and PNR as co-grantors, with 4-year construction period and 30-year operations and maintenance (O&M) period;  Concessionaire to design and construct the entire system, including provision and operation of the rolling stock, with construction milestone payments from the Government;  Availability payments to be provided by the Philippine government during the first 11 years of operations;  Concessionaire will also operate and maintain the entire NSRP South Line; O&M supported through fare box and other commercial revenues; and  Bid parameter based on lowest total infrastructure fees (milestone payments during construction, availability payments during operations). Design approach for the commuter rail will be as follows:  Double track the entire route from Tutuban in Manila to Calamba (the line will be a combination of viaduct, elevated earth embankment and at-grade segments);  Design speed of 75 kph  Minimize the impact of road crossings at grade, and add pedestrian overpasses as required;  Modernize and enlarge 19 stations, and depot facilities at Calamba;  Electric multiple unit-based rolling stock comprised of around 14 8-car trains rising to 32 trains by 2044; and  Electromechanical, signaling, communication, and automatic fare collection systems. Design approach for the long-haul rail will be as follows:  Rehabilitation and restoration of existing track structure for safe use at a design speed of 75 kph and maximum permissible axle loads of 15 tons;  Repair or replacement of over 420 bridges along alignment;  Rehabilitation and development of estimated 15 stations and 3 depot sites along alignment;  Development of new line extension from Legaspi to Matnog (approximately 117 km);  Rehabilitation and restoration of line extension from Calamba to Batangas (approximately 58 km); and  Diesel multiple unit based rolling stock comprised of around 6 8-car trains with additional spares. Bidding consortia could comprise the following:  International as well as local partners, subject to nationality requirements of the 1987 Constitution of the Republic of the Philippines;  Rail system construction companies;  Rail system operators and rail franchisees;  Rolling stock providers/Rolling stock operating companies; and/or  Equity providers/strategic investors.
  • 4. INVESTMENT HIGHLIGHTS The Project has numerous benefits for a concessionaire: Solid support from investment grade sovereign  Because of the high profile nature of project, DOTC is providing significant support through milestone payments during construction and availability payments during operation.  The Philippines has held a stable investment grade rating for over 2 years from each of the three major rating agencies. Moody’s further raised the sovereign credit rating by Baa2 in December 2014, the 21st positive credit-rating action (including actual rating upgrade and improved outlook).  Additional government support, for example grantors of concession will shoulder real property tax payments for the project land of the core operations. Landmark and high profile project connecting to major populated regions south of the National Capital Region  NSRP South Line is the only planned rail network connecting Metro Manila to the southern Provinces.  As of May 2015, this will be the largest PPP project ever tendered by the GoP.  NSRP was recently highlighted by the World Bank as one of 15 key projects for ASEAN connectivity. Determined to be technically feasible by leading rail infrastructure advisor  CPCS, a global leader in rail infrastructure project development and advisory services, conducted a detailed feasibility study, which concluded that the technical specifications for the Project are feasible.  Rail infrastructure already exists along most of the total system length, although significant rehabilitation will be required. New rail infrastructure will be required for the Batangas branch and the Matnog extension.  All proposed components are based on proven technology with substantial operations history. Integration with current and future transport systems in Metro Manila  The Project was developed with the intent to provide connectivity with Metro Manila’s existing urban rail systems including LRT-1, LRT-2, MRT-3, and others.  Planned projects, including the NSRP North Line, LRT-2 west extension, C5 Modern Bus Transit System, and the Integrated Transport System – South Terminal (“ITS-South”) in Food Terminal Incorporated (FTI) in Taguig City are expected to connect with NSRP South Line and provide increased reach within Metro Manila. Strong demand projection for commuter and southern provincial rail service along this alignment  316,000 trips per day forecast for the commuter rail in 2020; rising to 485,000 by 2030  The CPCS long-haul passenger survey, conducted as part of feasibility study, indicates 66% of current provincial bus passengers were at least moderately likely to switch to train at similar fare levels (50% for private vehicle passengers). - 5,000 10,000 15,000 20,000 25,000 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 OneWayTripsPerDay Projected Long Haul Passenger Demand - 100,000 200,000 300,000 400,000 500,000 600,000 700,000 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 OneWayTripsPerDay Projected Commuter Passenger Demand
  • 5. Positive demographic and economic growth prospects in rail coverage area  Asian Development Bank (ADB), in its Asian Development Outlook 2015, forecasts Philippine GDP to grow by 6.4% in 2015 and 6.3% in 2016. Strong fundamentals are driven by government expenditure, private consumption, and investment  South Luzon’s population is expected to grow by 1.5% per annum over the next 20 years, while the Manila area is expected to grow by 1.0% over the same period PNR is in possession of at-grade right of way from Tutuban to Legaspi  PNR has operated the line from Manila to Legaspi for decades. Because NSRP South Line will be implemented along this existing PNR alignment, at-grade right of way is available for the main line from Manila to Legaspi, as well as extension to Batangas. Portions of the right of way for the Matnog extension will still have to be acquired.  Land acquisition and resettlement framework has been developed and will be funded by the GoP  Philippines has long-standing laws in place for land acquisition and eminent domain Strong track record of PPPs in the Philippines  From just 11 projects in 2010, the Philippines now has 56 potential PPPs – 9 of which have already been awarded, valued at ~US$3 billion or just over 1% of GDP  The Philippines’ PPP Center has been consistently rated and awarded as one of the best central government PPP units. It won the Gold Award for being the Best Central / Regional Government PPP Promoter by Partnerships Bulletin 2014 and was recently awarded the 2014 Asia Pacific Grantor of the Year award by Infrastructure Journal. Strong multilateral support for the Project  ADB and Development Bank of the Philippines (DBP), as transaction advisors, have been working with DOTC and PNR with a view to bring a “bankable” structure to the market  Transportation and regional connectivity are both key priorities in ADB’s country partnership strategy for the Philippines  DBP has been actively involved in the GoP PPP Program, having acted as transaction advisors in the successful tenders of the LRT-1 Cavite Extension and the Ninoy Aquino International Airport (NAIA) Expressway. DBP is currently advising DOTC for the tender of the LRT-2 O&M PPP and the Davao Sasa Port projects.  ADB brings significant expertise and experience on advising and financing large infrastructure projects in emerging markets. PROCESS AND TIMING The international competitive public bidding for the Project will be conducted in accordance with the procurement rules and procedures for public bidding set out in the Philippine BOT Law. Indicative schedule is as follows: 2Q 2015 Release of Instructions to Prospective Bidders (ITPB) / Start of Pre-Qualification Phase 2Q 2015 Pre-Qualification Conference 3Q 2015 Qualification Documents Submission Date and Notice of Pre-Qualified Bidders 3Q 2015 Release of Bid Documents and draft Concession Agreement to Pre-Qualified Bidders, 3Q 2015 Pre-Bid Conference 1Q 2016 Bid Submission 1Q 2016 Notice of Award
  • 6. CONTACT DETAILS For any queries regarding the Project please contact ADB and DBP via email: Srinivas Sampath / Pratish Halady Office of Public–Private Partnership Asian Development Bank nsrp@adb.org Jedd Carlo F. Ugay Project Development Office Department of Transport and Communications jeddugay.dotc@gmail.com Francis Nicolas Chua / Nigel Rillon Investment Banking Development Bank of the Philippines fnmchua@dbp.ph / ngbrillon@dbp.ph Frocks Roque Project Development Service Public–Private Partnership Center fdmroque@ppp.gov.ph IMPORTANT NOTICE AND DISCLAIMER This document has been prepared by ADB and DBP in conjunction with DOTC and PNR strictly for information purposes only and has no binding force. It is intended to assist prospective bidders and investors in their preliminary evaluation of the opportunity to participate in the North-South Railway Project – South Line, but is not intended to provide a basis for any decision to participate or invest. The information contained in this document is by its nature selective and indicative, and is not intended to be complete. Each prospective bidder and investor is expected to make its own independent investigation and to obtain such independent advice as it may deem necessary or desirable in order to assess the opportunity without reliance upon the information contained in this document, or GoP, DOTC,PNR, ADB or DBP. The information contained in this document is subject to change without notice. None of GoP, DOTC, PNR, ADB or DBP bears any responsibility or duty of care to update, supplement or revise this document if any of the information on which it is based changes or is found to be inaccurate. This document has been issued for use by selected recipients and their advisors only and is confidential. It may not be reproduced or distributed in whole or in part, or disclosed to third parties, without the prior written consent of ADB and DBP. Nothing in this document is intended to constitute or create (i) an offer capable of acceptance or the basis of any contract or award that may be concluded in relation to the Project, (ii) a legally binding relationship between any prospective bidder, investor or other recipient of this document (on the one hand) and GoP, DOTC, PNR, ADB or DBP (on the other), or (iii) any other duty or obligation enforceable by any prospective bidder, investor or other recipient of this document against GoP, DOTC, PNR, ADB or DBP. Nothing in this document is, or may be relied upon as, a promise, undertaking or representation as to the future performance or policies of the Project, or should be considered as a recommendation by GoP, DOTC, PNR, ADB or DBP to participate in the opportunity or Project. No undertakings, representations, or warranties (whether express or implied) are given or made by GoP, DOTC, PNR, ADB or DBP (or their respective members, affiliates, advisors, employees or agents) in relation to this document or the information contained in it. No person has been authorised to give or make any undertakings, representations, or warranties in any written or oral communications with respect to the opportunity or Project and, if given or made, such undertakings, representations or warranties must not be relied upon. GoP, DOTC, PNR, ADB and DBP (and their respective members, affiliates, advisors, employees or agents) shall have no liability for (i) any of the information contained in this document (including, without limitation, any errors or omissions), or for any written or oral communications made in the course of any interested bidder’s or investor’s assessment of the opportunity and Project or (ii) any damages, losses (including, without limitation, direct or consequential losses), costs or expenses suffered or incurred by any prospective bidder, investor or other recipient of this document in acting on any of the information contained in this document, or otherwise in connection with the opportunity or Project.