OPS 571 Week 4 Quiz
1. OPS 571 WEEK 4 QUIZ
By www.StudentWhiz.com
Copyright. All Rights Reserved by www.StudentWhiz.com
2. Copyright. All Rights Reserved by www.StudentWhiz.com
1. A work breakdown structure is
a hierarchy of tasks, subtasks, and work packages
a Cost and Performance tracking schedule
a structure that is incompatible with the Critical Path Method
a simple list of the activities making up a project
Quiz Answers just a click away OPS 571 Week 4 Quiz
2. The vertical axis on a Gantt chart is usually which of the following?
Activities
Time
Cost
Profit
3. Copyright. All Rights Reserved by www.StudentWhiz.com
3. Which of the following identifies a key principle of Reengineering?
Organize around tasks.
Downsize (layoff) workers and do the same amount of work as before.
Merge information processing work into the real work that produces the information.
Capture information both at the source and where it is interpreted.
4. At the onset, a project originates as which of the following?
A Gantt chart
A series of milestones
Critical path method (CPM)
A statement of work (SOW
Want help? Click to download OPS 571 Week 4 Quiz Answers
4. Copyright. All Rights Reserved by www.StudentWhiz.com
5. Consulting firms typically use which of the following techniques to plan and monitor the
engagements of the firm or specific projects?
CPM/PERT
Qualitative forecasting
Materials requirements planning (MRP)
Quantitative layout
6. A Responsibility Chart specifically identifies which of the following?
Planning the tasks for a project
Customer satisfaction
Commitment to quality
Level of inventory
Want more details? Download now OPS 571 All Quiz Answers
5. Copyright. All Rights Reserved by www.StudentWhiz.com
7. Which of the following would be the result of subdividing a project?
Job orders
Work events
Job categories
Tasks
8. Which project progress technique includes the essential features of a project plan,
budgeted cost of work scheduled and budgeted cost of work performed?
Earned value management
Critical path method
Cost analysis
Gantt chart
Final Exam Answers just a click away OPS 571 Final Exam
6. Copyright. All Rights Reserved by www.StudentWhiz.com
9. An example of a graphic project report utilized within project management is:
Project proposal
Equipment and supplies chart
Humphrey chart
Cost and performance tracking schedule
About Author
This article covers the topic for the University Of Phoenix OPS 571 Week 4 Quiz. The author is
working in the field of education from last 5 years. This article covers the basic of OPS 571 Week 4
Quiz Assignment from UOP.
7. Copyright. All Rights Reserved by www.StudentWhiz.com
OPS 571 Week 1 Quiz
OPS 571 Week 2 Quiz
OPS 571 Week 3 Quiz
OPS 571 Week 4 Quiz
OPS 571 Week 5 Quiz
OPS 571 Week 6 Quiz
OPS 571 Final Exam
For further information on the above topics you can always visit the website
www.StudentWhiz.com