SlideShare a Scribd company logo
1 of 20
An integrated application suite forTraffic Control Centers time Q32009 durationtwomonths
About VCV VerkeerscentrumVlaanderenmonitors Flemish (highway)  traffic to ensure traffic safety and traffic information reliability for an increasing number of vehicles on the road. Operators in the Traffic Control Centre monitor and guide traffic in real time by controlling traffic messages and signalization on the roads.  business b2b
Design challenge The rapid expansion of VerkeerscentrumVlaanderenrequires a thorough revision of its processes and applications.  Namahn was asked to redesign the basic traffic monitoring functionality and to provide a basis for future integration of  traffic monitoring tools.  discipline interaction design
Approach define understand explore ,[object Object]
Link analysis
Design requirements & constraints
Scenarios of use
Conceptual design
Prototyping
Style guide,[object Object]
understand               explore                define Field Study (1) Several observations on site allowed us to gain insights in the operators’ working processes, their needs and habits within the current application context.    “I regularly check whether traffic information appears correctly on our website.” While discussing ongoing traffic events, operators actively used the live footage. Sometimes they even walk over to the video wall and point out a specific event on one of the monitors.    “I prefer controlling traffic events manually to ensure that the information we send out is accurate.” During the night shift, the operator on duty moves from desk to desk to manage the complete Flemish region.
understand               explore                define Field Study (2) A one-day observation in a Dutch TCC provided a good basis for comparing work processes, best practises and insights from a broader perspective. Traffic jams are monitored and managed automatically, based on counters. The operators rarely need to intervene in this automated monitoring system. Operators focus mainly on defining and managing traffic diversions (whereas for the Flemish operators, this is of secondary importance). Operators are “always” on the phone coordinating the road inspectors. Sometimes, they even compete with the traffic police to be the first on the incident scene.
understand               explore                define Link analysis (1) To identify all actors and lines of communication within the control center, we performed a link analysis. This analysis provided information for exploring the possible physical setup of the control room and focus points for task- and process flows.
understand               explore                define Reporting The field study findings were consolidated in a written document. Learnings were grouped thematically, and illustrated using pictures and diagrams.
understand               explore                define Design requirements  Results from the field study were reformulated into prioritised design requirements, so the scope and focus of the design became clearer. For prioritising the requirements, we applied the MOSCOW-matrix: ,[object Object]
 Should have
 Could have
 Would have,[object Object]
 Working methods
 Representation of the traffic situation

More Related Content

Similar to An integrated application suite for Traffic Control Centers

Ieeepro techno solutions 2013 ieee embedded project an integrated design fr...
Ieeepro techno solutions   2013 ieee embedded project an integrated design fr...Ieeepro techno solutions   2013 ieee embedded project an integrated design fr...
Ieeepro techno solutions 2013 ieee embedded project an integrated design fr...srinivasanece7
 
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdfUnleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdfMarsBIM1
 
Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...muhammad87
 
An Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming EssayAn Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming EssaySharon Roberts
 
CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...
CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...
CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...OW2
 
Kelis king - requirements analysis and the unified process
Kelis king - requirements analysis and the unified processKelis king - requirements analysis and the unified process
Kelis king - requirements analysis and the unified processKelisKing
 
TRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNN
TRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNNTRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNN
TRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNNIRJET Journal
 
Congestion control using Image Processing
Congestion control using Image ProcessingCongestion control using Image Processing
Congestion control using Image ProcessingKumar Goud
 
Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...
Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...
Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...Deltares
 
Sofware Engineering Important Past Paper 2019
Sofware Engineering Important Past Paper 2019Sofware Engineering Important Past Paper 2019
Sofware Engineering Important Past Paper 2019MuhammadTalha436
 
From Components To Services
From Components To ServicesFrom Components To Services
From Components To ServicesJames Phillips
 
Online vehicle service center management system project report
Online vehicle service center management system project reportOnline vehicle service center management system project report
Online vehicle service center management system project reportmehulgundaliya
 

Similar to An integrated application suite for Traffic Control Centers (20)

CHI2021
CHI2021CHI2021
CHI2021
 
Artefacts of the Process
Artefacts of the ProcessArtefacts of the Process
Artefacts of the Process
 
Ieeepro techno solutions 2013 ieee embedded project an integrated design fr...
Ieeepro techno solutions   2013 ieee embedded project an integrated design fr...Ieeepro techno solutions   2013 ieee embedded project an integrated design fr...
Ieeepro techno solutions 2013 ieee embedded project an integrated design fr...
 
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdfUnleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
 
Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...Communication & Coordination on a Construction Project Through Building I...
Communication & Coordination on a Construction Project Through Building I...
 
An Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming EssayAn Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming Essay
 
CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...
CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...
CHOReVOLUTION: a dynamic platform ready to compose, run and scale IoT IoS app...
 
Kelis king - requirements analysis and the unified process
Kelis king - requirements analysis and the unified processKelis king - requirements analysis and the unified process
Kelis king - requirements analysis and the unified process
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Its architecture
Its architectureIts architecture
Its architecture
 
TRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNN
TRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNNTRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNN
TRAFFIC SIGN BOARD RECOGNITION AND VOICE ALERT SYSTEM USING CNN
 
Congestion control using Image Processing
Congestion control using Image ProcessingCongestion control using Image Processing
Congestion control using Image Processing
 
A Survey and Comparison of SDN Based Traffic Management Techniques
A Survey and Comparison of SDN Based Traffic Management TechniquesA Survey and Comparison of SDN Based Traffic Management Techniques
A Survey and Comparison of SDN Based Traffic Management Techniques
 
15.pdf
15.pdf15.pdf
15.pdf
 
Unit 2
Unit 2Unit 2
Unit 2
 
Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...
Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...
Dsd int 2014 - open mi symposium - federated modelling of critical infrastruc...
 
Sofware Engineering Important Past Paper 2019
Sofware Engineering Important Past Paper 2019Sofware Engineering Important Past Paper 2019
Sofware Engineering Important Past Paper 2019
 
From Components To Services
From Components To ServicesFrom Components To Services
From Components To Services
 
01_Program
01_Program01_Program
01_Program
 
Online vehicle service center management system project report
Online vehicle service center management system project reportOnline vehicle service center management system project report
Online vehicle service center management system project report
 

An integrated application suite for Traffic Control Centers

  • 1. An integrated application suite forTraffic Control Centers time Q32009 durationtwomonths
  • 2. About VCV VerkeerscentrumVlaanderenmonitors Flemish (highway) traffic to ensure traffic safety and traffic information reliability for an increasing number of vehicles on the road. Operators in the Traffic Control Centre monitor and guide traffic in real time by controlling traffic messages and signalization on the roads. business b2b
  • 3. Design challenge The rapid expansion of VerkeerscentrumVlaanderenrequires a thorough revision of its processes and applications. Namahn was asked to redesign the basic traffic monitoring functionality and to provide a basis for future integration of traffic monitoring tools. discipline interaction design
  • 4.
  • 10.
  • 11. understand explore define Field Study (1) Several observations on site allowed us to gain insights in the operators’ working processes, their needs and habits within the current application context. “I regularly check whether traffic information appears correctly on our website.” While discussing ongoing traffic events, operators actively used the live footage. Sometimes they even walk over to the video wall and point out a specific event on one of the monitors. “I prefer controlling traffic events manually to ensure that the information we send out is accurate.” During the night shift, the operator on duty moves from desk to desk to manage the complete Flemish region.
  • 12. understand explore define Field Study (2) A one-day observation in a Dutch TCC provided a good basis for comparing work processes, best practises and insights from a broader perspective. Traffic jams are monitored and managed automatically, based on counters. The operators rarely need to intervene in this automated monitoring system. Operators focus mainly on defining and managing traffic diversions (whereas for the Flemish operators, this is of secondary importance). Operators are “always” on the phone coordinating the road inspectors. Sometimes, they even compete with the traffic police to be the first on the incident scene.
  • 13. understand explore define Link analysis (1) To identify all actors and lines of communication within the control center, we performed a link analysis. This analysis provided information for exploring the possible physical setup of the control room and focus points for task- and process flows.
  • 14. understand explore define Reporting The field study findings were consolidated in a written document. Learnings were grouped thematically, and illustrated using pictures and diagrams.
  • 15.
  • 18.
  • 20. Representation of the traffic situation
  • 21.
  • 22.
  • 23. Dealing with a new traffic event
  • 24. A crisis situationIn each scenario, we focused on the various aspects that come into play: the organisation of the room, the work place, the software interactions and the human interactions.
  • 25. understand explore define Conceptual design We explored design alternatives by means of low-fidelity sketches and verified the main design principles by illustrating the descriptions of the scenarios in the wireframes. Due to the multiple monitor set-up, we did not solely focus on the screen design of the individual work monitors. The concept also defined organisation of, relations between and interactions with video monitors.
  • 26. understand explore define Detailed design (1) Based on the stakeholder’s feedback we refined the conceptual design introducing custom controls and added realistic details. Each task flow was illustrated by a sequence of static screen samples.
  • 27. understand explore define Detailed design (1) Based on the stakeholder’s feedback we refined the conceptual design introducing customized controls and added realistic details. Each task flow was illustrated by a sequence of static screen samples.
  • 28. understand explore define Detailed design (1) Based on the stakeholder’s feedback we refined the conceptual design introducing customized controls and added realistic details. Each task flow was illustrated by a sequence of static screen samples.
  • 29. understand explore define Link analysis (2) Based on the link analysis, we explored how the future control room could be organised so as to optimally support the new workflow, processes and roles within the control center.
  • 30. understand explore define Detailed design (2) During the design workshop, the designs were verified and refined for the specific tasks at hand. We focused on collaboration, exchanging and sharing information and situation awareness of the operator team.
  • 32. understandexploredefine Style guide The design patterns were defined in the style guide. This document helps the developers to build the application correctly and to add future functionalities in a consistent way.
  • 33. Outcome During the design process, we focused on consistency in design and efficiency in use. As a result, the legacy applications that will be integrated share interaction patterns and information design, increasing the learnability and familiarity. The explorations for control room organisation proved valuable for defining the view on future possibilities. The design verification confirmed the extensibility of the design and its potential to support an increasing flexibility in work flow procedures when monitoring road traffic.
  • 34. Grensstraat 21 rue de la Limite B-1210 Brussels info@namahn.com | +32 2 209 08 85

Editor's Notes

  1. Current state: collection of separate applications task allocation: 1 operator controls ‘rijstrooksignalisatie’, 1 ‘tekstborden’, 1 publishes info on webFuture state: Integration of applications Task allocation:Automatisation of ‘structurele files’ Each operator controls one certain area Areas are flexible; responsibilities can shift
  2. Communication iscrucial factor: Close collaborationwithtrafficpoliceCross-borderincidents
  3. Communication iscrucial factor: Close collaborationwithtrafficpoliceCross-borderincidents
  4. Steps:Dermination of futurecommunicationpathsBubble diagramMock-up (alternatives)Discussiononsharedvideowall:Largewall-sized, orsmalldesktop-sizedPotentialsolution: large (butnotwall-sized) monitors, one per two operators and onefordispatcher, police etc.
  5. Starting point design: 1 wall-sizedsharedvideowall 2 personalvideowalls, withvideosfromregion of yourresponsibility – technicallimitation: no direct interaction- 4 ‘work’ monitors
  6. A day in the controlcentre: description of one shift, without goinginto detailsOtherscenarios: detaileddescriptions of core tasks, incl. internal and externalcommunication
  7. Steps:Dermination of futurecommunicationpathsBubble diagramMock-up (alternatives)Discussiononsharedvideowall:Largewall-sized, orsmalldesktop-sizedPotentialsolution: large (butnotwall-sized) monitors, one per two operators and onefordispatcher, police etc.