SlideShare a Scribd company logo
1 of 2
Download to read offline
CASE study
The Lenton Gardens development is part of Nottingham Council’s ‘Building
a Better Nottingham’ initiative. The £14 million multi-phase project is being
undertaken by leading community regeneration specialist contractor, Keepmoat.
Lenton Gardens New Build Development
enabled Keepmoat to successfully
meet the exacting schedule of this
multi-phase development.
No single RhinoDeck component
weighs more than 9.5 kg, and the
components lock into place without
the need for hand tools or fixing.
Therefore the system can be quickly
and efficiently dismantled and re-
installed across the full site area,
compared to the often cumbersome
traditional scaffolding tube and plank
alternatives.
DESIGNED FOR FLEXIBILITY
The system was used on-site for the
full spectrum of bricklaying work, as
well as for the installation of floor
joists and roof trusses.
At the special request of the site
bricklayers, specific leg lengths
of 1.8m were supplied for this
project. This provided an optimum
solution for their working height
requirements, and could be easily
provided due to the flexible design of
the RhinoDeck system. Competitive
systems tend to be less easy to
modify, and are often only available
in standard 1.5m and 2m leg length
options.
THE DEVELOPMENT
The high profile scheme forms part
of a city council initiative to achieve
transformational regeneration to
key areas of Nottingham. It consists
of four phases which are scheduled
to take three years to complete,
with Sayfa Systems involved from
Phase 1 of the project – a five
storey construction which includes
the provision of a 54 apartment
independent living scheme for the
over 60’s with retail units below.
PROJECT SCALE
A large amount of the Rhino Load
Deck work platform system has
been supplied to the contractor
for this project – with the project
covering a total floor area of 1,500
square metres. The installed
RhinoDeck has generally been
utilised in a segmented approach,
with assemblies of around 500 square
metres at any one time – ultimately
unfolding across the full working
area.
LIGHTWEIGHT EFFICIENCY
The lightweight nature of the system
and its ease of installation has
“RhinoDeck is an effective and safe
system with excellent loadbearing
capabilities. It can be erected
quickly and I believe that it has
boosted productivity on-site. It’s also
far more stable than the alternative
plastic mechanisms that I have used
in the past.”
Andy Adlington
Project Manager, Keepmoat
T: 0845 241 9102 email: info@sayfasystems.com www.sayfasystems.co.uk
Ref: 128-12/14
LOAD DECK

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 

23456 Sayfa Lenton case study Ref 128

  • 1. CASE study The Lenton Gardens development is part of Nottingham Council’s ‘Building a Better Nottingham’ initiative. The £14 million multi-phase project is being undertaken by leading community regeneration specialist contractor, Keepmoat. Lenton Gardens New Build Development
  • 2. enabled Keepmoat to successfully meet the exacting schedule of this multi-phase development. No single RhinoDeck component weighs more than 9.5 kg, and the components lock into place without the need for hand tools or fixing. Therefore the system can be quickly and efficiently dismantled and re- installed across the full site area, compared to the often cumbersome traditional scaffolding tube and plank alternatives. DESIGNED FOR FLEXIBILITY The system was used on-site for the full spectrum of bricklaying work, as well as for the installation of floor joists and roof trusses. At the special request of the site bricklayers, specific leg lengths of 1.8m were supplied for this project. This provided an optimum solution for their working height requirements, and could be easily provided due to the flexible design of the RhinoDeck system. Competitive systems tend to be less easy to modify, and are often only available in standard 1.5m and 2m leg length options. THE DEVELOPMENT The high profile scheme forms part of a city council initiative to achieve transformational regeneration to key areas of Nottingham. It consists of four phases which are scheduled to take three years to complete, with Sayfa Systems involved from Phase 1 of the project – a five storey construction which includes the provision of a 54 apartment independent living scheme for the over 60’s with retail units below. PROJECT SCALE A large amount of the Rhino Load Deck work platform system has been supplied to the contractor for this project – with the project covering a total floor area of 1,500 square metres. The installed RhinoDeck has generally been utilised in a segmented approach, with assemblies of around 500 square metres at any one time – ultimately unfolding across the full working area. LIGHTWEIGHT EFFICIENCY The lightweight nature of the system and its ease of installation has “RhinoDeck is an effective and safe system with excellent loadbearing capabilities. It can be erected quickly and I believe that it has boosted productivity on-site. It’s also far more stable than the alternative plastic mechanisms that I have used in the past.” Andy Adlington Project Manager, Keepmoat T: 0845 241 9102 email: info@sayfasystems.com www.sayfasystems.co.uk Ref: 128-12/14 LOAD DECK