© John Glenning 2015© John Glenning 2015
John Glenning's EquipmentJohn Glenning's Equipment
Operations for ProductionOperations for Production
and Developmentand Development
John GlenningJohn Glenning
January 12January 12thth
, 2015, 2015
© John Glenning 2015© John Glenning 2015
ALWAYS be ready to do MaintenanceALWAYS be ready to do Maintenance
1. Be sure the Equipment is Operational1. Be sure the Equipment is Operational
2. Be sure the Equipment is operating at2. Be sure the Equipment is operating at
optimaloptimal
conditionsconditions
3. Be sure spare Parts are readily available3. Be sure spare Parts are readily available
4. Develop a relationship with Maintenance4. Develop a relationship with Maintenance
“Maintenance is an Engineer’s best friend”“Maintenance is an Engineer’s best friend”
John Glenning's Equipment Operations
for Production and Development
© John Glenning 2015© John Glenning 2015
Develop a Critical Spares List contains theDevelop a Critical Spares List contains the
following:following:
1. Machine1. Machine
2. Location in the machine2. Location in the machine
3. Part Name3. Part Name
4. Supplier Company Name4. Supplier Company Name
5. Contact Name5. Contact Name
6. Part Number6. Part Number
7. Minimum Inventory (order point)7. Minimum Inventory (order point)
8. Lead Time8. Lead Time
9. Costs9. Costs
John Glenning's Equipment Operations
for Production and Development
© John Glenning 2015© John Glenning 2015
Component FailuresComponent Failures
1. All components will eventually fail1. All components will eventually fail
2. Track all component failures2. Track all component failures
3. Determine failure rates for all components3. Determine failure rates for all components
4. Determine root cause of all failures4. Determine root cause of all failures
5. Develop relationships with other component5. Develop relationships with other component
ManufacturersManufacturers
6. Evaluate them for reliability and quality6. Evaluate them for reliability and quality
7. Visit suppliers to understand there ability to7. Visit suppliers to understand there ability to
provide the parts with the right quality,provide the parts with the right quality,
reliability and deliverabilityreliability and deliverability
8. Be prepared to switch suppliers8. Be prepared to switch suppliers
John Glenning's Equipment Operations
for Production and Development
© John Glenning 2015© John Glenning 2015
Track the following:Track the following:
1. Preventative Maintenance time1. Preventative Maintenance time
2. Idle Mills (this is the “Hidden Capital”)2. Idle Mills (this is the “Hidden Capital”)
3. Unplanned Down Time (Machine Failure)3. Unplanned Down Time (Machine Failure)
4. Down Time by Machine4. Down Time by Machine
5. Down Time by location in the machine5. Down Time by location in the machine
6. Down Time by supplier6. Down Time by supplier
7. Determine Up-Time7. Determine Up-Time
John Glenning's Equipment Operations
for Production and Development
© John Glenning 2015© John Glenning 2015
A robust MaintenanceA robust Maintenance
Program is the best way to toProgram is the best way to to
keep Equipment Operationalkeep Equipment Operational
John Glenning's Equipment Operations
for Production and Development
© John Glenning 2015© John Glenning 2015
End of PresentationEnd of Presentation
John GlenningJohn Glenning
January 12January 12thth
, 2015, 2015

More Related Content

Similar to Equipment Operations for Production and Development

Yield and Productivity Improvements
Yield and Productivity ImprovementsYield and Productivity Improvements
Yield and Productivity Improvements
John Glenning
 
Ruffing Consulting Overview
Ruffing Consulting OverviewRuffing Consulting Overview
Ruffing Consulting Overview
Hugh_Ruffing
 
PPTJuyan英文
PPTJuyan英文PPTJuyan英文
PPTJuyan英文
Amy Zhou
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON Torrance
Wayne Miller
 
Continuous Deployment
Continuous DeploymentContinuous Deployment
Continuous Deployment
Codeship
 
Final MBP Presenatation 1-27-17
Final MBP Presenatation 1-27-17Final MBP Presenatation 1-27-17
Final MBP Presenatation 1-27-17
Louis Poggenburg
 
Jeremy Kaszycki_Intern Presentation
Jeremy Kaszycki_Intern PresentationJeremy Kaszycki_Intern Presentation
Jeremy Kaszycki_Intern Presentation
Jeremy Kaszycki
 

Similar to Equipment Operations for Production and Development (20)

Yield and productivity improvements
Yield and productivity improvementsYield and productivity improvements
Yield and productivity improvements
 
Yield and Productivity Improvements
Yield and Productivity ImprovementsYield and Productivity Improvements
Yield and Productivity Improvements
 
Valuable plant shutdown tips
Valuable plant shutdown tipsValuable plant shutdown tips
Valuable plant shutdown tips
 
scottsresume1116
scottsresume1116scottsresume1116
scottsresume1116
 
New Product Commercialization
New Product CommercializationNew Product Commercialization
New Product Commercialization
 
Ruffing Consulting Overview
Ruffing Consulting OverviewRuffing Consulting Overview
Ruffing Consulting Overview
 
Continuous Integration for Spark Apps by Sean McIntyre
Continuous Integration for Spark Apps by Sean McIntyreContinuous Integration for Spark Apps by Sean McIntyre
Continuous Integration for Spark Apps by Sean McIntyre
 
PPTJuyan英文
PPTJuyan英文PPTJuyan英文
PPTJuyan英文
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON Torrance
 
Basic knowledge about project risk and risk management
Basic knowledge about project risk and risk managementBasic knowledge about project risk and risk management
Basic knowledge about project risk and risk management
 
CV_piroon3
CV_piroon3CV_piroon3
CV_piroon3
 
Greg Hallam, SoftwareONE Audit Defence Workshop
Greg Hallam, SoftwareONE Audit Defence Workshop Greg Hallam, SoftwareONE Audit Defence Workshop
Greg Hallam, SoftwareONE Audit Defence Workshop
 
Continuous Deployment
Continuous DeploymentContinuous Deployment
Continuous Deployment
 
Final MBP Presenatation 1-27-17
Final MBP Presenatation 1-27-17Final MBP Presenatation 1-27-17
Final MBP Presenatation 1-27-17
 
Jeremy Kaszycki_Intern Presentation
Jeremy Kaszycki_Intern PresentationJeremy Kaszycki_Intern Presentation
Jeremy Kaszycki_Intern Presentation
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
 
Tips to extend equipment life and roi
Tips to extend equipment life and roiTips to extend equipment life and roi
Tips to extend equipment life and roi
 
2020 ZIPP TOOL General catalog
2020 ZIPP TOOL General catalog2020 ZIPP TOOL General catalog
2020 ZIPP TOOL General catalog
 
Load and Performance Testing in Production, featuring Scott Barber
Load and Performance Testing in Production, featuring Scott BarberLoad and Performance Testing in Production, featuring Scott Barber
Load and Performance Testing in Production, featuring Scott Barber
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.
 

More from John Glenning

Jim Betar Letter of Recommendation
Jim Betar Letter of RecommendationJim Betar Letter of Recommendation
Jim Betar Letter of Recommendation
John Glenning
 
Letter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferLetter of Recommendation-Bill Lafer
Letter of Recommendation-Bill Lafer
John Glenning
 
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head Technology
John Glenning
 
Workforce New York.PDF
Workforce New York.PDFWorkforce New York.PDF
Workforce New York.PDF
John Glenning
 
Tompkins Community Action.PDF
Tompkins Community Action.PDFTompkins Community Action.PDF
Tompkins Community Action.PDF
John Glenning
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head Technology
John Glenning
 
Fluid Head Technology NYS Governor
Fluid Head Technology NYS GovernorFluid Head Technology NYS Governor
Fluid Head Technology NYS Governor
John Glenning
 
Hutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobsHutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobs
John Glenning
 
Steward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glennSteward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glenn
John Glenning
 
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategiesSteward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
John Glenning
 
Recommendation Letter for John Glenning-Bill Lafer
Recommendation Letter for John Glenning-Bill LaferRecommendation Letter for John Glenning-Bill Lafer
Recommendation Letter for John Glenning-Bill Lafer
John Glenning
 
3M Abrasives ASD Catalogue 2011
3M Abrasives ASD Catalogue 20113M Abrasives ASD Catalogue 2011
3M Abrasives ASD Catalogue 2011
John Glenning
 
United Technologies Locations Guide
United Technologies Locations GuideUnited Technologies Locations Guide
United Technologies Locations Guide
John Glenning
 

More from John Glenning (20)

Jim Betar Letter of Recommendation
Jim Betar Letter of RecommendationJim Betar Letter of Recommendation
Jim Betar Letter of Recommendation
 
Letter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferLetter of Recommendation-Bill Lafer
Letter of Recommendation-Bill Lafer
 
Velocys1
Velocys1Velocys1
Velocys1
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head Technology
 
Workforce New York.PDF
Workforce New York.PDFWorkforce New York.PDF
Workforce New York.PDF
 
Tompkins Community Action.PDF
Tompkins Community Action.PDFTompkins Community Action.PDF
Tompkins Community Action.PDF
 
Ed McLeskey.PDF
Ed McLeskey.PDFEd McLeskey.PDF
Ed McLeskey.PDF
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head Technology
 
Fluid Head Technology NYS Governor
Fluid Head Technology NYS GovernorFluid Head Technology NYS Governor
Fluid Head Technology NYS Governor
 
How To Read People
How To Read PeopleHow To Read People
How To Read People
 
Hutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobsHutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobs
 
Photo-Lithography and Wet Processing (Develop, Etch and Strip)
Photo-Lithography and Wet Processing (Develop, Etch and Strip)Photo-Lithography and Wet Processing (Develop, Etch and Strip)
Photo-Lithography and Wet Processing (Develop, Etch and Strip)
 
Photo lithography
Photo lithographyPhoto lithography
Photo lithography
 
Steward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glennSteward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glenn
 
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategiesSteward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
 
Recommendation Letter for John Glenning-Bill Lafer
Recommendation Letter for John Glenning-Bill LaferRecommendation Letter for John Glenning-Bill Lafer
Recommendation Letter for John Glenning-Bill Lafer
 
3M Abrasives ASD Catalogue 2011
3M Abrasives ASD Catalogue 20113M Abrasives ASD Catalogue 2011
3M Abrasives ASD Catalogue 2011
 
United Technologies Locations Guide
United Technologies Locations GuideUnited Technologies Locations Guide
United Technologies Locations Guide
 

Equipment Operations for Production and Development

  • 1. © John Glenning 2015© John Glenning 2015 John Glenning's EquipmentJohn Glenning's Equipment Operations for ProductionOperations for Production and Developmentand Development John GlenningJohn Glenning January 12January 12thth , 2015, 2015
  • 2. © John Glenning 2015© John Glenning 2015 ALWAYS be ready to do MaintenanceALWAYS be ready to do Maintenance 1. Be sure the Equipment is Operational1. Be sure the Equipment is Operational 2. Be sure the Equipment is operating at2. Be sure the Equipment is operating at optimaloptimal conditionsconditions 3. Be sure spare Parts are readily available3. Be sure spare Parts are readily available 4. Develop a relationship with Maintenance4. Develop a relationship with Maintenance “Maintenance is an Engineer’s best friend”“Maintenance is an Engineer’s best friend” John Glenning's Equipment Operations for Production and Development
  • 3. © John Glenning 2015© John Glenning 2015 Develop a Critical Spares List contains theDevelop a Critical Spares List contains the following:following: 1. Machine1. Machine 2. Location in the machine2. Location in the machine 3. Part Name3. Part Name 4. Supplier Company Name4. Supplier Company Name 5. Contact Name5. Contact Name 6. Part Number6. Part Number 7. Minimum Inventory (order point)7. Minimum Inventory (order point) 8. Lead Time8. Lead Time 9. Costs9. Costs John Glenning's Equipment Operations for Production and Development
  • 4. © John Glenning 2015© John Glenning 2015 Component FailuresComponent Failures 1. All components will eventually fail1. All components will eventually fail 2. Track all component failures2. Track all component failures 3. Determine failure rates for all components3. Determine failure rates for all components 4. Determine root cause of all failures4. Determine root cause of all failures 5. Develop relationships with other component5. Develop relationships with other component ManufacturersManufacturers 6. Evaluate them for reliability and quality6. Evaluate them for reliability and quality 7. Visit suppliers to understand there ability to7. Visit suppliers to understand there ability to provide the parts with the right quality,provide the parts with the right quality, reliability and deliverabilityreliability and deliverability 8. Be prepared to switch suppliers8. Be prepared to switch suppliers John Glenning's Equipment Operations for Production and Development
  • 5. © John Glenning 2015© John Glenning 2015 Track the following:Track the following: 1. Preventative Maintenance time1. Preventative Maintenance time 2. Idle Mills (this is the “Hidden Capital”)2. Idle Mills (this is the “Hidden Capital”) 3. Unplanned Down Time (Machine Failure)3. Unplanned Down Time (Machine Failure) 4. Down Time by Machine4. Down Time by Machine 5. Down Time by location in the machine5. Down Time by location in the machine 6. Down Time by supplier6. Down Time by supplier 7. Determine Up-Time7. Determine Up-Time John Glenning's Equipment Operations for Production and Development
  • 6. © John Glenning 2015© John Glenning 2015 A robust MaintenanceA robust Maintenance Program is the best way to toProgram is the best way to to keep Equipment Operationalkeep Equipment Operational John Glenning's Equipment Operations for Production and Development
  • 7. © John Glenning 2015© John Glenning 2015 End of PresentationEnd of Presentation John GlenningJohn Glenning January 12January 12thth , 2015, 2015